6-A06_Visitor_Center_and_Library_Remodel_-_CD_Specifications.pdf
PDF 6 MB Posted
- Attached to
- Visitor Center and Library Remodel Federal contract opportunity
- Solicitation number
- 140P2019R0072
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3-B08_WICR_Security_Camera_SOW.pdf | ||
| 5-B08_WICR-_Pre_Bid_Question_Answers_9.3.19.xlsx | XLSX spreadsheet | |
| 2-B08_Bid_Option_1_Vol_II_PriceSched_(1).xlsx | XLSX spreadsheet | |
| 1-B08_SF30_Amendment_3.pdf | ||
| 4-B08_Security_Camera_Floor_Plan.pdf | ||
| E09_PPT_Pre-Proposal_(1).ppt | PPT presentation | |
| Pre-Bid_Sign_In_Sheet.pdf | ||
| B08_SF30_Amendment_2.pdf | ||
| Amendment_1_-_8-16-2019.pdf | ||
| 8-B03_Wage_Determinations_8-8-2019.pdf | ||
| 5-B08_Solit_PSP_Vol_II_PriceSched_(1).xlsx | XLSX spreadsheet | |
| 3-SF1442_Fillable.pdf | ||
| 4-B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx | XLSX spreadsheet | |
| 9-B08_SF1442_and_Clauses.pdf | ||
| 1-B08_PSP_VOL_1.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt2_05-06-19.pdf | ||
| 2-B08_PSP_VOL_2.pdf | ||
| 7-A06_WICR_Final_ConstDocuments_DrawingsPt1_05-06-19.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WILSON'S CREEK
NATIONAL BATTLEFIELD
Missouri
VISITOR CENTER AND
LIBRARY REMODEL
WICR
PMIS NO. 251506
PROJECT SPECIFICATIONS
(Construction Documents)
NATIONAL PARK SERVICE
MIDWEST REGION
May 3, 2019
THIS PAGE INTENTIONALLY LEFT BLANK
WICR - 251506 00 01 07 - 1
PROJECT SEALS
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and that I am a duly registered Architect under the laws of the State of Missouri.
John S. Rickert May 3, 2019
Pages or sheets covered by this seal:
Divisions: 01 (except 01 40 00A), 06, 07, 08, 09, 10, 12 supervision and that I am a duly registered Professional Engineer under the laws of the State of Missouri.
Keith R. Kirchner, E-28893 May 3, 2019
Divisions: 03, 05, 31 Sections: 01 40 00A supervision and that I am a duly registered Professional Engineer under the laws of the State of Missouri.
Shane Chearney May 3, 2019
Divisions: 21, 28
WICR - 251506 00 01 07 - 2
WICR - 251506 00 01 07 - 3
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and that I am a licensed Professional Engineer under the laws of the State of Missouri.
Jeffrey A. Lewis May 3, 2019
Divisions: 22, 23 supervision and that I am a licensed Professional Engineer under the laws of the State of Missouri.
