DRAFT_Att1c_GRCA_190083_Vol_01_Drawings_Pg_218to383_4-22-22_4.pdf
PDF 47 MB Posted
- Solicitation number
- 140P2022R0100
About this file
This file provides details on a federal contract opportunity from the National Park Service to improve the potable water supply in Grand Canyon National Park. The solicitation number is 140P2022R0100 and seeks to construct a transcanyon water distribution pipeline. The opportunity type is a special notice and the contract aims to enhance potable water infrastructure for the Innercanyon and South Rim areas of Grand Canyon National Park. The relevant agency is the Department of the Interior National Park Service National Office. Key information presented includes the solicitation number, project name, opportunity type, description of work requirements, and the contracting federal agency.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOWER LEVEL
7047.00
PROCESS
CONTAINMENT LEVEL
7044.00
TOS
EL 7063.62
TOS
EL 7060.77
4"-AIR
CL 7062.05
6"-CIP-REC
CL 7058.70
8"-SET
CL 7049.00
1"-AIR
1"-SW
10"-FLT
UF SKID 3
1/2"-SMP
CL 7059.80
10"-BWW
CL 7045.75
2"-VT
36"-BR
CL 7044.05
3"-CIP
CL 7059.25
3"-CIP
CL 7059.25
LOWER LEVEL
7047.00
BASIN LEVEL
7064.00
PROCESS
CONTAINMENT LEVEL
7044.00
3"-PERM
CL 7047.65
10"-FLT
CL 7061.25
6"-CIP-RMT
CL 7058.70
1"-AIR
1/2"-AIR
3/4"-AIR
1"-SW
TOS
EL 7063.62
TOS
EL 7060.79
6"-CIP-REC
6"-CIP-RMT
6"-CIP-FILL
4"-AIR
8"-BWW
CL 7048.55
UF SKID 3
NF PERMEATE TANK
1/2"-SMP
CL 7059.80
4"-PERM
10"-SET
CL 7044.25
6"-BR
CL 7044.05
4"-CIP-OVF
4"-VT
TK-4611
1"-WST
LOWER LEVEL
7047.00
3"-PERM
CL 7047.65
10"-FLT
TOS
EL 7063.62
TOS
EL 7060.77
UF SKID 3
NF CIP SKID 1
3/4"-AIR
1/2"-AIR
CL 7059.70
3/4"-AIR
CL 7059.70
1/2"-AIR
1"-AIR
6"-CIP-FILL
CL 7058.70
6"-CIP-REC
6"-CIP-FILL
4"-AIR
10"-BWW
CL 7045.75
1/2"-SMP
CL 7059.80
4"-PERM
3/4"-AIR
1/2"-AIR
10"-SET
CL 7044.25
6"-BR
CL 7044.05
3/4"-WST
3"-CIP
CL 7059.25
3"-CIP
CL 7058.35
3"-CIP
3"-CIP
CL 7049.30
TK-4615
3"-CIP
CL 7051.00
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:3
P M
D412
GRAND CANYON NATIONAL PARK
190083
UF SKID 3 SECTIONSM. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
SCALE A01-D411
SECTIONB
SCALE A01-D411
SECTIONA
SCALE A01-D411
SECTIONC
KEYNOTES
1 STEEL GRATING
2 1" TAP VALVE AND DRAIN
3 2" BACKWASH WASTE FLUSH
CONNECTION. TAP 10" BF NEAR PIPE
INVERT.
4 SUEZ MEMBRANE MODULES TO BE
SUPPORTED. SUPPORTING METHOD TO
BE AGREED UPON BY CONTRACTOR AND
CONTRACTING OFFICER'S
REPRESENTATIVE.
218 738 741
A
01-D413
UF SKID 2
F
01-D304
8"-SET
6"-CIP-REC
A
IR
C
IP
-F
IL
L
C
IP
-R M
T
C
IP
-R E
C
F
L T
A
IR
C
IP
-F
IL
L
C
IP
-R M
T
C
IP
-R E
C
F L T
8"-BWW
6"-CIP-RMT
6"-CIP-FILL
8"-FLT
7'-6"
2'-5 5/8" 8 3/4" 1'-0" 1'-0" 1'-3" 1'-0 5/8"
TOS
EL 7060.77
TOS
EL 7060.77
10 1/4"
7 5/8"
6 1/4"
4 1/8"
1"-SW
CL 7063.65
3/4"-AIR
CL 7063.65
1"-AIR
CL 7063.65
1/2"-AIR
CL 7063.65
7'-6"
2'-5 5/8" 8 3/4" 1'-0" 1'-0" 1'-3" 1'-0 5/8"
4 1/8"
6 1/4"
7 5/8"
10 1/4"
1"-SW
CL 7063.65
3/4"-AIR
CL 7063.65
1/2"-AIR
CL 7063.65
1"-AIR
CL 7063.65
/4
1'-6 1/2"
/2
/8
/8
3'-3"
6'-6"
7'-3 1/2"
TOS
EL 7060.77
1'-6 1/2"
4"-AIR
11" 4'-4"
5 3/8"
/2
S
M P
/2
S
M P
/8
/8
LOWER LEVEL
7047.00
BASIN LEVEL
7064.00
10"-BWW
CL 7045.75
4"-AIR
CL 7062.05
TOS
EL 7063.59
TOS
EL 7060.77
1"-AIR
1/2"-AIR
3/4"-AIR
1"-SW
6"-CIP-FILL
6"-CIP-RMT
6"-CIP-REC
8"-FLT
3/4"-AIR
1/2"-AIR
CL 7059.70
6"-CIP-RMT
CL 7058.70
6"-CIP-REC
CL 7058.70
6"-CIP-FILL
CL 7058.70
8"-FLT
CL 7058.60
UF SKID 2
8"-BWW
CL 7048.55
8"-SET
CL 7049.00
3/4"-AIR
CL 7059.70
1/2"-SMP
CL 7059.80
6"-BR
CL 7044.05
10"-SET
CL 7044.25
4"-CIP-OVF
1"-WST
GENERAL NOTES
A. FOR PIPE TRENCH PIPING SEE 01/D101
PIPE TRENCH OVERALL PLAN.
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:4
P M
D413
GRAND CANYON NATIONAL PARK
190083
UF SKID 2 ENLARGED PLANM. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
SCALE A01-D104
UF SKID 2 ENLARGED PLAN1
KEYNOTES
1 UF FEED TURBIDIMETER PANEL
2 STEEL GRATING
SCALE A01-D413
SECTIONA
219 738 741
GENERAL NOTES
A. FOR PIPE TRENCH PIPING SEE 01/D101
PIPE TRENCH OVERALL PLAN.
A
01-D415
B
01-D415
1"-AIR
CL 7063.65
4"-AIR
3/4"-CA
3/4"-HYPO
1/2"-SBS
1/2"-STAB
1/2"-SCAL
1/2"-COR
3/4"-CA
3/4"-HYPO
10"-SET
/2
C
IT
/4
C
A
/2
H
C L
/2
S
B S
/4
H
Y P
O
6"-CIP-FILL
1"-SW
CL 7063.65
6"-CIP-FILL
CL 7058.70
8"-SET
1/2"-AIR
3/4"-AIR
3/4"-AIR
1"-AIR
CL 7063.65
1/2"-AIR
CL 7063.65
3/4"-AIR
CL 7063.65
1"-SW
CL 7063.65
A
IR
C
IP
-F
IL
L
C
IP
-R M
T
C
IP
-R E
C
F L T
6"-CIP-RMT
6"-CIP-REC
6"-CIP-REC 6"-CIP-RMT
4"-AIR
3/4"-AIR
CL 7059.70
2"-WST
8"-CIP-OVF
/2
S
M P
1/2"-SMP
1/2"-SMP
1/2"-HCL
4 TYP
UF SKID 1
UF CIP TANK
PMP-2721
TK-3011
TOS
EL 7060.77
TOS
EL 7060.77
TOS
EL 7060.77
/8
/8
7'-6"
7'-6"
8 3/4" 1'-0" 1'-0" 1'-3" 1'-0 5/8"
4 1/8"
2 1/8"
1 3/8"
2 5/8"
2'-5 5/8"
4 1/8"6 1/8"
/8
/8
/8
/8
/8
/8
/8
4'-3"
7 3/8"7 1/2"
11 5/8"
3'-3" 10" 8" 8" 8"
3'-3" 4'-0 1/2"
/2
1'-6 1/2"
1'-0 3/8" 11 5/8"
5 3/8"
5 3/8"
8 1/4"
1'-9 1/2"
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:5
P M
D414
GRAND CANYON NATIONAL PARK
190083
UF SKID 1 ENLARGED PLANM. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
KEYNOTES
1 SUEZ SKIDS FILTRATE TURBIDIMETERS.
2 FRP CHEMICAL TRAY
3 5 GALLON PLASTIC CHEMICAL DRAIN
CONTAINER
4 GALVANIZED WALL BRACKET FRP TRAY
SUPPORT
5 ROUTE "WST" SERVICE DRAIN LINE FROM
UF CIP TANK TO WST LINE, SEE D SHEETS
FOR FURTHER INFORMATION.
