B09_Amendment_3_Questions_and_Answers_0003.pdf
PDF 3 MB Posted
- Attached to
- LIBI 241430 - Replace Dilapidated Visitor Center F Federal contract opportunity
- Solicitation number
- 140P2023R0150
About this file
This document contains questions and answers related to solicitation number 140P2023R0150 to replace a dilapidated visitor center facility at Little Bighorn Battlefield National Monument. The solicitation is seeking to construct a new visitor center building, with the project being managed by the National Park Service.
The questions and answers provide clarification on structural design elements, such as foundation details, framing plans, and material specifications. They also address project scope items including signage, lighting, mechanical systems, site work requirements, and the responsibility for traffic control and THPO fees. Substitution requests are permitted after award for equivalent products meeting salient characteristics. The responses aim to ensure bidders have the information needed to fully understand requirements and submit a responsive proposal for replacing the visitor center facility.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Dilapidated Visitor Center Facility Little Bighorn Battlefield National Monument
(LIBI 241430)
Solicitation 140P2023R0150
Amendment 3 Questions and Answers November 3, 2023
21. Alternate #1 – Seat Wall Footing System:
a. Detail 3/L3.2 references structural drawings for footing system for the seat wall assembly. There is no structural information provided for this system. Please clarify.
RESPONSE: See detail B1 on sheet S5.3. Detail has been added for Bid Option seat wall reinforcing/footing.
22. MP5 Systems: No details on the imaging required. Also, the structural drawings do not show the 4x4 Tube steel column systems at this wall type.
RESPONSE: Imaging is to be provided by the exhibit designer. See updated sheets S1.2 and S2.0.
S1.2: Added steel column symbols at freestanding wall locations. S2.0: Added HSS4X4X1 to ‘Wind Frame’ 1&2 at inset wall.
23. Ceiling Access Panel Requirements: The RCP plans do not show the provision of any access panels that could potentially be required to be supplied/installed.
RESPONSE: See sheet A1.3 and A1.9 for the ceiling access panel locations.
24. Exterior Wood Ceiling Ventilation: Spec Section 062013, Item 2.6 – Misc. Materials calls out for continuous stainless steel soffit vent material to be provided. The RCP plan on A1.9 does not show this soffit vent material. Please confirm that this material does not need to be installed.
RESPONSE: The exterior wood ceiling ventilation is needed. See updated sheet A1.9.
25. Precast treads and risers:
a. What nosing do you want on the treads? The nosings are mentioned, but not specified.
RESPONSE: Nosing is radiused edge. See updated sheet A4.6 and the attached cut sheet (basis of design).
b. We use threaded inserts embedded into the bottom of the treads for attaching the treads rather than adhesive. Is this acceptable?
RESPONSE: Yes, that is acceptable.
c. What sort of finish do you want on the precast treads? No mention of this in the specs provided.
RESPONSE: Finish of the precast treads & landing is noted on sheet A1.4. It is designated as CN4 – sealed concrete.
d. How thick do you want the precast treads? Since they are fully supported by the bent plate stair structure, 2 ½” will work. We would typically make them 3” thick if they weren’t fully supported by the stair structure. Detail 01 on Drawing A4.5 (attached) shows the treads as 4” thick, but they appear to be 3” thick in Detail 02 on Drawing A4.5.
RESPONSE: The precast treads are at 2 1/2 “. See updated sheet A4.6 and the attached cut sheet (basis of design).
26. Plan Page A6.3 – Product “HR”. Please be advised that the HR materials (1 ½” Wyoming Rose hard rock) that is to be installed at the lower level of the building at the main staircase is not available through Valley Sand & Gravel. They advised that the quarry that this material came from has been shut down for a few years. They are not aware of another quarry in the area where they could get a similar material. Please advise of an alternate material to be installed in this area.
RESPONSE: “Wyoming Rose” hard rock is the basis of design. It does not need to be sourced from the Valley Sand & Gravel. Bidder can provide the equivalent product to the basis of design.
27. We have been advised that the LVT flooring product that was specified for use on the product has been discontinued. Please advise of an alternate product/style that should be.
RESPONSE: There are no sole source items specified in this solicitation. All items are “or equivalent” by the salient characteristics that are given with each product. It is up to the bidder to locate the equivalent product to the basis of design.
