This document contains a revised contract price schedule for solicitation number 140P2020R0027 to stabilize the Ellis Island seawall. The National Park Service is seeking offers for base line items including demolition, temporary floating berths, north and west seawall strengthening, slip and island seawall strengthening, fender and bollard replacements, ferry slip scour restoration, settlement monitoring, and rehabilitation repairs. Option line items include potential south east island and south slip seawall strengthening. Offerors must provide pricing for all base and option line items. Unit pricing is required for unit priced items with extended totals, and lump sums for lump sum items. The total proposed price should include the base price plus all option prices. Offerors are advised to review the definition of contract line items specification for measurement and payment details.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised BLANK
| CONTRACT PRICE SCHEDULE | |||||
| Solicitation Number: 140P2020R0027 | |||||
| PARK - PMIS: STLI-211568 | |||||
| Developed Area: Statue of Liberty | |||||
| Project Title: Stabilize Ellis Island Seawall | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Demolition, Removals, Site Work | 1 | LS | $0.00 | $0.00 |
| 2 | Temporary Floating Berth | 1 | LS | $0.00 | $0.00 |
| 3 | North and West Seawall Strengthening | ||||
| 3A | Combi Wall | 1,340 | LF | $0.00 | $0.00 |
| 3B | New Steel Sheet Pile Wall | 399 | LF | $0.00 | $0.00 |
| 3C | Access Bridge Stabiliation | 1 | LS | $0.00 | $0.00 |
| 4 | Slip North Seawall Strengthening | 662 | LF | $0.00 | $0.00 |
| 5 | North Island Seawall Strengthening | 596 | LF | $0.00 | $0.00 |
| 6 | Replace Fender System | 370 | LF | $0.00 | $0.00 |
| 7 | Bollards and Cleat Reinstallations | 17 | EA | $0.00 | $0.00 |
| 8 | Ferry Slip Scour Restoration | 1 | LS | $0.00 | $0.00 |
| 9 | Settlement and Vibration Monitoring Program | 1 | LS | $0.00 | $0.00 |
| 10 | Rehabilitation Repairs | ||||
| 10A | Toe Wall Rehabilitation | 768 | LF | $0.00 | $0.00 |
| 10B | Concrete Repair Type 1A | 2 | SF | $0.00 | $0.00 |
| 10C | Concrete Repair Type 1B | 3 | SF | $0.00 | $0.00 |
| 10D | Concrete Repair Type 2 | 2 | EA | $0.00 | $0.00 |
| 10E | Concrete Repair Type 3 | 5 | SF | $0.00 | $0.00 |
| 10F | Concrete Repair Type 4 | 100 | SF | $0.00 | $0.00 |
| 10G | Masonry Type 1 | 27,734 | LF | $0.00 | $0.00 |
| 10H | Masonry Type 2 | 30 | EA | $0.00 | $0.00 |
| 10I | Masonry Type 3 | 166 | EA | $0.00 | $0.00 |
| 10J | Masonry Type 4 | 863 | LF | $0.00 | $0.00 |
| 11 | Miscellaneous Work | ||||
| 11A | Wave Erosion Repair | 25000 | SF | $0.00 | $0.00 |
| 11B | Shore Power Replacement | 1 | LS | $0.00 | $0.00 |
| 11C | Monitoring Personnel | 180 | DAY | $0.00 | $0.00 |
| 11D | Misc Sitework | 1 | LS | $0.00 | $0.00 |
| 11E | Contaminated Material Management and Disposal | 2,500 | CY | $0.00 | $0.00 |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 11) ---------------------------------------------------------------------------------------------------------------- | $0.00 | ||||
| 12 | Option A: South East Island Seawall Strengthening | 185 | LF | $0.00 | $0.00 |
| 13 | Option B: South Slip Seawall Strengthening | ||||
| 13A | Stabilization | 573 | LF | $0.00 | $0.00 |
| 13B | Passenger Access Ramps | 1 | LS | $0.00 | $0.00 |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 12 through 13) --------------------------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 13) ------------------------------------------------------------------- | $0.00 | ||||
| Refer to Division 01 Specifications Section 01 27 00 Definition of Contract Line Items for additional measurement and payment information. |