SCALE A01-D104
1 UF SKID 1 ENLARGED PLAN
220 738 741
LOWER LEVEL
7047.00
BASIN LEVEL
7064.00
4"-AIR
CL 7062.05
6"-CIP-REC
CL 7057.60
6"-WST
CL 7045.60
6"-BR
CL 7044.05
10"-SET
CL 7044.25
TOS
EL 7063.62
UF CIP TANK
UF SKID 1
TOS
EL 7055.54
TOS
EL 7058.30
1/2"-SBS
1/2"-CIT
3/4"-CA
1/2"-HCL
8"-CIP-OVF
1"-DR
2"-WST
CL 7047.20
6"-CIP-RMT
CL 7049.00
6"-CIP-RMT
CL 7044.05
8"-BWW
CL 7048.55
6"-CIP-RMT
CL 7049.25
6"-CIP-FILL
6"-CIP-RMT
6"-CIP-REC
8"-FLT
6"-CIP-FILL
CL 7058.70
6"-CIP-REC
CL 7058.70
6"-CIP-RMT
CL 7058.70
8"-FLT
CL 7058.60
C
IP
-F
IL
L
1"-AIR
1"-SW
1/2"-AIR
3/4"-AIR
3/4"-AIR
CL 7059.20
1/2"-AIR
CL 7059.70
3/4"-AIR
CL 7059.70
TOS
EL 7060.77
TYP
1/2"-SMP
TK-3011
LOWER LEVEL
7047.00
BASIN LEVEL
7064.00
10"-BWW
CL 7045.75
TOS
EL 7060.77
TOS
EL 7063.62
1"-SW6"-CIP-FILL8"-FLT
4"-AIR
3/4"-AIR
3/4"-AIR
1/2"-AIR
CL 7059.70
3/4"-AIR
CL 7059.70
4"-AIR
3/4"-AIR
8"-FLT
/2
A
IR
/4
A
IR
3/4"-AIR
6"-CIP-FILL
6"-CIP-REC
6"-CIP-RMT
/8
UF SKID 1
6"-CIP-REC
6"-CIP-FILL
CL 7057.60
4"-VT
UF CIP TANK
6"-CIP-RMT
2"-WST
CL 7045.60
10"-SET
CL 7044.25
6"-BR
CL 7044.05
4 1"-DR
8"-BWW
1/2"-SMP
CL 7059.80
10"-BWW
CL 7045.75
TK-3011
4"-VT
CL 7058.80
6"-WST
CL 7045.60
2"-WST
CL 7045.60
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:0
P M
D415
GRAND CANYON NATIONAL PARK
190083
UF SKID 1 SECTIONSM. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
SCALE A01-D414
SECTIONA
SCALE A01-D414
SECTIONB
KEYNOTES
1 FRP CHEMICAL TRAY
2 STEEL GRATING
3 SUEZ SKIDS FILTRATE
TURBIDIMETERS.
4 5 GALLON PLASTIC CHEMICAL
DRAIN CONTAINER
5 2" BACKWASH WASTE FLUSH
CONNECTION. TAP 10" BF
NEAR PIPE INVERT.
6 1" SADDLE TAP VALVE AND
DRAIN
7 PIPE RACK DIMENSIONS
SHOWN ON 01-D101.
221 738 741
A
01-D301
PMP-2614
PMP-2612
4"-SLG
4"-SLG
4"-SLG
4"-SLG
SLUDGE PUMP SLUDGE PUMP
PMP-2721
10"-SET
3/4"-CA
3/4"-HYPO
TYP
/8
/8
5 5/8"
/2
41/2"-SMP
1/2"-SMP
1/2"-SMP
3/4"-CA
3/4"-CA
3/4"-HYPO
3/4"-HYPO
1/2"-SBS
1/2"-COR
1/2"-HCL
1/2"-STAB
1/2"-SCAL
1"-DR
1"-SMP
1"-VT
5 5
FV-2631
FV-2632
1'-2 1/8" 2'-6" 3'-8 1/8" 2'-6"
/8
2'-5 1/2"
PSL-2661
PSH-2662
PSL-2663
PSH-2664
FE-7171
4"-SLG
GENERAL NOTES
A. FOR CONTINUATION OF PIPING BELOW
TRENCH GRATE SEE SHEET 01/D417
PIPING TRENCH LEVEL ENLARGED
PLAN.
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/9
/2
:0
:5
P M
D416
GRAND CANYON NATIONAL PARK
190083
SLUDGE PUMP & PIPING
ENLARGED PLAN
M. BEEBE
R. STRATTON
04/22/2022
K. BREWSTER
14456601-
SCALE A01-D104
1 SLUDGE PUMP AND PIPING ENLARGED PLAN
KEYNOTES
1 SETTLED WATER TANK ABOVE SLUDGE
PUMPS.
2 6" MUD VALVE IN SUMP FOR BASIN DRAIN.
CONNECT TO 6"-PD IN PIPE TRENCH.
3 CHEMICAL INJECTION TAP
4 BALL CHECK VALVE
5 DISMANTLING JOINT
6 CONCRETE PEDESTAL SUPPORT
7 SETTLED WATER SAMPLE PANEL.
8 PROVIDE MODULAR MECHANICAL SEAL
FOR PIPE PENETRATIONS INTO
CONCRETE PROCESS TANKS.SEE
MODULAR MECH SEAL DETAIL 4/00-D502.
9 1" SADDLE TAP VALVE AND DRAIN
10 TERMINATE VENT LINE AT FF LEVEL OF
TOP OF PRETREATMENT BASINS.
OF222 738 741
6"-WST
6"-DR
6"-DR
6"-WST
10"-BWW
6"-CIP-RMT
2"-WST
10"-BWW
10"-SET
6"-BR
6"-WST
IE 7043.86
6"-BR
IE 7043.78
10"-SET
6"-BR
SEE CIVIL SHEETS FOR
CONTINUATION OF PIPING
1'-0 1/2"
/2
/8
/8
/8
/8 " 8
/8
2'-4 1/4"
13'-0 5/8"
1"-SMP
1"-DR
1"-VT
2 2
3/4"-WST
2"-VT
/4
1'-1 1/4"
/4
/8
2'-10 1/4" 11'-9 3/4" 9'-8 1/2"
6"-BR
/8
/4
7 8
/8
/8
/8
8 3/4" 2'-8 1/4"
1'-3 7/8"
1'-0 1/2"
/8
FE/FIT-7071
1"-WST
GENERAL NOTES
A. FOR CONTINUATION OF PIPING
ABOVE TRENCH GRATE SEE SHEET
A/01/D101 GROUND LEVEL OVERALL
PLAN.
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:1
P M
D417
GRAND CANYON NATIONAL PARK
190083
PIPING TRENCH LEVEL
ENLARGED PLAN
M. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
01-D417
PIPING TRENCH LEVEL ENLARGED PLAN1
KEYNOTES
1 FOR CONTINUATION OF PIPING SEE
SHEET 01-D101.
2 CONCRETE PEDESTAL SUPPORT
3 3/4" DRAIN SPILL INDIRECTLY ABOVE
TRENCH/FLOOR DRAIN.
4 TRANSITION FROM SS TO PVC PIPING.
5 2" BACKWASH WASTE FLUSH
CONNECTION. TAP 10" BF NEAR PIPE
INVERT.
6 1" PVC TAP AND VALVE FOR SAMPLE LINE
FROM 10"-SET
7 1" VENT TAP FOR 6"-WST
8 TRANSITION FROM DIP TO PVC PIPING.
9 1" SADDLE TAP VALVE AND DRAIN
10 1" TAP VALVE AND DRAIN
223 738 741
316 SST U-BOLTS
2" PIPE STAND
316 SST
(4) 1/2"x6"
WEDGE ANCHOR 316 SST
FINISH GRADE
INSTRUMENT PANEL
NOTE:
DIMENSIONS ARE APPROXIMATE,
CONTRACTOR TO ADJUST AS NEEDED.
14'-0"
3003 ALUMINUM
PLATE 0.25 INCH
THICK
2" PIPE STAND
KEYNOTES
1. PRESSURE GAUGE
2. 1" NPT PH PROBE IN 2" PVC SAMPLE LINE
3. PH CONTROLLER
4. FLOW SENSOR
5. 1/4" OD POLYETHYLENE INLET TUBING
6. RESIDUAL CHLORINE ANALYZER
7. 1/4" OD POLYETHYLENE OUTLET TUBING
8. FLOW REGULATOR
9. TURBIDIMETER
10. TURBIDIMETER PROBE MODULE
11. TURBIDIMETER DISPLAY MODULE
1" PVC SAMPLE LINE
TO
LAB
TO DRAIN
MOUNTED ON 60"x48" PANEL
FROM
SAMPLE
PUMP
1" PVC DRAIN
3 5
KEYNOTES
1. PRESSURE GAUGE
2. FLOW SENSOR
3. 1/4" OD POLYETHYLENE INLET TUBING
4. RESIDUAL CHLORINE ANALYZER
5. 1/4" OD POLYETHYLENE OUTLET TUBING
6. NOT USED
7. TURBIDIMETER
8. TURBIDIMETER PROBE MODULE
9. TURBIDIMETER DISPLAY MODULE
10. CONDUCTIVITY CONTROLLER
11. CABLE TO 3/4" NPT CONDUCTIVITY PROBE IN
FINISHED WATER LINE
12. PH CONTROLLER
13. CABLE TO 1" NPT PH PROBE IN FINISHED
WATER LINE.
1" PVC SAMPLE LINE FROM SAMPLE PUMP
1/2" PVC LINE TO LAB
TO DRAIN
1" PVC DRAIN
MOUNTED ON 120"x48" PANEL
KEYNOTES
1. PRESSURE GAUGE
2. FLOW SENSOR
3. TURBIDIMETER
4. TURBIDIMETER PROBE MODULE
5. TURBIDIMETER DISPLAY MODULE
6. NOT USED
7. 1/4" OD POLYETHYLENE INLET TUBING
8. 1/4" OD POLYETHYLENE OUTLET TUBING
9. PH CONTROLLER
10. ph PROBE INSTALLED IN 1" NPT
THREADED CONNECTION.
11. CONDUCTIVITY CONTROLLER
12. CONDUCTIVITY PROBE IN 3/4" NPT
THREADED CONNECTION.