28. Are the salient characteristics listed for every item that we call out with a basis of design manufacturer?
RESPONSE: “There are no sole source items in the solicitation. Everything is “or equivalent”. If that product meets the salient characteristics of the one noted for the basis of design, then you can use it. However, if it does not in anyway, I would ask that you use the one suggested for your proposal, then submit a substitution request after award, should you be successful, and our A/E team will consider the substitution.”
29. I am in the process of putting a bid together and I need to request a substitute for Hollow Metal
Doors and Frames, I did not see a Substitute request for to complete and return. I would like a substitute approval to use Curries/Assa Abloy product.
RESPONSE: There are no sole source items in the solicitation. Everything is “or equivalent”. If that product meets the salient characteristics of the one noted for the basis of design, then you can use it. However, if it does not in anyway, I would ask that you use the one suggested for your proposal, then submit a substitution request after award, should you be successful, and our A/E team will consider the substitution.
30. During the pre-solicitation walk-through, it was indicated that TPHO would have jurisdiction if any artifacts were discovered during the course of construction, but that any fees associated with TPHO are not required to be included in the pricing. Can you verify if this is correct?
RESPONSE: Contractor is not responsible for THPO fees.
31. New Electrical Transformer/Service: Please confirm if the cost of the new electrical transformer/service is to be included in the contractor pricing.
RESPONSE: Yes, include this cost in your proposal, in accordance with Spec 01 73 40 (3.2)(A)(1)(a).
32. During the pre-solicitation walk-through, it was stated that Traffic Control would not be the responsibility of the General Contractor, that the NPS would take of this. Please verify if this is correct, or the extent of what is required.
RESPONSE: The intent of the conversation at the pre-proposal meeting related to Traffic Control was to communicate that the contractor would not be responsible for big-picture Traffic Control, like directing traffic around the construction site and into the park. The contractor does have responsibilities regarding Traffic Control. That work is described in Spec 01 50 00 (3.3)(D).
No. 6 on this list is NOT required.
33. During the pre-solicitation walk-through, a question was asked if there were any vehicle weight load restrictions on the roads. Can this be verified?
RESPONSE: There are no load limits.
Attachments
A1.3 Lower Level – Reflected Ceiling Plan A1.9 Main Level – Reflected Ceiling Plan A4.6 Vertical Circulation – Monumental Stair - Details S1.2 Main Floor Framing Plan S2.0 Structural Frame Elevations S5.3 Wood Stud Wall on Foundations
Product Sheet Treads Style
FINISH COLOR
TBD
QTY
X TBD
SIZE PREPARED FOR
PROJECT NAME
ANSI B
REVISION
SCALE SHEET
1:20 1 OF 1
DATE
06.06.21
DRAWN BY
S.M.
PRODUCT TYPE
(BLUFF) STAIR TREAD STYLE 03
APPROVED BY: DATE
DESCRIPTION
DATE
GENERAL NOTES:
- READY MIX CONCRETE WITH A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 5000-6000 PSI UNLESS
OTHERWISE NOTED
- 2"x6" WIRE MESH 7 GA. x 10 GA. HOT DIPPED GALVANIZED STEEL; COMPLY WITH ASTM A 185/A 185M AND
ASTM A82/A 82M, EXCEPT FOR MINIMUM WIRE SIZE
- NON-CORROSIVE THREADED INSERTS WITH 3/8" BOLT WITH FLAT WASHER & LOCK WASHER
- ADA CONSTRAST STRIPE TO BE EXPOSED AGGREGATE CONTRASTING COLOR
-WELD-ON AND BOLT ON CONNECTIONS ARE AVAILABLE
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text
%%USIDE VIEW
AutoCAD SHX Text
%%UFRONT VIEW
AutoCAD SHX Text
%%UISO VIEW
AutoCAD SHX Text
%%UREINFORCING LAYOUT
AutoCAD SHX Text
REINFORCING MESH, SEE NOTES
AutoCAD SHX Text
REINFORCING MESH, SEE NOTES
AutoCAD SHX Text
ADA CONTRASTING STRIPE
AutoCAD SHX Text
ADA CONTRASTING STRIPE
AutoCAD SHX Text
ADA CONTRASTING STRIPE
AutoCAD SHX Text 1/2"R
DC
DC
DC
DC
DCDC
DC
EL
C
C
C
C
DCBA
52'-0" 25'-9" 47'-9" 10'-3"
C3
8'-0" C3
8'-0"
C3
8'-0"
C3
8'-0"
C3
8'-0"
OPEN TO
ABOVE
A3.0
A3.0
A3.1 02
A3.1
135'-9"
A3.6
A3.0
A3.1
A3.2
C3
8'-0"
C3
8'-0"
E
C3
8'-0"
C6
8'-0"C6
8'-0"
C6
8'-0"
C3
8'-0"
C6
8'-0"
C6
8'-0"
C6
8'-0"
FR
A3.3
C5 C5 C5 C5
C5
C8
9'-11 1/8"
A3.6
A4.16
A5.18
A5.18
A5.18
C8
8'-0"
*SEE FLOOR ASSEMBLIES ON A0.5
FOR 'CEILING' FINISH ASSEMBLY
F4
C8
OPEN
ABOVE
GALLERY RAIL TRACK.
