DRAFT_Att2c_GRCA_190083_Final_CD_Specifications_Vol_3_Division_26_-_46_4.pdf
PDF 14 MB Posted
- Solicitation number
- 140P2022R0100
About this file
This file is related to a federal contract solicitation for improving potable water supply infrastructure at Grand Canyon National Park. The solicitation number is 140P2022R0100 and seeks to construct a transcanyon water distribution pipeline. The Department of the Interior National Park Service National Office is the contracting agency. Offerors should provide construction services to build the pipeline connecting the inner canyon and south rim areas of the park in order to upgrade the potable water system. The response deadline and award date are not specified in the file.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAND CANYON NATIONAL PARK
GRAND CANYON, ARIZONA
REPLACE TRANSCAYON WATERLINE AND
IMPROVE POTABLE WATER SYSTEMS
GRCA 190083
VOLUME 3
DIVISION 26 - 46 SPECIFICATIONS
100% Final CDs Submittal
April 22, 2022
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
TABLE OF CONTENTS
DIVISION 26 — ELECTRICAL
26 05 00 - ELECTRICAL - BASIC REQUIREMENTS
26 05 13 - MEDIUM VOLTAGE CABLE
26 05 13-A - CS-2470 - Fault Indicators, Automatic Reset 26 05 13-B - CS-2903-2936 - 12kv Separable Molded Assemblies 26 05 13-C - CS-2894 - Hotstick-Operated System 26 05 13-D - CS-2530 - Splice, 12kV and 21kV, #1-0 and #4-0 Straight 26 05 13-E - CS-5360-5361 - Single Circuit Supported From Flat Tangent
26 05 19 - WIRE AND CABLE - 600 VOLT AND BELOW
26 05 26 - GROUNDING AND BONDING
26 05 33 - RACEWAYS AND BOXES
26 05 36 - CABLE TRAY
26 05 43 - ELECTRICAL - EXTERIOR UNDERGROUND
26 05 43-A - CS-8736-8738 - Light Duty Pullbox, Polymer or Fiberglass for 750kcmil Feeder Cable 26 05 43-B - CS-8610 - Minimum Parallel Separation and Cover Requirements
26 05 48 - ELECTRICAL SEISMIC RESTRAINT SYSTEMS
26 08 13 - ACCEPTANCE TESTING
26 09 13 - ELECTRICAL METERING DEVICES
26 09 16 - CONTROL EQUIPMENT ACCESSORIES
26 09 44 - CENTRALIZED DIGITAL LIGHTING CONTROL SYSTEMS
26 12 19 - DISTRIBUTION TRANSFORMERS
26 12 19-A - CS-7624-7626 - Transformers, Underground Single-Phase 26 12 19-B - CS-7665-7667 - Transformers, Underground Three-Phase Loop-Feed 26 12 19-C - MS-7625 - Transformers - Single-Phase Padmount 26 12 19-D - MS-7665 - Transformers, Underground Three-Phase Loop-Feed 26 12 19-E - CS-7922 - Transformer Pads, Underground Single-Phase 26 12 19-F - MS-7935 - Transformer Pads, Underground Three-Phase
26 13 16 - MEDIUM VOLTAGE METAL ENCLOSED LOAD INTERRUPTER SWITCHGEAR
26 13 16-A - CS-8476 - 600A, 4-Way Padmounted Switch, 12kV
26 13 23 - SECTIONALIZING EQUIPMENT
26 13 23-A - CS-8410 - 200A 3-Phase Junction Cabinet, 12kV and 21kV
26 22 13 - DRY-TYPE TRANSFORMERS
26 24 13 - SWITCHBOARDS
26 24 16 - PANELBOARDS
26 24 19 - MOTOR CONTROL EQUIPMENT
26 26 13 - PACKAGE POWER SUPPLY
26 27 26 - WIRING DEVICES
26 28 00 - OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES
26 28 01 - COORDINATED POWER SYSTEM PROTECTION
26 28 16 - SAFETY SWITCHES
26 29 23 - VARIABLE FREQUENCY DRIVES - LOW VOLTAGE
26 32 14 - ENGINE GENERATOR - DIESEL
26 35 26 - HARMONIC CORRECTION EQUIPMENT
26 36 00 - TRANSFER SWITCHES
26 41 13 - LIGHTNING PROTECTION SYSTEM
26 43 13 - SURGE PROTECTION DEVICES FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
26 50 00 - INTERIOR AND EXTERIOR LIGHTING
DIVISION 27 — COMMUNICATIONS
27 10 00 - STRUCTURED CABLING
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 42 00 - GAS DETECTION AND ALARM
28 46 00 - FIRE DETECTION AND ALARM
DIVISION 31 — EARTHWORK
31 10 00 - SITE CLEARING
31 22 00 - SITE GRADING
31 23 00 - EARTHWORK
31 23 17 - ROCK EXCAVATION
31 23 17.1 - ON-SITE AGGREGATE PROCESSING
31 23 33 - TRENCHING, BACKFILLING, AND COMPACTING FOR UTILITIES
31 25 00 - SOIL EROSION AND SEDIMENT CONTROL
31 68 13 - ROCK FOUNDATION ANCHORS
DIVISION 32 — EXTERIOR IMPROVEMENTS
32 12 16 - ASPHALTIC CONCRETE VEHICULAR PAVING
32 13 13 - CONCRETE PAVEMENT
32 15 40 - CRUSHED STONE SURFACING
32 16 13 - CONCRETE CURB AND GUTTER
32 16 23 - CONCRETE SIDEWALK AND STEPS
32 31 14 - GATE OPERATOR - SLIDING
32 91 13 - FINISHED GRADING
32 91 14 - SOIL PREPARATION
32 92 21 - NATIVE SEEDING
32 93 00 - PLANTS AND TREE RELOCATION
DIVISION 33 — UTILITIES
33 05 15 - PRECAST CONCRETE UTILITY STRUCTURES
33 05 16 - PRECAST CONCRETE MANHOLE STRUCTURES
33 05 23 - PIPELINE UNDERCROSSINGS
33 05 33.53 - POLYETHYLENE GAS UTILITY PIPE
33 11 13 - WATER MAIN CONSTRUCTION
33 12 19 - FIRE HYDRANT
33 31 11 - GRAVITY SEWER PIPELINE AND MANHOLE CONSTRUCTION
DIVISION 40 — PROCESS INTERCONNECTIONS
40 05 00 - PIPE AND PIPE FITTINGS - BASIC REQUIREMENTS
40 05 07 - PIPE SUPPORT SYSTEMS
40 05 17 - PIPE - COPPER
40 05 19 - PIPE - DUCTILE IRON
40 05 23 - PIPE - STAINLESS STEEL
40 05 24 - PIPE - STEEL
40 05 28 - PIPE - SPOOLABLE COMPOSITE
40 05 31 - PIPE - PLASTIC
40 05 33 - PIPE - HDPE
40 05 51 - VALVES - BASIC REQUIREMENTS
40 05 52 - MISCELLANEOUS VALVES
40 05 59 - FABRICATED STAINLESS STEEL SLIDE GATES
40 05 61 - GATE VALVES
40 05 62 - PLUG VALVES
40 05 63 - BALL VALVES
40 05 64 - BUTTERFLY VALVES
40 05 66 - CHECK VALVES
40 42 00 - PIPE, DUCT AND EQUIPMENT INSULATION
40 61 13 - PROCESS CONTROL SYSTEM GENERAL REQUIREMENTS
40 61 21 - PROCESS CONTROL SYSTEM TESTING
40 61 43 - SURGE PROTECTION DEVICES FOR INSTRUMENTATION AND CONTROL EQUIPMENT
40 61 93 - PROCESS CONTROL SYSTEM INPUT-OUTPUT LIST
40 61 93A - APPENDIX A IO LIST
40 61 96 - PROCESS CONTROL DESCRIPTIONS
40 62 05 - COMPUTER SYSTEM HARDWARE AND ANCILLARIES
40 63 43 - PROGRAMMABLE LOGIC CONTROLLERS
40 66 05 - NETWORK EQUIPMENT
40 66 40 - TELEMETRY SYSTEMS
40 67 00 - CONTROL SYSTEM EQUIPMENT PANELS AND RACKS
40 67 63 - UNINTERRUPTIBLE POWER SUPPLY
40 71 00 - FLOW INSTRUMENTATION
40 72 00 - LEVEL INSTRUMENTATION
40 73 00 - PRESSURE INSTRUMENTATION
40 74 00 - TEMPERATURE INSTRUMENTATION
40 75 00 - PROCESS LIQUID ANALYTICAL MEASUREMENT
40 78 00 - PANEL MOUNTED INSTRUMENTS
DIVISION 41 — MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23 - HOISTS, TROLLEYS, AND MONORAILS
DIVISION 43 — PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE
EQUIPMENT
43 21 00 - PUMPING EQUIPMENT - BASIC REQUIREMENTS
43 23 04 - PUMPING EQUIPMENT - HORIZONTAL MULTI-STAGE PUMPS
43 23 05 - PUMPING EQUIPMENT - VERTICAL MULTI-STAGE PUMPS
43 23 14 - PUMPING EQUIPMENT - NON-CLOG CENTRIFUGAL
43 23 57 - PUMPING EQUIPMENT - PROGRESSIVE CAVITY
43 24 17 - PUMPING EQUIPMENT - SAMPLE PUMPS
43 25 12 - PUMPING EQUIPMENT - SUBMERSIBLE SOLIDS HANDLING PUMPS
43 25 13 - PUMPING EQUIPMENT - SUBMERSIBLE END-SUCTION PUMPS
43 41 15 - FIELD ERECTED WELDED STEEL TANKS
43 41 16 - CARBON STEEL SODIUM HYDROXIDE STORAGE TANKS
43 41 45 - FIBERGLASS REINFORCED PLASTIC TANKS
43 41 45A - Tank Nozzle Sheets 4.12.22
DIVISION 46 — WATER AND WASTEWATER EQUIPMENT
46 21 56 - SURFACE WATER INTAKE SCREEN
46 33 11 - CHEMICAL FEED - LIQUID SYSTEMS
46 33 12 - INTERIM DISINFECTION SYSTEM - CHEMICAL FEED, ENCLOSURE, AND ACCESSORIES
46 41 11 - RAPID MIXERS
46 41 17 - STATIC MIXER
46 42 16 - WATER SOFTENER
46 43 22 - SLUDGE REMOVAL COLLECTION SYSTEM
46 43 61 - FLOCCULATOR EQUIPMENT