1" PVC LINE FROM SAMPLE PUMP
1/2" PVC LINE TO
LAB
TO DRAIN
1" PVC DRAIN
MOUNTED ON 72"x48" PANEL
1"x2" 2"x1/2"
KEYNOTES
1. PRESSURE GAUGE
2. FLOW SENSOR
3. RESIDUAL CHLORINE ANALYZER
4. FLOW REGULATOR
5. 1/4" OD POLYETHYLENE INLET TUBING
6. 1/4" OD POLYETHYLENE OUTLET TUBING
7. TURBIDIMETER
8. TURBIDIMETER PROBE MODULE
9. TURBIDIMETER DISPLAY MODULE
10. CONDUCTIVITY CONTROLLER
11. CABLE TO 3/4" NPT CONDUCTIVITY PROBE IN
NF FEED LINE
12. ROTAMETER
1" PVC SAMPLE LINE
TO DRAIN
1" PVC DRAIN
MOUNTED ON 60"x48" PANEL
1/2" PVC SAMPLE LINE
KEYNOTES
1. 1" PVC SAMPLE LINE CENTERED IN OPENING
FROM RAPID MIX
2. PH PROBE INSTALLED IN 1" NPT THREADED
CONNECTION
3. 1/2" PVC LINE TO ZETA POTENTIAL ANALYZER
4. ZETA POTENTIAL ANALYZER
5. ROTAMETER
6. SUPPORT SAMPLE PROBES FROM BASIN
FLOOR (TYP)
7. pH CONTROLLER
TO DRAIN
BASIN 1
1"x2" PVC
REDUCER
S
S
BASIN 2
SV2532
SV2331
TO DRAIN
1" PVC
1/2" PVC
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:5
:1
P M
D501
GRAND CANYON NATIONAL PARK
190083
PROCESS DETAILS 1M. BEEBE
R. STRATTON
04/22/2022
P.VELEZ
14456601-
NO SCALE01-D501
1 INSTRUMENT PANEL MOUNTING
NO SCALE01-D501
3 SETTLED WATER SAMPLE PANEL
NO SCALE01-D501
4 FINISHED WATER INSTRUMENT PANEL
NO SCALE01-D501
2 RAW WATER SAMPLE PANEL
NO SCALE01-D501
5 NF FEED SAMPLE PANEL
NO SCALE01-D501
6 FLOC/SED BASIN SAMPLE INSTRUMENTS
NO SCALE01-D501
7 EXAMPLE PIPE LOOP RACK
NOTES: CONTRACTOR SHALL HARVEST AND REPLACE 20 FT EACH OF (4) PIPE
SEGMENTS IDENTIFIED IN DISTRIBUTION SYSTEM. FINAL PIPE LOOP RACK DETAILS
AND HARVESTING LOCATIONS WILL BE PROVIDED BY CONTRACTING OFFICER.
224 738 741
3"-BWR
4"-SLG
10"-RW
10"-BWW
6"-PW
4"-PW
8"-FW
4"-PW
10"-FLT
4"-NF
4"-NF
4"-NF
4"-NF
4"-NF
4"-NF
1"-SW
1"-AIR
6"-VT
6"-VT
1"-AIR
1"-SW
1/2"-SCAL
1/2"-SBS
3"-NF
10"-FLT
8"-FLT
10"-FW
8"-FW
3/4"-HYPO
3"-PW
1/2"-SMP
NF SKIDS 3 & 4
3/4"-COAG
1/2"-SCAL
1/2"-HCL
1/2"-COR
1/2"-SBS
3/4"-HYPO
3/4"-HYPO
3/4"-CA
3/4"-CA
3/4"-CA
3/4"-HYPO
3/4"-HYPO
3/4"-CA
3/4"-HYPO
3/4"-HYPO
RM-2411
4TYP
14"-OVF
10"-FLT
8"-NF
1"-SMP
1/2"-SMP
1"-SMP
1/2"-SMP
1"-VT
1/2"-COR
3/4"-CA
3/4"-HYPO
8TYP OF 4
PMP-6221
8"-PERM
1"-SMP
4"-NF
3"-CIP
11 TYP
1"-DR
4"-NF
3"-CIP
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:5
:5
A M
D901
GRAND CANYON NATIONAL PARK
190083
PROCESS PIPING
ISOMETRIC 1
M. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-01-D901
PUMP PIPING 3D VIEW2
KEYNOTES
1 FINISHED WATER INSTRUMENTATION
PANEL
2 NF FEED INSTRUMENTAION PANEL
3 FRP CHEMICAL TRAY
4 BASIN INFLUENT CHANNEL SLIDE GATE.
5 8" DIAMETER x 28" LONG STATIC MIXER
6 CONDUCTIVITY PROBE 3/4" NPT SADDLE
TAP
7 PH PROBE 1" NPT SADDLE TAP
8 ANTI SIPHON BACKPRESSURE VALVE
9 BLIND FLANGE FOR DEMONSTRATION
CONNECTION FOR PUMP TESTING.
10 DAVIT CRANE. SEE SECTION 41 22 23
11 AIR RELEASE VALVE.
741225
1"-AIR
1"-SW
10"-FLT
4"-NF
4"-NF
4"-NF
4"-AIR
10"-SET
10"-BWW
4"-AIR
6"-CIP-REC
8"-FLT
8"-BWW
6"-CIP-REC
6"-CIP-RMT
6"-CIP-RMT
4"-AIR
TK-4615
6"-CIP-FILL
6"-CIP-REC
10"-FLT1/2"-STAB
1"-DR
1"-DR
3"-PERM
8"-SET
NF SKIDS
1 & 2
NF SKIDS
3 & 4
1/2"-SMP
1/2"-AIR
3/4"-AIR
UF SKID 3
NF SKID 2
3/4"-CA
3/4"-CA
3/4"-HYPO
3/4"-HYPO
1/2"-SBS
1/2"-COR
1/2"-HCL
1/2"-STAB
1/2"-SCAL
1"-SMP
1"-SMP
1"-DR
8"-PERM
1/2"-SMP
1"-SMP
TK-4611
4"-PERM
3"-CIP
3"-CIP
3"-CIP
3"-CIP
4"-VT
4"-CIP-OVF
8TYP
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:5
:2
A M
D902
GRAND CANYON NATIONAL PARK
190083
PROCESS PIPING
ISOMETRIC 2
M. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-01-D902
NF SKID 1 & 2 3D VIEW1
KEYNOTES
1 FINISHED WATER INSTRUMENTATION PANEL
2 UF FEED TURBIDIMETER PANEL
3 5 GALLON PLASTIC CHEMICAL DRAIN CONTAINER
4 GALVANIZED WALL BRACKET FRP TRAY SUPPORT
5 FRP CHEMICAL TRAY
6 FLOC/SED BASIN SAMPLE INSTRUMENTS.
7 DAVIT CRANE. SEE SECTION 41 22 23
8 AIR RELEASE VALVE.
9 PIPE RACK DIMENSIONS SHOWN ON 01-D101.
741226
TK-3011
10"-SET
6"-WST
6"-BR
2"-WST
10"-BWW
6"-CIP-RMT
1"-AIR
1"-SW
4"-AIR
4"-AIR
6"-CIP-REC
6"-CIP-RMT
6"-CIP-FILL
6"-CIP-REC
6"-CIP-FILL
6"-CIP-REC
2"-WST
8"-FLT
6"-CIP-REC
6"-CIP-RMT
6"-CIP-FILL
4"-AIR
3"-PERM
1"-AIR
1/2"-AIR
3/4"-AIR
1"-SW
10"-FLT
6"-CIP-REC
6"-CIP-RMT
6"-CIP-FILL
8"-BWW
8"-SET
1/2"-SMP
1/2"-SMP
1"-AIR
UF SKID 1
UF SKID 2
UF SKID 3
4"-PERM
1/2"-SMP
TK-4611
4"-VT
3/4"-CA
3/4"-HYPO
1/2"-SBS
1/2"-COR
1/2"-HCL
1/2"-STAB
1/2"-SCAL
1/2"-SCAL
1/2"-CIT
1/2"-STAB
1/2"-HCL
1/2"-SBS
1/2"-HCL
1/2"-COR
1/2"-SBS
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:2
P M
D903
GRAND CANYON NATIONAL PARK
190083
PROCESS PIPING
ISOMETRIC 3
M. BEEBE
R. STRATTON
04/22/2022
P. VELEZ
14456601-
NO SCALE01-D903
UF SKID 1 3D VIEW1
KEYNOTES
1 CHEMICAL DRUM ROOM I/O PANEL
2 UF FEED TURBIDIMETER PANEL
3 FRP CHEMICAL TRAY
4 2" BACKWASH WASTE FLUSH
CONNECTION. TAP 10" BF NEAR PIPE
INVERT.
5 WALL BRACKET PIPE SUPPORT.
6 BOLTED BLIND FLANGE.
227 738 741
1/2"-SMP
1/2"-SMP
1/2"-DR
1/2"-DR
1/2"-DR
1/2"-SMP
1/2"-SMP
1/2"-DR
4 TYP
3 3
1/2"-SMP
1"-SMP 1"-SMP
1"-DR
TYP
1"-DR
1"-SMP
1/2"-SMP
1"-SMP
1"-SMP
1"-SMP
1"-DR1"-DR
1"-SMP
4TYP
1"-SMP
1"-SMP
2"-SMP
1/2"-SMP
1"-SMP
1/2"-DR
TYP
1"-SMP
1"-DR
15 TYP
1/2"-SMP1"-SMP
1"-SMP
1"-SMP
1"-SMP
1"-DR
1"-DR
1"-DR
4TYP
ASCALE 3/4" = 1'-0"
SCALE OF FEET
0 1 2 3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d
C a n y o n S o u th R im W
T P
/1
D
S
R W
T P
.r v t
/1
/2
:2
:3
P M
D904
GRAND CANYON NATIONAL PARK
190083
PROCESS PIPING
ISOMETRIC 4
C. LARSON
J. GLOVER
04/22/2022
P. VELEZ
14456601-
NO SCALE01-D904
NF FEED SAMPLE PANEL4
NO SCALE01-D904
RAW WATER SAMPLE PANEL3
NO SCALE01-D904
SETTLED WATER SAMPLE PANEL5
NO SCALE01-D904
FLOC SED SAMPLE PANEL1
NO SCALE01-D904
FINISHED WATER SAMPLE PANEL2
KEYNOTES
1 FLOC/SED BASIN SAMPLE INSTRUMENTS.
2 1/2" DRAIN SPILL INDIRECTLY ABOVE TRENCH/FLOOR
DRAIN.
3 1" DRAIN SPILL INDIRECTLY ABOVE TRENCH/FLOOR
DRAIN.
4 BALL VALVE
5 NF FEED SAMPLE PANEL.
6 SETTLED WATER SAMPLE PANEL.
7 RAW WATER SAMPLE PANEL.
8 FINISHED WATER INSTRUMNENT PANEL.
9 FOR CONTINUATION OF PIPING SEE SHEET 01-D417.
10 FOR CONTINUATION OF PIPING SEE SHEET 01-D416.
11 FOR CONTINUATION OF PIPING SEE SHEET 01-D408.
12 FOR CONTINUATION OF PIPING SEE SHEET 01-D403.
13 FOR CONTINUATION OF PIPING SEE SHEET
B/01-D301.
