This statement of work describes maintenance requirements for a liquified natural gas fueling station owned by Grand Canyon National Park. The National Park Service is soliciting maintenance services for the station to ensure continuous operation of shuttle buses and building heating. Key requirements include preventative maintenance visits quarterly with technicians on call 24/7, repairing any issues identified during visits or on call within 24 hours. The contractor must maintain the station in compliance with all safety and regulatory standards. Additional tasks like identifying a backup power solution, assisting emergency plans and training staff, and providing spare parts are also required. The base period of performance is one year with four one-year options. Pricing includes fixed quarterly maintenance costs and hourly rates for repairs.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Liquefied Natural Gas Station Maintenance November 1, 2021
PART 1 – GENERAL
a. Purpose
The National Park Service (NPS) at Grand Canyon National Park (GRCA) owns and utilizes a liquid natural gas/liquid to compressed natural gas (LNG/LCNG) fueling station located on the park’s South Rim. The NPS relies on the station to provide CNG fuel to NPS and NPS concessioner vehicles. Vehicles fueled at the station are primarily large transit and tour buses operated by the park’s South Rim transportation system operations contractor (approximately 33 CNG transit buses) and the park’s South Rim hospitality contractor (approximately 15 CNG tour buses). The station also has a vaporization system to send low-pressure natural gas to a nearby administrative and maintenance complex of buildings for heating purposes.
An operational and well-maintained LNG/LCNG fueling station is essential to NPS operations at GRCA. The GRCA visitor transportation system is operated entirely by CNG buses. The system operates year round on the park’s South Rim providing service to more than 7.5 million riders annually. The transportation system is a critical part of the visitor experience with some areas of the South Rim only accessible by shuttle bus. Any issues or problems taking the LNG/LCNG station out of service for more than 24 to 48 hours would cause an unacceptable shut down of the visitor transportation system. In addition, the park’s maintenance, administrative and wildland fire complex rely on the station for heat.
It is therefore essential that the Contractor maintain the LNG/LCNG station in good working order and in accordance with all applicable municipal, county, state and federal regulations, codes, laws, ordinances, standards, rules, supplements and industry standards in force during the period of the contract. In addition, the park’s Contracting Officer’s Representative (COR) and the Contractor must establish and maintain good communications to ensure that park operations are not unacceptably interrupted.
b. Background
The NPS preserves unimpaired the natural and cultural resources and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world. For basic information about the NPS and its mission please visit http://www.nps.gov.
Grand Canyon National Park encompasses approximately 1,218,375 acres of public land in the southern end of the Colorado Plateau. It is a globally significant natural resource containing scenic vistas known throughout the world. In recognition of its significant values, GRCA was designated as a world heritage site in 1979. More than six million people visit GRCA, with most people visiting the park’s South Rim. For basic information about GRCA, please visit the park’s website at http://www.nps.gov/grca. For more specific information, please also see the park’s 2020 park profile at https://www.nps.gov/grca/learn/management/upload/2020-Park-Profile-508.pdf.
The LNG/LCNG station has been in operation since 2001 and consists of an LNG storage tank and associated pumps. A LCNG capability exists at the station and incorporates LCNG pumps, vaporizer, CNG storage, and two CNG dispensers. The station was manufactured by NorthStar, Inc. of Evanston, Wyoming and was upgraded in 2021 by Nikkiso Solutions out of Escondido, California. Please see photographs in Attachment 1 and Facility Diagrams (original from 2001 and as-builds from 2021).
c. Objectives
The Contractor must meet the following objectives:
Maintain GRCA’s LNG/LCNG station in a safe manner that allows NPS operations, including the park’s visitor transportation system, to continue operations without interruption.
Perform preventative and periodic maintenance and required inspections so that all components of GRCA’s LNG/LCNG station are maintained in good working order and in accordance with all applicable municipal, county, state and federal regulations, codes, laws, ordinances, standards, rules, supplements and industry standards in force during the period of the contract.
