This file contains Questions and Answers addressing seven Requests for Information (RFIs) submitted by potential offerors for the Project Scoping Assessments-FY26 (PSA) solicitation (140P4326Q0050) issued by the Department of the Interior National Park Service Northeast Region.
The government clarifications address structural and submission requirements for this RFQ. The correct NAICS code is 541618, and small business prime contractors may utilize qualified subcontractors for specialized work including inspection, engineering, architecture, accessibility, historic structure, fire/life-safety, utilities, and cost-estimating services. However, the prime contractor must serve as Project Manager controlling the entire project, with a Project Manager also assigned to each individual park list, and the majority of the assessment team must consist of prime contractor employees. Professional licensure is preferred but not required for engineers, architects, landscape architects, accessibility specialists, fire/life-safety specialists, historic preservation specialists, utilities specialists, and cost estimators; all team members must demonstrate knowledge of design, construction, current codes, and industry standards. Site visits will be coordinated with the NPS regional office and individual parks during the kick-off meeting rather than at predetermined dates. Submission requirements specify that the technical proposal is limited to 8 pages, with pricing submitted as a separate attachment outside this page limit. All other submissions, including resumes, are collectively limited to 8 pages, with resumes permitted as separate attachments but not evaluated beyond the combined 8-page threshold. Required attachments per the RFQ and Statement of Work are excluded from the technical proposal page limit.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P4326Q0050
PSA FY26
Amendment 001 RFIs 1-7
1. The SAM.gov listing identifies NAICS 541618, while the solicitation PDF states NAICS 561210. Which NAICS code controls for this RFQ?
Government Response: The correct NAICS is 541618
2. May a small business prime contractor submit with qualified subcontractors for the inspection, engineering, architecture, accessibility, historic-structure, fire/life-safety, utilities, and cost-estimating portions of the work?
Government Response: The prime contractor needs to be the Project Manager (PM) and control the entire project, specialists for example, mechanical engineer, historic architect or landscape architects, can be a subcontractor.
3. Are all required inspectors and specialists required to be employees of the prime, or may they be named subcontract personnel?
Government Response: The overall contract shall have a Project Manager (PM) from the prime contractor, and each individual park list shall also have a PM from the prime. Specialists may be subcontractors; however, the majority of the assessment team must be employees of the prime contractor.
4. Does the Government require licensed professional engineers, architects, landscape architects, accessibility specialists, fire/life-safety specialists, historic preservation specialists, utilities specialists, or certified cost estimators for specific portions of the work?
Government Response: Professional licensure is not a requirement but preferred. All the discipline must knowledge of design and construction of current code and industry standards.
5. Are there mandatory site visit dates already established, or should offerors propose the site visit schedule?
Government Response: Site visits are coordinated with NPS regional office as well as individual parks during the kick-off meeting.
6. Is there a page limit for the business submission, resumes, pricing workbook, or attachments, separate from the 8-page technical proposal limit?
Government Response: The 8-page technical proposal limit is for the technical proposal. The pricing is a separate attachment included in the RFQ and is not part of the 8-page limit. All other submissions need to be limited to 8 pages as well. The required attachments per this RFQ and the SOW are not part of the technical proposal limit of 8 pages.
7. Should offerors include resumes within the 8-page technical proposal, or may resumes be submitted as a separate attachment?
Government Response: Please refer to #6 above. The Government will not evaluate past 8 pages of all resumes combined.