46 43 76 - INCLINED PLATE SETTLERS
46 61 33 - UF MEMBRANE EQUIPMENT
46 61 37 - NF MEMBRANE EQUIPMENT
10301936 National Park Service GRCA 190083 - TCWL Replacement Package B&C - 100% Final CDs
SEALS AND SIGNATURES - VOLUME 3
00 01 07.3 - 1
SEALS AND SIGNATURES - VOLUME 3
It is a violation of applicable laws and regulations governing professional licensing and registration for any person, unless acting under the direction of the licensed and registered design professional(s) indicated above, to alter in any way the Specifications in this project manual.
I hereby certify that the portion of the Specifications described below was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Arizona.
Travis Moore 04/22/2022
Pages or Specifications divisions or sections covered by this seal:
Sections 26 05 00, 26 05 19, 26 05 26, 26 05 33, 26 05 36, 26 05 48, 26 08 13, 26 09 13, 26 09 16, 26 09 44, 26 22 13, 26 24 13, 26 24 16, 26 24 19, 26 26 13, 26 27 26, 26 28 00, 26 28 01, 26 28 16, 26 29 23, 26 32 14, 26 35 26, 26 36 00, 26 41 13, 26 43 13, 26 50 00, 32 31 14
Tou Vang 04/22/2022
Sections 26 05 13, 26 05 43, 26 12 19, 26 1 16, 26 13 23
Zach Sachsenmaier 04/22/2022
Sections 28 4 00, 28 46 00
00 01 07.3 - 2
Robert Moore 04/22/2022
Sections 31 10 00, 31 22 00, 31 23 00, 31 23 17, 31 23 17.1, 31 23 33, 31 25 00, 32 15 40, 32 91 13
Ron Manske 04/22/2022
Section 31 68 13
Greg Young 04/22/2022
Sections 32 12 16, 32 13 13, 32 16 13, 32 16 23, 33 05 15, 33 05 16, 33 05 23, 33 12 19, 33 31 11
00 01 07.3 - 3
Amirah Shahid 04/22/2022
Sections 32 91 14, 32 92 21, 32 93 00
Richard Thornton 04/22/2022
Sections 33 11 13, 40 05 24, 40 05 28, 40 05 33, 40 05 61, 43 23 04, 43 23 05
Brian Perlberg 04/22/2022
Section 33 05 33.53
Kevin Greer 04/22/2022
Sections 40 05 00, 40 05 07, 40 05 17, 40 15 19, 40 05 23, 40 05 31, 40 05 51, 40 05 52, 40 05 62, 40 05 63, 40 05 64, 40 05 66, 40 42 00, 41 22 23, 43 25 13, 46 21 56
00 01 07.3 - 4
William Cassity 04/22/2022
Sections 27 10 00, 40 61 13, 40 61 21, 40 61 43, 40 61 93, 40 61 96, 40 62 05, 40 63 43, 40 66 05, 40 66 40, 40 67 00, 40 67 63, 40 71 00, 40 72 00, 40 73 00, 40 74 00, 40 75 00, 40 78 00
Jennifer Stillman 04/22/2022
Sections 40 05 59, 43 21 00, 43 23 14, 43 23 57, 43 24 17, 43 25 12, 43 41 15, 43 41 16, 43 41 45, 46 33 11, 46 33 12, 46 41 11, 46 41 17, 46 42 16, 46 43 22, 46 43 61, 46 43 76, 46 61 33, 46 61 37
END OF SEALS AND SIGNATURES
D I V I S I O N 2 6
ELECTRICAL
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 1
SECTION 26 05 00 1
ELECTRICAL - BASIC REQUIREMENTS 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Basic requirements for electrical systems. 6
B. Related Specification Sections include but are not necessarily limited to: 7
1. Division 03 - Concrete. 8
2. Section 01 61 03 - Equipment - Basic Requirements. 9
3. Section 01 67 00 – Product Requirements. 10
4. Section 01 73 40 – Execution. 11
5. Section 03 15 19 - Anchorage to Concrete. 12
6. Section 10 14 00 - Identification Devices. 13
7. Section 26 05 19 - Wire and Cable - 600 Volt and Below. 14
8. Section 26 05 33 - Raceways and Boxes. 15
9. Section 26 05 48 – Electrical Seismic Restraint Systems. 16
1.2 QUALITY ASSURANCE 17
A. Referenced Standards: 18
1. Aluminum Association (AA): 19
a. ADM, Aluminum Design Manual. 20
2. American Institute of Steel Construction (AISC): 21
a. Steel Construction Manual. 22
3. American National Standards Institute (ANSI). 23
4. ASTM International (ASTM): 24
a. A36/A36M, Standard Specification for Carbon Structural Steel. 25
b. A123/A123M, Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron 26 and Steel Products. 27
c. A153/A153M, Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel 28
Hardware. 29
5. Institute of Electrical and Electronics Engineers, Inc. (IEEE): 30
a. C2, National Electrical Safety Code (NESC). 31
6. National Fire Protection Association (NFPA): 32
a. 70, National Electrical Code (NEC). 33
7. Underwriters Laboratories, Inc. (UL). 34
B. Products to be listed by a Nationally Recognized Testing Laboratory (NRTL) in accordance with 35 applicable product standards. 36
1. Applicable product standards including, but not limited to, ANSI, FM, IEEE, NEMA and 37
UL. 38
2. NRTL includes, but is not limited to, CSA Group Testing and Certification (CS), FM 39
Approvals LLC (FM), Intertek Testing Services NA, Inc. (ETL), and Underwriters 40
Laboratories, Inc. (UL). 41
1.3 DEFINITIONS 42
A. Contracting Officer: Includes the Contracting Officer (CO) and the Contracting Officer 43
Representative (COR). 44
B. For the purposes of providing materials and installing electrical work the following definitions 45 shall be used. 46
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 2
1. Outdoor area: Exterior locations where the equipment is normally exposed to the weather 1 and including below grade structures, such as vaults, manholes, handholes and in-ground 2 pump stations. 3
2. Architecturally finished interior area: Offices, laboratories, conference rooms, restrooms, 4 corridors and other similar occupied spaces. 5
3. Non-architecturally finished interior area: Pump, chemical, mechanical, electrical rooms 6 and other similar process type rooms. 7
4. Highly corrosive and corrosive area: Areas identified on the Drawings where there is a 8 varying degree of spillage or splashing of corrosive materials such as water, wastewater or 9 chemical solutions; or chronic exposure to corrosive, caustic or acidic agents, chemicals, 10 chemical fumes or chemical mixtures. 11
5. Hazardous areas: Class I, II or III areas as defined in NFPA 70. 12
6. Shop fabricated: Manufactured or assembled equipment for which a UL test procedure has 13 not been established. 14
C. Coordinate installation of the South Rim WTP service transformer and metering at South Rim 15
WTP and Phantom Ranch WTP with the serving utility. 16
1. The serving utility for this Project is Arizona Public Service (APS). 17
a. Contact: 18
1) South Rim WTP: Chad Brooks 19
Chad.Brooks@aps.com 20
928-231-3242 21
2) Phantom Ranch WTP: Roger Yensen 22
Roger.Yensen@aps.com 23
602-321-9195 24
2. Refer to the Drawings for Contractor and APS work scope listing. Generally: 26
a. South Rim WTP: 27
1) Provide the transformer pad, transformer ground ring, primary conduit, secondary 28 conduit and wire, space in the service entrance switchboard for mounting of 29 metering CTs, meter socket in the service entrance switchboard.. 30
2) Size and construct transformer pad in conformance with APS requirements. 31
3) The utility will furnish the transformer, primary service wire, metering CTs to be 32 mounted in the switchboard, meter, and make all connections at the transformer, 33
CTs and meter socket. 34
4) Coordinate the switchboard supplier and the utility for the CT compartment. 35
b. Phantom Ranch WTP: 36
1) The utility will provide metering CTs and the meter and install CTs and meter in 37 the service entrance switchboard. 38
2) Contractor shall provide and install all other equipment and materials. 39
D. Refer to APS Electrical Service Requirement Manual for general service requirements: APS 40