Consult with the NPS, research, and determine a backup energy supply (e.g. generator, uninterrupted power supply) that is capable of supporting the LNG/LCNG station in the event of an extended power outage (longer than 24 hours). The backup energy supply must meet all applicable laws, guidelines, regulations, codes and industry standards.
Perform non-emergency and emergency repair work to ensure that the LNG/LCNG station operates safely and effectively and in compliance with all applicable laws, regulations, codes and industry standards. This includes ordering and ensuring timely delivery of any necessary parts.
Provide for on-call emergency response with a qualified technician available by phone 24 hours a day 365 days a year and with a qualified technician on site within 24 hours of initial on-site request.
Provide accurate and comprehensive reports, invoices, and any other requested information in a timely manner.
d. Partnership
It is essential that the Contractor and the NPS COR maintain good communications, including the Contractor communicating foreseeable issues and the park COR communicating park needs.
Prior to commencement of services under this contract, the Contractor must provide to the NPS the name of the employee who will serve as the Contractor's Representative and will be the Contractor's primary representative having full authority to act on matters pertaining to the performance of services required under this contract. The Contractor's Representative will follow all NPS procedures and ensure all invoices, reports and any other deliverables are submitted to the Contracting Officer (CO) or COR in the timeframe required by the contract.
The NPS COR and Contractor’s Representative will establish regular meetings within 30 days of contract execution.
e. Preventative and Periodic Maintenance
The Contractor must provide at least two skilled technicians with a truck and the necessary tools per calendar quarter at the site performing preventive maintenance tasks as defined below. History suggests at least 20 hours are required for two technicians to complete all the quarterly maintenance tasks, but the technicians shall take as much time as is required to properly complete all tasks. No contract price adjustment will be made if it takes more (or less) time to perform the tasks. NPS personnel, or their designated support, operate the system and may perform very limited minor maintenance tasks. The Contractor must provide support for such minor maintenance tasks via telephone 24 hours per day, 365 days per year. On-call telephone support requirements are further described under Section j. On-Call Telephone Support below.
The Contractor must inform the NPS COR anytime a technician is onsite performing work or inspections giving as much advanced notice as possible. For preventative and periodic maintenance, the Contractor must provide advanced notice of at least one week prior to work beginning onsite.
The Contractor must perform at least the following tasks:
i. Quarterly Maintenance Tasks
1. Conduct safety walk-through inspections. Document any deficiencies that are found. Resolve or repair deficiencies immediately and document such repairs.
2. Perform leak inspections on all process piping. Resolve or repair deficiencies immediately and document such repairs.
3. Drain moisture from vent stack
4. Inspect fill and vent hoses. Check for leaks, damage, and wear (loose braid conditions). Repair or replace as necessary.
5. Inspect all dispensers (CNG and LNG) for leaks and malfunctions. Repair as necessary.
6. Ensure there is an adequate amount of Mercaptan in the Odorant Tank. Fill as necessary.
7. Inspect high pressure pump seals, ensure pump is operating, has oil, and inspect the belts.
8. Inspect valves, piping, and tanks for leaks and malfunctions. Repair as necessary.
9. Inspect air compressor belts. Check compressor oil level. Add oil and replace worn belts if necessary.
10. Inspect dispenser ground clamp. Repair or replace any missing or damaged parts as necessary.
11. Inspect fuel nozzles for damage, leaks, and excessive wear. Repair as necessary.
12. Drain air compressor tank and/or water separator.
13. Inspect LNG tanks for signs of corrosion. Repair as necessary and cCheck plugs and fittings on vent stack.
14. Ensure fire extinguishers are charged and functional.
15. Perform visual inspection of entire station for leaks. Repair as necessary.
16. Clean dispenser blower motor filters.
17. Clean LNG Control Panel Air Conditioner Air Filter.
18. Function check all valves (manual and automatic), Electronic Controls, Pneumatic Controls, Temperature Controls, and ESD Switches. Replace or repair inoperable or malfunctioning items.