GALLERY RAIL TRACK.
A5.24
A5.24
SEE SHEET G1 FOR DRAWING INDEX.
SEE SHEET G2 FOR GENERAL NOTES AND ABBREVIATIONS.
DO NOT SCALE DRAWINGS.
CONTRACTOR / SUBCONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND CONDITIONS BEFORE BEGINNING WORK, AND
SHALL REPORT TO THE CONTRACTING OFFICER ANY ERRORS,
INCONSISTENCIES OR OMISSIONS BEFORE BEGINNING WORK.
SEE GENERAL NOTES AND SPECIFICATIONS.
THIS IS A REFLECTED CEILING PLAN AND IS NOT TO BE
INTENDED TO BE A LIGHTING PLAN. NO WALL MOUNTED
LIGHTING FIXTURES OR OTHER WALL MOUNTED
APPURTENANCES ARE SHOWN. SEE THE LIGHTING PLAN FOR
ALL LIGHTING AND EGRESS SIGNS, SIZE AND TYPES OF
ELECTRICAL FIXTURES ETC. SEE MECHANICAL PLANS FOR ALL
CEILING MOUNTED DIFFUSERS/GRILLES ETC.
CEILING NOTES AND LEGEND
CEILING LEGEND
C32' X 2' ACOUSTICAL PANEL CEILING
C4GYPSUM BOARD CEILING, PAINTED
SECURITY CAMERA
EXIT SIGN
HORN AND STROBE ALARM
WALL MOUNTED EXTERIOR LIGHT
LINEAR PENDANT LIGHTDC
CEILING DIFFUSER RETURN
CEILING DIFFUSER SUPPLY
CEILING EXHAUST
DIGITAL LIGHTING CONTROLLER -
DIMMER
LINEAR SUPPLY VENT
6" LED DOWNLIGHT
6" LED DOWNLIGHT WITH
EMERGENCY BATTERY
C5EXPOSED STRUCTURE
MOTION SENSORS
CEILING WIRELESS ACCESS POINT
(2-POINT)
4' LED STRIP LIGHT, LENSED
WALL MOUNTED EXTERIOR LIGHT
WITH EMERGENCY BATTERY
4' LED STRIP LIGHT, LENSED
WITH EMERGENCY BATTERY
C8GYPSUM BOARD CEILING, PAINTED,
FIRE RATE
C6GYPSUM SUSPENDED, PAINTED
HAT CHANNEL LAYOUT FOR
SUSPENDED GYPSUM CEILING
CEILING ACCESS PANEL
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
ajc ajc
A1.3
LOWER LEVEL -
REFLECTED CEILING
PLANajc
SEPT. 21, 2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
101 254
SCALEA1.3 3/16" = 1'-0"
01 LOWER LEVEL - REFLECTED CEILING PLAN
SCALE OF FEET
4 0 4 128
SCALE OF FEET
MARK DATE DESCRIPTION
2 10/30/2023 ADDENDUM
1 GALLERY RAIL TRACK.
2 CEILING ACCESS PANEL. PANEL FINISH
AT PUBLIC SPACE IS TO MATCH THE
ADJACENT CEILING FINISH AND COLOR.
KEYED NOTES:
dijana Text Box
RATED
J J JJ
P P
C
C
C
C
J J J J J
J J J J
J
DCBA
52'-0" 25'-9" 47'-9" 10'-3"
A3.0
A3.0
A3.1
A3.1
A3.6
A3.0
C1
11'-9"
A3.1
A3.2
OPEN TO ABOVE
C6
10'-0"
E
C6
10'-0"
C6
10'-0"
C1
11'-9"
C1
11'-9"
C9
10'-0"
A5.7
A5.7
C1
11'-9"
C6
10'-0"
A5.19
A3.3
135'-9"
C5
C5
C5
C7
11'-9"
A3.6
A5.24
A5.24
A5.24
A5.8
A5.8
A5.7
A5.10
A5.10
C2
9'-0"
C2
9'-0"
A5.16
R3
*SEE ROOF ASSEMBLIES ON A0.5
FOR 'CEILING' FINISH
A5.10
C6
12'-0"
E5
C6
12'-0"
C6
12'-0"
METAL PANEL SEAM. TYP.
