A04_Final_CD_specifications_02-18-22_0001.pdf
PDF 14 MB Posted
- Attached to
- Adaptive Reuse of Maurice Stephens House
- Solicitation number
- 140P4222R0019
About this file
This document is a request for proposal for the adaptive reuse of the Maurice Stephens House located at Valley Forge National Historical Park. The project includes interior and exterior restoration of the existing house with mechanical, electrical, and plumbing work. A new foundation, footings, underground utilities, sitework and stonework for a new deck are also required. The contract value is estimated between $1,000,000 and $5,000,000. Interested parties should submit proposals in accordance with the instructions in Sections L and M by the date specified in the solicitation. The National Park Service Northeast Region will award a single firm-fixed price contract to the responsible small business offering the best value using a tradeoff source selection process. The North American Industry Classification System code for this opportunity is 238990 and the small business size standard is $16.5 million or less in average annual receipts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4222R0019_Amd_0003.pdf | ||
| Q___A_0002.docx | DOCX document | |
| E30_SV_sign_in_0002.pdf | ||
| Sol_140P4222R0019_Amd_0002.pdf | ||
| Sol_140P4222R0019_Amd_0001.pdf | ||
| A04_Rev_M__Stephens_Addendum.doc | DOC document | |
| B08_Solit_Experience_REQD.docx | DOCX document | |
| Attachment_6_Covid_Certification_of_Vaccination.pdf | ||
| B08_Solit_PSP_Vol_I_PastPerf_REQD.docx | DOCX document | |
| Attachment_8_Limitation_on_Subcontracting_Report_Template.xlsx | XLSX spreadsheet | |
| Sol_140P4222R0019.pdf | ||
| B03_Wage_Determination_Montg_County.txt | TXT text file | |
| Rev_M__Stephens_Addendum.doc | DOC document | |
| B08_Solit_PSP_Vol_II_General_References.doc | DOC document | |
| Attachment_1_Product_File_Div_9.zip | ZIP file | |
| Attachment_5_Vaccination_Certification_Notification.pdf | ||
| Attachment_1_Product_File_Div_10_to_Div_33.zip | ZIP file | |
| Attachment_1_Product_File_Div_7_to_Div_8.zip | ZIP file | |
| Attachment_1_Product_File_Cover_to_Division_6.zip | ZIP file | |
| Attachment_2_Drawings_rev_8_15.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAURICE STEPHENS HOUSE
VALLEY FORGE NATIONAL HISTORICAL
PARK
KING OF PRUSSIA, PENNSYLVANIA
ADAPTIVE REUSE OF MAURICE STEPHENS HOUSE AT
VALLEY FORGE NATIONAL HISTORICAL PARK
VAFO
PMIS NO. 238128
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
FEBRUARY 18, 2022
FINAL CONSTRUCTION DOCUMENT SUBMISSION
VAFO - 238128 1
021822 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 26 01 Contract Modification Procedures
01 27 00 Definition of Contract Line Items
01 31 00 Project Management & Coordination
01 32 16 Construction Schedule
01 32 33 Photo Documentation
01 33 23 Submittal Procedures
Submittal List
01 35 13.22 Archeological Protection
01 35 23 Safety Requirements
01 35 91 Historic Preservation Treatment Procedures
01 40 00 Quality Requirements
Statement of Structural Tests and Special Inspections
01 42 00 Reference Standards
01 50 00 Temporary Facilities and Controls
01 57 19.11 Indoor Air Quality Management
01 57 23 Under-an-Acre Pollution Prevention
01 67 00 Product Requirements
Affirmative Procurement Reporting Form
01 73 40 Execution
01 74 19 Construction Waste Management and Disposal
Appendix A: Project Waste Management Plan Worksheet
Appendix B: Standard Solid Waste Conversions
01 77 00 Closeout Procedures
Closeout and Operation & Maintenance Requirements
01 78 23 Operation and Maintenance Data
01 79 00 Demonstration and Training
01 81 13 Sustainable Design Requirements for Non-LEED Projects
DIVISION 02 – EXISTING CONDITIONS
02 05 50 Temporary Protections
02 42 97 Selective Removals and Salvaging
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 03 10 Historic Masonry Cleaning
04 03 30 Historic Masonry Repair and Repointing
04 10 00 Mortar
04 43 13 Anchored Stone Masonry Veneer
VAFO - 238128 2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 50 00 Metal Fabrications
05 52 13 Decorative Metal Railings
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 03 12 Historic Wood Repair
06 10 00 Rough Carpentry
06 15 33 Wood Decking
06 16 00 Sheathing