ESRM Manual 41
1. Coordinate with APS to obtain APS Construction Standards for reference. 42
1.4 SUBMITTALS 43
A. See Specification Section 01 33 23 for requirements for the mechanics and administration of the 44 submittal process. 45
B. Shop Drawings: 46
1. See Specification Section 01 61 03 and individual specification sections for submittal 47 requirements for products defined as equipment. 48
2. General requirements: 49
a. Provide manufacturer's technical information on products to be used, including product 50 descriptive bulletin. 51
b. Include data sheets that include manufacturer's name and product model number. 52
1) Clearly identify all optional accessories. 53 mailto:Chad.Brooks@aps.co mailto:Roger.Yensen@aps.com https://www.aps.com/-/media/APS/APSCOM-PDFs/About/Construction-and-Power-Line-Siting/Construction-Services/20210510_ESRM-All-Sections.ashx?la=en&hash=8E0F575C40D50A04537EB509A4159C1C https://www.aps.com/-/media/APS/APSCOM-PDFs/About/Construction-and-Power-Line-Siting/Construction-Services/20210510_ESRM-All-Sections.ashx?la=en&hash=8E0F575C40D50A04537EB509A4159C1C
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 3
c. Acknowledgement that products are NRTL listed or are constructed utilizing NRTL 1 recognized components. 2
d. Manufacturer's delivery, storage, handling and installation instructions. 3
e. Product installation details. 4
f. Short Circuit Current Rating (SCCR) nameplate marking per NFPA 70, include any 5 required calculations. 6
g. See individual specification sections for any additional requirements. 7
3. Product technical data: 8
a. Provide submittal data for all products specified in PART 2 of this Specification 9
Section. 10
4. Fabrication and/or layout drawings: 11
a. Concrete and reinforcing steel, per Division 03 requirements. 12
C. Operation and Maintenance Manuals: 13
1. See Specification Section 01 78 23 for requirements for: 14
a. The mechanics and administration of the submittal process. 15
b. The content process of Operation and Maintenance Manuals. 16
D. When a Specification Section includes products specified in another Specification Section, each 17
Specification Section shall have the required Shop Drawing transmittal form per Specification 18
Section 01 33 23 and all Specification Sections shall be submitted simultaneously. 19
1.5 DELIVERY, STORAGE, AND HANDLING 20
A. See Specification Section 01 67 00 for storage requirements. 21
B. Protect nameplates on electrical equipment to prevent defacing. 22
1.6 AREA DESIGNATIONS 23
A. Designation of an area will determine the NEMA rating of the electrical equipment enclosures, 24 types of conduits and installation methods to be used in that area. 25
1. Outdoor areas: 26
a. Wet. 27
b. Also, corrosive and/or hazardous when specifically designated on the Drawings or in 28 the Specifications. 29
2. Indoor areas: 30
a. Dry. 31
b. Also, wet, corrosive and/or hazardous when specifically designated on the Drawings or 32 in the Specifications. 33
PART 2 - PRODUCTS 34
2.1 MANUFACTURERS 35
A. Subject to compliance with the Contract Documents, refer to specific Electrical Specification 36
Sections and specific material paragraphs below for acceptable manufacturers. 37
B. Submit request for substitution in accordance with Section 01 67 00. 38
C. Provide all components of a similar type by one (1) manufacturer. 39
2.2 MATERIALS 40
A. Electrical Equipment Support Pedestals and/or Racks: 41
1. Manufacturers: 42
a. Modular strut: 43
1) Unistrut Building Systems. 44
2) B-Line by Eaton. 45
3) Globe Strut. 46
4) Superstrut by Thomas & Betts. 47
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 4
2. Material requirements: 1
a. Modular strut: 2
1) Galvanized steel (hot-dipped): ASTM A123/123M or ASTM A153/A153M. 3
2) Stainless steel: AISI Type 316. 4
3) PVC coated galvanized steel: ASTM A123/A123M or ASTM A153/A153M and 5
20 MIL PVC coating. 6
4) Aluminum: AA Type 6063-T6. 7
5) Fiberglass: Fire-retardant polyester or vinylester resin, ASTM E84, UL 94. 8
b. Structural members (e.g., I beams, L and C channels): 9
1) Galvanized steel (hot-dipped): ASTM A36/A36M steel with galvanizing per 10
ASTM A123/A123M. 11
2) Aluminum: AA Type 6061-T6 or 6063-T6. 12
c. Mounting plates: 13
1) Galvanized steel (hot-dipped): ASTM A36/A36M steel with galvanizing per 14
ASTM A123/A123M. 15
2) Aluminum: AA Type 6063-T6. 16
d. Mounting hardware: 17
1) Galvanized steel (hot-dipped). 18
2) Stainless steel. 19
e. Anchorage per Specification Section 03 15 19. 20
f. Concrete and reinforcing steel: See Division 03 specifications. 21
B. Equipment pads (interior and exterior): 22
1. Concrete and reinforcing steel: See Division 03 specifications. 23
C. Field touch-up of galvanized surfaces. 24
1. Zinc-rich primer. 25
a. One coat, 3.0 MILS, ZRC by ZRC Products. 26
PART 3 - EXECUTION 27
3.1 INSTALLATION 28
A. Install and wire all equipment, including prepurchased equipment, and perform all tests 29 necessary to assure conformance to the Drawings and Specification Sections and ensure that 30 equipment is ready and safe for energization. 31
B. Install equipment in accordance with the requirements of: 32
1. NFPA 70. 33
2. IEEE C2. 34
3. The manufacturer's instructions. 35
C. In general, conduit routing is not shown on the Drawings. 36
1. The Contractor is responsible for routing all conduits including those shown on one-line and 37 control block diagrams and home runs shown on floor plans. 38
2. Conduit routings and stub-up locations that are shown are approximate; exact routing to be 39 as required for equipment furnished and field conditions. 40
D. When complete branch circuiting is not shown on the Drawings: 41
1. A homerun indicating panelboard name and circuit number will be shown and the circuit 42 number will be shown adjacent to the additional devices (e.g., light fixture and receptacles) 43 on the same circuit. 44
2. The Contractor is to furnish and install all conduit and conductors required for proper 45 operation of the circuit. 46
3. The indicated home run conduit and conductor size shall be used for the entire branch 47 circuit. 48
4. See Specification Section 26 05 19 for combining multiple branch circuits in a common 49 conduit. 50
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 5
E. Do not use equipment that exceed dimensions or reduce clearances indicated on the Drawings or 1 as required by the NFPA 70. 2
F. Install equipment plumb, square and true with construction features and securely fastened. 3
G. Install electrical equipment, including pull and junction boxes, minimum of 6 IN from process, 4 gas, air and water piping and equipment. 5
H. Install equipment so it is readily accessible for operation and maintenance, is not blocked or 6 concealed and does not interfere with normal operation and maintenance requirements of other 7 equipment. 8
I. Device Mounting Schedule: 9
1. Unless indicated otherwise on the Drawings, mounting heights are as indicated below: 10
a. Light switch (to center): 46 IN. 11
b. Receptacle in architecturally finished areas (to center): 18 IN. 12
