(x)
9A. AMENDMENT OF SOLICITATION NO.
140P2018R0023 x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
OSTB 20048604/2/20180004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/16/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OSTB 200486
Rehabilitate Exterior Envelope
The purpose of Amendment 0004 is to:
a) Provide presentation and sign-in sheet associated with Pre-Bid site tour.
b) Provide questions and answers received to date.
All other terms and conditions remain unchanged.
Legacy Doc #: NPS
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jason Longshore
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
x 1
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P2018R0023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Old Santa Fe Trail Building Rehabilitate Exterior Envelope and Historic Elements
Pre-Bid Meeting: March 29, 2018
National Park Service U.S. Department of the Interior
Introductions
National Park Service (NPS) Project Team:
Dennis Brookie Jason Longshore Charles Vickrey
All inquiries to be directed to Jason Longshore (Contracting Officer) at:
e-mail: Jason_Longshore@nps.gov telephone: 303-969-2288 mailto:Jason_Longshore@nps.gov
Agenda
9:00am – Welcome
Introduction to Project
Site and Building Tour
Questions
Thank you and Closeout
12:00pm – Conclude
Historic Significance
The Old Santa Fe Trail Building is an adobe walled structure built between 1937-1939 by the CCC/WPA
The structure is listed as a National Historic Landmark and designated in the category of "Must Be Preserved"
Overview of Project Scope
Re-roofing
Remove and Replace Cementitious Plaster
Site Work for Drainage
Woodwork
Miscellaneous Elements
Re-roofing
Demo and replacement of roofing material on first and second level roofs
Address roof slope, runoff, and concealed flashing
Cementitious Plaster and Adobe Restoration
Repair and replacement of all degraded adobe bricks beneath the cementitious plaster
Demo of existing and replacement of cementitious plaster on all exterior walls and parapets of the structures
Wall section detail below of typical application
Site work
Landscape is designated as a National Historic Landmark
Poor drainage leading to cementitious plaster delamination and cracking
Building site drainage includes:
Door entries
Splash blocks
Vegetated swales
Grading
Woodwork
Repair and replacement of all damaged/degraded structural components (wooden) to include vigas, lintels, sills, latillas, beams, and rough cut framing
Repair and replacement of all degraded drains, canales, and gutters
Original wooden elements will be retained, or if needed, Historic gates will be repaired as needed, not replaced
Miscellaneous Elements
Seismic improvements will be concealed beneath new cementitious plaster
‘Trace’ amounts of asbestos found in various layers of cementitious plaster
Lead based paints also found in the building
Bid Process
Solicitation # 140P2018R0023
Posted Date – March 15, 2018
Proposal Due Date – April 17, 2018
Anticipated Notice to Proceed – Early June, 2018
Please refer to https://www.fbo.gov/ for all RFP details, including specs, drawings, supplementary documents, and construction wage rates
Unrestricted – Full and Open Competition
Firm-Fixed Price contract
Best Value Trade Off Process
Section L&M
Range of Magnitude - $5 to $10 million
Period of Performance - 365 calendar days from Notice to Proceed https://www.fbo.gov/ https://www.fbo.gov/
Schedule
Spring 2018 Summer 2018 – Summer 2019
Bid and Advertisement Period
Thank You
Questions?
OSTB 200486
Old Santa Fe Trail Building
Rehabilitate Exterior Envelope and Historic Elements National Park Service - Intermountain Region
Question and Answer
Spreadsheet
140P2018R0023 /
OSTB 200486
Question No. Sheet or Reference Question Response Amendment Answered
| 1 Factor | 2. | Past | Performance | ||
| Is | the | NPS | expecting | past | performance |
| evidence | for | every | project | submitted | in |
| Sub‐Factor | A | and | Sub‐Factor | B? |
| There | are | different | qualifications | and | ||||
| experiences | that | are | requested | in | Sub‐ | |||
| Factor | A | and | Sub‐Factor | B. | The | NPS | has | |
| requested | that | the | proposal | includes | ||||
| sufficient | past | performance | to | evaluate | the | |||
| offerors | qualifications | and | experiences | as | ||||
| requested | in | the | solicitation |
| 2 Factor | 2. | Past | Performance | |||
| Is | the | NPS | looking | for | past | performance |
| of | our | specialty | trade | sub‐contractors | ||
| listed | in | Sub‐Factor | B? |
| Yes, | the | NPS | has | identified | the |
| requirement | for | specific | specialty | trades. | |
| The | offerors | qualifications | should | ||
| adequately | represent | the | prime | contractor | |
| and | specialty | contractors | alike. |
Factor 2. Past Performance
Questionnaire
| Many | of | our | government | projects | have | ||
| already | been | assessed | through | the | |||
| CPARS | system | or | the | USACE/NAVFAC | |||
| Past | Performance | Questionnaire. | In | ||||
| order | to | reduce | the | burden | of | multiple | |
| assessments, | may | we | submit | these | with | ||
| our | proposal | in | lieu | of | requesting | a | new |
| Past | Performance | Questionnaire | to | be | |||
| filled | out | by | our | clients? |
| The | contractor | may | include | CPARS | ||
| evaluations | for | past | performances. | If | the | |
| contractor | believes | that | a | new | Past | |
| Performance | Questionnaire | is | more | |||
| appropriate | then | the | contractor | may | do | so. |
| The | NPS | will | research | contractor's | past | |
| performances | via | CPARS. |
Sub‐Factor C. Key
Personnel
| Please | clarify | whether | the | Job‐site |
| Superintendent | may | also | fulfill | the |
| Safety | Manager | position. |
| The | offeror | may | submit | an | individual | from |
| their | proposed | project | management | team | ||
| to | serve | as | Superintendent | and | Safety | |
| Manager | if | they | meet | the | qualifications | |
| and | experience | of | both | positions. |
Sub‐Factor C. Key
Personnel
| Please | clarify | whether | the | Project | |||
| Manager | must | be | on | site | at | all | times. |
| The | Project | Manager | is | not | required | too | be |
| onsite | at | all | times. | The | Project | ||
| Superintendent | is | required | to | be | on | site | |
| whenever | there | are | construction | activities |
occurring.
