SF30_Amendment_0006.pdf

PDF 39 MB Posted

Attached to
Rehabilitate Exterior Envelope and Historic Elements of the Old Santa Fe Trail
Solicitation number
140P2018R0023
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

9A. AMENDMENT OF SOLICITATION NO.

140P2018R0023 x x

3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

OSTB 20048604/13/20180006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/16/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OSTB 200486

Rehabilitate Exterior Envelope

The purpose of Amendment 0006 is to:

a) Provide Cultural Landscape Report as supplemental information.

b) Provide questions and answers received to date.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jason Longshore

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

x 1

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

PAGE OF

(A) (B) (C) (D) (E) (F)

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140P2018R0023

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Question and Answer

Spreadsheet

140P2018R0023 /

OSTB 200486

Question No. Sheet or Reference Question Response Amendment Answered

1 Factor 2. Past Performance

Is the NPS expecting past performance evidence for every project submitted in Sub‐

Factor A and Sub‐Factor B?

There are different qualifications and experiences that are requested in Sub‐Factor A and Sub‐Factor B. The NPS has requested that the proposal includes sufficient past performance to evaluate the offerors qualifications and experiences as requested in the solicitation

2 Factor 2. Past Performance

Is the NPS looking for past performance of our specialty trade sub‐contractors listed in

Sub‐Factor B?

Yes, the NPS has identified the requirement for specific specialty trades. The offerors qualifications should adequately represent the prime contractor and specialty contractors alike.

Factor 2. Past Performance

Questionnaire

Many of our government projects have already been assessed through the CPARS system or the USACE/NAVFAC Past

Performance Questionnaire. In order to reduce the burden of multiple assessments, may we submit these with our proposal in lieu of requesting a new Past Performance

Questionnaire to be filled out by our clients?

The contractor may include CPARS evaluations for past performances. If the contractor believes that a new Past Performance Questionnaire is more appropriate then the contractor may do so.

The NPS will research contractor's past performances via CPARS.

4 Sub‐Factor C. Key Personnel

Please clarify whether the Job‐site

Superintendent may also fulfill the Safety

Manager position.

The offeror may submit an individual from their proposed project management team to serve as

Superintendent and Safety Manager if they meet the qualifications and experience of both positions.

5 Sub‐Factor C. Key Personnel Please clarify whether the Project Manager must be on site at all times.

The Project Manager is not required too be onsite at all times. The Project Superintendent is required to be on site whenever there are construction activities occurring.

6 General Please provide a due date for questions All questions must be submitted no later than

5:00 Mountain Time, April 10, 2018

7 General

In reference to the Experience Questionnaire, is the term “offeror” considered the Prime

Contractor only; or is the “offeror” considered to be the entire team, to include critical subcontractors?

The term offeror is to be considered for your entire team to include subcontractor.

8 General

Is the contractor responsible for the archaeological monitoring? Should the contractor factor in the cost of archaeological monitoring into our pricing?

No, govt will provide Archaeological monitoring 3

9 General Can you confirm the Government intends to add a factor of 10% to Hubzone companies?

HUBZONE preference will be done in accordance with clause .52.219‐4 ‐‐ Notice of Price

Evaluation Preference for HUBZone Small

Business Concerns.

10 General Is the building going to be vacated during construction?

Yes 4

11 General Can contractors work on weekends/holidays?

Yes, per coordinating with the Contracting

Officer refer to specifications.

12 General Who should we contact for coming back to do more site visits?

Charles L Vickrey 505‐988‐6032 Ken

Hornback Office 505‐988‐6858 Cindy Lucier

505‐988‐6896 Tammy K. Gallegos 505‐

988‐6085 Contractors shall provide a 24 hour notice prior to arrival

13 General

When can we come back for additional site visits? Are we allowed in each of the rooms of the building OR is it just the exterior? (to look at vigas)

See 12 above. The return visits are limited to exterior and common space.

14 General In the sunken area and window wells is there a treatment plan?

Yes, Refer to contract documents. 4

15 General Who is responsible for cutting back trees around the building?

NPS staff will remove tree limbs prior to the construction contract award. The intent is to provide 3'‐5' clear space for scaffolding. The contractor will need to submit a cultural landscape protection plan to ensure trees are protected.

16 General Will we still need an arborist and landscape architect as part of team?

Yes, refer to contract documents. 4

17 General

Who determines what the treatment is for the wood gates for “and what is to be done with each being individually prescribed?

Refer to A5‐15 A5‐14 and wood gate restoration

08 03 52

18 General Are light fixtures to be removed by others? Yes, by National Park Service 4

19 General Will table remain in building and protected? Yes. Refer to contract documents. 4

20 General Will chairs and fluorescent lights be removed?

Chairs in the Maier Conference Room will be removed and the table remains. Chairs at desks throughout the building will remain and are to be protected in place. The fluorescents will not be removed and are to be protected in place. Refer to contract documents.

21 General Will computers and printers be removed?

Some will remain (minimal) and need to be protected. Refer to contract documents.