c. Receptacle on exterior wall of building (to center): 18 IN. 13
d. Receptacle in non-architecturally finished areas (to center): 46 IN. 14
e. Telephone outlet in architecturally finished areas (to center): 18 IN. 15
f. Telephone outlet for wall-mounted phone (to center): 46 IN. 16
g. Safety switch (to center of operating handle): 54 IN. 17
h. Separately mounted motor starter (to center of operating handle): 54 IN. 18
i. Pushbutton or selector switch control station (to center): 46 IN. 19
j. Panelboard (to top): 72 IN. 20
J. Avoid interference of electrical equipment operation and maintenance with structural members, 21 building features and equipment of other trades. 22
1. When it is necessary to adjust the intended location of electrical equipment, unless 23 specifically dimensioned or detailed, the Contractor may make adjustments of up to 6 IN in 24 equipment location with the Contracting Officer's approval. 25
K. Provide electrical equipment support system per the following area designations: 26
1. Dry areas: 27
a. Galvanized system consisting of hot-dipped galvanized steel channels and fittings, nuts 28 and hardware. 29
b. Aluminum system consisting of aluminum channels and fittings with stainless steel nuts 30 and hardware. 31
c. Field touch-up cut ends and scratches of galvanized components with the specified 32 primer during the installation, before rust appears. 33
2. Wet areas: 34
a. Galvanized system consisting of hot-dipped galvanized steel channels and fittings, nuts 35 and hardware. 36
b. Field touch-up cut ends and scratches of galvanized components with the specified 37 primer during the installation, before rust appears. 38
3. Corrosive areas: 39
a. Aluminum system consisting of aluminum channels and fittings with stainless steel nuts 40 and hardware. 41
b. Stainless steel system consisting of stainless steel channels and fittings, nuts and 42 hardware. 43
c. PVC coated steel system consisting of PVC coated steel channels and fittings with 44 stainless steel nuts and hardware. 45
d. Fiberglass system consisting of fiberglass channels and fittings, nuts and hardware. 46
4. Highly corrosive areas: 47
a. PVC coated steel system consisting of PVC coated steel channels and fittings with 48 stainless steel nuts and hardware. 49
b. Fiberglass system consisting of fiberglass channels and fittings, nuts and hardware. 50
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 6
L. Provide all necessary anchoring devices and supports rated for the equipment load based on 1 dimensions and weights verified from approved submittals, or as recommended by the 2 manufacturer. 3
1. See Specification Section 03 15 19. 4
2. Do not cut, or weld to, building structural members. 5
3. Do not mount safety switches or other equipment to equipment enclosures, unless enclosure 6 mounting surface is properly braced to accept mounting of external equipment. 7
M. Provide non-metallic corrosion resistant spacers to maintain 1/4 IN separation between metallic 8 equipment and/or metallic equipment supports and mounting surface in wet areas, on below 9 grade walls and on walls of liquid containment or processing areas such as Basins, Clarifiers, 10
Digesters, Reservoirs, etc. 11
N. Do not place equipment fabricated from aluminum in direct contact with earth or concrete. 12
O. Screen or seal all openings into equipment mounted outdoors to prevent the entrance of rodents 13 and insects. 14
P. Do not use materials that may cause the walls or roof of a building to discolor or rust. 15
Q. Identify electrical equipment and components in accordance with Specification Section 16
10 14 00. 17
R. Provide field markings and/or documentation of available short-circuit current (available fault 18 current) and related information for equipment as required by the NFPA 70 and other applicable 19 codes. 20
S. Provide equipment or control panels with Short Circuit Current Rating (SCCR) labeling as 21 required by NFPA 70 and other applicable codes. 22
1. Determine the SCCR rating by one of the following methods: 23
a. Method 1: SCCR rating meets or exceeds the available fault current of the source 24 equipment when indicated on the Drawings. 25
b. Method 2: SCCR rating meets or exceeds the source equipment’s Amp Interrupting 26
Current (AIC) rating as indicated on the Drawings. 27
c. Method 3: SCCR rating meets or exceeds the calculated available short circuit current 28 at the control panel. 29
2. The source equipment is the switchboard, panelboard, motor control center or similar 30 equipment where the equipment or control panel circuit originates. 31
3. For Method 3, provide calculations justifying the SCCR rating. Utilize source equipment 32 available fault current or AIC rating as indicated on the Drawings. 33
T. Install APS will provide labels and tags for medium voltage equipment (transformers, switch, 34 splice vaults, pull vaults). 35
3.2 FIELD QUALITY CONTROL 36
A. Verify exact rough-in location and dimensions for connection to electrified equipment, provided 37 by others. 38
1. See Specification Section 01 73 20 for openings and penetrations in structures. 39
B. Replace equipment and systems found inoperative or defective and re-test. 40
C. Cleaning: 41
1. See Specification Section 01 73 40. 42
D. The protective coating integrity of support structures and equipment enclosures shall be 43 maintained. 44
1. Repair galvanized components utilizing a zinc rich paint. 45
2. Repair painted components utilizing touch up paint provided by or approved by the 46 manufacturer. 47
3. Repair PVC coated components utilizing a patching compound, of the same material as the 48 coating, provided by the manufacturer of the component. 49
ELECTRICAL - BASIC REQUIREMENTS
26 05 00 - 7
4. Repair surfaces which will be inaccessible after installation prior to installation. 1
5. See Specification Section 26 05 33 for requirements for conduits and associated accessories. 2
E. Replace nameplates damaged during installation. 3
3.3 DEMONSTRATION 4
A. Demonstrate equipment in accordance with Specification Section 01 75 00. 5
END OF SECTION 7
MEDIUM VOLTAGE CABLE
26 05 13 - 1
SECTION 26 05 13 1
MEDIUM VOLTAGE CABLE 2
PART 1 - GENERAL 3
1.1 SUMMARY 4
A. Section Includes: 5
1. Material and installation requirements for: 6
a. Medium voltage cable (601 V and above). 7
b. Cable terminations and splices. 8
B. Related Specification Sections include but are not necessarily limited to: 9
1. Section 26 05 00 - Electrical - Basic Requirements. 10
2. Section 26 05 19 - Wire and Cable - 600 Volt and Below. 11
3. Section 26 08 13 - Acceptance Testing. 12
1.2 QUALITY ASSURANCE 13
A. Referenced Standards: 14
1. Association of Edison Illuminating Companies (AEIC). 15
a. CS8, Specification for Extruded Dielectric Shielded Power Cables Rated 5 Through 16
46 kV. 17
2. Institute of Electrical and Electronics Engineers, Inc. (IEEE): 18
a. 48, Standard for Test Procedures and Requirements for Alternating-Current Cable 19