Kevin K. Thernes May 3, 2019
Divisions: 26, 27
WICR - 251506 00 01 07 - 4
WICR - 251506 00 01 10 - 1
Table of Contents
TABLE OF CONTENTS
DIVISION 01 — GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
01 26 01 - CONTRACT MODIFICATION PROCEDURES
01 27 00 - DEFINITION OF CONTRACT LINE ITEMS
01 31 00 - PROJECT MANAGEMENT AND COORDINATION
01 32 16 - CONSTRUCTION SCHEDULE
01 32 33 - PHOTO DOCUMENTATION
01 33 23 - SUBMITTAL PROCEDURES
01 35 23 - SAFETY REQUIREMENTS
01 40 00 - QUALITY REQUIREMENTS
01 40 00A - STATEMENT OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS
01 42 00 - REFERENCE STANDARDS
01 50 00 - TEMPORARY FACILITIES AND CONTROLS
01 57 19.11 - INDOOR AIR QUALITY MANAGEMENT
01 57 19.12 - NOISE AND ACOUSTICS MANAGEMENT
01 67 00 - PRODUCT REQUIREMENTS
01 73 29 - CUTTING AND PATCHING
01 73 40 - EXECUTION
01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 74 19A - PROJECT WASTE MANAGEMENT PLAN WORKSHEET
01 74 19B - STANDARD SOLID WASTE CONVERSIONS
01 77 00 - CLOSEOUT PROCEDURES
01 78 23 - OPERATION AND MAINTENANCE DATA
01 79 00 - DEMONSTRATION AND TRAINING
01 81 13 - SUSTAINABLE DESIGN REQUIREMENTS FOR NON LEED PROJECTS
01 91 14 - TOTAL BUILDING COMMISSIONING
DIVISION 03 — CONCRETE
03 05 05 - CONCRETE TESTING AND INSPECTION
03 11 13 - FORMWORK
03 15 19 - ANCHORAGE TO CONCRETE
03 21 00 - REINFORCEMENT
03 31 30 - CONCRETE, MATERIALS AND PROPORTIONING
03 31 31 - CONCRETE MIXING, PLACING, JOINTING, AND CURING
03 35 00 - CONCRETE FINISHING AND REPAIR OF SURFACE DEFECTS
DIVISION 05 — METALS
05 12 00 - STRUCTURAL STEEL
05 30 00 - METAL DECK
05 41 00 - LOAD-BEARING METAL STUD SYSTEM
05 50 00 - METAL FABRICATIONS
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 10 00 - ROUGH CARPENTRY
06 20 00 - FINISH CARPENTRY
WICR - 251506 00 01 10 - 2
06 41 00 - ARCHITECTURAL CABINETWORK (MILLWORK)
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 21 00 - BUILDING INSULATION
07 21 31 - SPRAYED POLYURETHANE FOAM (SPF) INSULATION - MEDIUM DENSITY
07 24 13 - EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)
07 26 00 - UNDER SLAB VAPOR RETARDER
07 42 13 - PREFORMED METAL WALL PANELS
07 42 43 - ALUMINUM COMPOSITE MATERIAL (ACM) SYSTEM
07 54 25 - FULLY ADHERED TPO ROOFING
07 62 00 - FLASHING AND SHEET METAL
07 92 00 - JOINT SEALANTS
DIVISION 08 — OPENINGS
08 11 00 - HOLLOW METAL DOORS AND FRAMES
08 14 16 - FLUSH WOOD DOORS
08 35 16 - SIDE-FOLDING ALUMINUM GRILLES
08 44 13 - CURTAINWALL SYSTEM
08 70 00 - FINISH HARDWARE
08 81 00 - GLASS AND GLAZING
08 90 00 - LOUVERS AND VENTS
DIVISION 09 — FINISHES
09 06 00 - COLOR SCHEDULE
09 22 16 - NON-STRUCTURAL METAL FRAMING
09 29 00 - GYPSUM BOARD
09 30 13 - CERAMIC TILE (CT)
09 51 00 - ACOUSTICAL CEILINGS (ACT)
09 65 00 - VINYL COMPOSITION TILE FLOORING AND RESILIENT BASE
09 67 00 - EPOXY FLOORING SYSTEM
09 68 13 - CARPET TILE (CPT)
09 91 10 - ARCHITECTURAL PAINTING
DIVISION 10 — SPECIALTIES
10 14 23 - SIGNAGE
10 21 14 - SOLID POLYMER HDPE TOILET PARTITIONS
10 28 13 - TOILET AND BATH ACCESSORIES
10 41 00 - EMERGENCY ACCESS CABINETS
10 44 33 - FIRE PROTECTION SPECIALTIES
10 56 26 - MOTORIZED MOBILE STORAGE SHELVING
DIVISION 12 — FURNISHINGS
12 20 00 - WINDOW TREATMENT
WICR - 251506 00 01 10 - 3
DIVISION 21 — FIRE SUPPRESSION
21 05 00 - FIRE PROTECTION SYSTEMS
DIVISION 22 — PLUMBING
22 05 03 - PIPE AND PIPE FITTINGS - PLUMBING SYSTEMS
