This is a Statement of Work for intrusion and fire alarm systems monitoring and maintenance services at five National Park Service units in Western Pennsylvania (WEPA). The National Park Service, Northeast Region, requires 24-hour professional monitoring and annual maintenance of alarm systems across the Allegheny Portage Railroad NHS (Blair and Cambria Counties), Flight 93 National Memorial (Somerset County), Johnstown Flood National Memorial (Cambria County), Fort Necessity National Battlefield (Fayette County), and Friendship Hill National Historic Site (Fayette County). The contractor must own and maintain a UL-approved monitoring station, be an authorized dealer for Ademco, Honeywell, and Radionics/Bosch equipment, and employ certified technicians with at least three years of experience servicing these systems. The five parks collectively require 25 monitoring lines (both wireless and hardwire connections), with specific requirements including enhanced monitoring capabilities to identify specific sensors and buildings, monthly opening and closing reports due by the 15th of each month, annual inspections and equipment testing by June at no additional cost, and sensitivity testing at contract start and every two years thereafter.
The contract period of performance is twelve months from the date of award, with a base period and four optional periods exercisable at the government's discretion. The Service Contract Act applies to this procurement. The contractor must provide references demonstrating similar experience and maintain system access upon contract expiration without additional government cost. Key contractor responsibilities include remote system programming capabilities from the monitoring station, immediate notification of all alarms to designated call-out lists, maintenance of individual PIN codes for each user, and compliance with biobased product reporting requirements through SAM.gov. Wage determinations are specified for three Pennsylvania counties: Cambria County (WD 15-4227), Fayette County (WD 15-4235), and Somerset County (WD 15-5793).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Alarm Monitoring at the Western Pennsylvania Parks (WEPA)
D.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The National Park System currently has 433 units (often referred to as parks), covering more than 85 million acres in all 50 states, the District of Columbia, and US territories.
The NPS also has more than 150 related areas that are linked in importance and purpose to places managed directly by the National Park Service by preserving important segments of the nation's natural and cultural heritage. They are designated by acts of Congress or by the Secretary of the Interior (affiliated areas). The majority of related areas are not units of the National Park Service and are managed by other government agencies or non-government organizations and landowners. The National Park Service is involved in related areas by directly managing the entire or sections of a related area, or by providing technical or financial assistance.
The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS – Business Service Contracting Division (BSCD) – Contracting Operations – Northeast Region – Philadephia MABO. The NPS – BSCD-Northeast issues contracts through the Federal Acquisition Regulation’s (FAR) for supplies, services, construction, A&E for Northeast Regional Parks only.
D.1 WEPA Park Descriptions Allegheny Portage Railroad NHS (ALPO The first railroad to cross the Allegheny Mountains, the Allegheny Portage Railroad was the final piece of the Pennsylvania Main Line Canal. "The Portage" opened in 1834, marking the first time that there was one, direct route between Philadelphia and Pittsburgh. All things to all people, it served merchants, passengers, slaves in pursuit of freedom, and soldiers from the Mexican War.
For more information, please visit ALPO’s website at: https://www.nps.gov/alpo/index.htm
Johnstown Flood National Memorial (JOFL) The South Fork Dam failed on Friday, May 31, 1889, and unleashed 20,000,000 tons of water that devastated Johnstown, PA. The flood killed 2,209 people but it brought the nation and the world together to aid the "Johnstown sufferers." The story of the Johnstown Flood reminds us all, "...that we must leave nothing undone for the preservation and protection of our brother men."
For more information, please visit JOFL’s website at: https://www.nps.gov/jofl/index.htm Flight 93 National Memorial (FLNI) On Tuesday morning, September 11, 2001, the U.S. came under attack when four commercial airliners were hijacked and used to strike targets on the ground. Nearly 3,000 people tragically lost their lives. Because of the actions of the 40 passengers and crew aboard one of the planes, Flight 93, the attack on the U.S. Capitol was thwarted.