06 20 13 Interior and Exterior Finish Carpentry
06 40 23 Interior and Exterior Architectural Woodwork
06 41 13 Wood-Veneer-Faced Architectural Cabinets
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 13 26 Self-Adhering Sheet Waterproofing
07 21 00 Thermal Insulation
07 25 00 Weather Barriers
07 26 00 Vapor Retarders
07 31 29 Wood Shingle Roofing
07 61 00 Sheet Metal Roofing, Flashing, and Trim
07 92 00 Joint Sealants
DIVISION 08 – OPENINGS
08 03 52 Historic Treatment of Wood Windows and Doors
08 14 33 Stile and Rail Wood Doors
08 31 13 Access Doors and Frames
08 52 00 Wood Windows and Shutters
08 71 00 Door Hardware
08 91 19 Fixed Louvers
DIVISION 09 – FINISHES
09 03 20 Interior and Exterior Plaster
09 29 00 Gypsum Board
09 30 13 Ceramic Tiling
09 64 00 Wood Flooring
09 65 43 Linoleum Flooring
09 91 34 Interior and Exterior Painting
09 93 00 Staining and Transparent Finishing
DIVISION 10 – SPECIALTIES
10 14 23 Panel Signage
10 28 00 Toilet Accessories
10 44 16 Fire Extinguishers and Fire-Protection Cabinets
VAFO - 238128 3
DIVISION 12 – FURNISHINGS
12 36 61 Solid Surfacing Countertops
DIVISION 21 – FIRE SUPPRESSION
21 05 00 Common Work Results for Fire Suppression
21 05 17 Sleeves and Sleeve Seals for Fire-Suppression Piping
21 05 23 General-Duty Valves for Water-Based Fire-Suppression Piping
21 05 48 Vibration and Seismic Controls for Fire-Suppression Piping and Equipment
21 11 00 Facility Fire-Suppression Water-Service Piping
21 11 19 Fire-Department Connections
21 13 13 Wet-Pipe Sprinkler Systems
21 13 16 Dry-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 00 Common Work Results for Plumbing
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping
22 05 18 Escutcheons for Plumbing Piping
22 05 23.12 Ball Valves for Plumbing Piping
22 05 23.14 Check Valves for Plumbing Piping
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 35 Heat Tracing for Plumbing Piping- Hot Water Temperature Maintenance
22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment
22 05 53 Identification for Plumbing Piping and Equipment
22 07 19 Plumbing Piping Insulation
22 11 16 Domestic Water Piping
22 11 19 Domestic Water Piping Specialties
22 13 16 Sanitary Waste and Vent Piping
22 13 19 Sanitary Waste Piping Specialties
22 13 19.13 Sanitary Drains
22 13 23 Sanitary Waste Interceptors
22 33 00 Electric, Domestic-Water Heaters
22 42 13 Commercial Toilets
22 42 16 Commercial Lavatories and Sinks
22 47 13 Drinking Fountains
DIVISION 23 – HVAC
23 00 00 General Provisions
23 05 13 Common Motor Requirements for HVAC Equipment
23 05 17 Sleeves and Sleeve Seals for HVAC Piping
23 05 29 Hangers and Supports for HVAC Piping and Equipment
23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment
23 05 53 Identification for HVAC Piping and Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 00 HVAC Insulation
23 09 00 Instrumentation and Control for HVAC, Electrical, and Plumbing Systems
23 09 93 Sequence of Operations for HVAC, Plumbing, and Electrical Controls
23 21 13 Hydronic Piping
VAFO - 238128 4
23 23 00 Refrigerant Piping
23 31 13 Metal Ducts
23 33 00 Air Duct Accessories
23 34 23 HVAC Power Ventilators
23 37 13 Diffusers, Registers, and Grilles
23 72 00 Air-to-Air Energy Recovery Equipment
23 82 39 Unit Heaters
23 90 00 Variable Refrigerant Flow
DIVISION 26 – ELECTRICAL
26 01 00 General Electrical Requirements
26 05 00 Common Work Results for Electrical
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 48 Vibration and Seismic Controls for Electrical Systems
26 05 53 Identification for Electrical Systems
26 05 73 Overcurrent Protective Device Coordination Study
26 24 16 Panelboards
26 27 26 Wiring Devices
26 28 16 Enclosed Switches and Circuit Breakers
26 33 23.11 Central Battery Equipment for Emergency Lighting
26 41 13 Lightning Protection for Structures
DIVISION 28 – ELECTRONINC SAFETY AND SECURITY
28 31 11 Digital, Addressable Fire-Alarm System
DIVISION 31 – EARTHWORK
31 20 00 Earth Moving
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 14 00 Unit Paving
DIVISION 33 – UTILITIES
33 46 00 Stormwater Conveyance
END OF TABLE OF CONTENTS
VAFO - 238128 01 11 00 - 1
091015 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Provisions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Contractor use of premises.