22 05 23 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 20 00 - PLUMBING FIXTURES AND EQUIPMENT
22 33 13 - INSTANTANEOUS DOMESTIC WATER HEATERS
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 05 13 - COMMON MOTOR REQUIREMENTS FOR PLUMBING AND HVAC EQUIPMENT
23 05 53 - IDENTIFICATION FOR HVAC, DUCTWORK, PIPING AND HVAC EQUIPMENT
23 05 93 - HVAC SYSTEMS - BALANCING AND TESTING
23 07 00 - PIPE, DUCT AND EQUIPMENT INSULATION
23 09 23 - INSTRUMENTATION AND CONTROL (DDC) FOR HVAC SYSTEMS
23 31 00 - HVAC - DUCTWORK
23 34 00 - HVAC - FANS
23 80 00 - HVAC - EQUIPMENT
23 83 00 - RADIANT HEATERS
23 84 00 - HUMIDITY CONTROL EQUIPMENT
DIVISION 26 — ELECTRICAL
26 05 00 - ELECTRICAL - BASIC REQUIREMENTS
26 05 19 - WIRE AND CABLE - 600 VOLT AND BELOW
26 05 26 - GROUNDING AND BONDING
26 05 33 - RACEWAYS AND BOXES
26 05 43 - ELECTRICAL - EXTERIOR UNDERGROUND
26 24 16 - PANELBOARDS
26 27 26 - WIRING DEVICES
26 28 00 - OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES
26 28 16 - SAFETY SWITCHES
26 29 23 - VARIABLE FREQUENCY DRIVES - LOW VOLTAGE
26 50 00 - INTERIOR AND EXTERIOR LIGHTING
DIVISION 27 — COMMUNICATIONS
27 10 00 - STRUCTURED CABLING
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 31 00 - FIRE ALARM SYSTEM
DIVISION 31 — EARTHWORK
31 23 00 - EARTHWORK
WICR - 251506 00 01 10 - 1
D I V I S I O N 0 1
GENERAL REQUIREMENTS
WICR - 251506 01 11 00 - 1
091015 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work phases.
3. Work under other contracts.
4. Government Furnished Materials.
5. Contractor use of premises.
6. Public use of site.
7. Occupancy requirements for buildings.
8. Work Restrictions.
9. Special Construction Requirements.
10. Soils Investigation Report.
11. Additional Reports.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: The project site is located 10 miles southwest of Springfield, Missouri on Green County and Farm Road 182 Route ZZ.
B. The Work consists of the following:
1. The Work includes the remodel of the existing Library wing and Visitor Center at Wilson’s Creek National Battlefield near Republic, Missouri. The work includes relocating the existing restrooms in the Visitor Center, remodeling the curatorial space to increase the area to house artifacts, remodeling of the exhibit area in the Visitor Center to create additional exhibit space and the display of artifacts that are currently in storage, upgrade of fire alarm and protection systems, and upgrade of HVAC system to control building temperature and humidity.
2. The Work includes providing specialized items for the exhibit displays. The contractor will provide museum quality crafted cabinets and display cases, including glass cases, elevated platforms and carved scenic ground forms. As part of the exhibit the Contractor will provide six life-like museum quality figures, the uniforms will be provided by the National Park Service (NPS). The contractor will provide two reproduction cannon carriages and one limber carriage reproduction. The contractor will provide and install forty interpretive reader rail panels to be mounted along the exhibits. The text for these panels will be provided by the NPS. It will be the contractor’s responsibility to provide and install audio/visual equipment, to include touchscreens and video displays. The videos will be provided by the NPS.
