Pre-Bid Power Point Presentation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 4-B08_Security_Camera_Floor_Plan.pdf | ||
| 1-B08_SF30_Amendment_3.pdf | ||
| 3-B08_WICR_Security_Camera_SOW.pdf | ||
| 5-B08_WICR-_Pre_Bid_Question_Answers_9.3.19.xlsx | XLSX spreadsheet | |
| 2-B08_Bid_Option_1_Vol_II_PriceSched_(1).xlsx | XLSX spreadsheet | |
| Pre-Bid_Sign_In_Sheet.pdf | ||
| B08_SF30_Amendment_2.pdf | ||
| Amendment_1_-_8-16-2019.pdf | ||
| 6-A06_Visitor_Center_and_Library_Remodel_-_CD_Specifications.pdf | ||
| 3-SF1442_Fillable.pdf | ||
| 4-B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx | XLSX spreadsheet | |
| 9-B08_SF1442_and_Clauses.pdf | ||
| 1-B08_PSP_VOL_1.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt2_05-06-19.pdf | ||
| 2-B08_PSP_VOL_2.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt1_05-06-19.pdf | ||
| 8-B03_Wage_Determinations_8-8-2019.pdf | ||
| 5-B08_Solit_PSP_Vol_II_PriceSched_(1).xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jason Longshore – Project Manager Jason Longshore – Contracting Officer Joy Ewalt – Contract Specialist
| Relocating bathrooms in the Visitor Center |
| Expand Curatorial Space for Artifacts |
| Create more Exhibit Space by Remodeling the VC |
| HVAC System to Control Bldg. Temps/Humidity |
| Upgrade Fire Alarm and Protection System |
| The contract will be awarded using Source Selection |
Procedures Evaluation factors - Price , Technical, & Past
Performance
SOLICITATION #140P2019R0072
Are available for downloading on FedBizOpps at fbo.gov Solicitation Drawings & Specifications --Amendments
| In the invitation for bid (IFB), FAR Part 14, process, a public bid opening occurs when the bids are due and the prices are read to the public |
| There can be no discussion |
| No correction of mistakes in most cases |
| Award is always to the lowest responsible bidder |
In the Request for Proposal (RFP), FAR PART 15, process
| After closing, the process is “closed” - information will not be available until time of award |
| Only Awardee identity and price is disclosed-not other offerors or their prices |
| The Government will award based on best value criteria |
| There can be clarification, and/or discussions |
| Award may not always be to the lowest offered price |
Construction period is 270 calendar days after receiving the Notice to Proceed Liquidated Damages is set at $1,482.00 per Day
OFFERORS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY
THE GOVERNMENT INTENDS TO AWARD WITHOUT DISCUSSIONS, THUS THERE MAY NOT BE A CHANCE FOR DISCUSSIONS, CORRECTIONS, OR REVISED PROPOSALS!
| Section L of the RFP details the required information and format for the proposal |
| Only one flash drive is required for Proposal Submission. |
| VOL 1 – Technical/Past Performance |
| VOL 2 – Business/Price |
| Provide Relevant Projects completed with the same type of scope and complexity as the contemplated contract. |
| Past Performance Questionnaires for relevant contracts completed (Complete PART A & B) provide reference who should complete and return to CO/CS. |
| Reference questionnaires should be submitted with your proposals for Relevant projects. |
| DO this early – make sure they are sent to them prior to closing date of the solicitation. |
| Review Section L closely. Instructions on what to submit for evaluation. |
| Review Section M closely. How we’re going to evaluate what you submit. |
| Offeror portion of SF1442 |
| Section B – Insert all required pricing |
| Section K - Complete and insert representations and certifications (return those in Section K) |
| Complete Electronic Representations and Certifications in System Awards Management – website SAM.gov |
| Subcontracting Plan if required (large business only) |
| Include the Supplemental information form |
| Proposal Due Date is September 10th, 2019 by 2:00 pm MT |
| Proposal must be signed by officer of your company |
| No facsimile or electronic offers will be accepted. |
| Process is detailed in RFP Section M |
| Carefully review Section M when preparing proposal |
| Comply with Section L requirements |
| Technical/Past Performance is approximately equal to Price |
| Failure to furnish a complete proposal may result in elimination from consideration !! |
Best Value is defined as an award based on the greatest overall benefit in response to the requirement. Award is based on price and other non-price/cost related factors.
| The contractor whose proposal provides the BEST VALUE to the Government. |
| TECHNICAL/PAST PERFORMANCE IS APPROXIMATELY EQUAL TO PRICE. |
| THE BEST VALUE MAY NOT BE THE LOWEST PRICE. |
Submit a complete proposal in accordance with Instructions Award without discussions is intended, so you may not have an opportunity to revise/correct Award in this process does not necessarily mean the lowest price wins
| http://www.fbo.gov |
| http://sam.gov |
| https://www.wdol.gov/dba.aspx |
| Questions must be submitted in writing only via email to: joy_ewalt@nps.gov |
| Submit questions NLT COB August 30th, 2019 |
| Questions received after August 30th, 2019 may be held and addressed after RFP closing with those offerors determined to be in the competitive range if discussions are deemed necessary |
| DO NOT CALL TECHNICAL PERSONNEL OR A&E- THIS WILL DELAY GETTING AN ANSWER |
| All questions, should be in writing, and sent electronically to joy_ewalt@nps.gov the official Government responses will be in an amendment to the solicitation on fbo.gov. |
| All addendums, issued by an amendment, will be posted to fbo.gov |
| Check web site regularly and don’t forget to refresh web page!! |
Site Visit Follows This Briefing
File details come from the government source that posted it.