19. Ensure Sump Pump is operating. Remove any debris from drain. Repair as necessary.
20. Check plugs and fittings on vent stack. Repair or replace as necessary.
21. Replace air dryer filter elements and desiccant cartridges. Blow instrument air lines.
22. Inspect CNG Odorant system.
23. Visually inspect Safety Relief Valves. Replace damaged or blown safety relief valves.
24. Purge air lines of all water.
25. Inspect station ground circuit. Repair as necessary.
26. Calibrate Methane and Fire Detection System and check operation of ESD system.
27. Inspect oil in LCNG pump, change if necessary. Refer to attached O&M Manual for correct oil.
28. Perform facility housekeeping tasks such as cleaning, touch-up paint, and replacement of light bulbs as needed.
29. Replace any signage as necessary.
30. Inspect LNG tank and CNG storage tanks for corrosion/rust.
31. Unless covered by warranty as part of the fuel station upgrade, perform any quarterly maintenance tasks associated with the new equipment installed as outlined in Section g. (refer to attached O&M manual and warranty letter).
The Contractor will bill for all costs associated with the above Quarterly Maintenance Tasks as part of the fixed quarterly maintenance costs - included in the Line Item Summary under line item number 00010 Quarterly Maintenance and corresponding line items for option years (00040, 00060, 00080, and 00100). Costs include, but are not limited to, labor and all parts and supplies necessary to perform the tasks and travel.
ii. Additional Tasks Identified During Quarterly and Annual Maintenance
As part of the Quarterly and Annual Maintenance Tasks, the Contractor must also identify any tasks, in addition to those described in this section, that need to be performed, including equipment that needs to be replaced or repaired after being inspected as part of the tasks outlined in section i. and section iv., to ensure that the LNG/LCNG station operates safely and effectively and in compliance with all applicable laws, regulations, codes and industry standards. These tasks include any needed additional tasks associated with the fuel station upgrade outlined in Section g. As part of the Quarterly Maintenance Tasks, the Contractor must submit a report identifying and describing the tasks that need to be performed, including any necessary parts and labor, and if applicable, dates by which the work needs to be performed.
The Contractor will bill for the identification of additional tasks and any associated reports as part of the quarterly maintenance costs - included in the Line Item Summary under line item number 00010 Quarterly Maintenance and corresponding line items for option years (00040, 00060, 00080, and 00100). The Contractor will follow the procedures for the performance of these additional tasks as outlined in section i. Emergency and Non-Emergency Repairs below.
iii. As-Needed Tasks (performed during Quarterly Maintenance as needed)
1. The Contractor will perform maintenance on centrifugal and reciprocating cryogenic pumps in accordance with the manufacturer's guidelines.
a. Each 4,000 hours of operation, the Contractor will disassemble the centrifugal (LNG) pumps, inspect all parts for wear and replace the bearings. Each 8,000 hours of operation, the Contractor will overhaul the centrifugal pumps. The Contractor shall notify the COR when the centrifugal pumps are close to meeting the end of their life expectancy. The Contractor will work with GRCA, who will purchase parts needed for the overhaul to have on hand to expedite the process, if required. All other costs associated with the overhaul, including, but not limited to travel and labor, will be part of the quarterly maintenance costs.
b. The Contractor shall ensure the LCNG pumps are operating properly and repair as necessary. The Contractor shall overhaul the LCNG pumps at two-year intervals. The Contractor shall notify the COR when the LCNG pumps are close to needing an overhaul. The Contractor will work with GRCA, who will purchase parts needed for the overhaul to have on hand to expedite the process, if required. All other costs associated with the overhaul, including, but not limited to travel and labor, will be part of the quarterly maintenance costs.
c. The Contractor will retest and recertify all pressure safety devices every two years in accordance with applicable regulations.
d. The Contractor will change the air compressor oil every 1,500 hours or every three months.
e. Unless covered by warranty as part of the fuel station upgrade, the Contractor will perform any as-needed tasks associated with the new equipment installed as outlined in Section g. (refer to attached O&M manual and warranty letter).