5'-2 3/4
4'-9
/4
2'-11 7/8"
3'-2 3/8
2'-6
/2
2'-9 3/8"
3'-7 5/8" 5'-6 3/4"
4'-9 1/8"
METAL PANEL SEAM. TYP.
5' -2
/2
4'-1 0 3
/8
4'-3 5/8
/8
3' -0
/8
" 2'-1 1 5/8
2 TYP.
2TYP.
EQ EQ
CL
EQ EQ
CL
EQ EQ
CL
CLCLCL
CL
EQ EQ
CL
EQ EQ
CL
10"
CL
CL
SEE SHEET G1 FOR DRAWING INDEX.
SEE SHEET G2 FOR GENERAL NOTES AND ABBREVIATIONS.
DO NOT SCALE DRAWINGS.
CONTRACTOR / SUBCONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND CONDITIONS BEFORE BEGINNING WORK, AND
SHALL REPORT TO THE CONTRACTING OFFICER ANY ERRORS,
INCONSISTENCIES OR OMISSIONS BEFORE BEGINNING WORK.
SEE GENERAL NOTES AND SPECIFICATIONS.
THIS IS A REFLECTED CEILING PLAN AND IS NOT TO BE
INTENDED TO BE A LIGHTING PLAN. NO WALL MOUNTED
LIGHTING FIXTURES OR OTHER WALL MOUNTED
APPURTENANCES ARE SHOWN. SEE THE LIGHTING PLAN FOR
ALL LIGHTING AND EGRESS SIGNS, SIZE AND TYPES OF
ELECTRICAL FIXTURES ETC. SEE MECHANICAL PLANS FOR ALL
CEILING MOUNTED DIFFUSERS/GRILLES ETC.
CEILING NOTES AND LEGEND
CEILING LEGEND
WOOD TONGUE AND GROOVE CEILING,
STAINED
METAL PANEL CEILING
C5EXPOSED STRUCTURE
C1
C2
SECURITY CAMERA
EXIT SIGN
HORN AND STROBE ALARM
WALL MOUNTED EXTERIOR LIGHT
LINEAR PENDANT LIGHTDC
CEILING DIFFUSER RETURN
CEILING DIFFUSER SUPPLY
CEILING EXHAUST
DIGITAL LIGHTING CONTROLLER -
DIMMER
LINEAR SUPPLY VENT
6" LED DOWNLIGHT
6" LED DOWNLIGHT WITH
EMERGENCY BATTERY
MOTION SENSORS
CEILING WIRELESS ACCESS POINT
(2-POINT)
4' LED STRIP LIGHT, LENSED
WALL MOUNTED EXTERIOR LIGHT
WITH EMERGENCY BATTERY
4' LED STRIP LIGHT, LENSED
C7EXTERIOR WOOD TONGUE AND
GROOVE CEILING, STAINED
C9EXTERIOR METAL PANEL CEILING
C6GYPSUM BOARD SUSPENDED, PAINTED
HAT CHANNEL LAYOUT FOR
SUSPENDED GYPSUM CEILING
CEILING ACCESS PANEL
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
ajc ajc
A1.9
MAIN LEVEL -
REFLECTED CEILING
PLANajc
SEPT. 21, 2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
107 254
SCALEA1.9 3/16" = 1'-0"
01 MAIN LEVEL - REFLECTED CEILING PLAN
SCALE OF FEET
4 0 4 128
SCALE OF FEET
1 GLULAM BEAM, STAINED, SEE
STRUCTURAL DRAWINGS.
2 1X12 INCH CONTINUOUS SOFFIT VENT.
3 CEILING ACCESS PANEL. PANEL FINISH
AT PUBLIC SPACE IS TO MATCH THE
ADJACENT CEILING FINISH AND COLOR.
KEYED NOTES:
MARK DATE DESCRIPTION
1 10/25/2023 ADDENDUM
2 10/30/2023 ADDENDUM
1"
1/2" REVEAL
1 1/2" DIA. STEEL HANDRAIL.
