B09_Amd1_Tribal_Monitor_Fieldnotes_Daily_Rpt_Form_0001.docx

DOCX document 37 KB Posted

Attached to
YOSE 228193, 228205, 228214, Tuolumne Meadows Elec
Solicitation number
140P2022R0110
Issued by

About this file

This document is a daily field notes form and report for cultural monitoring of a Yosemite National Park electric distribution replacement project. The form collects information on monitor name, date, billable hours, travel time, construction monitoring location, cultural monitoring activities including site visits, surveys, grading, and more. It documents resource types observed such as archaeological artifacts, structures, plants, wildlife, and areas of cultural significance. The form also records threats or disturbances to resources including effect size and safety impact. Recommendations include further study, restoration, monitoring, and data recovery. Photos with descriptions and map drawings are included to indicate resources, impacts, and notes.

The related federal contract opportunity is for replacement of electric distribution lines at three locations within Yosemite National Park: Ranger Camp West, Ranger Camp East, and Bug Camp. The solicitation is issued by the National Park Service National Office within the Department of the Interior.

View the file

Other files

File Type Posted
B09_Question_Tracker_140P2022R0110_Amd3_-YOSE_Electrical__0003.pdf PDF
Sol_140P2022R0110_Amd_0003.pdf PDF
Sol_140P2022R0110_Amd_0002.pdf PDF
B09_Question_Tracker_140P2022R0110_Amd2-YOSE_Electrical__0002.pdf PDF
B09_Question_Tracker_140P2022R0110_-YOSE_Electrical__0001.pdf PDF
B11_Site_Visit_Minutes_0001.docx DOCX document
B09_Amd1_Exp_YOSE_TM_Elec_Dist_0001.docx DOCX document
B09_Amd1_GenRefs_0001.doc DOC document
B09_Amd1_Yosemite_Camps_E115_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E212_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E118_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E124_Mark-up_0001.pdf PDF
B09_Amd_1_Site_Visit_Tri_Fold_YOSE_TM_Elec_Distribution_Replacement_0001.docx DOCX document
B09_Amd1_Yosemite_Camps_E102_Mark-up_0001.pdf PDF
B09_Amd1_TM_Electric_Pre-Bid_Sign-In_8_8_2022_0001.pdf PDF
Sol_140P2022R0110_Amd_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E123_Mark-up_0001.pdf PDF
B09_Amd1_32_01_18_Asphalt_Patch_Specs_0001.docx DOCX document
B08_Attach_2_Yosemite_Camps_062322_22x34_reduced.pdf PDF
B08_Attach_4_Vaccination_Cert_Notification.pdf PDF
B08_Attach_5_Certification_of_Vaccination_Form_(3).pdf PDF
B08_Attach_6_Past_Performance_Questionnaire.docx DOCX document
B08_Attach_7_LmtOnSubcon.xlsx XLSX spreadsheet
Sol_140P2022R0110.pdf PDF
B08_Attach_1b_Asb_and_Lead_Rpt_Ranger.pdf PDF
B08_Attach_1c_SoCa_Edison_Inv_Rpt.pdf PDF
B08_Solicit_140P2022R0110_package.pdf PDF
B08_Attach_3__CA20220018_WD.pdf PDF
B08_Attach_1a_C99-21_Asb_and_Lead_Rpt_Bug.pdf PDF
B08_Attach_1_Specifications.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YOSEMITE CULTURAL MONITORING

DAILY FIELD NOTES

PROJECT

LOCATION

MONITOR NAME

DATE

BILLABLE HOURS
Filed/Office Hours Worked
Travel (as applicable)

· Complete this form in the field each day, take a photo of the completed form and submit daily field notes with associated maps and photos on a regular basis.

· This information is provided per the terms of the cultural resource management agreement/contract to identify the resources, impacts, and protection measures.

· It will be shared with other tribal partners per the terms of the agreement/contract.

Construction Monitoring

Location (Describe specific location within project area)

Cultural Monitoring Activity (check all that apply)

Site Visit
Meeting
Survey
Grading / Site Prep
Construction Staging
Tree Removal
Subsurface Testing
Trenching
Post Hole / Auger / Boring
Trail Construction
Paving / Surfacing
Research / Excavation
Restoration
Burning

Other

Resource Type(s)

Archeological Resource(s) (check all that apply)

Artifact Scatter
Bedrock Milling Feat.
Burial
Depression/pit
Cache
Hearth
Lithic Scatter
Midden
Petroglyph/pictograph
Quarry
Rock feat.
Rock shelter
Blaze/tree carving
Bridge
Bldg./

Struct./ Hist. Struct.

Cemetery/Grave
Depression
Ditch
Earthworks
Foundation/ Structure Pad
Privy/

Dump/ Trash Scatter Quarry

Roads/Trails/RR grades
Rock Alignment
Rock Feature
Wall/ Fence
Undetermined
Water conveyance systems

Culturally Significant Resource(s)

Water Resource
Traditional Use Plant(s)
Wildlife/Wildlife Habitat
Geographic Feature
Religious and Culturally Significant Site

Other

Threat/Disturbance Type
Time Frame
Effect on Resource
Area (m2)
Effect on Safety

Negligible Partial Loss: Repairable Partial Loss: Irretrievable Total Loss: Irretrievable

No Threat Potential Severe Undetermined

Negligible

Partial Loss: Irretrievable Total Loss: Irretrievable

No Threat Potential Severe Undetermined

Negligible

Partial Loss: Irretrievable Total Loss: Irretrievable

No Threat Potential Severe Undetermined

Recommendations (check all that apply)

Study Rec.:
Site Evaluation
Collections Study
Condition Assessment
Confirm Coordinates
Effects Assessment
Literature Search
Map Site
Reestablish Location
Rerecord
Research
Special Research
Tribal Review
Other
Treatment Prop.:
No Proposals
Restoration
Stabilization
Monitor
Hazard Fuel Redux
Protection
Data Recovery
NRHP Evaluation
Other

Photos

Photo Number
Description
Direction Facing (NSEW)

Map Draw on the construction drawings to indicate the work location, resources, survey coverage, impacts, and any other notes. Take a photo and include it with the photo submittal.

Map Photo Number
Description

Other Notes and Observations

File details come from the government source that posted it. Updated .