3. Public use of site.
4. Conduct of operations.
5. Work restrictions.
6. Special construction requirements.
7. Specification and Drawing conventions.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Maurice Stephens House, Valley Forge National Historical Park, 1400 North Outer Line Road, King of Prussia, Pennsylvania 19406.
B. The Work consists of the following:
1. The Work includes, but is not limited to, providing interior and exterior restoration of existing house, including mechanical, electrical, and plumbing work, and new foundation for an addition, deck and ramp. The addition, deck and ramp are NOT part of this contract.
C. Project will be constructed under a single prime contract.
1.4 CONTRACTOR USE OF SITE
A. General: Contractor shall have full use of the site for construction operations during the construction period. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
B. Storage of Materials: Confine storage of materials to lay-down area as indicated on Drawings.
C. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
VAFO - 238128 01 11 00 - 2
2. Provide temporary barriers to protect existing trees, plants, and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to
Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Construction Camp: Establishment of a camp within the park will not be permitted.
F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park
Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
1.5 PUBLIC USE OF SITE
A. The building will be closed to the public during construction.
1.6 CONDUCT OF OPERATIONS
A. At all times the Contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service and applicable park rules and regulations prescribed by the Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 48 hours in advance of the work to the
Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
1. Weekend Hours: None.
VAFO - 238128 01 11 00 - 3
2. Early Morning Hours: By written permission.
B. Existing Utilities:
1. Existing Utilities: Notify Contracting Officer, Contracting Officer’s Representative, and utility companies five days in advance of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Nonsmoking Building: Smoking is not permitted within building or within 25 feet of the building.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website may be administered by the NPS will be used for purposes of managing communication and documents during the construction stage.
1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.
1.9 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing
Specification Section numbers found in this Project Manual.
VAFO - 238128 01 11 00 - 4
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
VAFO - 238128 01 26 01 - 1
031414 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Provisions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. The Work of this Section consists of administrative and procedural requirements for contract modifications.
1.3 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a Contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent.
2. Utilities.
3. Furnishings.
4. Office equipment.
5. Executive and management staff not exclusively assigned to the project.
6. Support, accounting, and administrative staff.
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications.
8. Estimating and preconstruction services.
9. Mortgage costs.
10. Real estate and corporate taxes.
11. Automobile maintenance and travel costs for home office personnel.
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets.
14. Home office supplies (paper, staples, etc.)
15. Legal services.
16. Accounting and data processing.
17. Professional fees/registration.
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
VAFO - 238128 01 26 01 - 2
1. Project Manager, Assistant Project Manager.
2. Superintendent, Assistant Superintendent.
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers.
5. Travel, lodging, and per diem (as established by Federal Travel Regulations).
6. Scheduling.
7. Field Office Trailers and associated temporary utilities.
8. Field office supplies.
a. Mailing and couriers.
b. Reproduction costs.
c. Storage.
d. Phones.
e. Computers.
f. Copiers.