OIL RUBBED BRONZE.
STEEL CHANNEL STRINGER.
SEE STRUCTURAL DRAWINGS.
6" CHANNEL STUD @ 16" O.C.
5/8" TYPE "X" GYP. BD., PAINT.
PREFINISHED 'Z' REVEAL TRIM.
12 GA. PREFABRICATED METAL
PANEL. PREFINISHED.
CAST-IN-PLACE CONCRETE
LANDING.
PRECAST CONCRETE TREADS
& RISERS.
STEEL CHANNEL STRINGER.
SEE STRUCTURAL DRAWINGS.
6" CHANNEL STUD @ 16" O.C.
5/8" GYP. BD. PAINTED.
1 1/2" DIA. STEEL HANDRAIL.
OIL RUBBED BRONZE.
12 GA. PREFABRICATED METAL
PANEL. PREFINISHED.
CAST-IN-PLACE CONCRETE
LANDING.
2"
1 1/8"
11"
/2
2 1/4"
1/2" R
LOWER LEVEL
88'-6"
12 GA. PREFABRICATED METAL
PANEL. PREFINISHED.
1 1/2" DIA. STEEL HANDRAIL.
OIL RUBBED BRONZE.
PRECAST CONCRETE TREADS
& RISERS.
4" CAST-IN-PLACE CONCRETE
SLAB, SEE STRUCTURAL
DRAWINGS.
2"
SEE STRUCTURAL DRAWINGS
2 1/4"
1/2" R
2"
1 1/8"
11"
MAIN LEVEL
100'-0"
12 GA. PREFABRICATED METAL
PANEL. PREFINISHED.
1 1/2" DIA. STEEL HANDRAIL.
OIL RUBBED BRONZE.
1 1/2" CAST-IN-PLACE
CONCRETE SLAB, SEE
STRUCTURAL DRAWINGS.
FLOOR SHEATHING, SEE
STRUCTURAL DRAWINGS FOR
TYPE AND FASTENING.
WOOD JOIST, SEE
STRUCTURAL DRAWINGS FOR
SIZE AND SPACING.
12 GA. SUSPENSION WIRE @ 4'
O.C. OR AS REQ. BY CODE.
5/8" TYPE "X" GYP. BD., PAINT.
5/8" TYPE "X" GYP. BD., PAINT.
PREFINISHED 'Z' REVEAL TRIM.
SUSPENDED GYP. BD. CEILING
SYSTEM. SEE RCP.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
ajc ajc
A4.6
VERTICAL CIRCULATION
- MONUMENTAL STAIR -
DETAILSajc
SEPT. 21, 2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
129 254
SCALEA4.6 1 1/2" = 1'-0"
01 DETAIL SECTION - MONUMENTAL STAIR GUARDRAIL TYP.
SCALEA4.6 1 1/2" = 1'-0"
02 DETAIL SECTION - MONUMENTAL STAIR @LANDING
SCALEA4.6 1 1/2" = 1'-0"
DETAIL SECTION - MONUMENTAL STAIR RUN @ LOWER
LEVEL
SCALEA4.6 1 1/2" = 1'-0"
4 Detail 20
MARK DATE DESCRIPTION
2 10/30/2023 ADDENDUM
WOOD WALL LEGEND
1 A 2 B
SHEATHING. SEE WOOD STUD SHEAR WALL SHEATHING SCHEDULE
HOLDOWN/STRAP. SEE SHEAR WALL STRAP/HOLDOWN SCHEDULE
OPENING STRAP. SEE OPENING STRAP SCHEDULE
END POST MEMBER. SEE END POST MEMBER SCHEDULE
HOLDOWN/STRAP LOCATION TYP
EXTENTS OF SHEAR WALL
WOOD HEADER
CALLOUT: ____-K#-T#
SEE DETAIL
NUMBER INDICATES QUANTITY OF TRIM STUDS EA. SIDE OF
OPENING. DEPTH TO MATCH WALL THICKNESS
NUMBER INDICATES QUANTITY OF KING STUDS EA. SIDE OF
OPENING. DEPTH TO MATCH WALL THICKNESS
INDICATES WOOD HEADER TO BE USED
/S5.10B2
A B C D
3-2x10-K1-T2
6.3/4"x27" GLB
5.