22 General Is General Contractor responsible for area to be cleaned when done?

Yes, refer to contract documents. 4

23 General Is conduit on roof live? Answer Pending 4

24 General Is 2nd story roof laid over existing roof? Yes. 4

25 General What is access to site and who maintains control during construction?

The contractor is responsible for all access to the site during construction. The NPS will lock the electric gate in an open position throughout the construction period. The contractor must maintain access for NPS administrative access.

26 General Can we do cores on the roof prior to bid? Will come back and fill in cores.

Core roof memo and plan is attached. Please follow up with DSC if more information is needed.

27 General Was the Annex built at the same time? No, not built at the same time. 4

28 General Will the contractor have full and free use of water and electrical?

The contractor will be responsible for providing temporary power coordinated with PNM website: https://www.pnm.com/ telephone: 888‐342‐5766

The ESG (https://www.pnm.com/esg)

Contractor is reponsible for all coordination, costs, permits and payments to PNM. The contractor will not have use of any electrical service from the Old Santa Fe Trail Building interior or exterior power sources.

The contractor will be responsible for providing temporary water coordinated with City of Santa

Fe Water Division, contact Dora Marquez website:

https://www.santafenm.gov/water_division telephone: 505‐955‐4333

Contractor is reponsible for all coordination, costs, permits and payments to City of Santa Fe.

The contractor will not have use of any water service from the Old Santa Fe Trail Building interior or exterior sources.

29 General Did the A/E look at all foundations during the design process?

No. 4

30 General

Per code we are not permitted to have canales over windows? Are they to remain in the same location?

Yes, to remain in the same location. However, there will not be water flowing through several existing canales. Refer to contract documents.

31 General

Is it correct that asbestos containing material is to be removed under full containment and be disposed of as non‐ hazardous material?

Yes, refer to contract documents. 4

32 General Does the shoring have to be engineered and stamped by licensed engineer?

Yes, refer to contract documents. 4

33 General

Do all layers need to be removed as containing hazardous materials or just down to gray coat?

Refer to contract documents. 4

34 General Are all surveys attached on FBO? Answer Pending 4

35 General Which vigas are to be replaced and how it is to be determined?

Refer to contract documents. 4

36 General If asbestos is encountered what is the treatment?

Refer to contract documents. 4

37 General

How may square feet/yards of stucco can be removed at once? It is best to remove all stucco from the ground to the rooftop, at a minimum of 100' of length, per containment.

This allows the stucco sub to commence reinstallation, while we prep and abate another 100' section. Please clarify the requirements by the specs, or stucco industry standards.

Answer Pending

38 General

The roofing material was noted to have been replaced in the last 10 years, and is referred to in the "Non‐Asbestos Materials" section of the Summary Report; however, it does not state the built‐up roofing known to be below the newer insulation and roofing was sampled. If the entire roofing is to be removed to the deck, can additional roofing samples be taken of the original built up roofing materials, or do we assume it is

Asbestos Containing BUR?

Answer Pending

39 General

It is noted in the SCA Environmental Report that all asbestos (including trace amounts or materials of 1%) be abated, with disposal of waste as non‐hazardous materials. This would allow abatement contractors to remove all the stucco layering, to the wire lathe.

Answer Pending

40 General

It is noted that lead based paint, and asbestos materials exist throughout the interior walls;

Although some samples were noted as either non‐asbestos, or trace, and some paint as

"lead containing", only, the SCA Report states all interior plaster and asbestos should be abated by asbestos certified individuals, per

29CFR 1926.1101, Work Class 2 Procedures.

Therefore, any/all damaged or flaking plaster and paint associated with the Vigas wall repairs must be removed by an abatement contractor. Please clarify the NPS decision on this work.

Answer Pending

41 General

It is noted that any/all vinyl flooring was not tested and is assumed to be asbesos containing materials. Is there flooring to be removed and replaced?

Answer Pending

42 General

There is reference to pipe elbows throughout the basement stairs, and storage room. Is there removal of any of this material required.... It is noted it contains asbestos.

Answer Pending

43 General

Is there a page limit to the Technical

Proposal?Is there a page limit to the

Technical Proposal?Is there a page limit to the Technical Proposal?

See Amendment 6 6

44 General

Due to the specialized nature of this unique project would the NPS consider extending the relevant past experience time period to 7 years instead of the current 5 years which is typical for traditional projects?

Yes we will consider projects within the past 7 years.

45 General

Is there a limit to the number of Past

Performance Questionnaires that may be submitted to the Contract Officer?

No 5

46 General

On page 136 of 150 under Resumes, it states, “There are no pre‐printed forms for this submittal”. We assumed that the Key

Personnel Qualifications form was to be used for this requirement. Please confirm or clarify.

See revised answer in question 95. 5

47 General

Does the NPS want to see any kind of price breakdown in the Price Proposal, or is the lump sum amount all that is needed? Lump Sum 5

48 General

Please indicate where the connection(s) for power will be located for the project? Can we inspect?

The contractor will be responsible for providing temporary power coordinated with PNM website: https://www.pnm.com/ telephone: 888‐342‐5766

The ESG (https://www.pnm.com/esg)

Contractor is reponsible for all coordination, costs, permits and payments to PNM. The contractor will not have use of any electrical service from the Old Santa Fe Trail Building interior or exterior power sources.