9. Personal vehicles i.e. Superintendent Pickup trucks.
C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating
General Requirements:
1. Hoisting.
2. Material handling.
3. Temporary fencing.
4. Port-a-lets.
5. Trash removal, dumpsters.
6. Barricades.
7. Small tools.
8. Safety supplies.
9. Scaffolding.
10. Daily cleaning.
11. Traffic control.
12. Temporary signage.
13. Temporary heating and power.
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:
1) Social Security
VAFO - 238128 01 26 01 - 3
2) Medicare
3) Workers Compensation– Policy and company calculation to be made available.
4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.
5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.
6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums.
2) Cell Phone.
3) Clothing.
4) 401K and Pensions.
5) Vehicle allowances.
6) Gas allowance.
7) Life insurance premiums.
8) Disability insurance.
9) Other Fringe Benefits required under an enforceable collective bargaining agreement.
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General
Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.4 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the
Request for Proposal letter. Costs or delays resulting from failure of Contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank
VAFO - 238128 01 26 01 - 4
Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or Contractor is not requesting reimbursement. Contractor may utilize the government-provided Contractor Estimate Form, (http://www.nps.gov/dscw/publicforms.htm#CP___PAGEID=396735|) or their own form, provided that it contains the same information and level of detail as the Government-provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a
Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor
Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
http://www.nps.gov/dscw/publicforms.htm#ct
VAFO - 238128 01 26 01 - 5
a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR
31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US
Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit. Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in
FAR Part 31which have been applied to the specific type of work included in this project.
Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10%
Profit……………………8%
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
VAFO - 238128 01 26 01 - 6
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 01 26 01
VAFO - 238128 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Provisions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 0001.
1. This item consists of providing interior and exterior restoration of existing house, including mechanical, electrical, and plumbing work, and an addition containing accessible restrooms, and new wood deck with accessible ramp.
2. Measurement for Payment: No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item No. 002 – Option A: Lightning Protection.
1. This item consists of providing vertical line lightning protection system, including provisions for grounding as indicated on Drawings and in Section 26 41 13 “Lightning
Protection for Structures.”
2. Measurement for Payment: No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item No. 003 – Option B: Window Shutters.
1. This item consists of providing custom wood window shutters, including finishes and hardware as indicated on Drawings and in Section 06 40 23 “Interior and Exterior
Architectural Woodwork” and Section 09 91 34 “Interior and Exterior Painting.”
2. Measurement for Payment: No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
VAFO - 238128 01 27 00 - 2
082714 DEFINITION OF CONTRACT LINE ITEMS
D. Contract Line Item No. 004 – Option C: Storm Windows.
1. This item consists of providing metal storm windows, including hardware, as indicated on
Drawing and in Section 08 52 00 “Wood Windows and Shutters.”
2. Measurement for Payment: No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
VAFO - 238128 01 31 00 - 1
091015 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Provisions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on
Project including, but not limited to, the following:
1. Construction coordination.
2. Submittals.
3. Coordination drawings.
4. RFIs.
5. NPS/DSC Project Website.
6. Project meetings.
7. Environmental coordination.
8. Permits.
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.
1.3 DEFINITIONS
A. Agency(ies) with Jurisdiction: An Agency that has been granted legal authority over a location, action, or resource. This authority includes the ability to issue a permit or other legal permission document.
B. Construction Permits – Contractor Provided: Permits obtained by the Contractor based on the means and methods to conduct the Work. Construction Permits are typically issued by the
Agency to the Contractor and not the National Park Service (NPS). Examples of typical
Contractor Provided Permits are: NPDES Construction Permit (ground disturbance), dewatering permit, permit for work in a roadway (with traffic management plan), temporary utility tap permit, etc.
C. RFI: Request for Information. Request from Contractor seeking information required by or clarifications of the Contract Documents.
VAFO - 238128 01 31 00 - 2
1.4 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the
Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Permit requirements.
7. Pre-installation conferences.
8. Project closeout activities.
9. Commissioning activities.
1.5 SUBMITTALS
A. Coordination Drawings: Prepare coordination drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base coordination drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
VAFO - 238128 01 31 00 - 3
b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternative sketches to the Contracting Officer for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.
e. Indicate required installation sequences.
2. Sheet Size: At least 11 inches by 17 inches but no larger than 30 inches by 40 inches.
3. Number of Copies: Submit two paper copies of each submittal. Contracting Officer will return one copy.
4. Refer to individual Sections for coordination drawing requirements for Work in those
Sections.