14 ROTAMETER
15 SOLENOID VALVE
228 738 741
CHEMICAL
DRUM
ROOM
LABORATORY
WORK
ROOM
MECHANICAL
ELECTRICAL
ROOM
BLOWER
ROOM
PROCESS
AREA
MAINTENANCE
ROOM
SODIUM
HYPOCHLORITE
ROOM
1 1.2 2.3 2.8 3 4.8 5 6
K
J
H
G.1
D.4
D.2
C.8
C
B
A
G
G.4
FIRE RISER
ROOM
COAGULANT
ROOM
CAUSTIC
SODA
ROOM
F
E
D
ASCALE 1/16" = 1'-0"
16 0 16 32
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:2
:4
P M
M101 190083
GROUND LEVEL OVERALL
PLAN
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M101
1 GROUND LEVEL OVERALL PLAN
1. REFER TO ARCHITECTURAL PLANS FOR EXACT LOUVER ELEVATIONS.
2. ALL INTERIOR/EXTERIOR WALL PENETRATIONS SHALL BE SEALED
AIR/WATER TIGHT. REFER TO 00-M501 FOR PIPE PENETRATION THRU
WALL DETAIL.
3. REFER TO 00-M501 FOR STANDARD DUCT CONSTRUCTION DETAILS.
4. ALL BRANCH DUCTWORK SHALL BE SAME AS DIFFUSER/GRILLE UNLESS
NOTED OTHERWISE.
5. NO DUCTWORK/PIPING SHALL BE ROUTED OVER ELECTRICAL
EQUIPMENT.
6. MOUNT ALL THERMOSTATS/SENSORS 48" ABOVE FINISHED FLOOR.
7. ADD INSULATION INSERT BEHIND ALL THERMOSTATS ON EXTERIOR
WALLS.
GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)
SEE SHEET 01-M102 FOR AREA A PLAN
SEE SHEET 01-M103 FOR AREA B PLAN
SEE SHEET 01-M104 FOR AREA C PLAN
SEE SHEET 01-M105 FOR AREA D PLAN
229 738 741GRAND CANYON NATIONAL PARK
SODIUM
HYPOCHLORITE
ROOM
PROCESS
AREA
CAUSTIC
SODA
ROOM
COAGULANT
ROOM
FIRE RISER
ROOM
MATCHLINE - SEE SHEET 01-M103 FOR CONTINUATION
1 1.2 2.3 2.8 3 4.8 5 6
K
J
H
G.4
MATCHLINE - SEE SHEET 01-M103 FOR CONTINUATION
01-EUH-1
14"x14" 14"x14" 14"x14"
01-L-07 01-L-08 01-L-09
01-MAU-1 CTRL
PANEL 01-MAU-2 CTRL
PANEL
01-MAU-3 CTRL
PANEL
SG-1 12"x10"
500 CFM
(TYP. 2)
SG-1 12"x10"
500 CFM
SG-1 12"x10"
500 CFM
(TYP. 2)
T 01-IRH-5 T 01-IRH-6
T T T
T 01-EUH-1
T: 16' - 0" B: 14' - 10"
T: 16' - 0" B: 14' - 10" T: 16' - 0"
B: 14' - 10"
(TYP.)
(TYP. 2)
01-EF-4
16"x12" DN 16"x12" DN
01-EF-5
24"x24" 24"x24"24"x24"
3 3
55 56 6
01-CU-5
RS/RL
RS/RL UP
(TYP.)
(TYP.)
16"x12" DN
T: 15' - 4" B: 13' - 4"
T: 15' - 4" B: 13' - 4"
T: 15' - 4" B: 13' - 4"
13 13 13
(TYP.)
01-EF-668
BDDBDD BDD
01-EF-1 &
01-EF-2 CTRL
PANEL
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:2
:5
P M
M102 190083
GROUND LEVEL PLAN -
AREA A
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M102
1 GROUND LEVEL PLAN - AREA A
KEYNOTES
1 MOUNT EUH TO WALL APPROXIMATELY 9'-0" AFF.
2 REF: 00-M504 FOR FIRE DAMPER THRU WALL
DETAIL.
3 SUPPLY DUCTWORK DOWN FROM ABOVE. REF:
01-M107 FOR CONTINUATION.
4 TERMINATE DUCT APPROXIMATELY 6" ABOVE
FINISHED FLOOR OPEN ENDED WITH 316 SS
HARDWARE MESH OVER OPENING.
5 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
6 REF: 00-M502 FOR HORIZONTAL INLINE FAN DETAIL.
7 GLOBAL SENSOR ARRAY. MOUNT AT
APPROXIMATELY 10'-0" ABOVE FINISHED GRADE ON
NORTH FACE OF BUILDING. REF: 00-M702 FOR
GLOBAL SENSOR ARRAY.
8 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION DETAIL.
9 ROUTE REFRIGERANT PIPING BETWEEN INDOOR
AND OUTDOOR UNITS. EXACT SIZE, QUANTITY OF
PIPES, AND PIPING ACCESSORIES SHALL BE PER
MANUFACTURER'S REQUIREMENTS. (TYP.)
10 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
11 BLUE STROBE/HORN ALARM SIGNALING DEVICE
FOR VENTILATION MONITORING. MOUNT ABOVE
DOOR OR AT INDICATED LOCATION
APPROXIMATELY 10' AFF. COORDINATE FINAL
LOCATION WITH OTHER TRADES. REF: 00-M700
SERIES FOR CONTROL SEQUENCE, MECHANICAL
EQUIPMENT SCHEDULES FOR SPECIFIC CONTROL
SEQUENCE AND 28 42 00 FOR SPECIFICATIONS.
12 ALL DUCTWORK WITHIN CHEMICAL STORAGE
ROOMS SHALL BE OF ALUMINUM CONSTRUCTION.
REF: SPEC SECTION 23 31 00.
13 EMERGENCY ALARM PUSHBUTTON. MOUNT AT 48"
AFF WITH POLYCARBONATE COVER. REF: 00-M700
SERIES FOR CONTROL SEQUENCE, MECHANICAL
EQUIPMENT SCHEDULES FOR SPECIFIC CONTROL
SEQUENCE AND 28 42 00 FOR SPECIFICATIONS.
14 SUSPEND FAN FROM STRUCTURE ABOVE WITH
RUBBER-IN-SHEAR VIBRATION ISOLATORS.
14"x14" UP 14"x14" UP14"x14" UP
230 738 741GRAND CANYON NATIONAL PARK
PROCESS
AREA
MATCHLINE - SEE SHEET 01-M102 FOR CONTINUATIONMATCHLINE - SEE SHEET 01-M102 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-M104 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M104 FOR CONTINUATION
1 2.3 2.8 3 5 6
G.1
G
G.4
01-EUH-2
T01-IRH-1
T01-EUH-2
T01-IRH-2
T01-IRH-7
T01-EF-1 &
01-EF-2
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:2
:0
P M
M103
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL PLAN -
AREA B
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M103
1 GROUND LEVEL PLAN - AREA B
KEYNOTES
1 MOUNT EUH TO WALL APPROXIMATELY 9'-0" AFF.
231 738 741
ELECTRICAL
ROOM
BLOWER
ROOM
MATCHLINE - SEE SHEET 01-M103 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M103 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-M105 FOR CONTINUATION
1 2.8 3 5
D.4
D.2
C.8
C
16"x16"
01-AHU-3
01-CU-3
01-AHU-2
RS/RL
30"x16"
SG-1 10"x10"
350 CFM
(TYP. 4)
T
T
01-AHU-3
01-AHU-2
RS/RL
SG-1 22"x22"
1825 CFM
(TYP. 2)
T: 14' - 8" B: 13' - 4"
T: 14' - 8" B: 13' - 4"
RG-2 42"x24"
01-MOD-4
01-MOD-5
T
T01-IRH-4
01-IRH-3
T IRH-12
XG-1 16"x8"
(TYP.2)
RS/RL UP
01-L-033
DN FROM
BASIN LEVEL 01-L-10
BDD
6 (TYP.)
16"x16" UP
01-EUH-3
01-EUH-4
T 01-EUH-4
T
01-EUH-3
PROCESS
AREA
54"x12"
01-CU-62
01-CU-22
T: 2' - 4" B: 1' - 8"
T: 15' - 0" B: 13' - 0"
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:2
:3
P M
M104
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL PLAN -
AREA C
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M104
1 GROUND LEVEL PLAN - AREA C
KEYNOTES
1 REF: 00-M503 FOR SUSPENDED AIR HANDLING UNIT
DETAIL.
2 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
3 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
4 ROUTE REFRIGERANT PIPING BETWEEN INDOOR
AND OUTDOOR UNITS. EXACT SIZE, QUANTITY OF
PIPES, AND PIPING ACCESSORIES SHALL BE PER
MANUFACTURER'S REQUIREMENTS. (TYP.)
5 REF: 00-M501 FOR NON-DUCTED LOUVER DETAIL.
6 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION DETAIL.
7 MOUNT EUH TO WALL APPROXIMATELY 9'-0" AFF.
8 BLUE STROBE/HORN ALARM SIGNALING DEVICE
FOR VENTILATION MONITORING. MOUNT ABOVE
DOOR OR AT INDICATED LOCATION
APPROXIMATELY 10' AFF. COORDINATE FINAL
LOCATION WITH OTHER TRADES. REF: 00-M700
SERIES FOR CONTROL SEQUENCE, MECHANICAL
EQUIPMENT SCHEDULES FOR SPECIFIC CONTROL
SEQUENCE AND 28 42 00 FOR SPECIFICATIONS.
9 EMERGENCY ALARM PUSHBUTTON. MOUNT AT 48"
AFF WITH POLYCARBONATE COVER. REF: 00-M700
SERIES FOR CONTROL SEQUENCE, MECHANICAL
EQUIPMENT SCHEDULES FOR SPECIFIC CONTROL
SEQUENCE AND 28 42 00 FOR SPECIFICATIONS.
ADJUST BAROMETRIC DAMPER TO MAINTAIN A
POSITIVE PRESSURE OF 0.02 IN W.C. WITH
RESPECT TO THE OUTSIDE.