49 General Please indicate where the connection(s) for water will be located for the project?

The contractor will be responsible for providing temporary water coordinated with City of Santa

Fe Water Division, contact Dora Marquez website:

https://www.santafenm.gov/water_division telephone: 505‐955‐4333

Contractor is reponsible for all coordination, costs, permits and payments to City of Santa Fe.

The contractor will not have use of any water service from the Old Santa Fe Trail Building interior or exterior sources.

50 General

Can the contractor install heated storage/shop for duration of construction adjacent to office that is shown on staging plan?

Answer Pending

51 General Is there an irrigation plan available for review?

Answer Pending

52 General

In demo plan note 1 refers to conduit in the foam under roofing. Is it known that all electrical and data are in conduit? Are there as built drawings for the electrical renovations?

Answer Pending

53 General Do shoring plans need to be stamped?

Yes, refer to response 32 above, contract documents.

54 General

Should we use the Contract price schedule included in the solicitation (page 11 of 150) or should we use the Contract Price Schedule included as the last page of

Volume_II_Proposal_Submission_Package_O

STB? The forms are different.

Please use the Price Schedule on page 11 of 150 of the RFP.

55 General

We are a small business. Are we required to submit the subcontracting plan with our proposal?

No 5

56 General For prime contractor experience, please confirm we are limited to 5 projects Yes 5

57 General

To enable a broader view of our experience, and show our experience with NHL / NHR sites, would the government allow us to submit project experience within the past 10 years, rather than the past 5 years limitation noted on the “Experience Questionnaire”?

Refer to Question #44. 5

58 General Where are we to include the “Subcontractor

Reference” forms

Those are sent directly to the Contracting

Officer. Not included into bid package.

59 General Is there a possibility of the due date being extended on this solicitation?

See Amendment 5 5

60 General

1. Reference Final Construction Documents

Submittal Specifications, Section 01 27 00 –

Definition of Contract Line Items, 3.1 List of

Contract Line Items. This section defines various contract line items that are not identified in the Contract Price Schedule.

The Contract Price Schedule contains only one Contract Line Item Number, No. 1, Rehabilitate Exterior Envelope of the Old

Santa Fe Trail Building and Annex Building.

Question: Is the NPS going to amend the

Contract Price Schedule to correlate with

Section 01 27 00?

Answer Pending

61 General

We feel introducing a torch to a building of this historic significance, age construction would be very risky. Would the government entertain a modified roof system that is cold applied that meets the exact specification of the modified membrane?

Answer Pending

62 General

Would the government entertain alternate roof systems that meet the performance and warranty requirements of the specification?

Answer Pending

63 General

Sheet 13, note 1 indicates: “Demo existing surface‐mounted conduit. Exercise care w/roofing demo as other conduit reportedly exists w/in existing insulation. Verify extents of conduit demo w/CO prior to roofing and conduit demo”.Can the government please identify what utilities are known to exist within the existing insulation? Please confirm any work to existing utilities within the existing insulation that are not included in the scope of this project.

Answer Pending

64 General

Can the government provide as‐builts of the building, in particular the roof and any systems which may be impacted by the scope of the project?

Answer Pending

65 General

Can the government please confirm the extent of systems on the 2nd floor for which we will be required to provide temporary protection? As we did not get to inspect the rooms, would the government be able to provide a standard that all bidders should use? For example, should we account for computer and electronic equipment in every room, or will these be relocated and stored in a central location by NPS?

Answer Pending

66 General

What is the directive and specifications to repair and or replace any compromised adobe units after the removal of the existing stucco surface materials? A repair adobe soil mix design, adhesion products, and admixtures will play an important role in the repairing of compromised and possible damaged adobes and possible deteriorated and damaged wall areas in the existing adobe wall surfaces. The repair products and soils could be part of the materials specifications provided or does the field contractor supply this information? Note: one would expect that we may see more issues of poor materials at the parapets and around the existing the windows and doorways after the stucco removal, as well as areas that may have encountered moisture and certain issues over the years.

Answer Pending

67 General

Is it possible to get the specifications for the earth tone color specified for the canale dissipater units?

Answer Pending

68 General

In the details there is no reinforcing shown in the canale dissipater units. Being there will be moisture and at times an extreme freeze thaw condition at the dissipaters, we want to confirm there is no reinforcing included in the proposed construction.

Answer Pending

69 General

On page C‐501, detail 1‐C501 please confirm that the color concrete is only under the provided placed 2" ‐4" rock units. In the upper detail, the right side arrow points to what I presume to be the re‐compacted existing soil surround.

Answer Pending

70 General

In the notes, page C‐501 calls for verification of the depth of the foundation by the contractor, which is unknown. This work is for the installation of the new dissipaters on the east side of the building. Is this exploratory work a line item cost or is it to be included in the work scope and proposed cost?

Answer Pending

71 General

Drawings and details for the gate repair note

"stripping of coatings." The Abatement

Summary of Work and Lead Hazard

Procedures address the "scrapping and stabilization of loose and peeling paint."