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to doors, windows, and walls. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Plenum Space: Indicate sub-framing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.
3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.
4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.
6. Mechanical and Plumbing Work: Show the following:
a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.
b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.
7. Electrical Work: Show the following:
a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.
b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.
c. Panel board, switch board, switchgear, transformer, and busway locations.
d. Location of pull boxes and junction boxes, dimensioned from wall edge or nearest architectural feature.
8. Fire-Protection System: Show the following:
VAFO - 238128 01 31 00 - 4
a. Locations of mains piping, branch lines, pipe drops, and sprinkler heads.
9. Review: Contracting Officer will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Contracting Officer determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Contracting Officer will so inform Contractor, who shall make changes as directed and resubmit.
C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:
1. File Preparation Format: AutoCad.dwg, Version 2007, operating in Microsoft Windows operating system.
2. File Submittal Format: Submit coordination drawing files using Portable Document
Format (PDF) file format.
3. Contracting Officer will furnish Contractor one set of digital data files of drawings for use in preparing coordination digital data files.
a. Contracting Officer makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
c. Contractor shall execute a data licensing agreement in the form of Architect’s standard CAD waiver.
d. The CAD files alone shall in no way be regarded as Contract Documents;
accordingly the Contractor may only use the CAD files as background or base documentation for the purpose of creating documents for review purposes, to be submitted to the Contracting Officer, and solely in conjunction with the Project.
e. Use of CAD files prepared by the Architect shall not alter the Contractor’s responsibility for field verification of dimensions and conditions.
D. Submittals: The following items shall be submitted a minimum of one week prior to the
Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the
Preconstruction Conference.
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. Comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan.
5. A list of subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Under-an-Acre Pollution Prevention Plan (UPPP).
11. Indoor Air Quality (IAQ) Management Plan.
12. Historic Preservation Treatment Plan.
13. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
VAFO - 238128 01 31 00 - 5
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
E. All items listed must be provided to the Contracting Officer before the Preconstruction
Conference is held. If all of these documents have not been received one week prior to the scheduled Preconstruction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
1.6 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the
Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC management software website. If NPS/DSC management software website is not utilized, prepare and submit RFIs directly to Contracting Officer.
1. Contracting Officer will not respond to RFIs submitted by other entities controlled by
Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number, title, and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution. If suggested resolution impacts the Contract Time or the Contract Sum, state impact in the RFI.
8. Contractor's signature.
9. Requested date for response.
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, and details of affected materials, assemblies, and attachments.
C. RFI Form: Complete the RFI Form on the NPS/DSC Project Website as follows:
1. Enter the general information at the top of the form.
2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.
3. Enter the details of the question and attach related documents.
4. Select “Submit Form” at the bottom of the page.
VAFO - 238128 01 31 00 - 6
D. Contracting Officer’s Action: Contracting Officer will review each RFI, determine action required, and respond. Contracting Officer will determine the critical nature of each RFI and issue a response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of Contracting Officer's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. Contracting Officer's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.
3. Contracting Officer's action on RFIs may result in the need for a change to the Contract
Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the Contract.
1.7 PROJECT WEBSITE
A. NPS/DSC management software website may be used for communication throughout the contract period for the following functions:
1. Project directory.
2. Project correspondence.
3. Meeting agendas and minutes.
4. Contract modification forms and logs.
5. RFI form and processing.
6. Task and issue management.
7. Photo documentation.
8. Baseline schedule, schedule updates, and calendar management.
9. Submittal form and processing.
10. Payment coordination documentation.
11. Drawing and specification document hosting, viewing, and updating.
12. Online document collaboration.
13. Reminder and tracking functions.
14. Archiving functions.
15. Notification of submittal and RFI statuses and current responsible party.
16. Permits and addenda.
B. If NPS/DSC management software website is not utilized, prepare and submit communication directly to Contracting Officer.
C. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC management software website and shall be coordinated with the Project team as appropriate.
VAFO - 238128 01 31 00 - 7
D. Submit to the Contracting Officer a list of employees who will need access to the website. Users will receive an invitation to register from the Department of Interior (DOI). Once registered on the DOI website, user will be given access to the NPS/DSC management software website.