Terminations Used on Shielded Cables Having Laminated Insulation Rated 2.5 kV 20 through 765 kV or Extruded Insulation Rated 2.5 kV through 500 kV. 21
b. 386, Standard for Separable Insulated Connector Systems for Power Distribution 22
Systems Rated 2.5 kV through 35 kV. 23
c. 404, Standard for Extruded and Laminated Dielectric Shielded Cable Joints Rated 2.5 24 kV to 500 kV. 25
3. National Electrical Manufacturers Association/Insulated Cable Engineers Association 26
(NEMA/ICEA): 27
a. WC 74/S-93-639, 5 - 46 kV Shielded Power Cable for Use in the Transmission and 28
Distribution of Electric Energy. 29
4. National Fire Protection Association (NFPA): 30
a. 70, National Electrical Code (NEC). 31
5. Underwriters Laboratories, Inc. (UL): 32
a. 1072, Standard for Medium-Voltage Power Cables. 33
B. Qualifications: 34
1. Cable technician: 35
a. Three years of experience in handling, terminating and splicing medium voltage cables. 36
b. Specifically trained by a factory representative on the terminations and splices to be 37 used on the project. 38
1.3 DEFINITIONS 39
A. Contracting Officer: Includes the Contracting Officer (CO) and the Contracting Officer 40
Representative (COR). 41
1.4 SUBMITTALS 42
A. See Specification Section 01 33 23 for requirements for the mechanics and administration of the 43 submittal process. 44
B. Shop Drawings: 45
1. Product data: 46
MEDIUM VOLTAGE CABLE
26 05 13 - 2
a. Provide submittal data for all products specified in PART 2 of this Specification 1
Section. 2
b. See Specification Section 26 05 00 for additional requirements. 3
2. Fabrication and/or layout drawings: 4
a. Cable pulling plan. 5
C. Informational Submittals: 6
1. Cable pulling tension measurements or photograph of breakaway swivel attached to cable. 7
2. Submit the following before terminating cables: 8
a. Cable Technician qualifications. 9
1.5 DELIVERY, STORAGE, AND HANDLING 10
A. Ship cable with removable watertight end seals, and store in dry place. 11
PART 2 - PRODUCTS 12
2.1 MANUFACTURERS 13
A. Subject to compliance with the Contract Documents, the following manufacturers are 14 acceptable: 15
1. Armored Wire and Cable: 16
a. The Okonite Company. 17
b. No substitutions allowed. 18
2. Non-Armored Wire and cable: 19
a. General Cable. 20
b. The Kerite Company. 21
c. The Okonite Company. 22
d. Prysmian Group. 23
e. Southwire Company. 24
3. Lugs, connectors, and terminations: 25
a. 3M. 26
b. Elastimold by Thomas & Betts. 27
c. Joslyn. 28
d. TE Connectivity Raychem. 29
e. Eaton Cooper Power Systems. 30
4. Fault indicators: 31
a. Chance. 32
b. Eaton Cooper Power Systems. 33
c. Schweitzer Engineering Laboratories. 34
d. Fisher Pierce by Thomas & Betts. 35
5. Elbow Arrester 36
a. Eaton Cooper Power systems 37
b. Hubbell 38
c. Maclean Power 39
6. Overhead Surge Arrestor 40
a. Hubbell 41
b. Maclean Power 42
c. TE Connectivity Raychem 43
7. Rock Wall Cable Support Clamps: 44
a. Prysmian Group 45
b. TE Connectivity Raychem 46
c. Southwire Company 47
8. Cable Support Grips: 48
a. Hubbell 49
b. Eaton Cooper Powr Systems 50
9. 51
MEDIUM VOLTAGE CABLE
26 05 13 - 3
B. Submit request for substitution in accordance with Section 01 67 00. 1
2.2 MEDIUM VOLTAGE CABLES 2
A. Ratings: 3
1. 15 kV class unless otherwise indicated on the Drawings. 4
B. Standards: 5
1. NEMA/ICEA WC 74/S-93-639. 6
2. AEIC CS8. 7
3. UL 1072. 8
C. Conductor Material: 9
1. Single Phase 10
a. Solid aluminum 11
b. Compact stranded aluminum 12
2. Three Phase 13
a. Compact or compressed concentric stranded copper. 14
b. Compact or compressed concentric stranded aluminum. 15
D. Insulation: 16
1. Temperature rating: Type MV-90 or MV-105 per NFPA 70. 17
2. Tree-retardant cross-linked polyethylene (TRXLPE) or Ethylene-propylene-rubber (EPR) 18
3. 133 percent insulation level. 19
E. Shielding: 20
1. Shielding on cables rated above 2 kV consists of: 21
a. Semiconductor conductor screen. 22
b. Semiconductor insulation screen. 23
c. Copper concentric neutral. 24
F. Grounds: 25
1. Insulated copper per Specification Section 26 05 19. 26
G. Jackets: 27
1. Direct buried cables shall be rated for direct bury. 28
2. Jacket: Polyethylene (PE). 29
H. Conduit Fill: 30
1. MV cable to be installed to meet NEC conduit fill requirements 31
a. Single cable – 53 percent filled 32
b. Three or more conductors – 40 percent filled 33
2. Conduit size as indicated in the drawings. 34
I. Armored Conductor (CLX) - Three Phase: 35
1. Material: Compressed Aluminum 36
2. Conductor size: 4/0 AWG 37
3. Sheath: Close fitting, impervious, continuous, corrugated aluminum, CLX, with outer 38 polyethylene (PE) jacket. 39
4. Multiconductor cable, Type MV-105 40
5. Cable Exterior Color: Utilize two different colors for cable distinction. 41
a. Tan 42
b. Black 43
6. Rated for surface-mounted installation. 44
2.3 CABLE ACCESSORIES 46
A. Lugs and Connectors: 47
1. Lugs: 48
a. Compression type. 49
b. Standard UL 486B for aluminum and copper cables. 50
MEDIUM VOLTAGE CABLE
26 05 13 - 4
c. Voltage rating: Up to 35 kV. 1
d. Current rating: Continuous operation at the rating of the cable. 2
e. Material: Tin-plated copper or Aluminum with bronze underplating, tin outerplating 3 and aluminum anti-oxide paste]. 4
f. Number of holes: Two, except one on motor leads. 5
2. Splice connectors: 6
a. Standard: UL 486B for aluminum and copper cables. 7
b. Voltage rating: Up to 35 kV. 8
c. Current rating: Continuous operation at the rating of the cable. 9
d. Material: Tin-plated copper or Aluminum with bronze underplating, tin outerplating 10 and aluminum anti-oxide paste. 11
B. Terminations: 12
1. End caps: 13
a. Cold or hot shrink. 14
b. Used to environmentally seal and mechanically protect exposed cable ends. 15
2. Cold shrink kits: 16
a. Standard: IEEE 48, Class 1 termination. 17
b. Voltage rating: Same as the cable rating. 18
c. Current rating: Continuous operation at the rating of the cable. 19
d. One-piece design, where high-dielectric constant stress control is integrated within a 20 skirted insulator made of silicone rubber. 21
e. Suitable for contaminated indoor and outdoor locations. 22
3. Molded rubber kit: 23
a. Standard: IEEE 48. 24
b. Voltage rating: Same as the cable rating. 25
c. Current rating: Continuous operation at the rating of the cable. 26
d. One-piece design or modular with stress cone and skirts, where high-dielectric constant 27 stress control is integrated within a skirted insulator made of EPDM rubber. 28
e. Suitable for contaminated indoor and outdoor locations. 29
f. See attached Single-Circuit Cable Support Transition exhibit for additional details. 30
4. Elbow connectors: 31
a. Standard: IEEE 386. 32
b. Voltage rating: Same as the cable rating. 33
c. Current rating: 34
1) 200A Loadbreak 35
2) 600A Deadbreak 36
d. One-piece design, comprised of an insulation shield, insulation layer and an outer shield 37 constructed of EPDM rubber. 38
e. Deadfront, loadbreak type with: 39
1) Hot stick pulling eye. 40
2) Grounding tab. 41
3) Test point. 42
4) See attached Hotstick-Operated system, 200 Amp Bushing Inserts exhibit for 43 additional details. 44
f. Deadfront, deadbreak type with: 45
1) T-Body style. 46