Please clarify. Possibly consider removing the specification that calls for stripping the gate.

Answer Pending

72 General

In the Asbestos and Lead Summary of Work notes: Asbestos containing pipe TSI impacted by seismic upgrades. Please provide locations and quantities for this abatement. Standard

Procedures note: "See Mechanical Plans"

Answer Pending

73 General

Abatement Summary of Work notes: Removal and disposal of rodent waste throughout the crawlspace tunnels. Is this work additional and not associated with this project? Rodent waste cleaning was noted in S501 related to roof work. Should we assume all areas that are accessible will need abatement?

74 General

Exterior stucco removal requires full isolation per the specifications. Will each separate enclosure need to have a final air clearance following a visual inspection by the IH

Consultant? Asbestos Summary of Work directs each enclosure to have final TEM samples. Since no public laboratories have

TEM capabilities in NM, the impact on cost, productivity and schedule need to be considered.

Answer Pending

75 General

40 to 50 exterior stucco areas were sampled for asbestos content. Of those only a handful reported "trace". In reviewing the lab sample results attached to the solicitation, the finish or color coats all layers need to be removed as asbestos containing within a full enclosure. The mud coat and non‐colored cementous base coats need to be removed but not as asbestos materials? Will the NPS allow for abatement of just the layers of hot material and leave the first generation grey coat (scratch and Brown coat)?

Answer Pending

76 General

The specs state that we should assume 1300 linear feet of adobe replacement at top of parapet. In order that the NPS should receive pricing for this line item that is apples to apples, could the NPS be more specific in terms of the number of adobe bricks? For example, if one contractor assumes the top 3 rows 2 wide of replacement = 1 SF per LF, then we’re looking at approximately 8000

Adobes. Whereas if another contractor assumes 1 row, 2 wide then it’s approximately 2600 adobe bricks. Please clarify.

Answer Pending

77 General

The plans and specs indicate 4750 linear feet of adobe crack repair. Should we include pricing for Adobe “stitching or as defined in spec as Crack Mortar Repair: install helical anchors to stitch across crack plane. If so what quantity should be assumed?

Answer Pending

78 General

The specs state that methods of demolition must be constrained to minimize damage to the existing adobe masonry. Please define or clarify “constrained”. Is There a specific spec for constrained removal or a sequencing plan? Will this need to be included in a Historic Treatment Plan?

Answer Pending

79 General Can the mud plaster coat be disposed of onsite?

Answer Pending

80 General

What is the quantity of vigas to be repaired in conference room? It appears to be only one according to sheet 52?

Answer Pending

81 General

May we submit additional pages as a supplement to the Experience Questionnaire in order to provide additional relevant information with pictures of the projects?

No, the technical proposal is limited to 30 pages and should capture this information

82 General Please define the Key Personnel for whom the NPS would like to see resumes.

Refer to Section H of the RFP 6

83 General

Can we use our own formatted resumes to supplement or instead of the Key Personnel

Qualifications Form as long as the Resumes contain the relevant information?

Yes 6

84 General

Please confirm whether the intent of detail

3/A511 is to remove and replace backer rod and sealant 11 months after installation, which based on the timeline, will be after completion of the project.

Answer Pending

85 General

The property boundary on the south side of the building restricts work access, with numerous trees between the building and the property line, limiting equipment access to the building for movement of demolition and new construction materials. Please confirm that the contractor will be allowed to encroach on the neighboring property to access all areas of the perimeter of the building.

Answer Pending

86 General

Please confirm the contractor will be allowed to use wheeled equipment such as skid steer loaders and forklifts on all sides of the building, considering final grading and re‐ seeding will be completed to restore the property at completion.

Answer Pending

87 General

Will stucco work be performed on the site walls for this project? If so, will it be the same system as the structural walls (remove and replace) or just a patch and color to match the new system on the building?

Answer Pending

88 General

There is a note on Sheet G003 – Staging Plan:

“(E) 6’ – 0” + wall to serve as construction fencing if allowed by Contracting Officer otherwise provide for fully fenced site.” For pricing purposes, we need to know if we will be allowed to use the existing wall to enclose part of the staging area or if we will need to provide additional fencing which would run inside the existing wall.

Answer Pending

89 General What is the desired new roof insulation thickness?

Answer Pending

90 General What is the desired new roof insulation “R” value?

Answer Pending

91 General

Drawing G003 contemplates the use of the existing 6’‐0” wall at the east side of the site to serve as construction fencing “if allowed by

Contracting Officer.” Please confirm this will be acceptable to the Contracting Officer.

Answer Pending

92 General

During the site walk, it was discussed that the plaster at the window sills, jambs and heads should be installed with a square edge in lieu of the rounded bullnose condition that currently exists. Please clarify whether the details on sheet A512 are correct or if the detail should be more square.

Answer Pending

93 General

Specification Section 01 56 39 Paragraph 1.2 references a Cultural Landscape Report dated

2011, as well as two Existing feature reports dated 2010. None of these 3 reports appear to be included with the RFP documents.

Please provide the 3 reports.