E. All users will be required to have the following software packages:
1. Internet Explorer version 7 or later.
2. Adobe Acrobat Professional (Pro) version 9 or later.
1.8 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:
1. Roles & Responsibilities/ Lines of Authority.
2. Park rules and regulations.
3. Jobsite Safety.
4. Resolution of comments on required Division 01 documents.
5. Coordination of subcontractors.
6. Labor law application.
7. Modifications.
8. Payments to Contractor.
9. Payroll reports.
10. Contract time.
11. Liquidated damages.
12. Contractor Performance Evaluation.
13. Display of Hotline posters.
14. Notice to proceed.
15. Correspondence procedures.
16. NPS/DSC Project website.
17. Acceptance/rejection of Work.
18. Progress meetings.
19. Submittal procedures.
20. NPS Final Accessibility Inspection.
21. Environmental requirements.
22. Permit requirements.
23. As-constructed drawings/operation and maintenance (O&M) manuals.
24. Saturday, Sunday, holiday, and night work.
25. Reference materials.
26. Value engineering.
B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.
1. Attendees: In addition to Government Representatives, each Contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.
VAFO - 238128 01 31 00 - 8
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:
a. Approval of minutes of previous meetings.
b. Submittal status.
c. Review of off-site fabrication and delivery schedules.
d. Review status of outstanding and anticipated RFIs and other issues.
e. Modifications.
f. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
g. Construction schedule update (provide updated CPM).
h. Status of Project Record Drawings and O&M manuals.
i. Other business relating to the Work.
j. Permit requirements.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise
Contracting Officer of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:
a. Contract Documents.
b. Related RFIs.
c. Related Change Orders.
d. Purchases.
e. Deliveries.
f. Submittals.
g. Review of mockups.
h. Possible conflicts.
i. Compatibility requirements.
j. Time schedules.
k. Weather limitations.
l. Manufacturer's written instructions.
m. Warranty requirements.
n. Compatibility of materials.
o. Acceptability of substrates.
p. Temporary facilities and controls.
q. Space and access limitations.
r. Regulations of agencies with jurisdiction.
s. Testing and inspecting requirements.
t. Installation procedures.
u. Required performance results.
v. Protection of adjacent work.
w. Protection of construction and personnel.
VAFO - 238128 01 31 00 - 9
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.
5. Do not proceed with installation if the conference cannot be successfully concluded.
Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
1.9 ENVIRONMENTAL COORDINATION
A. Environmental Manager: Designate an on-site party responsible for overseeing conformance to environmental goals for the Project and implementing procedures for environmental protection.
1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.
2. Responsibilities:
a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.
b. Implementation of the Waste Management Plan (WMP).
c. Implementation of the Indoor Air Quality (IAQ) Management Plan.
d. Implementation of the Under-an-Acre Pollution Prevention Plan (UPPP).
e. Present an overview of environmental issues and summarize site specific procedures relating to management plans at the Preconstruction conference.
f. Training for Contractor personnel in accordance with their position requirements.
g. Monitoring and documentation of environmental procedures.
B. Perform project quality control in accordance with requirements specified in Related Sections, including:
1. Quality Requirements.
2. Regulatory Requirements.
3. Indoor Air Quality (IAQ) Management.
4. Under-an-Acre Water Pollution Prevention Environmental Management.
5. Construction Waste Management.
C. Environmental Training Program: Provide environmental training for workers performing work on the Project site. Training shall include the following:
1. Overview of environmental issues related to the building industry.
2. Overview of environmental issues related to the Project.
3. Review of site specific procedures and management plans:
a. Construction Waste Management.
b. Indoor Air Quality (IAQ) Management.
c. Under-an-Acre Water Pollution Prevention.
4. Pollution Prevention (P2) Practices: Submit evidence of familiarity with P2 practices.
VAFO - 238128 01 31 00 - 10
D. Provide documentation for environmental procedures as specified and in accordance with approved Waste Management Plan, IAQ Management Plan, and Under-an-Acre Pollution
Prevention Plan.
1.10 PERMITS
A. General:
1. Permits and Responsibilities: The Contractor shall, without additional expense to the
Government, be responsible for obtaining any necessary licenses and permits, and for…
This is the start of the file's text. The full file is on GovTribe.