1/
8" x2
7" G
LB
5.1/8"x27" GLB
W10 x45
5.1/2"x12" GLB
HSS10x6x5/16 6.3/4"x21" GLB 6.3/4"x21" GLB 6.3/4"x21" GLB
6.3/4"x16.1/2" GLB
2x12 @ 12" O.C.
TJI BLOCKING AT
STAIR LOCATION
ABOVE
2- 2x
8- K1
-T
3-2x10-K1-T2
3-2x10-K1-T2 3-2x10-K1-T2
135' - 9"
52' - 0" 25' - 9" 47' - 9" 10' - 3"
0"
1'
S2.0
C3
3-2x10-K1-T2 3-2x10-K1-T2
3-2x10-K1-T2
3-2x10-K1-T2
3-2x10-K1-T2
CL-1
W D
-5
COLUMN ABV
6.3/4"x25.1/2" GLB 6.3/4"x13.1/2" GLB
COLUMN ABV
B2
S5.4
B1
S5.4
A1
S5.8
A3
S5.4
B2
S5.4
B1
S5.4
B2
S5.4
A3
S5.4
B2
S5.4
A1
S5.4
C4
S5.5
TYP
C3
S5.5
C3
S5.5
TYP
TYP
C2
S5.5
4-2x6 3-2x6
HATCHED AREA INDICATES 4"
NORMAL WEIGHT CONCRETE
TOPPING SLAB W/ #4 @ 8" O.C.
EACH WAY
E
S4.1
C3
5.1/2"x12" GLB2-2x10-K1-T2
4-2x6
6x6 4-2x6 4-
2x
3- 2x
4- 2x
4-
2x
4- 2x
6x
2-2x10-K1-T2 4-
2x 62-2x6
3-2x6 3- 2x
S2.0
A4
S2.0
A3
5.
1/
2" x1
2" G
LB
6.
x7 .5
GLC
6x6
6x6 6x6
6x6
DOUBLE JOIST,
ALIGN W/ COLUMN
C1
S5.6
B1
S5.5
B2
S5.5
6.
x6
GLC
3-2x6
5.1/2"x1 2" G
LB-K3-T2
S2.0
C1
3- 2x
6.75x6
GLC
TYP
C1
S5.5
6.
x9
GLC
C2
S5.5
B3
S5.1
SC-2
SIM
A3
S5.6 TYP @ DOUBLE
WYTHE WALL
TYP
TYP
TYP
S5.5
B3
S5.5
B3
SIM
SIM
SC-2
C2
S5.4
C3
S5.4
C4
S5.4
W x5
W D
-2
B4
S5.9
SIM
P T
P T
PROVIDE
SIMPSON CC66
A3
S5.5
A2
S5.6A1
S5.6
TYP
B2
S5.7
B1
S5.7
C4
S5.8
COL
ABV
COL ABV
COL ABV
DOUBLE JOIST,
ALIGN WITH
BEAM
SOLID BLOCKING
SOLID BLOCKING
SOLID BLOCKING
A3
S5.6
C2
S5.8
C4
S5.2
C3
S5.11
SIM
5.
1/
2" x1
2" G
LB
5.1/2"x12" GLB
W10x19
5.
1/
2" x1
2" G
LB
2-2x12
S2.0
A1
5.
1/
2" x1
2" G
LB
5.
1/
2" x1
2" G
LB
A1
S5.7
A2
S6.2
4-2x10
B4
S5.9
SIM
DOUBLE JOIST
9' - 4" 9' - 4" 9' - 4"
C2
S5.9
C2
S5.9
SIM
A2
S5.7
SOLID BLOCKING
SOLID BLOCKING
SIM
A3
S5.11
3- 2x
[-4
[-4"]
4" CONC SLAB W/
#4 @ 10" O.C. E.W.
WOOD FLOOR FRAMING PLAN NOTES
1. PROVIDE 1.1/2" GYPCRETE TOPPING SLAB W/ 4x4-
W4.0/W4.0 WWF AT FLOOR, UNO.
2. SEE S5.10 FOR WOOD DIAPHRAGM SCHEDULE.
3. ALLOWABLE PENETRATIONS THROUGH TYPICAL
SOLID SAWN WOOD STRUCTURAL MEMEBERS SHALL
BE PER DETAIL ANYTHING OUTSIDE THE
LIMITS OF THAT DETAIL SHALL BE SUPMITTED FOR
APPROVAL TO THE ENGINEER.