Answer Pending

94 General

2/S122, Second Floor Roof Plan, does not quantify the out‐of‐plane connections on the south end of the second floor. Please provide this quantity.

95 General

On page 136 of 150 under Resumes, it states, “There are no pre‐printed forms for this submittal”. We assumed that the Key

Personnel Qualifications form was to be used for this requirement. Please confirm or clarify.

Resumes shall be submitted for personnnel identified in Section H. Volume I of the Proposal

Submission Package contains a form "Key

Personnel Qualifications" that shall be used as intended. Contractors shall refer to Section L on how to submit their proposal.

96 General

With regards to Q&A #43, which reads:Q = Is there a page limit to the Technical Proposal?R

= (15) Fifteen 8 1/2 x 11 inch pages printed single sided or reduced. 15 pages for an entire technical proposal appears to be too few. The project experience sheets alone for the prime contractor (Sub‐Factor A), total 15 pages (3 pages each x 5 projects). Therefore, was it the NPS’ intent to limit the Sub‐Factor

C Management Plan response to 15 pages

(excluding resumes and the schedule print‐ out).

Volume I ‐ Technical Proposal shall not exceed 30 pages. This excludes the schedule.

97 General

Tree protection fencing requirements are for the protective fencing around trees to be 1.5 time the diameter of the protected trees canopy. The canopies of many of the existing trees extend over the building. Can the protective fence line be adjusted on the building side of the tree to “the distance from the building needed to conduct the required removal and restucco work”?

Answer Pending

98 General

Will the NPS allow use of the existing exterior wall hydrants to connect temporary irrigation system to water the native grass reseeding?

Answer Pending

99 General

Will the NPS allow a temporary irrigation system for the native grass revegetations areas to be at surface and pinned in location as opposed to buried? The above ground system would be removed at the end of the watering period required in the contract.

Answer Pending

100 General

If a temporary irrigation system is allowed and it is allowed to be at surface, can connecting lines go through gates openings and possibly over short yard walls for the duration of the use?

Answer Pending

101 General

Response to Question 7 about the

Experience Questionnaire states “The term offeror is to be considered for your entire team to include subcontractor". However, there is a Subcontractor Reference form included that states “The purpose of this form is for the offeror to list certain subcontractors identified … who are considered critical to the successful accomplishment of the project.

Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described. Do we submit our major subcontractors’ projects on the Experience

Questionnaire or the Subcontractor

Reference” form?

See answer to question #106. 6

102 General

With regard to the existing adobe structure, there will be areas in need of repairs and patching after the stucco surface is removed.

The extent of repair and patching will vary.

Will there be an allowance to provide for this unknown work scope? What is the suggested approach to pricing so all Offerors are pricing the same level of effort?

Answer Pending

103 General

For the Experience Questionnaires, is the requirement to include 5 projects for the prime contractor and 5 for each specialty subcontractor or 5 total for the offeror?

5 total 6

104 General

Will the NPS consider allowing us to submit

Experience Questionnaires for our Key

Personnel if those projects meet the other criteria? Experience questionnaire is used for projects.

105 General

Relative to the Experience Questionnaire, it states “The purpose of this form is for the offeror to list projects performed during the past five (5) years that are similar to the work described in this solicitation.” However, there has not been significant adobe projects in recent years. Can the date be extended to the past ten (10) years?

Refer to Question #44. 6

106 General

Amendment 2, Response to Question 7 about the Experience Questionnaire states “The term offeror is to be considered for your entire team to include subcontractor".

However, there is a Subcontractor Reference form included that states “The purpose of this form is for the offeror to list certain subcontractors identified … who are considered critical to the successful accomplishment of the project. Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described…” Do we submit our major subcontractors’ projects on the Experience Questionnaire or the

Subcontractor Reference” form?

Experience Questionanaire is for the Prime. Can be used for sub if used on major project.

Subcontractor reference form is for

Subcontractor. All of the documents in the RFP shall be used for the offeror to demonstrate their capability to meet contract requirements.

O

LD

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

PO

RT

NATIONAL PARK SERVICE

OLD SANTA FE TRAIL BUILDING

NATIONAL HISTORIC LANDMARK

CULTURAL LANDSCAPE REPORT

Prepared for:

National Park Service Intermountain Region

April 2011

Part I & II

Consulting Member:

Morrow Reardon Wilkinson Miller, Ltd., Landscape Architects Albuquerque, NM

Old Santa Fe Trail Building, Central Courtyard, 1940, NPS Archives.

Th is Cultural Landscape Report was completed through a Cooperative Agreement between the National Park Service and the University of New Mexico.