For more information, please visit FLNI’s website at: https://www.nps.gov/flni/index.htm Fort Necessity National Battlefield (FONE) The battle at Fort Necessity in the summer of 1754 was the opening action of the French and Indian War. This war was a clash of British, French and American Indian cultures. It ended with the removal of French power from North America. The stage was set for the American Revolution.
For more information, please visit FONE’s website at: https://www.nps.gov/fone/index.htm Friendship Hill National Historic Site (FRHI) Albert Gallatin is best remembered for his thirteen year tenure as Secretary of the Treasury during the Jefferson and Madison administrations. In that time he reduced the national debt, purchased the Louisiana Territory and funded the Lewis & Clark exploration. Gallatin's accomplishments and contributions are highlighted at Friendship Hill, his restored country estate.
For more information, please visit FRHI’s website at: https://www.nps.gov/frhi/index.htm
D.2 BACKGROUND
Monitoring and maintenance service is required for the intrusion and fire alarm systems at Allegheny Portage Railroad NHS (ALPO), Cresson, Cambria and Blair Counties, PA, Flight 93 National Memorial (FLNI), Shanksville, Somerset County, PA, Johnstown Flood National Memorial (JOFL), St. Michael, Cambria County, PA, Fort Necessity National Battlefield (FONE), Farmington, Fayette County, PA, and Friendship Hill National Historic Site (FRHI), Point Marion, Fayette County, PA. The period of performance from the date of award and each performance period will be twelve months. The proposed award will include a base period and four options periods. The option periods will be exercised at the discretion of the government.
D.3 SUMMARY OF WORK
The required service is for the monitoring and maintenance of intrusion and fire alarm systems in various buildings withing the five parks in WEPA.
D.4 OBJECTIVES/TASKS
A complete list of all structures will be furnished by the government to the contractor upon award.
Contractor must own and maintain their monitoring station, which must be UL approved and employ certified service technicians.
Contractor must be an authorized “Ademco”, “Honeywell” and “Radionics/Bosch” dealer and employ certified technicians for systems submitting providing proof of certification with the price quote. Further, contractor must provide proof of “Incipient” fire alarm protection system repair experience.
Monitoring station must have the capabilities to arm, disarm, bypass, change codes, and reprogram control panels remotely from the monitoring station upon request from the Contracting officer’s Technical Representative (COTR).
24-hour monitoring and immediate notice of all alarms will be made to the individuals and agencies listed on the “Call Out List”. This list will be provided to the contractor.
Enhanced monitoring capabilities will be maintained to permit the monitoring station to provide the specific sensor and specific building that has been activated to the individuals and agencies listed on the Call Out List.
Opening and closing reports, which include monthly status reports, will be provided to the COTR by the 15th of each month. This submission should be an electronic version.
An annual inspection will be conducted by June, including testing and cleaning of each piece of fire and intrusion equipment at no additional cost to the park. A list of equipment will be provided by the contractor and will indicate that all equipment has been tested, cleaned, and inspected. It is the contractor’s responsibility to schedule and perform this inspection by June each year.
Initial programming, inspection and monitoring connections must be compatible with present systems and completed prior to October 1 of a new fiscal year or the first day of transition when newly awarded.
System will be programmed with each user having a separate and unique pin number, which includes the availability of changes to users throughout the year at no additional charge.
Successful contractor will have at least three years’ experience in monitoring and servicing Ademco/Honeywell and Radionics/Bosch systems/equipment.
Contractor will provide, at the time of their offer, a list of three references for similar monitoring and maintenance service previously performed on Ademco/Honeywell and Radionics/Bosch equipment. Additional information regarding Incipient and FCI/DMP experience or goals will be provided by the government.
Contractor will ensure access to alarm system(s) upon expiration of termination of this service contract without additional cost to the Government. Access will include all programming information remaining in place including zone information, employee pass codes, alarm panels including default lock codes, and will ensure the systems report as a local alarm at the time of expiration/termination. The only programming information that will be removed is the current contractor’s receiving account numbers, receiver telephone numbers, and remote lock out codes.
