About this file
Written by GovTribe AI
· Aug 4, 2025
The document is a site visit sign-in sheet for the Tuolumne Meadows Water Project, dated 7/31/25, with contact information for three individuals. The attendees include Zara Cardas from Sierra Nevada, Cody Carreras from Air Pacific Contracting, and Leo Nisheasky from an unspecified organization. Each participant's contact details are recorded, including phone numbers and email addresses, suggesting this is a sign-in sheet for a project site visit related to the water distribution system rehabilitation at Yosemite National Park.
Other files
File
Type
Posted
B09_Amd_7_Tree_locations_0007.pdf
PDF
Aug 28, 2025
Sol_140P2025R0062_Amd_0007.pdf
PDF
Aug 28, 2025
B09_Amd_6_Finalized_Q_A_0006.docx
DOCX document
Aug 21, 2025
Sol_140P2025R0062_Amd_0006.pdf
PDF
Aug 21, 2025
B09_Amd_6_Clauses_YOSE_228647_Rev_2_0006.pdf
PDF
Aug 21, 2025
Sol_140P2025R0062_Amd_0005.pdf
PDF
Aug 21, 2025
B09_Amd_5_Bridge_Inspection_Report_8800-023P7333_0005.pdf
PDF
Aug 21, 2025
B09_Amd_5_2025_0819_Revised_Staging_Areas_0005.pdf
PDF
Aug 21, 2025
B09_Amd_5_2025_0819_Addendum_0005.docx
DOCX document
Aug 21, 2025
Sol_140P2025R0062_Amd_0004.pdf
PDF
Aug 14, 2025
2025_0811_Addendum__v2_0004.pdf
PDF
Aug 14, 2025
Sol_140P2025R0062_Amd_0003.pdf
PDF
Aug 5, 2025
Sol_140P2025R0062_Amd_0002.pdf
PDF
Aug 4, 2025
B09_Amd_01_Site_Visit_Itinerary_0001.xlsx
XLSX spreadsheet
Jul 24, 2025
B09_Amd_01_Site_Visit_Google_Maps_Driving_Route_0001.pdf
PDF
Jul 24, 2025
Sol_140P2025R0062_Amd_0001.pdf
PDF
Jul 24, 2025
B08_Solit_Clauses_Construction_YOSE_228647_Rev_1_0001.pdf
PDF
Jul 24, 2025
B08_Solit_Clauses_Construction_YOSE_228647.pdf
PDF
Jul 23, 2025
Sol_140P2025R0062.pdf
PDF
Jul 23, 2025
B08_Attach_(10)_Addendum-Steel_Tank.docx
DOCX document
Jul 23, 2025
B08_Attach_(8)_YOSE_228647_ContractPriceSchedule_Template031318AF.xlsx
XLSX spreadsheet
Jul 23, 2025
B08_Attach_(3)_YOSE_228647_100per_Final_CD_Drawings_09112024.pdf
PDF
Jul 23, 2025
B08_Attach_(6)_Solit_PSP_Vol_I_PastPerf_REQD(1).docx
DOCX document
Jul 23, 2025
B08_Attach_(1)_Tuolumne_Meadows_WD_Sys_Vol_1_IFB_Specs_10OCT2024.pdf
PDF
Jul 23, 2025
B08_Attach_(7)_Solit_PSP_Vol_I_Exp_REQD.docx
DOCX document
Jul 23, 2025
B08_Attach_(9)_Sailient_Characteristics_Addendum.docx
DOCX document
Jul 23, 2025
B08_Attach_(2)_Tuolumne_Meadows_WD_Sys_Vol_2_IFB_Specs_10OCT2024.pdf
PDF
Jul 23, 2025
B08_Attach_(5)_Deliverables_LmtOnSubconRpt_REQD.pdf
PDF
Jul 23, 2025
B08_Attach_(4)_Wage_Determination_18_July_2025.pdf
PDF
Jul 23, 2025
Show all 29
On GovTribe
Work with this file
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Aug 4, 2025 .