Cooperative Agreement Number: H1200090005

Table of Contents

OLD SANTA FE TRAIL BUILDING

NATIONAL HISTORIC LANDMARK

CULTURAL LANDSCAPE REPORT

CHAPTER # PAGE #

1 Introduction …………………………………….………………............……..…1

1.1. Management Summary.………………….……………………………...…...1

1.2. Historical Summary………………………………………………………

1.3. Project Scope/Methodology Overview……………….……..………….…

1.4. Study Boundary…………………………………..…………….………..…..3

1.5. Summary of Findings………....……………………..………….………...….5

Part I Site History, Existing Conditions, and Analysis & Evaluation

2 Landscape History………………………………………….……………………

2.1. Physical History Narrative……..…………………….…………………....…6

2.2. Summary of Historic Political Context.………………………..…….……...11

2.3. Summary of Historic Cultural Context…………………………

2.4. General Land Use Chronology

2.5. Chronology of Related Events and Developments.....…………………....….14 3 Existing Conditions…….………………………...…………..……………..…….18

3.1. Introduction and Site Description.....…….…………………………..……..18

3.2. Landscape Characteristics…….....………….……………..…………..…….18

3.3. Drainage………………….....………………………………………..…

3.4. Lighting…………………………….....………………………………

4 Analysis and Evaluation of Integrity.…...……………..……….……………...….60

4.1. Statement of Signifi cance

4.2. Area of Signifi cance…

4.3. National Historic Landmark Nomination & Criteria..……….......….….…..62

4.4. Analysis & Evaluation of Landscape Characteristics………..…........….……63

4.5. Evaluation of Historic Integrity….…….…………………….....……….…122

4.6. Summary…………..…………………..………………...........……….….126

Part II Treatment Recommendations

5 Treatment Recommendations.…...……………..……….……………...…

5.1. Management Philosophy & Primary Treatments…………….....…........….127

5.2. Overall Objectives & General Treatment Recommendations

5.3. Area Specifi c Treatment Recommendations......................................…

Bibliography………………………………………………………………………...…...148

APPENDICES

Appendix A: NHL and NR Nomination Forms Appendix B: Historic Structure Report Excerpt Appendix C: Historic Sketches, Plans & Detail Drawings Appendix D: Conjectural Original Exterior and Courtyard & Patio Landscape Plans Appendix E: Existing Features Exterior and Courtyard & Patio Landscape Plans Appendix F: Historic Photos Appendix G: Santa Fe National Historic Trail Map Supplement Appendix H: Excerpt from the Secretary of the Interior’s Standards for the Treatment of Historic Properties, Guidelines for the Treatment of Cultural Landscapes Appendix I: Piñon Needle Scale Reports Appendix J: Treatment Recommendations Exterior and Courtyards & Patios Appendix K: Fire Program - Fuels Reduction Objectives Appendix L: Review Process and Summary of Public Comments Appendix M: State Historic Preservation Offi ce Correspondence

Note on photography: All photographs were taken by the authors of this report in 2009-2010 unless otherwise noted.

LIST OF ILLUSTRATIONS

FIGURE # PAGE #

1 Location of the OSFTB on USGS Quad Map……………….……..…….………4 2 Pedestrian and Vehicle Circulation Diagram…………………………...….…….27 3 Drainage and Irrigation Plan, Central Courtyard………………..……...….……43 4 November 1938 Topography Plan……………………….………………...……64 5 March 1938 Grading and Dimension Plan, OSFTB…………......................…..65 6 Floor Plan from the 2001 General Management Plan…………............….… 7 March 1938 Grading and Dimension Plan, Central Courtyard…………...… 8 Circulation patterns during the period of signifi cance…..................…….… 9 Circulation patterns today...........................................……………....…….....…75 10 Updated proposal for the demolition of the original greenhouse………….......…77 11 Th e 1959 revision to the original 1951 Parking Expansion Plan…………......….79 12 An updated plan showing the layout of the expanded parking areas to the northeast and west of the OSFTB………………………...……………...80 13 Walks and Walls Detail, 1938...……………………………………..............…..82 14 Proposal to construct a ramp at the front entry of the OSFTB, 1991…….......…83 15 Detail of portal column base showing adjacent fl agstone……………….........….86 16 Conference Room Patio Planting and Seat Details, January 1941…..............…...88 17 Original and Existing Vegetation Patterns……………………..……………...…93 18 Sprinkler System Plan for the Central Courtyard, 1939……………….…...…..100 19 Details of the Pool and Fountain……...………………………………..….…..105 20 Alterations and Repairs to Pool and Fountain Plan……………………….… 21 Entrance Sign Detail by Harvey Cornell, 1939………………………….….….109 22 Parking after 1950s expansion…………………………............................……111 23 Detail of the Walks and Walls, 1938………………….………......................…112 24 Cattle Guard Plan and Detail by John Kell, 1939……….……..................……113 25 Walk and Walls Parking Area Plan, 1938.....………...………………….……...116 26 Bench Detail by Cecil Doty, 1939…………..........……………..……..………119 27 Central Courtyard Storm Drain Piping Plan, 1939………………….…….…..123

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

CHAPTER 1

INTRODUCTION

1.1. MANAGEMENT SUMMARY

Th e purpose of this project is the completion of Parts I and II of a Cultural Landscape Report (CLR) for the Old Santa Fe Trail Building National Historic Landmark (OSFTB) cultural landscape, which meets National Park Service (NPS) and Secretary of the Interior standards as described in the 1998 NPS Guide to Cultural Landscape Reports. Th e over arching objective of the CLR is to provide the NPS with well documented and considered landscape treatment recommendations that will assist NPS staff in retaining the historic integrity of the OSFTB landscape into the future.