232 738 741
VESTIBULE
CORRIDOR
CHEMICAL
DRUM
ROOM
CONTROLS
LABORATORY
WORK
ROOM
MECHANICAL
UNISEX
RESTROOM
UNISEX
RESTROOM
MAINTENANCE
ROOM
JANITORS
CLOSET
SCADA / IT
CLOSET
01-CU-1
01-SS-1
MATCHLINE - SEE SHEET 01-M104 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M104 FOR CONTINUATION
1 5
C
B
A
2 4
"x
"x
8"x6"
"x
"x
"x
"x
24"x16"
36"x24"
48"x24"
"x
"x
01-GDH-1
01-SSCU-11
01-L-02
01-L-01
BDD
01-MOD-3
(TYP. 2)
01-AHU-1
T: 12' - 6" B: 11' - 2"
01-MOD-1
01-MOD-2
RS/RL
24"x16"
RS/RL
01-EF-75
01-SS-2
T
01-EWH-1
01-SSCU-2
24"x16"
T: 10' - 8" B: 9' - 4"
RS/RL
T 01-AHU-4
T 01-GFUH-1
CD-2 6"ø
35 CFM
20"x16"
CD-2 6"ø
35 CFM
CD-1 6"ø
80 CFM
CD-1 8"ø
200 CFM
SG-1 16"x8"
180 CFM
SG-1 16"x8"
180 CFM
(TYP. 2)
01-GFUH-1
EG-1 8"x8"
75 CFM
EG-1 8"x8"
75 CFM
CD-1 12"ø
375 CFM
CD-1 12"ø
350 CFM
SG-1 10"x10"
200 CFM
T01-AHU-1
T SS-1
01-MAU-5 CTRL
PANEL
01-SS-2
"x
R
D
(TYP. 2) (TYP. 2)
RG-2 10"x10"
1 6
RG-1
RG-1
RG-1
RG-1
T
SG-1 12"x8"
255 CFM
(TYP.5)
01-AHU-4
12"x12"
8"ø
8"x8"
01-MOD-7
01-L-13
01-CF-1
EG-1 8"x8"
75 CFM
T: 20' - 2" B: 18' - 10"
01-EF-312
16"x16" DN
16"x16"
01-CU-41
32"x24"
D
T: 12' - 6" B: 11' - 6"
B: 12'-0"
(TYP.)
17 (TYP.)
18 19
10"x10"
01-L-12
18"x12"
800 CFM
T: 12' - 8" B: 10' - 8"
24"x16"
"x
"x
(TYP.)
BDD
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:0
P M
M105
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL PLAN -
AREA D
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M105
1 GROUND LEVEL PLAN - AREA D
KEYNOTES
1 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
2 RISE FULL SIZE COMBUSTION AIR AND FLUE DUCTS
UP TO CONCENTRIC FLUE THROUGH ROOF. REF:
00-M503 FOR CONCENTRIC FLUE DETAIL.
3 SUSPEND DUCT HEATER AND GAS FIRED UNIT
HEATER FROM BOTTOM OF STRUCTURE ABOVE.
REF: PLUMBING PLANS FOR GAS CONNECTION.
4 TERMINATE RETURN AIR DUCT OPEN ENDED IN
PLENUM ABOVE CEILING. PROVIDE HARDWARE
MESH TO PROTECT OPENING.
5 SUSPEND FAN FROM STRUCTURE ABOVE WITH
RUBBER-IN-SHEAR VIBRATION ISOLATORS.
6 ROUTE REFRIGERANT PIPING BETWEEN INDOOR
AND OUTDOOR UNITS. EXACT SIZE, QUANTITY OF
PIPES, AND PIPING ACCESSORIES SHALL BE PER
MANUFACTURER'S REQUIREMENTS. (TYP.)
7 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
8 PROVIDE FULL SIZED INSULATED RETURN PLENUM.
SUPPORT FROM FLOOR. CONNECT DUCTWORK AS
INDICATED.
9 MOUNT TO WALL APPROXIMATELY 12'-0" AFF WITH
MANUFACTURER'S WALL BRACKET AND EXPANSION
BOLTS.
10 REF: 00-M503 FOR SUSPENDED AIR HANDLING UNIT
DETAIL.
11 COORDINATE ROUTING OF UTILITIES ACROSS
CORRIDOR WITH CEILING SYSTEM TO ENSURE
THEY ARE CONCEALED.
12 REF: 00-M502 FOR HORIZONTAL INLINE FAN DETAIL.
13 FUTURE LOCATION OF LAB FUME HOOD. KEEP AREA
CLEAR OF MECHANICAL AND PLUMBING UTILITIES.
14 TERMINATE DUCT APPROXIMATELY 6" ABOVE
FINISHED FLOOR OPEN ENDED WITH 316 SS
HARDWARE MESH OVER OPENING.
15 ADJUST BAROMETRIC DAMPER TO MAINTAIN A
POSITIVE PRESSURE OF 0.02 IN W.C. WITH
RESPECT TO THE OUTSIDE.
16 PROVIDE ACOUSTICALLY LINED FULL SIZE RETURN
AIR BOOT. REF: 00-M504 FOR RETURN AIR BOOT
DETAIL.
17 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION DETAIL.
18 ALL DUCTWORK WITHIN CHEMICAL STORAGE
ROOMS SHALL BE OF ALUMINUM CONSTRUCTION.
REF: SPEC SECTION 23 31 00.
19 BLUE STROBE/HORN ALARM SIGNALING DEVICE
FOR VENTILATION MONITORING. MOUNT ABOVE
DOOR OR AT INDICATED LOCATION
APPROXIMATELY 10' AFF. COORDINATE FINAL
LOCATION WITH OTHER TRADES. REF: 00-M700
SERIES FOR CONTROL SEQUENCE, MECHANICAL
EQUIPMENT SCHEDULES FOR SPECIFIC CONTROL
SEQUENCE AND 28 42 00 FOR SPECIFICATIONS.
20 REF: 00-M504 FOR FIRE DAMPER THRU WALL
DETAIL.
233 738 741
1 1.2 2.3 2.8 3 4.8 5 6
K
J
H
G.1
D.4
D.2
C.8
C
B
A
G
G.4
MECHANICAL
MEZZANINE
F
E
D
ASCALE 1/16" = 1'-0"
16 0 16 32
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:2
P M
M106
GRAND CANYON NATIONAL PARK
190083
BASIN LEVEL OVERALL
PLAN
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-01-M106
1 BASIN LEVEL MECHANICAL OVERALL PLAN
SEE SHEET 01-M107 FOR AREA A PLAN
SEE SHEET 01-M108 FOR AREA B PLAN
SEE SHEET 01-M109 FOR AREA C PLAN
234 738 741
MATCHLINE - SEE SHEET 01-M108 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M108 FOR CONTINUATION
1 1.2 2.3 2.8 3 4.8 5 6
K
J
H
G.4
MECHANICAL
MEZZANINE
24"x24" 20"x20"
20"x20"
14"x14" 14"x14"
01-EF-1
01-EF-2
01-IRH-5 01-IRH-6
(TYP.2)
R
T: 3' - 1" B: 1' - 5"
20"x20"
T: 9' - 6" B: 7' - 6"
T: 3' - 1" B: 1' - 5"
36"x24"
T: 9' - 2" B: 8' - 0"
T: 9' - 2" B: 8' - 0"
BOE: 15' -5"
BOE: 15' -5"
20"x20"
(TYP. 2)
01-L-061
A
01-M302
A
01-M302
(TYP.)
14"x14"
DL-1 41"x13"
1250 CFM
DL-1 41"x13"
1250 CFM
14"x14" 14"x14"
01-MAU-6
01-MAU-13 3 01-MAU-2
3 01-MAU-3 01-MAU-43
14"x14"
T: 9' - 2" B: 8' - 0"
4 4
RS/RL
RS/RL DOWN
TO LEVEL
BELOW
T: 9' - 4" B: 7' - 8"
01-MAU-4
CTRL PNL
01-MAU-6
CTRL PNL
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:2
P M
M107
GRAND CANYON NATIONAL PARK
190083
BASIN LEVEL PLAN - AREA AA. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M107
1 BASIN LEVEL PLAN - AREA A
KEYNOTES
1 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
2 SUPPLY DUCTWORK DOWN TO BELOW. REF:
01-M102 FOR CONTINUATION.
3 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
4 SUSPEND RADIANT HEATER FROM STRUCTURE
ABOVE AS HIGH AS POSSIBLE. ANGLE DOWN AT 45
DEGREES FROM THE HORIZONTAL. REF: PLUMBING
PLANS FOR GAS PIPING CONNECTION.
5 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION DETAIL.
6 SUPPORT DUCTWORK ROUTED LOW TO THE FLOOR
WITH GALVANIZED STEEL FLOOR SUPPORTS.
235 738 741
MATCHLINE - SEE SHEET 01-M107 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M107 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-M109 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M109 FOR CONTINUATION
1 2.3 2.8 3 5 6
G.1
G.4
MECHANICAL
MEZZANINE
01-IRH-01
01-IRH-02
4"ø
4"ø
FLUE THRU ROOF
F
01-IRH-07
01-IRH-08
01-IRH-09
T
T
01-IRH-09
01-IRH-10
T
01-IRH-08
01-EF-8
01-L-14
EG-2 16"x16"
600 CFM
T: 10' - 0" B: 8' - 0"
T: 9' - 10" B: 8' - 2"
T: 9' - 10" B: 8' - 2"
24"x24"24"x24"
64"x48"
H 01-EF-8
(TYP. 4)
"x
"x
BDD
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
M108
GRAND CANYON NATIONAL PARK
190083
BASIN LEVEL PLAN - AREA BA. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M108
1 BASIN LEVEL PLAN - AREA B
KEYNOTES
1 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
2 REF: 00-M502 FOR HORIZONTAL INLINE FAN DETAIL.
3 SUSPEND RADIANT HEATER FROM STRUCTURE
ABOVE AS HIGH AS POSSIBLE. ANGLE DOWN AT 45
DEGREES FROM THE HORIZONTAL. REF: PLUMBING
PLANS FOR GAS PIPING CONNECTION.
4 SUSPEND RADIANT HEATER FROM STRUCTURE
ABOVE AT APPROXIMATELY 25'-0" AFF. ROUTE FLUE
AS INDICATED. REF: PLUMBING PLANS FOR GAS
PIPING CONNECTION.
5 COMBINE TWO HEATER FLUE VENTS INTO A SINGLE
VENT BEFORE RISING THROUGH ROOF AND
TERMINATING WITH MANUFACTURER'S
RECOMMENDED FLUE VENT CAP. COMMON VENT
SIZING PER MANUFACTURER'S RECOMMENDATION.
6 PROVIDE FULL SIZED INSULATED PLENUM BEHIND
LOUVER. CONNECT DUCTWORK AS INDICATED.