Contractor will perform sensitivity test on all required equipment at the start of the contract and every 2 years following toil the end of contract. The contractor will provide the park with documented results.
D.5 PLACE OF PERFORMANCE AND HOURS OF OPERATION
The structures to be monitored and serviced are located in Blair County, Cambria County, Somerset County and Fayette County, PA. The Service Contract Act is applicable.
Blair & Cambria County: (Gallitzin and Cresson PA) ALPO currently has Ademco/Honeywell equipment which will require 7 lines (wireless). Also, one building at ALPO, (Lemon House), has an additional Incipient fire alarm protection system that will need serviced and maintained. JOFL St. Micheal and South Fork PA) has Ademco/Honeywell equipment Requiring 6 lines (wireless).
Somerset County: FLNI (Shanksville and Stoystown PA) has Ademco/Honeywell System, a burglary/access control/CCTV switching system that includes the equipment with two monitoring accounts which requires 4 lines (2-wireless, 2-hardwire).
In Fayette County: FONE (Farmington PA) currently has Radionics/Bosch equipment with three monitoring accounts and has a visitor center with Fire Control Instruments (FCI) and Digital Monitoring Products (DMP) equipment with two monitoring accounts. The FCI/DMP equipment requires monitoring and service, but equipment replacement would need to be coordinated with FCI/DMP. FONE requires 5 lines (wireless). FRHI (Point Marion PA) currently has Radionics/Bosch equipment which requires 3 lines (wireless).
D.6 SCHEDULING AND COORDINATION
The COR will be responsible for acting on behalf of the Contracting Officer (CO) on all matters of work within the scope of the contract. Approval of all work beyond the scope of the contract is reserved for the CO. The contractor is responsible for notifying the COR in writing all work that is beyond the scope of the contract.
D.7 GENERAL CONTRACTOR RESPONSIBLITIES
The contractor will be responsible intrusion and fire alarm system monitoring and maintenance.
| D.8 | THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT ADMINISTRATION |
| 1. | Contracting Officer: The Contracting Officer (CO) has overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives. |
| 2. | Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to; |
| (A) | Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract. |
| (B) | Requesting removal of unsuitable contractor employees. |
| (C) | Ensuring adequacy of schedule and Quality Control Plan, including changes. |
| (D) | Ordering re-performance of unacceptable work or performance by other means, etc. |
3. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.
D.9 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-CONTACT (POC) A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.
| B. | The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the Contracting Officer prior to completion of the contract. |
| C. | The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.) |
| D. | On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim. |
| E. | The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer: |
| 1. | Changing or modifying any of the terms and conditions of the contract. |
| 2. | Directing the contractor to perform work or make deliveries not specifically required under the contract. |
| 3. | Directing the contractor to begin work prior to contract award date. |
| 4. | Waving or relaxing, in any way, the Government’s rights with regard to the contractor’s compliance with the specifications, price, delivery or any other terms or conditions of the contract. |
| 5. | Interfering with contractor’s management of its employees, including “supervising” or directing the work of the employees. |
| 6. | Making any commitments or approving any actions that would create any financial obligation on the part of the Government. As per Acquisition Policy and Procedures Memorandum (AP&P) 1443.01-04, personnel who direct any contracting actions without formally delegated contracting authority may be held liable for costs incurred for unauthorized contract actions. |
| 7. | Causing the contractor to incur costs not otherwise detailed in the contracting instrument with the expectation that such costs will be reimbursed by the Government. |
| 8. | Takins any action with respect to termination, other than notifying the Contracting Officer that action may be necessary and to assist with the process as requested. |
| 9. | Participating in negotiations with a contractor outside the presence of a Contracting Officer. |
| 10. | Rendering a decision on any dispute or question of fact under the Disputes clause of the contract. |
| F. | The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance. |
| 1. | The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the CO prior to completion of the contract. |
| 2. | The CO should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.) |
| 3. | On all matters that pertain to the contract terms the Contractor must communicate with the CO. Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim. |
| 4. | The POC has limited authority under this contract and responsibilities may include, but are not limited to: |
| a. | Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract. |
| b. | Requesting removal of unsuitable contractor employees. |
| c. | Ensuring adequacy of schedule and Quality Control Plan, including changes. |
| d. | Ordering re-performance of unacceptable work or performance by other means, etc. |
| e. | Approval or invoices and submitted reports. |
D.10 CONTRACTOR'S REPRESENTATIVE
The Contractor shall provide a contract representative for the performance of the work. The name of this person and an alternate(s) who act for the contractor when the Contractor is absent shall be designated in writing to the CO. The Contractor representative or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contractor representative and alternate(s) must be able to read, write, speak, and understand English without use of a translator. Under no circumstances shall any documents, Statement of Work, Work Schedules, Contractor submittals, Contractor plans, etc., be translated. All documentation shall be submitted in the English language.