A September 2001 General Management Plan (GMP) for the OSFTB calls for the completion of a CLR and begins to delineate the framework within which treatment recommendations will be made. Th e GMP states that:

“Because specifi c decisions about what to rehabilitate and what to restore require detailed analyses of historically signifi cant (contributing) landscape elements, a CLR needs to be completed. Using work already completed as a base, the CLR will graphically identify all contributing landscape characteristics, and, in coordination with other management requirements, will determine specifi c rehabilitation and restoration guidelines for landscape elements throughout the site. Existing landscape integrity will be retained through rehabilitation (e.g. various repair and maintenance activities revolving around vegetation and landscape features) and, based on CLR guidelines, through partial restoration (e.g. would return certain areas to the original circa-1937 design intent)… A balanced rehabilitation and restoration approach will allow a certain amount of fl exibility for accommodating contemporary uses, while the most signifi cant historic elements will be preserved. Restoration will occur only in areas where suffi cient historic information is available for accurate restoration work.” (National Park Service, General Management Plan, September 2001, page 28)

Th e GMP also identifi es issues and proposes actions to be addressed in the CLR for specifi c subject areas, including vegetation and planting design; vehicle circulation and signs; wildland fi re; recreational use of grounds; and irrigation and water conservation. Issues regarding the condition and historic integrity of the OSFTB landscape identifi ed in the GMP are discussed, respectively, in this CLR in Part I, Chapter 3, Existing Conditions and Part I, Chapter 4, Analysis and Evaluation; proposed actions or options are addressed in Part II, Chapter 5, Treatment Recommendations.

Th e Old Santa Fe Trail Building, previously referred to as either the National Park Service’s Region III Headquarters or Southwest Regional Offi ce, was listed in the National Register of Historic Places Inventory on October 6, 1970 (NR# 70000067) and designated as a National Historic Landmark on May 28, 1987.

A National Historic Landmark Nomination form was prepared by Laura Harrison, Architectural Historian, National Park Service in 1985 (see Appendix A).

1.2. HISTORICAL SUMMARY

Th e Old Santa Fe Trail Building and its grounds were designed by the NPS and constructed between 1937 and

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

1941 by the Civilian Conservation Corp (CCC) and Works Progress Administration (WPA). Th e OFSTB was to serve as the new Region III Headquarters for the National Park Service, a need brought about by the regionalization of the Department of the Interior and National Park System during the 1930s. According to the GMP:

“Acting Region III Director Herbert Maier began to plan the relocation of the National Park Service regional headquarters from Oklahoma City in 1936. His goal was to situate it where it was more physically centralized for the region’s designated states of Arkansas, Texas, Oklahoma, New Mexico, Arizona, southern Utah and Colorado.” (National Park Service, General Management Plan, September 2001, page 2)

Th e 8.04 acres of land upon which the OSFTB sits was bought in early 1937 from the Laboratory of Anthropology and De Vargas Development Company for a single dollar. Essentially a donation, “a reversionary clause in the deed stipulated that if the property should cease to be devoted to the use and benefi t of the National Park Service, the land and improvements would revert to the Laboratory of Anthropology or its successors.”

(National Park Service, General Management Plan, September 2001, page 2)

Completed in 1941 (though a dedication and employee move-in took place in 1939), the OSFTB was built in the ‘Spanish-Pueblo Revival’ style and signifi es the CCC’s and WPA’s eff orts to faithfully recreate and revive traditional architectural and craftsman traditions. Designed by NPS Architect Cecil Doty under the leadership of Acting Region III Director Herbert Maier, the design succeeded in following the principles of the “Government Rustic” style to construct buildings to look like they were built by “pioneer craftsmen with limited hand tools” (Albert Good, Park and Recreation Structures, Washington D.C., NPS, 1935, part I:5).

Th e landscape plans completed by National Park Service Landscape Architects Harvey Cornell and John Kell also follow the tradition of the Spanish-Pueblo revival style with well articulated planting plans in the interior courtyards and native or naturalized plantings in parking lots and in the surrounding site. During the construction of the OSFTB, the CCC crews both protected and established new stands of native vegetation near the building. In the peripheral and interior courtyards, the planting scheme generally utilized exotic and naturalized plants to emulate courtyard design traditions typical throughout New Mexico. Th is tradition of creating interior outdoor rooms for solace and respite was clearly infl uential in the design of the building and landscape.

From the end of construction in 1941 to 1959, the National Park Service maintained the OSFTB landscape, then handed the responsibility of maintaining the site to the Bureau of Public Buildings. Th e General Services Administration managed the OSFTB from 1966 to 1987, at which time the management of the site returned to the NPS. At present, the OSFTB is used for NPS Administrative Offi ces for the Intermountain Region.

View of Front Entry, 1940, NPS Archives.