4. FLOOR JOISTS TO BE 11.7/8" TJI 360 @ 16" O.C.
U.N.O.
/S5.6B4
JEROD G.
JOHNSON
No. 19480
MO N T A N A
L
IC
E N
S E
D
PROF E S S I ONA L
E N
G I
N E
E R
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
09/21/2023
NT/RE+A
JTA/RE+A
S1.2
MAIN FLOOR FRAMING
PLAN
JTA/RE+A
09/21/2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
REAVELEY
ENGINEERS
515 E 100 S
SLC, UT 84102
SCALE:S1.2 1/8" = 1'-0"
A1 MAIN FLOOR FRAMING PLAN
MARK DATE DESCRIPTION
1 10/30/2023 ADDENDUM
MAIN LEVEL
100' - 0"
ROOF
114' - 0"
LOWER LEVEL
88' - 6"
S6.6
B2
4 3
W x1
W x1
W10x100
S5.2
C4
SEE PLAN
S6.6
B2
S6.6
B2
S5.3
C2
OPP
MOMENT FRAME ELEVATION
NOTES AND LEGEND
1. ALL MOMENT FRAME HORIZONTAL FRAMING
MEMBERS (BEAMS) SHALL BE ASTM A992 (Fy = 50KSI)
STEEL U.N.O.
2. ALL MOMENT FRAME VERTICAL FRAMING
MEMBERS (COLUMNS) SHALL BE ASTM A992
(Fy = 50KSI) STEEL U.N.O.
3. SEE PLANS FOR ADDITIONAL MOMENT FRAME
LOCATIONS.
4. VERIFY ALL DATUM ELEVATIONS W/
ARCHITECTURAL DRAWINGS.
MAIN LEVEL
100' - 0"
ROOF
114' - 0"
A
H S
S x4 x5
/1
H S
S x4 x5
/1
H S
S x4 x5
/1
H S
S x4 x5
/1
H S
S x4 x5
/1
H S
S x4 x5
/1
HSS10x4x5/16 (LSH) HSS10x4x5/16 (LSH)
HSS10x4x5/16 (LSH) HSS10x4x5/16 (LSH)HSS10x4x5/16 (LSH)HSS10x4x5/16 (LSH)HSS10x4x5/16 (LSH)
S5.4
A2
SIM
C3
S5.7
TYP
S5.4
A2
TYP
WOOD STUD WALL
C2
S5.7
SIM
C2
S5.7
TYP
TYPC4
S5.7
H S
S 4x
4x 1/
H S
S 4x
4x 1/
MAIN LEVEL
100' - 0"
D E
H S
S x6 x1
/2
H S
S x6 x1
/2 HSS10x6x1/2 (LSH)
HSS10x6x1/2 (LSH)HSS10x6x1/2 (LSH) HSS10x6x1/2 (LSH)
H S
S x6 x1
/2
H S
S x6 x1
/2
WOOD STUD WALL
C2
S5.7
TYP
TYP
S5.4
A2 SIM
S5.4
A2
TYP
C4
S5.7
C3
S5.7
H S
S 4x
4x 1/
MAIN LEVEL
100' - 0"
ROOF
114' - 0"
LOWER LEVEL
88' - 6"
CANOPY
123' - 6 5/8"
HSS10x4x5/16 (LSH)
H S
S x4 x5
/1
H S
S x4 x5
/1
S5.4
A2
WOOD STUD WALL
1/4
2x NAILER W/ 1/2"
STUDS @ 24" O.C.,
STAGGERED
C2
S5.7
C3
S5.7
SEE PLAN
H S
S x4 x5
/1
H S
S x4 x5
/1
H S
S 4x
4x 1/
C4
S5.7
SBP-2
SIM C4
S5.7
SIM
C3
S5.7
C2
S5.7
S5.4
A2
HSS10x4x5/16 (LSH)
SIM
S5.4
A2
SIM
S5.8
B5
MAIN LEVEL
100' - 0"
ROOF
114' - 0"
WOOD BEAM WOOD BEAM WOOD BEAM
6x6 6x6
W O
O D
C O
LU
M
N
M O
M E
N T
F R
A M
E C
O
LU
M N
S5.10
B3
TYP
S5.9
C3
WOOD BEAM
6x6 6x6
W O
O D
C O
LU
M
N
W O
O D
C O
LU
M
N
W O
O D
C O
LU
M
N
6x6
S5.10
A4
TYP
S5.3
B4 TYP
JEROD G.
