2-B08_Bid_Option_1_Vol_II_PriceSched_(1).xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Visitor Center and Library Remodel
- Solicitation number
- 140P2019R0072
About this file
Fillable Revised Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-B08_WICR_Security_Camera_SOW.pdf | ||
| 5-B08_WICR-_Pre_Bid_Question_Answers_9.3.19.xlsx | XLSX spreadsheet | |
| 1-B08_SF30_Amendment_3.pdf | ||
| 4-B08_Security_Camera_Floor_Plan.pdf | ||
| E09_PPT_Pre-Proposal_(1).ppt | PPT presentation | |
| B08_SF30_Amendment_2.pdf | ||
| Pre-Bid_Sign_In_Sheet.pdf | ||
| Amendment_1_-_8-16-2019.pdf | ||
| 8-B03_Wage_Determinations_8-8-2019.pdf | ||
| 5-B08_Solit_PSP_Vol_II_PriceSched_(1).xlsx | XLSX spreadsheet | |
| 2-B08_PSP_VOL_2.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt1_05-06-19.pdf | ||
| 6-A06_Visitor_Center_and_Library_Remodel_-_CD_Specifications.pdf | ||
| 3-SF1442_Fillable.pdf | ||
| 4-B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx | XLSX spreadsheet | |
| 9-B08_SF1442_and_Clauses.pdf | ||
| 1-B08_PSP_VOL_1.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt2_05-06-19.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18 | |||||
| Solicitation Number: 140P2019R0072 | |||||
| PARK - PMIS: WICR-251506 | |||||
| Developed Area: Wilson's Creek National Battlefield | |||||
| Project Title: Visitor Center and Library Remodel | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Curatorial Storage Area | 1 | Lump Sum | ||
| 2 | Install HVAC System | 1 | Lump Sum | ||
| 3 | Relocate Restrooms | 1 | Lump Sum | ||
| 4 | Fire Alarm System | 1 | Lump Sum | ||
| 5 | Create Exhibit Space | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 5) --------------------------------------------------------------------------------- | |||||
| OPTION 1 | BID OPTION 1 - Security Cameras | 1 | Lump Sum | ||
| TOTAL BASE PRICE PLUS OPTION 1 --------------------------------------------------------------------------------- | |||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it.