This solicitation requests proposals for construction services to preserve and protect Meridian Hill Park Phases 5 and 6. The National Park Service is seeking a firm-fixed price contract to restore and rehabilitate the Lower Plaza, including replacing drainage lines, removing and replacing trees, repairing and replicating exposed aggregate paving, building a steel trellis, updating electrical and lighting, and replanting. Proposals are due December 5, 2019 with a pre-proposal meeting on November 15, 2019 and an anticipated award date of January 2020. The estimated price range is $5-10 million for work to be completed between March 2020 and February 2021. The solicitation is open to all responsible sources under NAICS code 237990 with subcontracting plans required from large businesses.
Hazardous Materials Identification Listing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Amend 02_111919.pdf | ||
| B08_Amend 04_120919.pdf | ||
| B08_Amend 01_110719.pdf | ||
| B08_Amend 05_121719.pdf | ||
| B08_Amend 03_120219.pdf | ||
| B08_Attch_4_Bid_Bond.pdf | ||
| ROCR_185767-FinalCDSpecs-101019.pdf | ||
| Langan Storm Sewer Report.pdf | ||
| B08_Attch_8_Prop_Equals.doc | DOC document | |
| B03_Solicit_Wages_140P2020R0005.pdf | ||
| ROCR_185767_Final_Construction_Documents_reduced.pdf | ||
| B08_Attch_6_PP_Qstr.docx | DOCX document | |
| B08_Attch_7_Sub_Plan_Sample.doc | DOC document | |
| Architrave Report.pdf | ||
| B08_Attch_9_Gen_References.doc | DOC document | |
| B08_Attch_5_Exp_Qstr.docx | DOCX document | |
| Langan Geotech Report.pdf | ||
| B08_SF1442_ROCR_185767_140P2020R0005.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS MATERIALS IDENTIFICATION LISTING
In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.
List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.