2) Insulating Cap. 47
3) Grounding tab. 48
4) Capacitive test point. 49
g. Accessories to be constructed in a similar manner as the elbow connector: 50
1) Bushing inserts. 51
2) Bushing well plugs. 52
3) Feed thru inserts. 53
4) Protective caps. 54
5) 600A/200A Bushing Adapters. 55
MEDIUM VOLTAGE CABLE
26 05 13 - 5
C. Splices: 1
1. Cold shrink kits: 2
a. Standard: IEEE 404. 3
b. Voltage rating: Same as the cable rating. 4
c. Current rating: Continuous operation at the rating of the cable. 5
d. One-piece design, comprised of an insulation shield, insulation layer and a silicone 6 rubber body. 7
e. Suitable for indoor, direct burial or submersible applications. 8
f. See attached Splice exhibit for additional details. 9
2. Molded rubber kit: 10
a. Standard: IEEE 386 or IEEE 404. 11
b. Voltage rating: Same as the cable rating. 12
c. Current rating: Continuous operation at the rating of the cable. 13
d. One- or multi-piece design, comprised of an insulation shield, insulation layer and an 14 outer shield constructed of EPDM rubber. 15
e. Suitable for indoor, direct burial or submersible applications. 16
3. Modular separable molded rubber: 17
a. Standard: IEEE 386. 18
b. Voltage rating: Same as the cable rating. 19
c. Current rating: 600A. 20
d. One-piece design, comprised of an insulation shield, insulation layer and an outer shield 21 constructed of EPDM rubber. 22
e. Deadfront, deadbreak type. 23
f. Components: T-body, insulating plug with cap, insulating plug with cap and stud, and 24 connecting plug. 25
g. Suitable for submersible applications. 26
h. See attached Separable Molded Assemblies exhibit for additional details. 27
4. Motor lead kits: 28
a. Voltage rating: Same as the cable rating. 29
b. Current rating: Continuous operation at the rating of the cable. 30
c. Material: EPDM rubber boot with nylon pin. 31
d. On shielded cables provide and additional EPDM rubber cold shrink sleeve. 32
D. Elbow Arrester 33
1. 10kV 34
2. Loadbreak elbow 35
3. #4 copper ground or larger 36
4. One arrester per phase 37
5. 8.4 MCOV 38
E. Overhead Surge Arrestor 39
1. Metal Oxide type 40
2. Manufactured per IEEE C62.11 41
3. 9kV 42
4. 7.6 MCOV 43
F. Cable Shield Grounding Adapters: 44
1. Type: Molded rubber with constant force spring and solder-blocked tinned copper braid 45 pigtail. 46
2. Waterproof, providing a positive seal for the cable jacket. 47
3. May be integral with termination of splice device with Contracting Officer’s approval. 48
G. Rock Wall Cable Support Clamp: 49
1. Type: Galvanized Steel 50
2. Direct sunlight application 51
3. Match clamp range to fit CLX cable diameter 52
4. Minimum 50lb holding capacity 53
5. Install cable clamp to manufacturer recommendations 54
MEDIUM VOLTAGE CABLE
26 05 13 - 6
H. Fault Indicators: 1
1. Standards: IEEE 495. 2
2. See attached Fault Indicator exhibit for details 3
I. Cable Support Grips: 4
1. Type: Stainless Steel 5
2. Double eye, Double Weave 6
3. Match cable support diameter range to internal CLX conductor cable diameter 7
4. One cable grip per conductor 8
5. Ensure working load of grip is suitable for application 9
PART 3 - EXECUTION 10
3.1 INSTALLATION 11
A. Do not install cable during wet conditions. 12
1. Prior to pulling cables, drain or pump out handholes and other low points if standing water 13 is present. 14
2. Blow out conduits with dried compressed air if moisture is present in conduits. 15
3. Install end caps immediately on all cut ends of cable prior to pulling, and maintain end caps 16 while pulling in cable. 17
a. If end caps are damaged, remove and install new end caps. 18
b. Do not remove end caps until ready to terminate or splice cable. 19
4. . 20
B. Do not install conductors when ambient temperature is near minimum as recommended by 21 manufacturer for installation of the type of conductor insulation. 22
C. Provide components in kit form, complete with instructions, supplied by a single approved 23 manufacturer and suitable for each shielded cable termination. 24
1. Select correct termination to match cable diameter and construction. 25
2. Form and install terminations in strict accordance with instructions of cable manufacturer 26 and termination manufacturer. 27
D. Splices: 28
1. Provide components in kit form, complete with instructions, supplied by a single approved 29 manufacturer and suitable for the type of cable being used. 30
2. Prepare cable ends, provide materials and follow all application steps in accordance with 31 manufacturer's instructions. 32
a. As a minimum requirement: 33
1) The cable ends shall be cut squarely. 34
2) The insulation shall be free from nicks or burrs after removal of jacket. 35
3) The conductors shall be cleaned and an oxide inhibitor applied. 36
4) For splices, connector indents shall be filled with insulating putty to eliminate 37 voids or prepared per manufacturer's instructions. 38
5) Attach grounding lead to system ground. 39
3. Splices shall be avoided whenever possible. 40
a. No more than one splice is permitted between termination points without Contracting 41
Officer’s approval. 42
b. No splices are permitted in runs less than 100 FT long. 43
c. Splices will be made only at handholes or other accessible locations. 44
d. Do not pull splices into ductbanks or conduits or leave them under tension. 45
E. The ground shield grounding adaptors shall be grounded: 46
1. Shirted and elbow terminators: Grounded to ground bar or cable loop in equipment. 47
2. Splices: Grounded to ground bar or rod in handhole. 48
3. Connect with bare, stranded #6 AWG wire. 49
MEDIUM VOLTAGE CABLE
26 05 13 - 7
3.2 FIELD QUALITY CONTROL 1
A. Provide cable pulling plan showing all proposed splice points and cable pulling directions for 2 each pull. 3
B. Provide measurement of tensions during the pull. 4
C. See Specification Section 26 08 13 for acceptance testing requirements. 5
END OF SECTION 6
5''
NOTE 5
LED
LED
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
RJJ B. BOOKER
LDR.
S. GUDEMAN
MGR.
09/2014 6
ACCESSORIES
FAULT INDICATORS
AUTOMATIC RESET 2470
1 2
2470. _
A = 1/0 AND 4/0 CABLE 400 AMP, SINGLE PHASE - NOTE 1
B = 750 AND 1100 CABLE 600 AMP, 3 PHASE - NOTE 2
C = 750 AND 1100 CABLE 800 AMP, SINGLE PHASE - NOTE 3
NOTES:
1. THE AUTOMATIC RESET FAULT INDICATOR, APN 33101560, WITH A
MAXIMUM 1-1/4-INCH CABLE O.D. WITH ACTUATING CURRENT AMPS
OF 400 PLUS 10 PERCENT, SHOULD BE USED WITH #1/0 AND #4/0 AL
CABLE.
2. FAULT INDICATOR APN 33101564 IS THREE-PHASE AND HAS A
MAXIMUM 2-INCH CABLE OUTSIDE DIAMETER WITH ACTUATING
CURRENT OF 600 AMPS.
3. FAULT INDICATOR APN 33101565 IS SINGLE PHASE AND HAS A
MAXIMUM 2-3/16-INCH CABLE OUTSIDE DIAMETER WITH ACTUATING
CURRENT OF 800 AMPS, FLAG DISPLAY, AND AUTOMATIC CURRENT
RESET.
4. THE AUTOMATIC RESET FAULT INDICATORS MAY BE INSTALLED ON
THE OUTGOING UNFUSED CIRCUITS OF PAD-MOUNTED
TRANSFORMERS, THREE- AND FOUR WAY JUNCTION CABINETS,
SINGLE- AND THREE-PHASE TERMINATION CABINETS, AND OTHER
SIMILAR EQUIPMENT.
5. THE CABLE TIE IS NOT REQUIRED IF THE DISTANCE BETWEEN THE
JACKET CUTBACK AND THE DEVICE OR TERMINATION DOES NOT
EXCEED 3/4-INCH.