3. Project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System, as specified in Division 01 Section "Sustainable Design Requirements."
WICR - 251506 01 11 00 - 2
C. Project will be constructed under a single prime contract.
1.3 WORK PHASES
A. The Work shall be conducted in a single phase. The Contractor is responsible for planning and scheduling the work in both major areas of the building (i.e. Visitor Center and Library). See 01 32 16 CONSTRUCTION SCHEDULE for more information.
1.4 GOVERNMENT-FURNISHED MATERIALS
A. Government will furnish products indicated.
1. Government will arrange and pay for delivery of Government-furnished items according to Contractor's Construction Schedule.
2. After delivery, Government will inspect delivered items for damage. Contractor shall be present for and assist in Government's inspection.
3. If Government-furnished items are damaged, defective, or missing, Government will arrange for replacement.
4. Contractor is responsible for receiving, unloading, and handling Government-furnished items at Project site.
5. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.
7. Contractor shall install and otherwise incorporate Government-furnished items into the Work.
1.5 CONTRACTOR USE OF PREMISES
A. General: Contractor shall have use of the premises for construction operations. Limit use of premises to work in areas indicated. Do not disturb portions of Project site or premises beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to the Library and Visitor Center and associated areas of the site in order to complete installation of Air Handling Units (AHUs), and other essential utility connections as required (e.g. sanitary sewer, electrical, gas, water, etc).
2. Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet beyond building perimeter; 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter; 15 feet beyond primary roadway curbs and main utility branch trenches; and 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.
B. Storage of Materials: Confine storage of materials to the designated area directly adjoining the premises.
C. Preservation of Natural Features:
WICR - 251506 01 11 00 - 3
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times, unless coordinated and approved by the Contracting Officer. Do not use these areas for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Construction Camp: Establishment of a camp within the park will not be permitted.
F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
1.6 PUBLIC USE OF SITE
A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Building and road closures will not be permitted without prior approval from the Contracting Officer. In the unlikely event that limited building or road closures are required, upon specific approval of Contracting Officer, would be limited to 24 hours not including weekends..
1.7 OCCUPANCY REQUIRMENTS FOR BUILIDINGS
A. Existing Buildings
1. Full Government Occupancy: Government will have limited access to buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage.
Perform the Work so as not to interfere with Government's day-to-day operations.
Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
WICR - 251506 01 11 00 - 4
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. Remodeled Building Area
1. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.
a. Contracting Officer will prepare a Beneficial Occupancy letter for each specific portion of the Work to be occupied before Government occupancy.
b. Obtain a Certificate of Occupancy from the NPS before Government occupancy.
c. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.
d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.
1.8 CONDUCT OF OPERATIONS
A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 48 hours in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.9 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
1. Weekend Hours: Upon approval by the Contracting Officer.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
WICR - 251506 01 11 00 - 5
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Hours for Utility Shutdowns: <TBD by Contracting Officer on case by case basis, as necessary.>
D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.10 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.
1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.
B. Off-Site Storage of Artifacts: The Park will move library books and artifacts, but the Contractor shall notify the Contracting Officer 4 weeks in advance of the date needed to begin demolition and Visitor Center.
C. Provide 4 week notice before start of demolition in the Visitor Center. Assume off site storage of artifacts and library material for one year.
D. Contractor to secure site at all times.
1.11 SOILS INVESTIGATION REPORT
A. A soils investigation report has been prepared by Anderson Engineering, August 2000.
B. A copy of the report is available to all plan holders with this package.
C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.
PART 2 - PRODUCTS (See Section 01 67 00)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
WICR - 251506 01 26 01 - 1
031414 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager, Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
WICR - 251506 01 26 01 - 2
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:
1) Social Security
2) Medicare
3) Workers Compensation– Policy and company calculation to be made available.
4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.
5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.
WICR - 251506 01 26 01 - 3
6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.