Unless otherwise stated above, the Contractor will bill for all costs associated with As-Needed Tasks as part of the quarterly maintenance costs - included in the Line Item Summary under line item number 00010 Quarterly Maintenance and corresponding line items for option years (00040, 00060, 00080, and 00100). Costs include, but are not limited to, labor and all parts and supplies necessary to perform the tasks and travel. This billing standard applies whether the Contractor performs these As-Needed Tasks during quarterly maintenance or on a separate occasion.
iv. Annual Maintenance Tasks (performed annually during Quarterly Maintenance)
1. The Contractor will inspect the lift plate to ensure it has not been altered. Repair if necessary. Grease (vacuum grease) lift plate between lift plate and flange after completing vacuum repairs.
2. The Contractor will check the vacuum of tank annular space. Repair as necessary.
3. The Contractor will inspect the integrity of pipe insulation. Repair as necessary.
4. The Contractor will inspect the pressure gauge, liquid level, and flow transmitters - check operation and for leaks. Repair and calibrate as necessary.
5. The Contractor will inspect the line relief valves - check operation and for leaks. Repair and calibrate as necessary.
6. The Contractor will ensure dispenser measuring meters are calibrated. Calibrate as necessary.
7. The Contractor will inspect sump pump and sump pump vacuum insulated piping. Repair as necessary.
8. The Contractor will ensure the LCNG pumps are operating properly. Repair as necessary . Note: The LCNG pumps shall be overhauled at two-year intervals. More details under section iii. As-Needed Tasks.
9. Unless covered by warranty as part of the fuel station upgrade, the Contractor will perform any needed annual tasks associated with the new equipment installed as outlined in Section g. (refer to attached O&M manual and warranty letter.
The Contractor will bill for all costs associated with Annual Maintenance Tasks as part of the quarterly maintenance costs - included in the Line Item Summary under line item number 00010 Quarterly Maintenance and corresponding line items for option years (00040, 00060, 00080, and 00100). Costs include, but are not limited to, labor and all parts and supplies necessary to perform the tasks and travel. This billing standard applies whether the Contractor performs these Annual Maintenance Tasks during quarterly maintenance or on a separate occasion.
v. Five-Year Maintenance Tasks (to be performed during option year four)
1. The Contractor will retest and recertify all pressure safety devices in accordance with applicable regulations.
2. The Contractor will change the rupture disk on the LNG storage tank and order new disk. Alternate the 3-way valve position.
3. The Contractor will repaint all bollards.
4. Replace all batteries in the control panel.
5. Unless covered by warranty as part of the fuel station upgrade, the Contractor will perform any needed five-year maintenance tasks associated with the new equipment installed as outlined in Section g. (refer to attached O&M manual and warranty letter).
The Contractor will bill for all costs associated with Five-Year Maintenance Tasks as part of the five-year maintenance costs – included in the Line Item Summary under line item number 00120 Five-Year Maintenance. Costs include, but are not limited to, labor and all parts and supplies necessary to perform the tasks and travel. This billing standard applies whether the Contractor performs these Five-Year Maintenance Tasks during quarterly maintenance or on a separate occasion.
f. Backup Energy Supply
In the base year of the contract, the Contractor will research and determine a backup energy supply, along with any support equipment and materials, capable of supporting the LNG/LCNG station in the event of an extended power outage (longer than 24 hours). The station not only provides fuel to the South Rim’s shuttle and tour buses, but also supplies fuel to area buildings.
The Contractor will research and submit a written document that provides an overview of each backup energy supply, the costs (including labor and maintenance) associated with each one, and any supporting equipment and materials needed to ensure its successful operation. The NPS will be consulted throughout this process.
The site currently has two breakers combined for 230 amps and operates on 480v power. The backup energy supply shall be adequately sized to meet the demands of the fuel station equipment. The backup energy supply must meet all applicable laws, guidelines, regulations, codes and industry standards.