D.11 BIOBASED REPORTING REQUIREMENTS
Prime contractors are required to report the category of product, type of product, and dollar value of all USDA designated biobased products that were purchased in the performance of federal contracts. Federal contractors are required to report annual biobased product purchases made under their service and construction contracts. Based on the Federal Acquisition Regulation (FAR) Clause 52.223-2 - Reporting of Biobased Products Under Service and Construction Contracts(DEVIATION FEB 2025), reporting of biobased product purchases is completed through a portal in the System for Award Management (SAM) at SAM.gov | Home.
If a contract contains FAR Clause 52.223-2, the contractor must report all biobased purchases through SAM.
The Reporting Requirement(s):
· The reporting requirement became effective September 3, 2013;
· It applies to services and construction contractors where contracts have a FAR Clause 52.223-2 - Reporting of Biobased Products Under Service and Construction Contracts, requiring the reporting of biobased product purchases;
· Contractors must report their purchases of biobased products to a reporting portal within SAM;
· Contractors must report the category, product type and dollar value of any USDA designated biobased products purchased by the Contractor; and
· Reporting must be completed by October 31st for the previous entire fiscal year (October 1 - September 30).
To Meet the Requirement(s) Contractors must:
· Access SAM.gov | Home;
· Complete the required information within the portal and provide documentation to the Contracting Officer;
· If the applicable contract is not accessible in SAM, the contractor should contact their Contracting Officer.
Actions that may be taken to Meet Reporting Requirement(s) by Contracting Officer:
· Require a copy of the reporting data from the Contractor as required in FAR Clause 52.223-2;
· Remind the contractor, as necessary, of the requirement to report BioPreferred product types and dollar value, if any, into SAM at http://www.sam.gov. This includes any BioPreferred products used in performing contract-related services or in delivering contract-related products;
· Cure Notice may be issued by Contracting Officer as required by termination clauses.
· Upon failure to correct deficiency issued through Cure Notice contract may be terminated for Cause (FAR 52.212-4) of Terminated for Default under FAR Part 49.
D.12 NOTIFICATION OF SUBCONTRACTING
The contractor shall within 14 days after award notify the Contracting Officer upon entering into any subcontract arrangement, as required by FAR 52.222-11 – Subcontracts (Labor Standards). The subcontractor shall have the experience and be equipped for such work. The written notification shall be completed:
| A. | Prime Contract Number and Subcontract Number (if applicable) |
| B. | The name and address of the Prime Contractor. |
| C. | The name and address of the subcontractor. |
| D. | The date upon which the subcontract was entered into and its duration. |
| E. | A detailed description of the work being subcontracted. |
| F. | Project Name and Location of Work. |
| G. | Identify the names of any intermediate subcontractors (if applicable) |
| H. | Must be signed by both Prime Contractor and Subcontractor |
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
D.13 ATTACHMENTS
| Attachment 1 – Wage Determination WD 15-4227 Rev 30 Cambria | 10 pages | |
| Attachment 2 –Wage Determination WD 15-4235 Rev 32 Fayette | 10 pages | |
| Attachment 3 - Wage Determination WD 15-5793 Rev 31 Somerset | 10 pages |
File details come from the government source that posted it. Updated .