Contractor may utilize the government provided Contractor Estimate Form, or their http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#ct
WICR - 251506 01 26 01 - 4
own form, provided that it contains the same information and level of detail as the Gov’t provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.
Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.
Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
WICR - 251506 01 26 01 - 5
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.
Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
Utilize the Profit Calculator to generate the allowable maximum rate for Profit on self-performed work.
Insert the result below where indicated by the red X.XX%. Work collaboratively with the COR to produce the draft Profit Calculator for Design Development (DD) submission. Denver Service Center Contracting Services division will approve the final number. Submit completed Profit Calculator with the DD submission.
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit………………X.XX%
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
http://www.nps.gov/dscw/publicforms.htm#dt
WICR - 251506 01 26 01 - 6
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 01 26 01
WICR - 251506 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 0001: Exhibit Area.
1. This item consists of furnishing contract labor, material and equipment to construct 1,500 square feet of additional museum exhibits. The work includes the following: installing security mesh and a fire wall on all interior walls and the ceiling and installing exhibit cases in the 1,500 square foot exhibit area. The concept is to have large glass enclosed exhibits that will be able to display numerous items at one time. The idea is that these large displays will not only have a stunning visual impact on the visitors, but will also showcase the vast number of items that are being preserved by the park, for visitor enjoyment. This CLIN includes additional display cases to house interchangeable exhibits. Some items, such as textiles, are sensitive to the light and should only be displayed for short periods of time.
2. Payment will be made at the contract lump sum price.
B. Contract Line Item No. 0002A: Curatorial Room.
1. This item consists of furnishing contract labor, material and equipment to rehabilitate existing offices into 1,360 sq. ft. of curatorial space that will be created by demolition of one existing breakroom, 3 offices, and a conference room; demolition of 1,800 sq. ft. of carpet; demolition and plug holes from 5 windows, 4 sky lights; demolition of breakroom cabinets and doors; electrical demolition (outlets, lighting, security and fire devices);
installation of carpet in two offices, and epoxy paint on floors in storage areas; construction of fire walls and security mesh on ceiling and outer walls of curatorial storage and workroom; finish, prime, and paint walls and ceilings; install new fire and security devices, fire doors, LED lighting, electrical outlets, and data ports; relocate breakroom; install cabinets, counters, and an exhaust hood in a curatorial workroom; install compact shelving in storage area and replace obsolete museum cabinets..
2. Payment will be made at the contract lump sum price.
WICR - 251506 01 27 00 - 2
082714 DEFINITION OF CONTRACT LINE ITEMS
C. Contract Line Item 0002B: Curatorial Room (Wall and Window Systems)
1. This item consists of window removal and infill, new drywall, steel mesh and plaster, and cut opening for new door at the Curatorial Storage area. This “Exterior Enclosure” CLIN also includes exterior window (curtain) wall systems at south elevation, partial elevation, north elevation and east elevation, as shown on drawing A10 (Visitor Center). The CLIN includes paint storefront frame and trim, paint window frame and trim, removal of exterior windows, and double exterior aluminum and glass entry door, paint of all doors, frames and trim.
D. Contract Line Item No. 0003: Restroom
1. This item consists of supply of contract labor, material and equipment necessary to relocate existing restrooms and demolition of offices to create space for relocated Architectural Barriers Act (ABA) restrooms and to facilitate the installation of drains and piping from the new restrooms to the existing sewer line; demolition of carpet from offices, a hallway, lobby area, sales area, and a coffee area; demolition of floor and wall tiles from 2 existing restroom areas; demolition of existing restroom vents and above grade piping; demolition of an existing commercial exhaust fan and patch the holes in the roof; demolition of existing cabinets, sinks, urinals, partitions, and counter tops in the restrooms; demolition of 3 water fountains; install a new drywall ceiling, security mesh, finish, primer and paint for offices, and relocated restrooms, tile floor and walls in new restrooms; install new carpeting and windows in 2 reconstructed offices, a lobby area, sales area, and hallway;
install new electric outlets, lighting, communications cabling, fire alarm devices, and security devices; install new restroom partitions, diaper changing stations, urinals, toilets, sinks, and faucets; install new water lines; saw concrete and remove utility corridor for sewer and drain lines in an existing 5” thick concrete slab; install new sewer pipe and hook to existing; install 2 new water fountains near the relocated restrooms..