The Contractor will bill for all costs associated with consulting, researching and determining a backup energy supply and providing a written document as outlined above – included in the Line Item Summary under line item number 00030 Identify Backup Energy Supply.
g. Upgrades to Fuel Station
In 2021, the fuel station had the following upgrades:
· Replacement of the existing LNG process pump skid at the transit fueling station with a new “double boost” LNG fuel pump skid,
· Installation of a second LCNG pump installed next to the existing LCNG pump,
· Removal of the LNG vaporizer, LNG dispenser, and LNG dispenser piping,
· Installation of a steel cover for the LNG dispenser pit frame,
· Updating of the PLC and HMI controls system,
· Repair of the bracing in the CNG bottle fill panel and addressing the rust issues within the panel,
· Replacement of damaged gauges on the LNG storage tank,
· Replacement of existing tank valves and addition of isolation valves between the LNG storage tank and the process equipment,
· Repair of level indicator on the building feed odorizer, and
· Modification and/or replacement of the plumbing to accommodate the new equipment pieces among other necessary safety and maintenance tasks.
All documentation, including, but not limited to, warranty information, manuals and drawings, associated with the fuel station upgrade are attached to this scope of work. All equipment will be the responsibility of the Contractor to maintain and repair. The Contractor shall immediately notify the COR of any problems associated with the equipment or workmanship of the recently completed fuel station upgrade project to determine if the issues fall under the warranty of that project. The equipment, workmanship, and materials associated with the fuel station upgrade are warrantied through August 19, 2022. Please refer to the attached warranty letter.
Data associated with the updated PLC and HMI controls belongs to the NPS and will be made available to the Contractor as necessary.
The current, attached station diagrams include the original diagram from 2001 and the as-built drawings associated with the upgrade in 2021.
h. Card Reader System & Collaborative Relationship with Fuel and Shuttle Bus Contractors
The Contractor is responsible for the card reader itself and any hardware associated with the card reader. The current card reader is custom built by Northwest Pump and Equipment Co. and uses a Gilbarco 5.7 inch monochrome display.
The fuel contractor is responsible for the point of sale system, including the software that supports the card reader. Since it is not always clear why the card reader is not functioning properly, the Contractor will collaboratively work with the fuel contractor and shuttle bus contractor to troubleshoot any card reader issues or repairs.
If the repair is the responsibility of the Contractor, it will be work with the COR to determine if it is an emergency or non-emergency repair and fix the card reader as outlined in section i. Emergency Repair and Non-Emergency Repair Tasks.
i. Emergency Repair and Non- Emergency Repair Tasks The Contractor must be available to perform emergency repair work that falls outside of the maintenance tasks listed above as required to ensure that the LNG/LCNG station operates safely and effectively and in compliance with all applicable laws, regulations, codes and industry standards. This includes ordering and ensuring timely delivery of any necessary parts. Parts and shipping costs will be billed at actual prices paid. The Contractor is responsible for all emergency and non-emergency repair tasks at the LNG/LCNG fuel station, including all repairs associated with the new equipment outlined in Section g. unless covered by warranty as part of the fuel station upgrade. The equipment, workmanship, and materials associated with the fuel station upgrade are warrantied through August 19, 2022. Please refer to the attached O&M manuals and warranty letter submitted as part of the 2021 fuel station upgrade for details on the new equipment and warranty info.
For emergency call-outs, one technician with a truck and the necessary tools shall be on call 24 hours per day, 365 days per year. This technician shall be able to be on site and working on the problem within 24 hours of the initial contact from the park.
All Emergency Repairs under this section must be authorized in advance. The proposed contract will require the Contracting Officer's Representative (COR) to review the proposed costs of the repairs and recommend approval to the CO and require subsequent reporting from the contractor detailing the work performed. The NPS will make all final determinations if a repair is emergency or non-emergency.
Emergency Repairs will be billed at an hourly rate as described in the Line Item Summary under line item number 00020. Repairs and corresponding line items in option years (00050, 00070, 00090 and 00110). The Contractor may bill at an hourly rate for travel to and from the site and for actual hours worked onsite. All other travel expenses must be captured in the hourly rate and not billed separately. For each emergency repair call-out with less than four hours onsite time, the Contractor may bill for four hours. For all other emergency repair call-outs, the Contractor must bill only for hours actually worked onsite. All travel, travel time, transportation and incidental expenses must be included in the hourly rate.