6. CIRCUITS OF LESS THAN FEEDER CLASS ARE NORMALLY FUSED AT
THE SWITCHING CABINET. ON OCCASION, IT BECOMES NECESSARY TO
"SLUG" THE FUSEHOLDER. IN THESE CASES, IT IS NECESSARY TO
INSTALL AUTOMATIC RESETTING FAULT INDICATORS IN THE
SWITCHING ENCLOSURE.
7. THREE-PHASE AUTOMATIC RESETTING FAULT INDICATORS SHALL NOT
BE USED BEHIND FUSES OR OTHER SINGLE-PHASE PROTECTIVE
DEVICES, THEY DO NOT COORDINATE PROPERLY.
8. ALL NEW 750 AND 1100 OUTGOING RUNS ARE REQUIRED TO HAVE
FAULT INDICATORS INSTALLED. ONLY ONE SET IS REQUIRED ON A
PARALLELED FEEDER.
9. ON NEW 1/0 AND 4/0 OUTGOING RUNS, IT IS OPTIONAL TO HAVE
FAULT INDICATORS INSTALLED WITH THE FOLLOWING EXCEPTIONS:
(A) WHEN 1/0 OR 4/0 CABLE IS FEEDING ANOTHER CABINET AND IS
SOLIDLY FUSED IN THE SOURCE CABINET,
(B) WHEN 1/0 OR 4/0 CABLE IS FEEDING A TRANSFORMER THAT
CANNOT BE FUSED AT THE TRANSFORMER SOURCE,
(C) WHEN 1/0 OR 4/0 CABLE IS TRANSITIONING FROM A DIP POLE
AND IT IS FUSED SOLID.
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
RJJ B. BOOKER
LDR.
S. GUDEMAN
MGR.
09/2014 6
ACCESSORIES
FAULT INDICATORS
AUTOMATIC RESET 2470
2 2
CO
DE
70 MATERIAL LIST
ITEM QTY DESCRIPTION APN
1 1 INDICATOR FAULT 3PH 600A 33101564
2 1 INDICATOR FAULT 400A 1/0 33101560
3 1 INDICATOR FAULT 800 AMP 33101565
NOTE 14 - INDICATOR FAULT OVERHEAD 00119559
10. OPERATIONS MAY REQUEST FAULT INDICATORS TO BE INSTALLED ON
UNDERGROUND CABLE IN OTHER CIRCUMSTANCES.
11. WHEN WRITING A JOB TO REPLACE 750 CABLE RUNS NOTES
THREE-PHASE 1/0 RUNS THAT MEET THE CRITERIA IN NOTES 1, 2 OR
3, EXISTING FAULT INDICATORS (NEW CLIP ON TYPE) SHOULD BE
TRANSFERRED TO THE NEW CABLES. RETURN ALL OTHER TO
SALVAGE.
12. SINGLE-PHASE RUNS THAT ARE BEING REPLACED SHOULD HAVE ANY
EXISTING FAULT INDICATORS (NEW CLIP ON TYPE) REMOVED AND
RETURNED TO THE RESPECTIVE OPERATIONS DEPARTMENT. ALL
OTHER TYPE OF FAULT INDICATORS SHOULD BE RETURNED TO
SALVAGE.
13. ALL CIRCUIT-ISOLATED DEAD-FRONT ENCLOSURE STANDARDS
PROVIDE ONE THREE-PHASE FAULT INDICATOR APN 33101564 FOR
EACH 600A GANG-OPERATED SWITCH.
14. FAULT INDICATOR APN 00119559 IS FOR OVERHEAD APPLICATION AS
A FAULT INDICATION TROUBLESHOOTING TOOL, 0.30 - 1.15 INCH
CONDUCTOR DIAMETER, 100 AMPS MINIMUM TRIP CURRENT, LOAD
TRACKING/PEAK LOAD MEMORY, 8 HOUR CURRENT RESET AND LED
INDICATION WITH 360 DEGREES VISIBILITY.
OR
1/0
1/0
OR
CABLE TIE
2-BOLT CONNECTOR
ASSEMBLY WRENCH
RECEPTACLE
PLUG W/O STUD &
RECEPTACLE
PLUG W/STUD &
PLUG W/O STUD
STUD W/ PLUG
W/O STUD
PLUG W/STUD & PLUG
ELBOW WITH
TEE ELBOW HOUSING
SPADE COMP TERMINAL
CABLE ADAPTER
200 A
ELBOW
DEADEND
200 A
SPLICE
200 A 600 A
TAPS
TWO 200 A
600 A WITH
WITH 200 A TAP
600 A SPLICE
TAPS
WITH TWO 200 A
600 A SPLICE
WITH 200 A TAP
600 A 3 WAY SPLICE
33-3/4''29-7/8''25-1/8''21-1/4''10-9/16'' 11-3/4'' 16-1/2''
4 WAY SPLICE
600 A
37-5/8''
3 WAY SPLICE
600 A
29''
SPLICE
600 A
20-3/8''
DEADEND
600 A
11-3/4''
600 A
ELBOW
10-9/16''
MAINTENANCE ONLY
OBSOLETE
MAINTENANCE ONLY
WITH THREADED STUD
WITH THREADED STUD
GROUND TEST ROD
OPERATING
STICK-OP TOOL
NON-LOAD BREAK
REQUIRED BAIL
*BAIL ASSEMBLY REQUIRED ON NON-LOADBREAK ELBOW.
2903 2906 2909 2912 2915
2918 2921 2924 2927 2930 2933 2936
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
LO S. WHITEY
LDR.
M. RING
MGR.
03/2000 4
ACCESSORIES
DEVICES
12KV SEPARABLE MOLDED ASSEMBLIES
THRU
1 2
ILLUSTRATIVE DETAIL
NOTE 7 NOTE 7
NOTE 6
REMOVABLE
THREADED
STUD INCLUDED
BASIC ELBOW
WITH 600 AMP
CO
DE
36 MATERIAL LIST
ITEM QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY QTY DESCRIPTION APN
1 - - 2 - - 1 1 - - - - - ADAPTER FOR 1/0A CABLE 33101233
2 1 1 - 3 4 - - 1 1 2 2 3 ADAPTER FOR 750A CABLE 33101234
3 1 - 1 2 3 1 - 1 1 2 3 3 CONNECTOR 4/0 ACSR 2 BOLT 33002961
4 - - - - - - - 1 2 1 2 1 CONNECTOR NON-LB LBOW 1/0 33101300
5 1 1 2 3 4 1 1 1 1 2 2 3 ELBOW BASIC 750KCMIL 15KV 33101402
6 - - 1 2 3 - - - - 1 1 2 PLUG CONN FOR BASIC LBOW 33101604
7 - - - - - - - - - - - - PLUG D-E/STUD/BASIC ELBO OBSOLETE
8 - - - - - - - - - - - - PLUG REDUCE TAP/STUD ELBO 33101608
9 - - - - - - - 1 2 1 2 1 PLUG REDUCE TAP W/O STUD 33101612
10 1 2 2 2 2 1 2 1 - 1 - 1 PLUG W/O STUD BASIC ELBOW 33101606
11 - - - - - 1 1 - - - - - TERMINAL FOR 1/0A CABLE 33107283
12 1 1 2 3 4 - - 1 1 2 2 3 TERMINAL FOR 750A CABLE 33107284
13 2 2 4 6 8 2 2 4 6 6 8 8 TIE CABLE MAX 2 IN OD 33107355
14 - - 1 2 2 - - 1 2 2 2 2 WRENCH SPANNER/ESNA MT'L 71808944
15 - - - - - - - - - - - - ROD, LB GRDTEST 12/21KV 71807218
16 - - - - - - - - - - - - TOOL, OPERATING STICK-OP 33107288
NOTES:
1. THE 600 AMP COMPONENTS ARE DESIGNED TO BE SEPARATED
AND ENGAGED ON DE-ENERGIZED CIRCUITS ONLY.
2. BOND THE CABLE CONCENTRIC NEUTRALS TOGETHER. LEAVE
ENOUGH EXCESS CONCENTRIC TO FACILITATE DISASSEMBLING
THE COMPONENTS WITHOUT DISCONNECTING THE NEUTRAL.