2. Payment will be made at the contract lump sum price.
E. Contract Line Item No. 0004: HVAC
1. This item consists of contract labor, material, supplies, and equipment to: replace failing 13 HVAC; reduce energy costs by replacing 13 cooling units and 13 propane furnaces systems with 16 seer heat pumps and greater than 90% efficiency furnaces to provide climate control for 15,320 square feet of facilities (visitor center and library).
2. Payment will be made at the contract lump sum price.
F. Contract Line Item No. 0005: Fire Alarm and Fire Suppression Systems
1. This item consists of contract labor, material and equipment to demolish existing fire alarm and sprinkler system in the library and visitor center. The Contractor is required to install new fire alarm and sprinkler system s in accordance with NFPA 13 and 72 and in accordance with IBC and IFC.
2. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
WICR - 251506 01 31 00 - 1
091015 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination.
3. Submittals
4. Coordination Drawings.
5. Requests for Information (RFIs).
6. NPS/DSC SharePoint Project Website.
7. Project meetings.
8. Environmental Coordination.
9. Permits
B. Related Requirements:
1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.
4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with Owner’s
Commissioning Authority.
1.2 DEFINITIONS
A. Agency with Jurisdiction B. Construction Permits – Contractor Provided C. Government Furnished Permits
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
http://www.nps.gov/dscw/definitionsdc_a.htm#awj http://www.nps.gov/dscw/definitionsdc_c.htm#cpcp http://www.nps.gov/dscw/definitionsdc_g.htm#gfperm
WICR - 251506 01 31 00 - 2
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Permit requirements.
7. Pre-installation conferences.
8. Project closeout activities.
9. Commissioning activities.
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.
e. Indicate required installation sequences.
2. Sheet Size: At least 8-1/2 by 11 inches but no larger than 30 by 40 inches.
WICR - 251506 01 31 00 - 3
3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.
4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Plenum Space: Indicate sub-framing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.
3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.
4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.
6. Mechanical and Plumbing Work: Show the following:
a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.
b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.
c. Fire-rated enclosures around ductwork.
7. Electrical Work: Show the following:
a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.
b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.
c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.
d. Location of pull boxes and junction boxes, dimensioned from column center lines.
8. Fire-Protection System: Show the following:
a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.
9. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.
10. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."
WICR - 251506 01 31 00 - 4
C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Preparation Format: AutoCad.dwg, Version 2018, operating in Microsoft Windows operating system.
3. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.
4. Contracting Officer (CO) will furnish Contractor one set of digital data files (AutoCad.dwg) of Drawings for use in preparing coordination digital data files.
a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
D. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Indoor Air Quality (IAQ) Management Plan.
11. Contractors Commissioning Plan.
12. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
E. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
WICR - 251506 01 31 00 - 5
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.
1. CO will not respond to RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the
Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
8. Contractor's signature.
9. Requested date for response.
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:
1. Enter the general information at the top of the form.
2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.
3. Enter the details of the question and attach related documents.
4. Select “Submit Form” at the bottom of the page.
D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.
CO will determine the critical nature of each RFI and issue a response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
WICR - 251506 01 31 00 - 6
2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.
3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.
1.6 PROJECT WEB SITE
A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period.
The NPS/DSC SharePoint Project website will be used for the following functions:
1. Project directory.
2. Project correspondence.
3. Meeting agendas and minutes.
4. Contract modifications forms and logs.
5. RFI form and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.