The Contractor must also perform non-emergency repair work and tasks that fall outside of the maintenance tasks listed above as required to ensure that the LNG/LCNG station operates safely and effectively and in compliance with all applicable laws, regulations, codes and industry standards. These tasks may be identified during Quarterly or Annual Maintenance as described in section e(ii), Additional Tasks Identified During Quarterly and Annual Maintenance, above. Non-emergency repair includes ordering and ensuring timely delivery of any necessary parts. Parts and shipping costs will be billed at actual prices paid.
All Non-Emergency Repairs under this section must be authorized in advance by the COR or CO. The NPS will make all final determinations if a repair is emergency or non-emergency.
Non-Emergency Repairs will be billed at an hourly rate as described in the Line Item Summary under line item number 00020. Repairs and corresponding line items in option years (00050, 00070, 00090 and 00110). For all Non-Emergency Repairs, the Contractor must bill only for hours actually worked onsite. The Contractor may bill at an hourly rate for travel to and from the site and for actual hours worked onsite. All other travel expenses must be captured in the hourly rate and not billed separately. The Contractor must perform all Non-Emergency Repairs on a schedule and timeline approved by the COR or the CO. All travel, travel time, transportation and incidental expenses must be included in the hourly rate.
The NPS at GRCA maintains some extra parts for the LNG/LCNG station onsite. The spare parts maintained onsite are intended to aide in the quick response to unexpected maintenance issues, but do not include all parts necessary to maintain the station or to respond to unexpected maintenance issues. A list of the parts that the NPS typically had on-site before the 2021 upgrade is attached to this scope. During the base year of the contract, the Contractor will work with the NPS to update the parts list to include parts needed because of the station upgrade outlined in Section g. The Contractor is ultimately responsible for ensuring that the parts necessary to maintain the station are available at the time of a repair.
The Contractor will, with the prior approval of the NPS CO, be required to order and ensure delivery of necessary spare parts. Parts and shipping costs will be billed at actual prices paid, in accordance with line item number 00020 in the Line Item Summary and corresponding line items in option years (00050, 00070, 00090 and 00110).
In order to ensure that GRCA’s operations are not interrupted, all Emergency and Non- Emergency Repairs performed under this section must be performed in a manner that minimizes any time that the LNG/LCNG station is offline to the greatest extent practicable. The LNG/LCNG fuel station must not be out of service for more than 24-48 hours.
j. On-Call Telephone Support The Contractor must provide at least one qualified technician on-call and reachable via telephone 24 hours a day 365 days a year to assist the NPS or its delegated support with any minor maintenance and emergency issues associated with the LNG/LCNG station. The Contractor is responsible for providing the NPS COR with telephone numbers for the technician on-call.
On-call telephone support costs are included under line item number 00010 Quarterly Maintenance in the Line Item Summary and corresponding line items in option years (00040, 00060, 00080, and 00100).
k. Safety Equipment
The Contractor is responsible for installing and maintaining in good working order all aspects of all safety equipment associated with the LNG/LCNG station and required by all applicable laws, regulations, codes and industry standards. This includes but is not limited to, maintaining and inspecting all associated methane and other detection systems and fire extinguishers as necessary and ensuring that all detection systems and the automatic emergency phone system are in working order at all times.
Costs for inspections of safety equipment and any tasks associated with emergency equipment described in section e. Preventative and Periodic Maintenance above are included under line item number 00010 Quarterly Maintenance in the Line Item Summary and corresponding line items in option years (00040, 00060, 00080, and 00100).
Procedures for any other emergency or non-emergency repairs to or tasks associated with safety equipment are described in section i. Emergency Repair and Non- Emergency Repair Tasks above.
l. GRCA Emergency Response Plan Support
The Contractor will be required to assist the GRCA Emergency Services Branch and Safety Office with periodic review of emergency plans with components involving the LNG/LCNG station.