3. THE ASSEMBLY WRENCHES ARE RE-USABLE TOOLS. IT IS NOT
NECESSARY TO CHECK OUT NEW TOOLS FOR EACH JOB.
4. WHEN ADDITIONAL SILICONE GREASE IS NEEDED TO INSTALL
RUBBER MOLDED PRODUCTS, SPLICES, ELBOWS, ETC., ON
PRIMARY CABLE, USE APN 72401525. NOTE: SILICONE GREASE IN
A 5.3 OZ TUBE APN 72401525 SHALL NOT BE USED FOR
INSTALLING RUBBER MOLDED PRODUCTS ON HIGH VOLTAGE
CABLE.
5. FOR CABLE PREPARATION, SEE MANUFACTURER'S INSTRUCTIONS
PACKAGED WITH DEVICES.
6. REPLACEABLE APPARATUS STUDS FOR 600 AMP DEAD-FRONT
APPLICATIONS ARE APN 85411378.
7. BAIL ASSEMBLY REQUIRED FOR NON-LOADBREAK ELBOW.
8. SEALING KITS ARE PACKAGED WITH THE 1/0AL, 200AMP LOADBREAK
ELBOWS AND 750AL, 600AMP BASIC T-ELBOWS. INDIVIDUAL SEALING
KITS ARE AVAILABLE IF NEEDED:
1/0AL - APN 33101380
750AL - APN 33101381
ANOTHER OPTION IS TO SEAL THE CABLE AT THE JACKET CUT-BACK
EDGE WITH ELECTRICAL PUTTY APN 33101230 AND BLACK
ELECTRICAL TAPE APN 71604710.
STEP 1. PLACE ONE WRAP OF ELECTRICAL PUTTY UNDER THE
CONCENTRIC NEUTRALS AT THE FOLD-BACK EDGE OF THE
JACKET CUT-BACK.
STEP 2. FIRMLY EMBED THE CONCENTRIC NEUTRALS IN THE ELECTRICAL
PUTTY.
STEP 3. APPLY ADDITIONAL WRAP OF ELECTRICAL PUTTY OVER THE
CONCENTRIC NEUTRALS AT THE FOLD-BACK EDGE OF THE
JACKET CUT-BACK, OVER-LAPPING A MINIMUM OF 1/2 INCH
OVER THE JACKET AND INSULATION SHIELD AT THE CUT-BACK
EDGE OF THE JACKET.
STEP 4. COVER THE EXPOSED ELECTRICAL PUTTY WITH SEVERAL
WRAPS OF BLACK ELECTRICAL TAPE.
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
LO S. WHITEY
LDR.
M. RING
MGR.
03/2000 4
ACCESSORIES
DEVICES
12KV SEPARABLE MOLDED ASSEMBLIES
THRU
2 2
5"
NOTE 6
NOTE 5
200A
BUSHING
OR
OR
OR
OR
OR
NOTE 9
OR
3200A
BUSHING
12KV
21KV
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
HCD M. CAMPA
LDR.
M. W. ADAMS
MGR.
12/2021 10
ACCESSORIES
DEVICES
HOTSTICK-OPERATED SYSTEM
FROM 200 AMP BUSHING INSERTS
1 2
2894. C
200 AMP CAP INSTALL ON ALL FUTURE
POSITIONS. ATTACH CAP LEAD TO GROUND
BUS WITH HOT TAP. SEE NOTE 4
2894. F _ __
200 AMP ELBOW, WITH OR WITHOUT VOLTAGE
INDICATOR. SEE NOTE 7
UNDERGROUND CABLE CODE
= WITHOUT VOLTAGE INDICATOR
= WITH VOLTAGE INDICATOR
A B
2894. J _ __
200 AMP REPAIR ELBOW.
SEE NOTE 3
UNDERGROUND CABLE CODE
= WITHOUT VOLTAGE INDICATOR
= WITH VOLTAGE INDICATOR
A B
NOTES:
1. FOR INSTALLATION, SEE MANUFACTURER'S INSTRUCTIONS PACKAGED
WITH DEVICE.
2. WHEN USING ELBOW FOR FAULT LOCATING, INSPECT ELBOW PROBE
AFTER EACH OPERATION. IF SEVERE PITTING OR EROSION IS PRESENT
ON PROBE, REPLACE BUSHING INSERT AND ELBOW.
3. WHEN ADDITIONAL SILICONE GREASE IS NEEDED TO INSTALL RUBBER
MOLDED PRODUCTS, SPLICES, ELBOWS, ETC., ON PRIMARY CABLE,
USE APN 72401510. NOTE: SILICONE GREASE IN A 5.3 OZ TUBE, APN
72401525, SHALL NOT BE USED FOR INSTALLING RUBBER MOLDED
PRODUCTS ON HIGH VOLTAGE CABLE.
4. PRIOR TO ENERGIZING DEAD-FRONT EQUIPMENT, VERIFY ALL UNUSED
PRIMARY BUSHINGS HAVE THE PLASTIC DUST COVERS REMOVED AND
INSTALL INSULATED BUSHING COVERS OR ELBOW ARRESTERS.
OFSH
REV.DATEBY
ARIZONA PUBLIC SERVICE COMPANY
T&D CONSTRUCTION STANDARDS
HCD M. CAMPA
LDR.
M. W. ADAMS
MGR.
12/2021 10
ACCESSORIES
DEVICES
HOTSTICK-OPERATED SYSTEM
FROM 200 AMP BUSHING INSERTS
2 2
CO
DE
2894.C 2894.F 2894.J
MATERIAL LIST
12KV 21KV 12KV 21KV 12KV 21KV
ITEM QTY QTY QTY DESCRIPTION APN
1 - - 1 1 1 1 ALCOHOL DENATURED 72501200
2 1 - - - - - CAP INSUL 12 KV LOADBREAK 33101324
3 - 1 - - - - CAP INSUL 21 KV LOADBREAK 33101734
4 1 1 - - - - CLAMP HOTLINE S #8 SOL - 2/0 33002515
5 - - 1 1 1 1 CONN 2 - BOLT 2/0 RUN / #6 TAP 33002960
6 - - - - 1 - ELBOW LB 1/0 15KV REPAIR 00051829
7 - - 1 - - - ELBOW LB 1/0 15KV/TPOINT 33101311
8 - - - - - 1 ELBOW LB 1/0 21KV REPAIR 00051828
9 - - - 1 - - ELBOW LB 1/0 21KV / TPOINT 33101348
10 - - 1 - 1 - ELBOW LB 4/0 15KV / TPOINT 00108769
11 - - - 1 - 1 ELBOW LB 4/0A 15KV REPAIR 00108770
12 - - 1 1 - - INDICATOR VOLTAGE 33101645
13 - - 1 1 1 1 SOLVENT CABLE CLEANER 71504505
14 - - 1 1 1 1 TIE CABLE 8-1/2" BLCK NYL 00103864
5. CONNECT THE CONCENTRIC NEUTRAL AND BLEED WIRE TO THE EQUIPMENT
GROUND BUS USING A TWO-BOLT CONNECTOR (APN 33002960) OR
COMPRESSION CONNECTOR. USE APN 33002961 IN THE OLD-STYLE
PHASE-ISOLATED CABINETS WHERE THE GROUND BUS IS 4/0 CU.
6. THE BLEED WIRE MAY BE EITHER A SCRAP CONCENTRIC NEUTRAL
STRAND, OR A #14CU MOUSING WIRE - APN 31203094 (COIL
EQUALS 1280’). IT MUST NOT BE ONE OF THE CONCENTRIC WIRES OF THE
CABLE THAT IS BEING TERMINATED. THE WIRE SHALL BE WRAPPED
AROUND THE CONCENTRIC NEUTRAL IN THE OPPOSITE DIRECTION OF THE
CONCENTRICS, OR SHALL BE RUN PARALLEL TO THE CONCENTRIC SO AS
TO MAINTAIN A VISUALLY IDENTIFIABLE PATH TO GROUND.
7. MOST AREAS USE THE VOLTAGE INDICATOR AS A "TOOL". THEREFORE,