236 738 741
MATCHLINE - SEE SHEET 01-M108 FOR CONTINUATION MATCHLINE - SEE SHEET 01-M108 FOR CONTINUATION
1 2.8 3 5
D.4
D.2
C.8
C
01-L-11
01-L-05
01-IRH-12
01-IRH-03
01-IRH-04
4"ø
4"ø
01-L-04A
FLUE THRU ROOF
BDD
01-FA-101-FLT-1
A
01-M301
01-MOD-6
01-IRH-10
01-IRH-11
144"x72"
T 01-IRH-11
B
01-M301
01-FA-1 VFD
RS/RL
16"x16"
T: 19' - 11" B: 18' - 7"
T: 19' - 10" B: 18' - 6"
EG-2 16"x16"
600 CFM
T: 9' - 10" B: 8' - 2"
(TYP. 4)
T: 10' - 0" B: 8' - 8"
01-L-04B
01-L-04C
216"x72"
16"x16"
01-MAU-51
RS/RL
(TYP.)
16"x16"
16x16 DN
"x
(TYP.)
01-FA-1 CTRL PNL
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
M109
GRAND CANYON NATIONAL PARK
190083
BASIN LEVEL PLAN - AREA CA. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M109
1 BASIN LEVEL PLAN - AREA C
KEYNOTES
1 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
2 REF: 00-M503 FOR DUCTED LOUVER IN WALL
DETAIL.
3 COMBINE TWO HEATER FLUE VENTS INTO A
SINGLE VENT BEFORE RISING THROUGH ROOF
AND TERMINATING WITH MANUFACTURER'S
RECOMMENDED FLUE VENT CAP. COMMON VENT
SIZING PER MANUFACTURER'S
RECOMMENDATION.
4 SUSPEND RADIANT HEATER FROM STRUCTURE
ABOVE AS HIGH AS POSSIBLE. ANGLE DOWN AT 45
DEGREES FROM THE HORIZONTAL. REF:
PLUMBING PLANS FOR GAS PIPING CONNECTION.
5 SUSPEND RADIANT HEATER FROM STRUCTURE
ABOVE AT APPROXIMATELY 25'-0" AFF. ROUTE
FLUE AS INDICATED. REF: PLUMBING PLANS FOR
GAS PIPING CONNECTION.
6 CONNECT 216" X 72" DUCT TO THREE LOUVER
SECTIONS AS INDICATED. SEAL DUCT AROUND
STRUCTURAL PENETRATIONS AIR TIGHT.
7 PROVIDE RIGID BOARD INSULATION ON
DUCTWORK UPSTREAM OF ISOLATION DAMPER.
8 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION
DETAIL.
9 ROUTE REFRIGERANT PIPING BETWEEN INDOOR
AND OUTDOOR UNITS. EXACT SIZE, QUANTITY OF
PIPES, AND PIPING ACCESSORIES SHALL BE PER
MANUFACTURER'S REQUIREMENTS. (TYP.)
10 5X3 GRID OF REMOVABLE GALVANIZED STEEL
FRAME SS HARDWARE MESH PANELS.
11 ADJUST BAROMETRIC DAMPER TO MAINTAIN A
POSITIVE PRESSURE OF 0.02 IN W.C. WITH
RESPECT TO THE OUTSIDE.
237 738 741
1 2
01-FA-101-FLT-1
01-L-04A
01-MOD-6
72"x144"
72"x216"
RS/RL
3"
72"x144"9
(TYP.)
C.8C
01-FA-1
01-FA-1
VFD
2" LP
RS/RL
01-FA-1
CTRLR
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
M301
GRAND CANYON NATIONAL PARK
190083
MECHANICAL SECTIONS 1A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M301
A SECTION AT FAN ARRAY
KEYNOTES
1 PROVIDE HOUSED SPRING ISOLATORS FOR FLOOR
MOUNTED INSTALLATION OF THE FAN ARRAY.
ISOLATORS SHALL BE PER MANUFACTURER'S
RECOMMENDATIONS FOR THE INSTALLATION
CONDITIONS AND ARRAY SIZE.
2 5X3 GRID OF REMOVABLE GALVANIZED STEEL
FRAME SS HARDWARE MESH PANELS.
3 PROVIDE INSULATD, HINGED, LATCHED, AND
GASKETED ACCESS DOOR IN DUCTWORK FOR
INSPECTION AND CLEANING.
4 SUPPORT FILTER HOUSING AND INTAKE
DUCTWORK FROM BELOW WITH GALVANIZED STEEL
C-CHANNEL OR WIDE FLANGE BEAM SUPPORTS.
FASTEN EQUIPMENT AND DUCTWORK TO
SUPPORTS AND FASTEN SUPPORTS TO CONCRETE
FLOOR.
5 PROVIDE FLEXIBLE CONNECTIONS WHERE
DUCTWORK CONNECTS TO EQUIPMENT. REF:
00-M503 FOR FLEXIBLE DUCT CONNECTION DETAIL.
6 GALVANIZED STEEL ANGLE IRON FRAME DESIGNED
TO ACCEPT FRAMED SS HARDWARE MESH PANELS.
CONTRACTOR TO COORDINATE FINAL SIZE AND
CONSTRUCTION OF MESH PANEL FRAME TO ALLOW
THE REMOVAL AND REPLACEMENT OF A SINGLE
FAN FROM THE ARRAY THROUGH THE PANEL
OPENING.
7 REINFORCE AND PROVIDE INTERNAL STIFFENING
AND CROSSBRACING FOR DUCTWORK FOR -4
INCHES WATER COLUMN PER SMACNA STANDARDS.
8 FULL SIZE ACCESS DOOR FOR FILTER REMOVAL,
BOTH SIDES OF FILTER HOUSING.
9 PROVIDE RIGID BOARD INSULATION ON DUCTWORK
UPSTREAM OF ISOLATION DAMPER.
01-M301
B END VIEW OF FAN ARRAY
238 738 741
TOS ROOF
7083.15
24"x24"
01-L-06
20"x20"
01-IRH-5 01-IRH-6
20"x20"
1" LP
(TYP. 2)(TYP. 2)
24"x36"
24"x36"
20"x20"
14"x14" 14"x14"
1" LP
1" LP
14"x14" 14"x14"
14"x14" 20"x20"
3/4" LP
01-EF-2
20"x20"
DL-1 41"x13"
1250 CFM
DL-1 41"x13"
1250 CFM
3/4" LP
1" LP3/4" LP
3/4" LP
01-MAU-6
RS/RL
01-MAU-1 01-MAU-2
3/4" LP 3/4" LP
RS/RL
RS/RL
RS/RL 01-MAU-3 01-MAU-4
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
M302
GRAND CANYON NATIONAL PARK
190083
MECHANICAL SECTIONS 2A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-M302
A SECTION AT BASIN LEVEL AREA A
239 738 741
K
J
H
G.1
D.4
D.2
C.8
C
B
A
G
G.4
F
E
D
ASCALE 1/16" = 1'-0"
16 0 16 32
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
P101
GRAND CANYON NATIONAL PARK
190083
UNDERGROUND OVERALL
PLAN
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P101
1 UNDERGROUND OVERALL PLAN
1. REFER TO 00-P600 SERIES FOR PLUMBING SCHEDULES AND
MATERIAL LIST.
2. REFER TO 00-P501 FOR PIPE HANGER INSTALLATION DETAIL.
3. ALL INTERIOR/EXTERIOR WALL PENETRATIONS SHALL BE SEALED
AIR/WATER TIGHT. REFER TO 00-M501 FOR PIPE PENETRATION
THRU WALL DETAIL.
4. PROVIDE SHUTOFF VALVES IN CW/HW BRANCHES TO ALL
PLUMBING FIXTURES AND PROCESS EQUIPMENT.
5. NO PIPING SHALL BE ROUTED OVER ELECTRICAL EQUIPMENT.
6. FINISHED FLOOR ELEVATION = 0'-0". INVERT ELEVATIONS LISTED
ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COORDINATE
EXACT INVERT ELEVATIONS IN THE FIELD WITH OTHER TRADES.
7. PIPE SUPPORTS ARE NOT SHOWN FOR ALL PIPING SYSTEMS.
SUPPORT ALL PIPING IN ACCORDANCE WITH SECTION 40 05 07.
8. COORDINATE EXACT HUB DRAINS AND FLOOR DRAIN LOCATIONS
WITH PROCESS PLANS AND PROCESS EQUIPMENT.
9. PROVIDE SHUT-OFF VALVES AT ALL PLUMBING FIXTURES. PROVIDE
ACCESS PANELS AT WALL FOR ACCESS OF SHUT-OFF VALVES
LOCATED IN CHASE WALLS. COORDINATE IN THE FIELD
GENERAL PLUMBING NOTES: (APPLIES TO ALL PLUMBING SHEETS)
SEE SHEET 01-P102 FOR AREA A PLAN
SEE SHEET 01-P103 FOR AREA B PLAN
SEE SHEET 01-P104 FOR AREA C PLAN
SEE SHEET 01-P105 FOR AREA D PLAN
240 738 741
MATCHLINE - SEE SHEET 01-P103 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P103 FOR CONTINUATION
K
J
H
I.E.: -1'-11"
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
6" CWV
6" CWV
UP TO GCO
6" VT UP
6" VT UP
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
4" CWV
4" CWV
2" DRAIN
FROM ABOVE
2" DRAIN
FROM ABOVE
2" DRAIN
FROM ABOVE
UP TO
FS-1
FS-2
TG-1
UP TO
FCO
4" CWV
4" CWV
2" VT UP
A
00-P503
6" CWV 6" CWV4" CWV
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
P102
GRAND CANYON NATIONAL PARK
190083
UNDERGROUND PLAN -
AREA A
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P102
1 UNDERGROUND PLAN - AREA A
SPILL CONTAINMENT AREA SPILL CONTAINMENT AREA SPILL CONTAINMENT AREA
DRAINAGE TRENCH
KEYNOTES
1 REF: CIVIL PLANS FOR CONTINUATION OF
PIPING AND INVERT ELEVATIONS.