Costs associated with review of emergency plans are included under line item number 00010 Quarterly Maintenance in the Line Item Summary and corresponding line items in option years (00040, 00060, 00080, and 00100).
m. Training for GRCA Emergency Personnel
The Contractor will be required to conduct an annual on-site training session for emergency response and maintenance personnel. The personnel attending the training will be NPS personnel and those selected to attend by the NPS, such as shuttle bus contractor employees and local firefighting organizations. It is anticipated that the number of participants attending will be between ten and twenty. The training will be a one-day session of not more than eight hours at a date to be determined by the NPS.
The training will include, but is not limited to, generally familiarizing participants with LNG facility and functions, including alarms and responses to alarms; introducing and explaining situations that could occur and would require immediate action; instructing participants on remedies to situations requiring immediate action; and cooperating with NPS personnel to facilitate practical training scenarios.
The cost for this training is included in the Line Item Summary under line item number 00010 and corresponding line items in option years (00040, 00060, 00080, and 00100). This includes all Contractor costs necessary to perform the training, including staff time, travel, equipment and supplies. This task will be performed at the option of the NPS not more than once during any performance period. The NPS will inform the Contractor as to whether training will be required at the beginning of each performance period.
n. Reports and Invoices
The Contractor must submit reports and invoices within a timely manner each time work is completed on the station, including each time quarterly preventative and periodic maintenance is performed and each time emergency or non-emergency repair tasks are performed. The Contractor will submit reports and invoices within 30 days of work being performed.
The Contractor shall invoice monthly via the Invoice Processing Platform (IPP).
If there is an ongoing repair that requires multiple trips to the LNG/LCNG station and does not allow for a timely invoice, the Contractor must submit a detailed report each time a technician is at the station. The Contractor will submit a report within 30 days of work being performed.
All reports should include, at least, tasks performed, technician hours, parts used and information about potential issues or tasks that may need to be performed in the near future. For inspections, the Contractor must also provide a description of the requirements of the inspection and a certification that the station meets the standards of the inspection.
The Contractor must report immediately to the NPS COR or GRCA Park Dispatch any issue or discrepancy discovered while maintenance is being performed or during an inspection if that issue or discrepancy would have safety implications or would bring the station out of compliance with any applicable laws, regulations, codes and industry standards.
On an annual basis, the Contractor is responsible for providing the NPS COR with a report, including an updated list of the spare parts that should be onsite to ensure that the LNG/LCNG station continues to operate uninterrupted. The report must include a description of the spare parts sufficient to allow the NPS to order or otherwise obtain the parts that are appropriate for and specific to the LNG/LCNG station.
Costs associated with reports and invoices are included under line item number 00010 Quarterly Maintenance in the Line Item Summary and corresponding line items in option years (00040, 00060, 00080, and 00100).
o. Applicable Standards
The Contractor is responsible for ensuring that GRCA’s LNG/LCNG station is maintained in good working order and in a manner that is consistent with all applicable municipal, county, state and federal regulations, codes, laws, ordinances, standards, rules, supplements, industry standards and manufacturer’s guidelines in force during the period of the contract.
The Contractor is responsible for researching applicable laws, regulations, codes, industry standards and manufacturer’s guidelines as they change to ensure that the highest standards practical and available are applied to the maintenance of GRCA’s LNG/LCNG station.
The Contractor must provide a list of applicable laws, regulations, codes, industry standards and manufacturer’s guidelines to the NPS COR on an annual basis.
The Contractor is responsible for ensuring that its technicians and staff are well trained, capable of performing the tasks required by this contract and have obtained any required certifications.
p. Attachments
Attachment 1: O&M Manual Attachment 2: Control System User Manual Attachment 3: Facility Diagram (2001) Attachment 4: As-Built Drawings from Fuel Station Upgrade (2021) Attachment 5: LCNG Spare Parts Inventory Attachment 6: Offload Procedures Attachment 7: Warranty Letter