DRAFT_Att1h_GRGA_261633_IG_Pump_3_Volume_06_2-24-21_4.pdf
PDF 17 MB Posted
- Solicitation number
- 140P2022R0100
About this file
This file relates to a federal contract opportunity from the Department of the Interior National Park Service National Office. The solicitation seeks proposals for improving the potable water supply to the inner canyon and south rim areas of Grand Canyon National Park. Specifically, the agency is soliciting bids to construct a transcanyon water distribution pipeline. The solicitation number is 140P2022R0100 and proposals are due by the date specified in the special notice. The opportunity type is listed as a special notice. No other details are provided in the file related to pricing terms, response dates, award dates, or set aside provisions.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 6 - REPLACE TRANSCANYON WATERLINE
AND IMPROVE POTABLE WATER SYSTEMS
http://www.djanda.com/Transcanyon/Setup_142.html
T
C p w w o r k i n g o m a d D d w g
P R O C E S S
D E T A I L S
P M
P V E L E Z
02/24/2021
Exp. 12/31/2022
02/24/2021
Exp. 12/31/2022
C p w w o r k i n g o m a d E d w g
E
P M
P V E L E Z
TP-ESP-100-POE24
| Sheets and Views |
| G0 COVER |
| G1 GENERAL - INDEX OF DRAWINGS |
| G2 GENERAL - ABBREVIATIONS |
| G3 GENERAL - SYMBOLS, LEGENDS, & NOTES |
| C1 CIVIL - SYMBOLS, LEGENDS, & NOTES |
| C2 CIVIL - OVERALL SITE CONDITIONS |
| C3 CIVIL - PUMP HOUSE SITE PLAN |
| C4 CIVIL - SITE DEMO PLAN |
| C5 CIVIL - CONCRETE STAGING PAD SITE PLAN |
| S1 STRUCTURAL - PLAN & GENERAL NOTES |
| S2 STRUCTURAL - VALVE VAULT ENLARGED PLANS |
| S3 STRUCTURAL - VALVE VAULT DETAILS |
| S4 STRUCTURAL - VALVE VAULT DETAILS |
| S5 STRUCTURAL - OPERATIONS ROOM ENLARGED CEILING PLAN & SECTION |
| S6 STRUCTURAL - OPERATIONS ROOM DETAILS & STCHEDULES |
| S7 STRUCTURAL - PUMP ROOM DETAILS |
| D1 PROCESS - SYMBOLS & LEGENDS |
| D2 PROCESS - FLOW DIAGRAM |
| D3 PROCESS - PUMP HOUSE DEMOLITION PLAN |
| D4 PROCESS - PUMP HOUSE DEMOLITION PHOTOS |
| D7 PROCESS - PUMP HOUSE PLAN |
| D8 PROCESS - SECTIONS |
| D9 PROCESS - SECTIONS |
| D10 PROCESS - VAULT PLAN & SECTIONS |
| D11 PROCESS - VAULT SECTIONS |
| D12 PROCESS - DETAILS |
| M1 MECHANICAL - LEGEND & SYMBOLS |
| M2 MECHANICAL PUMP HOUSE PLAN HVAC |
| E1 ELECTRICAL - SYMBOLS & LEGENDS |
| E2D ELECTRICAL - ONE-LINE |
| E2 ELECTRICAL - ONE LINE |
| E3D ELECTRICAL - PUMP HOUSE PLAN DEMO |
| E3 ELECTRICAL - PUMP HOUSE PLAN |
| E4 ELECTRICAL - VAULT PLAN |
| E5 ELECTRICAL - PANEL SCHEDULE AND LOAD CALCULATIONS |
| E6 ELECTRICAL - CONDUIT WIRE LIST |
| E7 ELECTRICAL - VFD DIAGRAM |
| E8 ELECTRICAL - STANDARD DETAILS |
| E9D ELECTRICAL - PUMP HOUSE DEMO PHOTOS |
| Y1 INSTRUMENTATION - SYMBOLS & LEGEND |
| Y2 INSTRUMENTATION - SCADA COMMUNICATIONS DIAGRAM |
| Y3 INSTRUMENTATION - P&ID |
| Y4 INSTRUMENTATION - P&ID |
| Y5 INSTRUMENTATION - P&ID VALVE VAULT |
| Y6 INSTRUMENTATION - IGPS SOUTH PUMP HOUSE PLC CONTROL PANEL LAYOUT |
| Y7 INSTRUMENTATION - TYPICAL AC DC POWER DISTRIBUTION |
| Y8 INSTRUMENTATION - TYPICAL 32 POINT DI MODULE |
| Y9 INSTRUMENTATION - TYPICAL 32 POINT DI MODULE |
| Y10 INSTRUMENTATION - TYPICAL AI (I, RTD) MODULE WIRING |
| Y11 INSTRUMENTATION - TYPICAL AO MODULE WIRING |
File details come from the government source that posted it. Updated .