DRAFT_Att1h_GRGA_261633_IG_Pump_3_Volume_06_2-24-21_4.pdf

PDF 17 MB Posted

Attached to
GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transc
Solicitation number
140P2022R0100
Issued by

About this file

This file relates to a federal contract opportunity from the Department of the Interior National Park Service National Office. The solicitation seeks proposals for improving the potable water supply to the inner canyon and south rim areas of Grand Canyon National Park. Specifically, the agency is soliciting bids to construct a transcanyon water distribution pipeline. The solicitation number is 140P2022R0100 and proposals are due by the date specified in the special notice. The opportunity type is listed as a special notice. No other details are provided in the file related to pricing terms, response dates, award dates, or set aside provisions.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME 6 - REPLACE TRANSCANYON WATERLINE

AND IMPROVE POTABLE WATER SYSTEMS

http://www.djanda.com/Transcanyon/Setup_142.html

T

C p w w o r k i n g o m a d D d w g

P R O C E S S

D E T A I L S

P M

P V E L E Z

02/24/2021

Exp. 12/31/2022

02/24/2021

Exp. 12/31/2022

C p w w o r k i n g o m a d E d w g

E

P M

P V E L E Z

TP-ESP-100-POE24

Sheets and Views
G0 COVER
G1 GENERAL - INDEX OF DRAWINGS
G2 GENERAL - ABBREVIATIONS
G3 GENERAL - SYMBOLS, LEGENDS, & NOTES
C1 CIVIL - SYMBOLS, LEGENDS, & NOTES
C2 CIVIL - OVERALL SITE CONDITIONS
C3 CIVIL - PUMP HOUSE SITE PLAN
C4 CIVIL - SITE DEMO PLAN
C5 CIVIL - CONCRETE STAGING PAD SITE PLAN
S1 STRUCTURAL - PLAN & GENERAL NOTES
S2 STRUCTURAL - VALVE VAULT ENLARGED PLANS
S3 STRUCTURAL - VALVE VAULT DETAILS
S4 STRUCTURAL - VALVE VAULT DETAILS
S5 STRUCTURAL - OPERATIONS ROOM ENLARGED CEILING PLAN & SECTION
S6 STRUCTURAL - OPERATIONS ROOM DETAILS & STCHEDULES
S7 STRUCTURAL - PUMP ROOM DETAILS
D1 PROCESS - SYMBOLS & LEGENDS
D2 PROCESS - FLOW DIAGRAM
D3 PROCESS - PUMP HOUSE DEMOLITION PLAN
D4 PROCESS - PUMP HOUSE DEMOLITION PHOTOS
D7 PROCESS - PUMP HOUSE PLAN
D8 PROCESS - SECTIONS
D9 PROCESS - SECTIONS
D10 PROCESS - VAULT PLAN & SECTIONS
D11 PROCESS - VAULT SECTIONS
D12 PROCESS - DETAILS
M1 MECHANICAL - LEGEND & SYMBOLS
M2 MECHANICAL PUMP HOUSE PLAN HVAC
E1 ELECTRICAL - SYMBOLS & LEGENDS
E2D ELECTRICAL - ONE-LINE
E2 ELECTRICAL - ONE LINE
E3D ELECTRICAL - PUMP HOUSE PLAN DEMO
E3 ELECTRICAL - PUMP HOUSE PLAN
E4 ELECTRICAL - VAULT PLAN
E5 ELECTRICAL - PANEL SCHEDULE AND LOAD CALCULATIONS
E6 ELECTRICAL - CONDUIT WIRE LIST
E7 ELECTRICAL - VFD DIAGRAM
E8 ELECTRICAL - STANDARD DETAILS
E9D ELECTRICAL - PUMP HOUSE DEMO PHOTOS
Y1 INSTRUMENTATION - SYMBOLS & LEGEND
Y2 INSTRUMENTATION - SCADA COMMUNICATIONS DIAGRAM
Y3 INSTRUMENTATION - P&ID
Y4 INSTRUMENTATION - P&ID
Y5 INSTRUMENTATION - P&ID VALVE VAULT
Y6 INSTRUMENTATION - IGPS SOUTH PUMP HOUSE PLC CONTROL PANEL LAYOUT
Y7 INSTRUMENTATION - TYPICAL AC DC POWER DISTRIBUTION
Y8 INSTRUMENTATION - TYPICAL 32 POINT DI MODULE
Y9 INSTRUMENTATION - TYPICAL 32 POINT DI MODULE
Y10 INSTRUMENTATION - TYPICAL AI (I, RTD) MODULE WIRING
Y11 INSTRUMENTATION - TYPICAL AO MODULE WIRING

File details come from the government source that posted it. Updated .