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

1.3. PROJECT SCOPE/METHODOLOGY OVERVIEW

Th rough this cooperative project between the National Park Service, University of New Mexico and Morrow Reardon Wilkinson Miller, Ltd., Landscape Architects, research, documentation and analysis, and development of treatment recommendations will be completed to produce Parts One and Two of a Cultural Landscape Report for the Old Santa Fe Trail Building NHL in Santa Fe, New Mexico. According to A Guide to Cultural Landscape Reports: Contents, Process, and Techniques, “A Cultural Landscape Report serves two important functions: it is the principal treatment document for cultural landscapes and it is the primary tool for long-term management of those landscapes. A CLR guides management and treatment decisions about a landscape’s physical attributes, biotic systems, and use when that use contributes to historical signifi cance.” (Dolan, Gilbert and Page, A Guide to Cultural Landscape Reports, 1998, page 3)

Th e methodology and format for undertaking this CLR has been determined using the 1998 A Guide to Cultural Landscape Reports and the 1996 Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for the Treatment of Cultural Landscapes. Th ese documents, together with the 2001 General Management Plan, served as the basis for establishing the primary treatment approach, and guided recommendations made regarding which approach was most appropriate for specifi c features.

Research, documentation and analysis performed in compiling Cultural Landscape Inventories of 2005 and 2001 are used as a foundation of Part I of this CLR. Th e 2005 CLI, for instance, includes a detailed analysis and evaluation of the historic integrity of the OSFTB cultural landscape, which the CLI concludes remains intact; whereas the 2001 CLI provides a comprehensive history of the site and region. Additional site investigation, examination of primary and secondary documentation and historical records, historic photographs, architectural drawings, maps, and administrative records, as well as fi rst person interviews, build upon the work done previously and contribute in determining appropriate treatment recommendations.

Overall, this CLR uses a comprehensive but not exhaustive level of investigation.

1.4. STUDY BOUNDARY

Th e Old Santa Fe Trail Building NHL comprises 8.04 acres of land located in the City and County of Santa Fe, New Mexico (see Figure 1, p. 4). Two property surveys have been conducted, in 1937 and 1999 (acquisition of 1999 survey pending). Th e original property survey performed by National Park Service Engineer J.H.

Veole, is located on drawing #930/80,010 and included in this CLR in Appendix C. Appendix C contains a drawing which shows the larger piece of land originally donated to the Laboratory of Anthropology in 1928, from which the NPS eventually obtained the OSFTB land. Th e study boundary for the CLR parallels both the property boundary and the study boundary used in the National Historic Landmark Nomination.

Th e General Management Plan states that:

“Th e property is bounded on the north by the Old Santa Fe Trail (city street), and on the east by the Arroyo de los Chamisos; the remainder of the tract adjoins property formerly owned by the School of American Research. A residence and the buildings for the Laboratory of Anthropology are located on the adjacent property.” (National Park Service, September 2001, page E-1)

Th e residence described in the GMP quotation is now the Spanish Colonial Arts Museum.

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

S

AN

T A

FE

T

RA

IL

B U

IL

D

IN

G C

U

LT

U

RA

L

LA

N D

SC

AP

E

RE

Th e Old Santa Fe Trail Building complex stands at 7,160 feet in elevation and lies within the upper piñon-juniper woodland zone typical of the foothills of the Sangre de Cristo mountain range. To the east of the site is Sun Mountain, rising to a height of 7,950 feet, and to the north the Sangre de Cristo Mountains ascend to some 12,000 feet (see Figure 1, pg 4). Th e surrounding foothills are composed of granite, and rise steeply from the alluvial plain the city of Santa Fe is built upon. Temperatures range from an average of 94 degrees in the summer to an average low of 44 degrees in the winter. Santa Fe’s precipitation rate averages 14 inches a year with rainfall occurring primarily during the months of July and August. In addition, Santa Fe gets an annual average of 32 inches of snow. Th e terrain is hilly to mountainous with strong arroyos interlacing the ranges.

Piñon and juniper randomly dot the foothills. Arroyos are fi lled with chamisa, common grasses and occasional clusters of trees, mainly cottonwoods.

1.5. SUMMARY OF FINDINGS

Th e Old Santa Fe Trail Building (NHL) cultural landscape is an historic designed landscape that accurately represents the eff orts of the National Park Service to design, and the CCC and WPA to construct, buildings and landscape features using revived and re-interpreted local vernacular design traditions.5 Th e site is signifi cant because of its association with the regional revival of architectural traditions (here known as “Spanish-Pueblo Revival” style), and important designers and architects such as John Gaw Meem, Cecil Doty, Isaac Hamilton Rapp, and others. Th e site also has signifi cance because of its association with the 1930s NPS design tenets as articulated by Albert Good in Park and Recreation Structures and referred to as “Parkitecture” or “Government Rustic style.”

As documented in the National Historic Landmark nomination, the period of signifi cance for the OSFTB cultural landscape extends from 1937 to the present, mirroring the property’s original and ongoing use as an administrative center of the NPS. Per the 2005 Cultural Landscapes Inventory for the OSFTB, the “Reference Period for Determining Compatibility” begins in July 1937 with the commencement of construction and ends in December of 1941 following the completion of construction and landscaping operations.

A comprehensive survey of the prevailing condition of the grounds of the Old Santa Fe Trail Building, together with an analysis and evaluation of its historic integrity, has demonstrated that the landscape retains its historic integrity.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.