This document provides details for a federal solicitation requesting proposals for electrical distribution replacement projects at three locations within Yosemite National Park. The solicitation seeks to replace severely non-compliant and corroded secondary electrical services and equipment across 56 structures combined at Ranger Camp West, Ranger Camp East, and Bug Camp in Tuolumne Meadows. The work includes replacement of underground and above-ground lines, panels, and some interior and exterior electrical work. Proposals are due by August 22nd, 2022. The contract is valued at an estimated $1,482 in liquidated damages per calendar day for delays beyond the 957 day period of performance from notice to proceed. The National Park Service is the contracting agency. Evaluation criteria prioritize technical approach, schedule, project experience, management approach, and past performance.

View the file

Other files

File Type Posted
B09_Question_Tracker_140P2022R0110_Amd3_-YOSE_Electrical__0003.pdf PDF
Sol_140P2022R0110_Amd_0003.pdf PDF
Sol_140P2022R0110_Amd_0002.pdf PDF
B09_Question_Tracker_140P2022R0110_Amd2-YOSE_Electrical__0002.pdf PDF
B09_Question_Tracker_140P2022R0110_-YOSE_Electrical__0001.pdf PDF
B11_Site_Visit_Minutes_0001.docx DOCX document
B09_Amd1_Exp_YOSE_TM_Elec_Dist_0001.docx DOCX document
B09_Amd1_GenRefs_0001.doc DOC document
B09_Amd1_Tribal_Monitor_Fieldnotes_Daily_Rpt_Form_0001.docx DOCX document
B09_Amd1_Yosemite_Camps_E115_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E212_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E118_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E124_Mark-up_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E102_Mark-up_0001.pdf PDF
B09_Amd1_TM_Electric_Pre-Bid_Sign-In_8_8_2022_0001.pdf PDF
Sol_140P2022R0110_Amd_0001.pdf PDF
B09_Amd1_Yosemite_Camps_E123_Mark-up_0001.pdf PDF
B09_Amd1_32_01_18_Asphalt_Patch_Specs_0001.docx DOCX document
B08_Attach_2_Yosemite_Camps_062322_22x34_reduced.pdf PDF
B08_Attach_4_Vaccination_Cert_Notification.pdf PDF
B08_Attach_5_Certification_of_Vaccination_Form_(3).pdf PDF
B08_Attach_6_Past_Performance_Questionnaire.docx DOCX document
B08_Attach_7_LmtOnSubcon.xlsx XLSX spreadsheet
Sol_140P2022R0110.pdf PDF
B08_Attach_1b_Asb_and_Lead_Rpt_Ranger.pdf PDF
B08_Attach_1c_SoCa_Edison_Inv_Rpt.pdf PDF
B08_Solicit_140P2022R0110_package.pdf PDF
B08_Attach_3__CA20220018_WD.pdf PDF
B08_Attach_1a_C99-21_Asb_and_Lead_Rpt_Bug.pdf PDF
B08_Attach_1_Specifications.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AFTER PREPROPOSAL CONFERENCE

· Direct all questions to both Natasha DiPietro, Contracting Officer, and Daena Mulleitner-Newman, Contracting Specialist. Please submit all questions not later than 8/15/22.

· Questions directed to any other Government team member will be redirected to Ms. DiPietro or Ms. Mulleitner-Newman. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation

· Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov Award of a Contract:

Best Value Trade Alternate proposals shall not be accepted or evaluated.

The government intends to evaluate proposals and award a contract without discussions with offerors, therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.

Project Location:

Yosemite National Park, Tuolumne Meadows Stables in Ranger Camp Park entry is reservation only between 6:00am-4:00pm, Contractors will be allowed entry by showing the A Admin Vehicle Permit for the pre-bid site visit There is very little to no cell service at the site; Contractor questions regarding directions should be sent to the CO no later than August 5, 2022

Any verbal responses to questions asked do not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Preproposal Conference/Site Visit meeting notes, attendance sheet, questions, and answers will be issued by a formal written amendment to the solicitation for information only

Tuolumne Meadows Electric Distribution Replacement Ranger Camp West, Ranger Camp East, & Bug Camp

YOSE 228193, 228205, 228214

Preproposal Conference/ Site Visit - Monday, August 8, 2022, 11:00 PDT

Request for Proposals No. 140P2022R0110 CO: Natasha DiPietro Natasha_dipietro@nps.gov CS: Daena Mulleitner-Newman daena_mulleitner-newman@contractor.nps.gov

Clauses 52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 957 days after NTP.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,482.00 for each calendar day of delay until the work is completed or accepted.

Special Clause 2 – Key Personnel: Project Manager, Job-site Superintendent, Quality Control Manager, Project Safety Officer. Prospective contractor shall not be allowed to change key personnel during the first 90 days of performance.

DIAR 1452.228-70 – Liability Insurance: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

Construction $100,000 each person $500,000 each occurrence $1,000,000 property damage

52.225-9 Buy American – Construction Materials Under Trade Agreements – Refer to Clause for specific requirements

Submission and Evaluation Section L Instructions for the Submission of Offers

· Proposals Due August 22, 14:00 MT

· Volume I – Non-Price Proposal

· Volume II - Business and Price Proposal

· Alternate proposals SHALL NOT be considered

· Government may award without discussion

· Send electronic proposals to: CS_DSC_Proposal_Submission@nps.gov

· Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation) Evaluation Factors:

The evaluation factors are correlated to the proposal preparation instructions.

Factors 1- 5 are listed in descending order of importance.

Overall: All evaluation factors, other than price, when combined, are approximately equally important to price.

FACTOR 1 – TECHNICAL APPROACH

FACTOR 2 – SCHEDULE

FACTOR 3 – PROJECT EXPERIENCE

FACTOR 4 – MANAGEMENT APPROACH

FACTOR 5 – PAST PERFORMANCE

Refer to solicitation for specific information on submission requirements and evaluation

Overview of project PMIS 228193 Ranger Camp West: This project will replace a severely non-code compliant, corroded, combination direct burial/surface mounted, electrical secondary service that provides electricity to 18-employee cabins, an employee restroom/laundry/shower, a Range Office, and a Search and Rescue Office in Ranger Camp West, in the Tuolumne Meadows service area of Yosemite, with a new National Electric Code (NEC) compliant system. This project will replace these secondary line and panels. Some interior and exterior electrical will be made to Tent Cabins and other camp facilities as well, such as a Barn, Search and Rescue/Ranger Station, and Historic Hard Roofed buildings.

PMIS 228205 Ranger Camp East: This project will replace a severely non-code compliant, corroded, combination direct burial/surface mounted, electrical secondary service that provides electricity to 20-employee cabins, an employee restroom/laundry/shower, in Ranger Camp East, in the Tuolumne Meadows service area of Yosemite, with a new National Electric Code (NEC) compliant system. This project will replace dangerous secondary line and panels with a new National Electric Code (NEC)compliant system. Some interior and exterior electrical will be made to Tent Cabins and Historic Hard Roofed buildings.

PMIS 228214 Bug Camp: This project will replace a severely non-code compliant, corroded, combination direct burial/surface mounted, electrical secondary service that provides electricity to 18-employee cabins, an employee restroom/laundry/shower, in Bug Camp in the Tuolumne Meadows service area of Yosemite, with a new National Electric Code (NEC)compliant system. This project will replace dangerous secondary line and panels with a new National Electric Code (NEC) compliant system. Some interior and exterior electrical will be made to Tent Cabins and Historic Hard Roofed buildings.