241 738 741
FS-2
TG-1
MATCHLINE - SEE SHEET 01-P102 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P102 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-P104 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P104 FOR CONTINUATION
1 2.3 2.8 3 5 6
G.1
G
G.4
6" CWV
4" CWV
F
DRAINAGE TRENCH
4" CWV
UP TO FD-1
UP TO FD-1
(TYP. 5)
6" CWV
UP TO
FCO
UP TO
FCO
UP TO FD-1
(TYP. 8)
UP TO
FCO
4" CWV
3" CWV
3" CWV 3" CWV 3" CWV
3" CWV
3" CWV
3" CWV
3" CWV
3" CWV
3" CWV
3" CWV
6" CWV4" CWV3" CWV 3" CWV
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
P103
GRAND CANYON NATIONAL PARK
190083
UNDERGROUND PLAN -
AREA B
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P103
1 UNDERGROUND PLAN - AREA B
KEYNOTES
1 PROVIDE FLOOR SINKS AT BOTTOM OF PROCESS
PIPING TRENCH. COORDINATE EXACT FLOOR SINK
LOCATIONS WITH PROCESS PLANS AND PROCESS
EQUIPMENT.
2 TERMINATE DOWNTURNED ELBOW 18" ABOVE
BOTTOM OF TRENCH.
242 738 741
FS-2
TG-1
MATCHLINE - SEE SHEET 01-P103 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P103 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-P105 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P105 FOR CONTINUATION
1 2.8 3 5
D.4
D.2
C.8
6" CWV
6" CWV
(TYP.)
(TYP.)
4" CWV
6" CWV
E
D
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
TG-1
FS-2
6" VT UP
4" CWV
UP TO
FS-1
UP TO
FCO
2" VT UP
UP TO
FS-2
2" VT UP
UP TO GCO
2" CWD UP TO ESEW-1
DRAINAGE TRENCH
2 2
UP TO
FD-13" DR
UP TO
FD-1
4" CWV
6" CWV
4" CWV
UP TO
TD-1
4" SAN
4" SAN
4" CWV
4" CWV
3" DR
UP TO
TD-1
4" DR
4" DR
6" VT
2" CMD
UP TO
FCO
4" CWV
EXTEND CD
TO 18" ABOVE
BOTTOM OF
TRENCH
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:4
P M
P104
GRAND CANYON NATIONAL PARK
190083
UNDERGROUND PLAN -
AREA C
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P104
1 UNDERGROUND PLAN - AREA C
KEYNOTES
1 PROVIDE FLOOR SINKS AT BOTTOM OF PROCESS
PIPING TRENCH. COORDINATE EXACT FLOOR SINK
LOCATIONS WITH PROCESS PLANS AND PROCESS
EQUIPMENT.
2 TERMINATE DOWNTURNED ELBOW 18" ABOVE
BOTTOM OF TRENCH.
3 REF: CIVIL PLANS FOR CONTINUATION OF PIPING
AND INVERT ELEVATIONS.
243 738 741
1" LP
4" CW
MATCHLINE - SEE SHEET 01-P104 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P104 FOR CONTINUATION
1 5
C
B
A
2 4
UP TO
FS-1
UP TO WC-1
UP TO LAV-1
UP TO EWC-1
UP TO FS-1
UP TO FD-1
UP TO SK-1
AND SK-3
4" SAN
4" SAN
2" VT UP
UP TO MS-1
UP TO FS-2
UP TO FCO
2" VT UP
I.E. : -3'-2"
UP TO GCO
DRYWELL
1" CD
FROM
ABOVE
UP TO US-1
UP TO FS-1
UP TO ESEW-1
2" VT UP
UP TO SK-2
SPILL CONTAINMENT AREA
UP TO FS-1
UP TO ESEW-1
4" SAN
4" SAN
2" SAN
UP TO UR-1
4" SAN
4" SAN
UP TO UR-1
UP TO FD-1
3" SAN
3" SAN
4" SAN
4" SAN
2" SAN
4" SAN
UP TO FCO
UP TO FCO
2" VT UP
2" VT UP
4" SAN
4" SAN
4" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" SAN
UP TO FD-1
3" SAN
UP TO
ECB-1
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:4
P M
P105
GRAND CANYON NATIONAL PARK
190083
UNDERGROUND PLAN -
AREA D
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P105
1 UNDERGROUND PLAN - AREA D
KEYNOTES
1 REF: CIVIL PLANS FOR CONTINUATION OF PIPING
AND INVERT ELEVATIONS.
2 CW INCOMING WATER. REF: 00-P501 FOR WATER
SERVICE ENTRANCE DETAIL.
3 LP GAS UP FROM BELOW. EXTEND PIPING TO
METER/PRESSURE REGULATOR. PROVIDE GAS
PRESSURE REGULATOR IN VERTICAL GAS MAIN
OUTSIDE THE BUILDING. PROVIDE SHUTOFF
VALVE IN VERTICAL GAS MAIN ON EITHER SIDE
OF PRESSURE REDUCING VALVE. IF PRESSURE
REDUCING VALVE IS NOT NEEDED. THEN
PROVIDE A SINGLE SHUTOFF VALVE ON OUTSIDE
MAIN. REF: 00-P502 FOR GAS SERVICE ENTRANCE
DETAIL.
4 REF: 00-M501 FOR CONDENSATE DRYWELL
DETAIL.
244 738 741
J
H
G.1
D.4
D.2
C.8
C
B
A
G.4
F
E
D
ASCALE 1/16" = 1'-0"
16 0 16 32
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:4
P M
P106
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL OVERALL
PLAN
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P106
1 GROUND LEVEL OVERALL PLAN
SEE SHEET 01-P107 FOR AREA A PLAN
SEE SHEET 01-P108 FOR AREA B PLAN
SEE SHEET 01-P109 FOR AREA C PLAN
SEE SHEET 01-P110 FOR AREA D PLAN
245 738 741
3" CW
1 1/2" HW
3" CW
1 1/2" HW
EEW-1
ES-1
EEW-1
ES-1
EEW-1
ES-1
MATCHLINE - SEE SHEET 01-P108 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P108 FOR CONTINUATION
1 1.2 2.3 2.8 3 4.8 5 6
K
J
H
G.4
SODIUM
HYPOCHLORITE
ROOM
FIRE RISER
ROOM
COAGULANT
ROOM
CAUSTIC
SODA
ROOM
WH-1
WH-1
EMV-1 EMV-1 EMV-1
6" VT 6" VT UP
GCO
WHA-2
WHA-2 WHA-2
EMV-1
WHA-2
ESEW-2
3" CW
1 1/2" HW
6" VT DN
1 1/2" HW
3" CW
6" VT
DN/UP
HB-1
3/4" CW
3/4" CW UP
2 2
1 1
CO
(TYP.)
FS-1
TG-1
FCO 5
TRENCH
BELOW TRENCH
BELOW
A
00-P503
CO
2" VT DN
01-CU-5
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:5
P M
P107
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL FLOOR
PLAN - AREA A
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P107
1 GROUND LEVEL FLOOR PLAN - AREA A
KEYNOTES
1 EXTEND DCW/DHW ALONG WALL DOWN TO
EMERGENCY SHOWER AND EYEWASH MIXING
VALVE BELOW. PROVIDE FLOOR SINK BELOW
SHOWER HEAD WHERE INDICATED.
2 PROVIDE DRAIN PIPE FOR DRAINABLE HATCH
FRAME. ROUTE THRU WALL AND TERMINATE WITH
DOWNTURNED ELBOW IN CORRIDOR AS HIGH AS
POSSIBLE. DRAIN SIZE SHALL BE SAME SIZE AS
CONNECTION. SLOPE AT 1%. (TYP.2).
3 REF: 00-P501 FOR DOUBLE GRADE CLEANOUT
DETAIL.
4 REF: 00-P502 FOR WALL HYDRANT INSTALLATION
DETAIL.
5 REF: 00-P501 FOR FLOOR CLEANOUT DETAIL.
6 REF: 00-P503 FOR HOSE RACK DETAIL.
(TYP.)
246 738 741
1 1/2" HW
3" CW
1 1/2" HW
MATCHLINE - SEE SHEET 01-P107 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P107 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-P109 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P109 FOR CONTINUATION
1 2.3 2.8 3 5 6
G.1
G
G.4
PROCESS
AREA
HB-1
HB-1
FCO FCO
FD-1
FD-1
FD-1
FD-1 FD-1 FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
TD-1
TD-1
3" CW
1 1/2" HW
3" CW
1 1/2" HW
1 1/2" HW
FD-1
(TYP.)
(TYP.)
TRENCH BELOW
3FCO
TG-1
TG-1
TG-1
TG-1
TG-1 TG-1 TG-1
TG-1
TG-1
TG-1
TG-1
TG-1
TG-1
CD UP TO BASIN LVL
FD-1
TG-1
BFP-2 3/4" NPW 1/2" NPW
2-1/2" CW UP
2-1/2" CW UP
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:0
P M
P108
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL FLOOR
PLAN - AREA B
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P108
1 GROUND LEVEL FLOOR PLAN - AREA B
KEYNOTES
1 REF: 00-P502 FOR FLOOR DRAIN INSTALLATION
DETAIL.
2 REF: 00-P503 FOR HOSE RACK DETAIL.
3 REF: 00-P501 FOR FLOOR CLEANOUT DETAIL.
4 ROUTE CONDENSATE AS INDICATED, AND
TERMINATE WITH DOWNTURNED ELBOW AT FLOOR
DRAIN.
5 SIZE OF CONDENSATE DRAIN SHALL BE SAME SIZE
AS OUTLET AT UNIT. TERMINATE AIR HANDLING
CONDENSATE DRAIN AT NEAREST FLOOR DRAIN OR
FLOOR SINK. REF: 00-M501 FOR CONDENSATE
DRAIN TRAP DETAIL.
6 ROUTE CONDENSATE DRAIN ALONG FLOOR. RE:
00-P503 FOR PROTECTIVE PIPE COVER DETAIL.
7 CONNECT 1/2" NPW TO PROCESS VALVE.
COORDINATE WITH D-DRAWINGS.