| 6 General Please | provide | a | due | date | for | questions |
| All | questions | must | be | submitted | no | later |
| than | 5:00 | Mountain | Time, | April | 10, | 2018 |
7 General
| In | reference | to | the | Experience | |||
| Questionnaire, | is | the | term | “offeror” | |||
| considered | the | Prime | Contractor | only; | |||
| or | is | the | “offeror” | considered | to | be | the |
| entire | team, | to | include | critical |
subcontractors?
| The | term | offeror | is | to | be | considered | for |
| your | entire | team | to | include | subcontractor. |
8 General
| Is | the | contractor | responsible | for | the |
| archaeological | monitoring? | Should | the | ||
| contractor | factor | in | the | cost | of |
| archaeological | monitoring | into | our |
pricing?
No, govt will provide Archaeological monitoring
9 General
| Can | you | confirm | the | Government | |||
| intends | to | add | a | factor | of | 10% | to |
| Hubzone | companies? |
| HUBZONE | preference | will | be | done | in |
| accordance | with | clause | .52.219‐4 | ‐‐ | |
| Notice | of | Price | Evaluation | Preference | |
| for | HUBZone | Small | Business | Concerns. |
10 General
| Is | the | building | going | to | be | vacated |
| during | construction? |
Yes 4
11 General Can contractors work on weekends/holidays?
| Yes, | per | coordinating | with | the | Contracting |
| Officer | refer | to | specifications. |
12 General
| Who | should | we | contact | for | coming | back |
| to | do | more | site | visits? |
| Charles | L | Vickrey | 505‐988‐6032 | ||
| Ken | Hornback | Office | 505‐988‐6858 | ||
| Cindy | Lucier | 505‐988‐6896 | |||
| Tammy | K. | Gallegos | 505‐988‐6085 | ||
| Contractors | shall | provide | a | 24 | hour |
| notice | prior | to | arrival |
13 General
When can we come back for additional site visits? Are we allowed in each of the rooms of the building OR is it just the exterior? (to look at vigas)
See 12 above. The return visits are limited to exterior and common space.
14 General In the sunken area and window wells is there a treatment plan?
Yes, Refer to contract documents. 4
15 General Who is responsible for cutting back trees around the building?
NPS staff will remove tree limbs prior to the construction contract award. The intent is to provide 3'-5' clear space for scaffolding. The contractor will need to submit a cultural landscape protection plan to ensure trees are protected.
16 General Will we still need an arborist and landscape architect as part of team?
Yes, refer to contract documents. 4
17 General
Who determines what the treatment is for the wood gates for “and what is to be done with each being individually prescribed?
Refer to A5-15 A5-14 and wood gate restoration 08 03 52
18 General Are light fixtures to be removed by others? Yes, by National Park Service 4
19 General Will table remain in building and protected?
Yes. Refer to contract documents. 4
20 General Will chairs and fluorescent lights be removed?
Chairs in the Maier Conference Room will be removed and the table remains. Chairs at desks throughout the building will remain and are to be protected in place. The fluorescents will not be removed and are to be protected in place. Refer to contract documents.
21 General Will computers and printers be removed?
Some will remain (minimal) and need to be protected. Refer to contract documents.
22 General Is General Contractor responsible for area to be cleaned when done?
Yes, refer to contract documents. 4
23 General Is conduit on roof live? Answer Pending 4
24 General Is 2nd story roof laid over existing roof? Yes. 4
25 General What is access to site and who maintains control during construction?
The contractor is responsible for all access to the site during construction. The NPS will lock the electric gate in an open position throughout the construction period. The contractor must maintain access for NPS administrative access.
26 General Can we do cores on the roof prior to bid?
Will come back and fill in cores.
Answer Pending 4
27 General Was the Annex built at the same time? No, not built at the same time. 4
28 General Will the contractor have full and free use of water and electrical?
Refer to contract documents. 4
29 General Did the A/E look at all foundations during the design process?
No. 4
30 General Per code we are not permitted to have canales over windows? Are they to remain in the same location?
Yes, to remain in the same location.
However, there will not be water flowing through several existing canales. Refer to contract documents.
31 General
Is it correct that asbestos containing material is to be removed under full containment and be disposed of as non-hazardous material?
Yes, refer to contract documents. 4
32 General Does the shoring have to be engineered and stamped by licensed engineer?
Yes, refer to contract documents. 4
33 General Do all layers need to be removed as containing hazardous materials or just down to gray coat?
Refer to contract documents. 4
34 General Are all surveys attached on FBO? Answer Pending 4
35 General Which vigas are to be replaced and how it is to be determined?
Refer to contract documents. 4
36 General If asbestos is encountered what is the treatment?
Refer to contract documents. 4