JOHNSON
No. 19480
MO N T A N A
L
IC
E N
S E
D
PROF E S S I ONA L
E N
G I
N E
E R
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
09/21/2023
NT/RE+A
JTA/RE+A
S2.0
STRUCTURAL FRAME
ELEVATIONS
JTA/RE+A
09/21/2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
REAVELEY
ENGINEERS
515 E 100 S
SLC, UT 84102
SCALE:S2.0 1/4" = 1'-0"
C3 MOMENT FRAME ELEVATION
SCALE:S2.0 1/4" = 1'-0"
A4 WIND FRAME #1
SCALE:S2.0 1/4" = 1'-0"
A3 WIND FRAME #2
SCALE:S2.0 1/4" = 1'-0"
C1 WIND FRAME #3
SCALE:S2.0 1/4" = 1'-0"
A1 WIND FRAME #4
MARK DATE DESCRIPTION
1 10/30/2023 ADDENDUM
CONC SLAB ON GRADE
ROUGHEN SURFACE
TO 1/4" AMPLITUDE
#4 SLAB DOWELS
@ 24" O.C.
#4 x CONT HORIZ
8"
32" t
M
IN
2t O
R
CONCRETE WALL
CONC SLAB ON
GRADE
TYP
2" MIN
Detail Name
CONC FOOTING
HOOK CONTINUOUS
REBAR
TURNED DOWN
FOOTING
CONC WALL
1'
8"
1'
Detail Name
CONC SLAB ON GRADE
BLOCKOUT IN SLAB.
POUR SOLID AFTER
COLUMN HAS BEEN
INSTALLED
STEEL COLUMN
CONC FOOTING
16"x16"x1.1/2" BASE
PLATE W/ 4-3/4"
SIMPSON PAB6H x 9-1/2"
EMBED
1/4
A
10"
TYP
2"
T Y
P
2"
PLAN VIEW A
1/4
WDFTNG25
CONCRETE FDTN WALL
HORIZ CONC FDTN
WALL REINF
CONT REINF TOP &
BOTTOM
EXTERIOR SLAB OR
GRADE.
CONCRETE FOOTING
VERT CONC FDTN
WALL REINF
CONCRETE SLAB ON
GRADE
CURTAIN WALL
SYSTEM, SEE ARCH
ROUGHEN JOINT TO
1/4" AMPLITUDE
8" M
IN
Detail Name
WALL SHEATHING
WOOD COLUMN
HDU14-SDS2.5 W/
SB1x30 ANCHOR BOLT
CONC FOUNDATION WALL
SITE RETAINING WALL.
SEE DETAIL
5'-0" x 12" x CONT
FOOTING W/ 5-#5 LONG.
& #5 @ 14" O.C.
TRANS.TOP & BOTTOM
/S6.2A1
CONC SLAB ON GRADE
CONC SEAT WALL
1' - 6" 1' - 6" 1'
#5 @ 8" O.C. E.F. HORZ &
#5 @ 14" O.C. E.F. VERT
#5 @ 8" O.C. HORZ & #5
@ 14" O.C. VERT
TYP
3"
JEROD G.
JOHNSON
No. 19480
MO N T A N A
L
IC
E N
S E
D
PROF E S S I ONA L
E N
G I
N E
E R
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.A/E FIRM TITLE OF DRAWING
OF
PMIS/PKG NO.
SHEET
DRAWING NO.
179600
241430
LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT
09/21/2023
NT/RE+A
JTA/RE+A
S5.3
WOOD STUD WALL ON
FOUNDATIONS
JTA/RE+A
09/21/2023
AJC ARCHITECTS
SALT LAKE CITY,
UT 84104
REAVELEY
ENGINEERS
515 E 100 S
SLC, UT 84102
NO SCALES5.3
C4 CONCRETE SLAB ON GRADE AT FOUNDATION WALL
NO SCALES5.3
C3 TURN DOWN FOOTING DETAIL
NO SCALES5.3
C2 STEEL COLUMN BASE AT FOOTING
NO SCALES5.3
C1
TYPICAL CURTAINWALL AT CONCRETE FOUNDATION
WALL
NO SCALES5.3
B4 WOOD COLUMN TO FOUNDATION WALL
MARK DATE DESCRIPTION
1 10/30/2023 ADDENDUM
NO SCALES5.3
B1 BID OPTION SEAT WALL
File details come from the government source that posted it. Updated .