247 738 741
1 1/2" HW
3" CW
MATCHLINE - SEE SHEET 01-P108 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P108 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-P110 FOR CONTINUATION MATCHLINE - SEE SHEET 01-P110 FOR CONTINUATION
1 2.8 3 5
D.4
D.2
C.8
C
ELECTRICAL
ROOM
BLOWER
ROOM
SCADA / IT
CLOSET
FS-2
ESEW-1
3" CW
3" CW
1" HW
1 1/2" HW
3" CW
FS-1
WH-1
WH-1
GCO
3/4" CW
3/4" CW
1" CD
1" CD
01-AHU-2
01-AHU-3
1" CD
HB-1
2" VT
FCO
2" VT DN
WHA-2
EMV-1
EMV-1
1 1/4" TW
6" VT
4" VT UP
1" HWC
TD-1
TD-1
FD-1
2" LP
2" LP UP
3" CW
6" VT
1 1/2" HW
BELOW
FD-1
3/4" LP UP TO
BASIN LEVEL
3/4" LP
BELOW
BFP-2
TG-1
TG-1
(TYP.)
TRENCH BELOW
TRENCH BELOW
TRENCH BELOW
CD UP TO
BASIN LEVEL
ABOVE
5.7 GPM
01-CU-6
01-CU-3
01-CU-2
6" VT DN
6" VT UP
2-1/2" CW UP
WHA-2
1" HW
3" CW
3" CW
1 1/2" HW
1 1/2" HW
3" CW
1" NPW (BELOW)
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:3
P M
P109
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL FLOOR
PLAN - AREA C
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P109
1 GROUND LEVEL FLOOR PLAN - AREA C
KEYNOTES
1 EXTEND DCW/DHW ALONG WALL DOWN TO
EMERGENCY SHOWER AND EYEWASH MIXING
VALVE BELOW. PROVIDE FLOOR SINK BELOW
SHOWER HEAD WHERE INDICATED.
2 REF: 00-M501 FOR COIL CONDENSATE DRAIN
PIPING DETAIL.
3 REF: 00-P501 FOR EMERGENCY SHOWER AND
EYEWASH DETAIL.
4 REF: 00-P501 FOR DOUBLE GRADE CLEANOUT
DETAIL.
5 REF: 00-P501 FOR FLOOR CLEANOUT DETAIL.
6 REF: 00-P502 FOR WALL HYDRANT INSTALLATION
DETAIL.
7 REF: 00-P502 FOR FLOOR DRAIN INSTALLATION
DETAIL.
8 REF: 00-P503 FOR HOSE RACK DETAIL.
9 TERMINATE DOWNTURNED ELBOW 18" ABOVE
BOTTOM OF TRENCH.
10 SIZE OF CONDENSATE DRAIN SHALL BE SAME SIZE
AS OUTLET AT UNIT. TERMINATE AIR HANDLING
CONDENSATE DRAIN AT NEAREST FLOOR DRAIN
OR FLOOR SINK. REF: 00-M501 FOR CONDENSATE
DRAIN TRAP DETAIL.
11 ROUTE 1" CW DOWN TO BFP-2. ROUTE 1" NPW
FROM BFP-2 TO WATER SOFTENER. REF: 01-P902
FOR PLUMBING WATER OVERALL ISOMETRIC.
248 738 741
M
01-GWH-1
4" CW
4" CW
3/4" HW
SK-3
MATCHLINE - SEE SHEET 01-P109 FOR CONTINUATION
MATCHLINE - SEE SHEET 01-P109 FOR CONTINUATION
1 5
C
B
A
2 4
FD-1
01-CP-1
HB-1
CONTROLS
SCADA / IT
CLOSET
MECHANICAL
UNISEX
RESTROOM
UNISEX
RESTROOM
WORK
ROOM
LABORATORY
CORRIDOR
JANITORS
CLOSET
VESTIBULE
MAINTENANCE
ROOM
CHEMICAL
DRUM
ROOM
EWC-1
01-ET-1
FS-2
ESEW-1
1 1/2" HW
4" CW
WC-1
FD-1
GCO
4" CW
V T
R
WH-1
MS-1
SK-1
GD-1
MV-1
LAV-1
MV-1
LAV-1
MV-1
01-BP-1
3/4" CW
FCO
1" CD
FS-1
01-AHU-1
2" VT
3/4" LP
01-GDH-1
01-AHU-4
01-SS-1
3/4" CD
2" V DN
4" VTR
2" VT DN
4" VTR
CONNECT TO
WATER
SOFTENER
01-GFUH-1
01-SS-2
3/4" LP
US-1
MV-1
UR-1
CORRIDOR
2" VT
UR-1
3/4" HWC
3" VT
ECB-1
ECB-1
SK-2
MV-1
FS-2
ESEW-1
WHA-2
WHA-1
EMV-1
FS-1
3/4" LP
HB-1
1" CD
3/4" COMP
3/4" COMP
3/4" COMP
4" CW
WHA-1
FS-1
WH-1
1 1/4" TW
3/4" COMP
2" LP
2" LP
2" LP
HR-1
HR-1
DI-1
3/4" LP
1" HWC
3" CW
3/4" COMP 3/4" COMP
3/4" COMP
1 1/2" CW
3" CW
1 1/2" HW
1" HWC
01-AC-1
1" NPW
1" NPW BELOW
TG-1
TG-1
TG-1
TG-1
TG-1
TG-1
TG-1
(TYP.)
(TYP.)
BFP-1
3/4" HWC
FCO
1 1/2" CW
WHA-1
WHA-1
FRL-1
FRL-1
FRL-1
FRL-1
WHA-1
FCO13
(TYP.)
(TYP.)
(TYP.)
(TYP.)
ECB-1
FD-1
TG-1
1" CW
1" CW
WHA-1
1" HWC
3" CW
3/4" HWC
3/4" HW
1" CW
3/4" HW
BFP-2
3/4" HW
WHA-1
4" CW
1" HWC
1 1/2" HW
WHA-2
4" VTR
3" VT
0.5 GPM
0.5 GPM
01-EWH-1
2" VT DN
2" VT
.5
G P
M
.5
G P
M
3/4" HWC
01-CU-4
01-SSCU-2
01-CU-1
01-SSCU-1
3" VT
PROCESS/WET/
CORROSIVE AREAS
ADMIN AREAS
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
A
B
D
C
KEY PLAN
MATCHLINE
MATCHLINE
MATCHLINE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N
P S
G ra n d C a n y o n
S o u th
R im W
T P
/1
M
P
S R
W T
P .r v t
/1
/2
:3
:0
P M
P110
GRAND CANYON NATIONAL PARK
190083
GROUND LEVEL FLOOR
PLAN - AREA D
A. ORTON
D. SAUCEDO
04/22/2022
S. GAETA
14456601-
01-P110
1 GROUND LEVEL FLOOR PLAN - AREA D
KEYNOTES
1 ROUTE GAS PIPING TO GAS-FIRED WATER
HEATER.PROVIDE SHUT-OFF VALVE, PRESSURE
REDUCING VALVE AND DIRT LEG AT CONNECTION
TO GAS FIRED WATER HEATER. PRESSURE
REDUCING VALVE SHALL BE SIZED TO REDUCE GAS
PRESSURE FROM 2 PSI TO ACCEPTABLE WATER
HEATER GAS PRESSURE AT FULL RANGE OF
OPERATION. ROUTE PRESSURE REDUCING VALVE
VENT UP THROUGH ROOF AND TERMINATE WITH
DOWN TURNED ELBOW.
2 EXTEND DCW/DHW ALONG WALL DOWN TO
EMERGENCY SHOWER AND EYEWASH MIXING
VALVE BELOW. PROVIDE FLOOR SINK BELOW
SHOWER HEAD WHERE INDICATED.
3 REF: 00-P503 FOR HOSE RACK DETAIL.
4 REF: 00-P501 FOR WATER SERVICE ENTRANCE
DETAIL.
5 REF: 00-P502 FOR GAS SERVICE ENTRANCE DETAIL.
6 ROUTE BFP DRAIN SAME SIZE TO OUTSIDE OF
BUILDING AND TERMINATE WITH DOWNTURNED
ELBOW. IF DISCHARGING TO A NON-PAVED
SURFACE, THEN PROVIDE A CONCRETE
SPLASHBLOCK UNDER PIPE OUTLET. PROVIDE A
SCREEN UNDER PIPE OUTLET TO PREVENT
INSECT/PEST INGRESS.
7 REF: D-SERIES DRAWINGS FOR CONTINUATION OF
SAMPLE WATER PIPING. TRANSITION FROM PVC TO
COPPER OUTSIDE OF RETURN AIR PLENUM.
8 (3) 1/2" PROCESS SAMPLE WATER PIPES DOWN IN
WALL. CONNECT TO SAMPLE SINK FAUCETS AND
PROVIDE ENGRAVED PLASTIC LABELS FOR EACH
SAMPLE STREAM FAUCET. COORDINATE EXACT
WORDING OF EACH LABEL WITH COR. PROVIDE
SHUTOFF VALVE BEFORE DROP IN WALL.
9 TERMINATE FULL SIZE AIR COMPRESSOR
CONDENSATE MANUAL AND AUTOMATIC DRAIN
PIPING 2" ABOVE FLOOR SINK AS INDICATED.
10 PROVIDE CONCRETE HOUSEKEEPING PAD FOR
EQUIPMENT. REF: STRUCTURAL DRAWINGS FOR
REQUIREMENTS.
11 REF: 00-M501 FOR COIL CONDENSATE DRAIN PIPING
DETAIL.
12 REF: 00-P501 FOR EMERGENCY SHOWER AND
EYEWASH DETAIL.
13 REF: 00-P501 FOR FLOOR CLEANOUT DETAIL.
14 REF: 00-P501 FOR DOUBLE GRADE CLEANOUT
DETAIL.
15 REF: 00-P502 FOR FLOOR DRAIN INSTALLATION
DETAIL.
16 REF: 00-P502 FOR WALL HYDRANT INSTALLATION
DETAIL.
17 REF: 00-P502 FOR GAS EQUIPMENT CONNECTION
DETAIL.
18 INSTALL HB-1 IN ACCESSIBLE LOCATION UNDER
LAVATORY.
19 ROUTE PIPING ABOVE CEILING CLOUD.
20 TERMINATE 1/2" CA AT EXTERIOR WALL WITH
BRASS FEMALE QUICK CONNECT FITTING AND
STAINLESS STEEL FACEPLATE APPROXIMATELY 5'
ABOVE FINISHED GRADE.
21 DROP 1" CONDENSATE DRAIN TO BELOW GRADE.
REF: 01-P105 FOR CONTUNATION OF PIPING.
22 COORDINATE ROUTING OF UTILITIES ACROSS
CORRIDOR WITH CEILING SYSTEM TO ENSURE
THEY ARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .