Sol_140P2025R0062_Amd_0004.pdf

PDF 82 KB Posted

Attached to
YOSE 228647 Rehabilitate Tuolumne Meadows Water Di
Solicitation number
140P2025R0062
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a contract with solicitation number 140P2025R0062, issued by the National Park Service (NPS), DSC Contracting Services Division located in Denver, Colorado. The amendment, dated 07/22/2025 with an effective date of 08/04/2025, serves two primary purposes: (1) to provide answers to questions 1-11, and (2) to amend the drawings to include a map of tree removal in a new tank area.

The amendment highlights key contact information for the contracting process, including Contracting Officer Mark A. Barber (mark_barber@nps.gov) and Contracting Specialist Gabe Castellanos (gabriel_castellanos@nps.gov). The document emphasizes that contractors must acknowledge receipt of this amendment prior to the specified hour and date, with potential rejection of offers for failure to do so. The amendment maintains all other terms and conditions of the original document unchanged and in full force and effect.

View the file

Other files

File Type Posted
B09_Amd_7_Tree_locations_0007.pdf PDF
Sol_140P2025R0062_Amd_0007.pdf PDF
B09_Amd_6_Finalized_Q_A_0006.docx DOCX document
Sol_140P2025R0062_Amd_0006.pdf PDF
B09_Amd_6_Clauses_YOSE_228647_Rev_2_0006.pdf PDF
Sol_140P2025R0062_Amd_0005.pdf PDF
B09_Amd_5_Bridge_Inspection_Report_8800-023P7333_0005.pdf PDF
B09_Amd_5_2025_0819_Revised_Staging_Areas_0005.pdf PDF
B09_Amd_5_2025_0819_Addendum_0005.docx DOCX document
2025_0811_Addendum__v2_0004.pdf PDF
Sol_140P2025R0062_Amd_0003.pdf PDF
Sol_140P2025R0062_Amd_0002.pdf PDF
B09_Amd_02_Site_Visit_Sign_In_-_7-31-25_0002.pdf PDF
B09_Amd_01_Site_Visit_Itinerary_0001.xlsx XLSX spreadsheet
B09_Amd_01_Site_Visit_Google_Maps_Driving_Route_0001.pdf PDF
Sol_140P2025R0062_Amd_0001.pdf PDF
B08_Solit_Clauses_Construction_YOSE_228647_Rev_1_0001.pdf PDF
B08_Solit_Clauses_Construction_YOSE_228647.pdf PDF
Sol_140P2025R0062.pdf PDF
B08_Attach_(10)_Addendum-Steel_Tank.docx DOCX document
B08_Attach_(8)_YOSE_228647_ContractPriceSchedule_Template031318AF.xlsx XLSX spreadsheet
B08_Attach_(3)_YOSE_228647_100per_Final_CD_Drawings_09112024.pdf PDF
B08_Attach_(6)_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_(1)_Tuolumne_Meadows_WD_Sys_Vol_1_IFB_Specs_10OCT2024.pdf PDF
B08_Attach_(7)_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_(9)_Sailient_Characteristics_Addendum.docx DOCX document
B08_Attach_(2)_Tuolumne_Meadows_WD_Sys_Vol_2_IFB_Specs_10OCT2024.pdf PDF
B08_Attach_(5)_Deliverables_LmtOnSubconRpt_REQD.pdf PDF
B08_Attach_(4)_Wage_Determination_18_July_2025.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2025R0062 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div

08/04/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/22/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to do the following:

1. Provide the answers to questions 1-11

2. Amend the drawings to include the Map of tree removal in new Tank area

Contracting Officer: Mark A Barber mark_barber@nps.gov

Contracting specialist Gabe Castellanos gabriel_castellanos@nps.gov

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Mark Barber

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .