Attachment_7_-_2023_Fire_Alarm_Tests_Combined_0001.pdf
PDF 7 MB Posted
- Attached to
- GLAC FIRE ALARM & SPRINKLER INSPECTIONS Federal contract opportunity
- Solicitation number
- 140P1426Q0090
About this file
This file is a collection of Fire Alarm Inspection and Testing Certificates documenting NFPA 72 compliance inspections conducted by Systems Northwest for multiple buildings at Glacier National Park between May 1-3, 2023. The inspections cover ten separate properties including dorms, apartments, administrative buildings, and specialized facilities, with testing performed by Luke Salewsky (License #FPL-IEL-LIC-001176) and accepted by Jon Murphy or Job Murphy representing Glacier National Park.
The certificates detail comprehensive testing results across fire control panels, initiating devices (smoke detectors, heat detectors, manual pull stations), power supplies (sealed lead-acid batteries), and water-based fire protection systems (waterflow switches, supervisory switches, and tamper switches). Most buildings achieved 100% pass rates on tested equipment; however, three buildings identified corrective actions requiring resolution: Building 41-55 Apartments had two failed supervisory low air switches and waterflow devices (marked as "missing on fire panel" and unresponsive); Archive Building #37 had one failed smoke detector in the vault requiring programming correction; and Building #217 Library had two batteries rated at 7Ah that tested significantly below capacity (2Ah and 3.9Ah), subsequently replaced during a follow-up inspection on the same date. The Headquarters Building had two skipped smoke detectors due to denied access. All inspections documented equipment specifications including manufacturer models (Silent Knight, Honeywell, FireLite, Simplex, Ademco, and Premium Power batteries), installation dates primarily from April-May 2021, and detailed load voltages and charger specifications for backup power systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Amendment_0001_Q_As_0001.docx | DOCX document | |
| Sol_140P1426Q0090_Amd_0001.pdf | ||
| Attachment_8_-_2023_Fire_Sprinkler_Test_Reports_Combined_0001.pdf | ||
| Attachment_2_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4_-_Wage_Determination_-_Flathead_Co_.pdf | ||
| Attachment_5_-_Wage_Determination_-_Glacier_Co_.pdf | ||
| Attachment_3_-_2026_Fire_Alarm_and_Sprinkler_Inspections_Schedule.pdf | ||
| Attachment_1_-_Scope_of_Work.docx | DOCX document | |
| Sol_140P1426Q0090.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection and Testing Certificate Presented To
Glacier National Park
For
#69 Dorm 35
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Monday, May 01, 2023
Test Session :01 May 2023 10:35
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903 United States
Systems Northwest
Inspection Summary
Building Information
PROPERTY #69 Dorm 35 CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
13 13(100%) 13(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
1 1(100%) 1(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Monday, May 01, 2023
ACCEPTED BY 05/01/2023 TESTED BY 05/01/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
Power Supplies
Water-Based Fire Protection Systems
Page 2 of 6Systems Northwest
System Details
Control Units
DESCRIPTION FACPADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER Silent Knight
LAST UPDATEMODEL 5808
S/W LOCATIONSERIAL NUMBER
INSTALL DATE 04/25/2021
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.59 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 13.73
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.67 AMP HOURS 8
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 13.73
Page 3 of 6Systems Northwest
Testing Details
Fire Control Panel
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP FACP Manual 5/1/2023 11:02:17 AM
Manufacturer Silent Knight
Model 5808
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Waterflow M4 Riser WF Manual 5/1/2023 11:09:29 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S9 Living Area Manual 5/1/2023 11:10:00 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S8 Kitchen Manual 5/1/2023 11:10:17 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S7 Hall Manual 5/1/2023 11:10:41 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S5 Hall Manual 5/1/2023 11:11:26 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S10 Room A Manual 5/1/2023 11:11:31 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S3 Room D Manual 5/1/2023 11:11:33 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S11 Room B Manual 5/1/2023 11:12:04 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S4 Room C Manual 5/1/2023 11:12:08 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S2 Room E Manual 5/1/2023 11:12:28 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S1 FACP Manual 5/1/2023 11:12:30 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M2 Hall Manual 5/1/2023 11:15:39 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1 Hall Manual 5/1/2023 11:15:41 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Page 4 of 6Systems Northwest
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/1/2023 11:07:09 AM
Comment: 6 Ah
Manufacturer Centennial
Model CB1280
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 8
Battery Location FACP
Charger Voltage 13.73
Load Voltage 12.67
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/1/2023 11:20:36 AM
Comment: 6.7 Ah
Manufacturer Centennial
Model CB1280
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Battery Location FACP
Charger Voltage 13.73
Load Voltage 12.59
Nominal Voltage 12
Water-Based Fire Protection Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Supervisory Low Air Switch M3 Riser Tamper Manual 5/1/2023 11:15:44 AM
Visual Inspection Passed (Manual)
Page 5 of 6Systems Northwest
Device/Equipment Details
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP FACP Silent Knight 5808 04/26/2021
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
S1 FACP 04/26/2021
S2 Room E 04/26/2021
S3 Room D 04/26/2021
S4 Room C 04/26/2021
S5 Hall 04/26/2021
S7 Hall 04/26/2021
S8 Kitchen 04/26/2021
S9 Living Area 04/26/2021
S10 Room A 04/26/2021
S11 Room B 04/26/2021
Manual Pull Station
M1 Hall 04/26/2021
M2 Hall 04/26/2021
Waterflow
M4 Riser WF 04/26/2021
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 Centennial CB1280 04/26/2021
Battery 2 FACP Battery 2 Centennial CB1280 04/26/2021
Water-Based Fire Protection Systems
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Supervisory Low Air Switch
M3 Riser Tamper 04/26/2021
Page 6 of 6Systems Northwest
Glacier National Park
For
41-55 Apartments
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Tuesday, May 02, 2023
Test Session :02 May 2023 14:55
ACCEPTED BY TESTED BY
Job Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY 41-55 Apartments CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
15 15(100%) 15(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
3 3(100%) 1(33%) 2(67%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Tuesday, May 02, 2023
ACCEPTED BY 05/02/2023 TESTED BY 05/02/2023
Job Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
Power Supplies
Page 2 of 7Systems Northwest
DESCRIPTION FACPADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER Honeywell
LAST UPDATEMODEL GWF-7075
S/W LOCATIONSERIAL NUMBER
INSTALL DATE
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.81 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.56
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.82 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.56
Page 3 of 7Systems Northwest
Open Corrective Action & Solution Summary The following 2 corrective action(s) remain open following the system inspection, testing or maintenance activities
EQUIPMENT TYPE ADDRESS DESCRIPTION
Supervisory Low Air Switch 18 Riser Low Air
Created By: Luke Salewsky
Creation Date: 05/02/2023
Corrective Action: Device shows missing on fire panel. When testing it is in responsive.
Proposed Solution: Replace module.
Manufacturer:
Model:
Water Flow 19 Riser Water Flow
Created By: Luke Salewsky
Creation Date: 05/02/2023
Corrective Action: Device shows missing on fire panel. When testing it is in responsive.
Proposed Solution: Replace module
Manufacturer:
Model:
Page 4 of 7Systems Northwest
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP FACP Manual 5/2/2023 3:11:22 PM
Manufacturer Honeywell
Model GWF-7075
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General 8 FACP Manual 5/2/2023 3:01:05 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 10 Dorm 51 Manual 5/2/2023 3:02:38 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 3 Dorm 43 Living Manual 5/2/2023 3:04:26 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 4 Dorm 43 Bedroom Manual 5/2/2023 3:04:43 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 5 Dorm 45 Manual 5/2/2023 3:05:33 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 6 Dorm 47 Manual 5/2/2023 3:06:43 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 9 Dorm 49 Manual 5/2/2023 3:07:33 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 11 Dorm 53 Living Manual 5/2/2023 3:09:25 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 12 Dorm 53 Bedroom Manual 5/2/2023 3:09:34 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 14 Dorm 55 Living Manual 5/2/2023 3:10:19 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 13 Dorm 55 Bedroom Manual 5/2/2023 3:10:32 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 1 Dorm 41 Living Manual 5/2/2023 3:10:55 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 2 Dorm 41 Bedroom Manual 5/2/2023 3:11:04 PM
Visual Inspection Passed (Manual)
Page 5 of 7Systems Northwest
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General 7 Laundry Room Manual 5/2/2023 3:12:14 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station 15 Outside Manual 5/2/2023 3:16:58 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/2/2023 3:15:25 PM
Comment: 7.6 Ah
Manufacturer PowerSonic
Model PS-1270
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Battery Location FACP
Charger Voltage 27.56
Load Voltage 12.82
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/2/2023 3:16:26 PM
Comment: 6.8 Ah
Manufacturer PowerSonic
Model PS-1270
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Battery Location FACP
Charger Voltage 27.56
Load Voltage 12.81
Nominal Voltage 12
Water-Based Fire Protection Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Supervisory Tamper Switch 16 OS&Y Manual 5/2/2023 3:16:46 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Failed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Supervisory Low Air Switch 18 Riser Low Air Manual 5/2/2023 3:26:28 PM
Visual Inspection Failed (Manual)
Functional Inspection Failed
Water Flow 19 Riser Water Flow Manual 5/2/2023 3:27:13 PM
Visual Inspection Failed (Manual)
Functional Inspection Failed
Page 6 of 7Systems Northwest
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP FACP Honeywell GWF-7075
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
1 Dorm 41 Living
2 Dorm 41 Bedroom
3 Dorm 43 Living
4 Dorm 43 Bedroom
5 Dorm 45
6 Dorm 47
7 Laundry Room
8 FACP
9 Dorm 49
10 Dorm 51
11 Dorm 53 Living
12 Dorm 53 Bedroom
13 Dorm 55 Bedroom
14 Dorm 55 Living
Manual Pull Station
15 Outside
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 PowerSonic PS-1270
Battery 2 FACP Battery 2 PowerSonic PS-1270
Water-Based Fire Protection Systems
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Supervisory Tamper Switch
16 OS&Y
Supervisory Low Air Switch
18 Riser Low Air
Water Flow
19 Riser Water Flow
Page 7 of 7Systems Northwest
Glacier National Park
For
99-113 Apartments
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Tuesday, May 02, 2023
Test Session :02 May 2023 15:32
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY 99-113 Apartments CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
15 15(100%) 15(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
4 4(100%) 4(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Tuesday, May 02, 2023
ACCEPTED BY 05/02/2023 TESTED BY 05/02/2023
Jon Murphy Luke Salewsky
Building Representative Technician
[Other]
Initiating Device
Power Supplies
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.65 AMP HOURS 8
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.55
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.87 AMP HOURS 8
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.55
[Other]
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
[Other] FACP FACP Manual 5/2/2023 3:48:33 PM
Manufacturer Honeywell
Model GWF-7075
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General 1 Dorm 99 Living Manual 5/2/2023 3:39:44 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 2 Dorm 99 Bedroom Manual 5/2/2023 3:39:47 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 3 Dorm 101 Living Manual 5/2/2023 3:40:47 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 4 Dorm 101 Bedroom Manual 5/2/2023 3:40:54 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 5 Dorm 103 Manual 5/2/2023 3:41:41 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 6 Dorm 105 Manual 5/2/2023 3:42:27 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 9 Dorm 107 Manual 5/2/2023 3:43:18 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 10 Dorm 109 Manual 5/2/2023 3:43:34 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 7 Laundry Room Manual 5/2/2023 3:44:53 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 11 Dorm 111 Living Manual 5/2/2023 3:46:02 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 13 Dorm 111 Bedroom Manual 5/2/2023 3:46:52 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 12 Dorm 113 Bedroom Manual 5/2/2023 3:47:47 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 14 Dorm 113 Living Manual 5/2/2023 3:47:50 PM
Visual Inspection Passed (Manual)
Manual Pull Station 15 Outside Manual 5/2/2023 3:48:11 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 8 FACP Manual 5/2/2023 3:48:30 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/2/2023 3:51:47 PM
Comment: 7.8 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 8
Battery Location FACP
Charger Voltage 27.55
Load Voltage 12.87
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/2/2023 3:52:19 PM
Comment: 7.6 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 8
Battery Location FACP
Charger Voltage 27.55
Load Voltage 12.65
Nominal Voltage 12
Water-Based Fire Protection Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Supervisory Tamper Switch 16 OS&Y Manual 5/2/2023 3:48:27 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory Low Air Switch 17 Riser Low Air Manual 5/2/2023 3:48:29 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Water Flow 18 Riser Water Flow Manual 5/2/2023 4:05:44 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory Tamper Switch 19 Riser Tamper Manual 5/2/2023 4:05:46 PM
Visual Inspection Passed (Manual)
[Other]
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
[Other]
FACP FACP Honeywell GWF-7075
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
1 Dorm 99 Living
2 Dorm 99 Bedroom
3 Dorm 101 Living
4 Dorm 101 Bedroom
5 Dorm 103
6 Dorm 105
7 Laundry Room
8 FACP
9 Dorm 107
10 Dorm 109
11 Dorm 111 Living
12 Dorm 113 Bedroom
13 Dorm 111 Bedroom
14 Dorm 113 Living
Manual Pull Station
15 Outside
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 Premium Power UB1280-ER
Battery 2 FACP Battery 2 Premium Power UB1280-ER
Water-Based Fire Protection Systems
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Supervisory Tamper Switch
16 OS&Y
19 Riser Tamper
Supervisory Low Air Switch
17 Riser Low Air
Water Flow
18 Riser Water Flow
Glacier National Park
For
201 Paint Shop Building
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Tuesday, May 02, 2023
Test Session :02 May 2023 14:15
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY 201 Paint Shop Building CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
1 1(100%) 1(100%) 0(0%)
6 6(100%) 6(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Tuesday, May 02, 2023
ACCEPTED BY 05/02/2023 TESTED BY 05/02/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Chemical Extinguishing Systems
Fire Control Panel
Initiating Device
Power Supplies
DESCRIPTION FACPADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER FireLite
LAST UPDATEMODEL MS-9200UDLS
S/W LOCATIONSERIAL NUMBER
INSTALL DATE 04/25/2021
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE
LOAD VOLTAGE 12.66 AMP HOURS
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION CHARGER VOLTAGE 27.35
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE
LOAD VOLTAGE 12.78 AMP HOURS
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION CHARGER VOLTAGE 27.35
Chemical Extinguishing Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fuel Shut-off Operated Correctly
L1M08 Gas Shutoff Manual 5/2/2023 2:30:07 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Fire Control Panel
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP FACP Manual 5/2/2023 2:23:20 PM
Manufacturer FireLite
Model MS-9200UDLS
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Manual Pull Station L1M01 Riser Room Manual 5/2/2023 2:23:17 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Valve Tamper Switch L1M06 Riser Room Tamper Manual 5/2/2023 2:23:23 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station L1M02 East Exit Manual 5/2/2023 2:23:25 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station L1M03 West Exit Manual 5/2/2023 2:23:27 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station L1M04 Office Area Manual 5/2/2023 2:23:29 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General L1D01 Riser Room Manual 5/2/2023 2:23:31 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/2/2023 2:37:34 PM
Comment: 7.2 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Charger Voltage 27.35
Load Voltage 12.78
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/2/2023 2:39:58 PM
Comment: 6.8 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Charger Voltage 27.35
Load Voltage 12.66
Water-Based Fire Protection Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Water Flow L1M05 Riser WF Manual 5/2/2023 2:23:19 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory Low Air Switch L1M07 Riser Low Air Manual 5/2/2023 2:23:33 PM
Visual Inspection Passed (Manual)
Chemical Extinguishing Systems
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fuel Shut-off Operated Correctly
L1M08 Gas Shutoff 04/26/2021
Fire Control Panel
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP FACP FireLite MS-9200UDLS 04/26/2021
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
L1D01 Riser Room 04/26/2021
Manual Pull Station
L1M01 Riser Room 04/26/2021
L1M02 East Exit 04/26/2021
L1M03 West Exit 04/26/2021
L1M04 Office Area 04/26/2021
Valve Tamper Switch
L1M06 Riser Room Tamper 04/26/2021
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 Premium Power UB1280-ER 04/26/2021
Battery 2 FACP Battery 2 Premium Power UB1280-ER 04/26/2021
Water-Based Fire Protection Systems
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Water Flow
L1M05 Riser WF 04/26/2021
Supervisory Low Air Switch
L1M07 Riser Low Air 04/26/2021
Glacier National Park
For
Apgar Transit Building #1584
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Monday, May 01, 2023
Test Session :01 May 2023 13:17
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY Apgar Transit Building #1584 CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
32 32(100%) 32(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
3 3(100%) 3(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Monday, May 01, 2023
ACCEPTED BY 05/01/2023 TESTED BY 05/01/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
Power Supplies
Page 2 of 8Systems Northwest
DESCRIPTION FACPADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER Simplex
LAST UPDATEMODEL 4010
S/W LOCATIONSERIAL NUMBER
INSTALL DATE
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 13.19 AMP HOURS 14
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.49
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 13.25 AMP HOURS 14
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.49
Page 3 of 8Systems Northwest
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP FACP Manual 5/1/2023 1:18:38 PM
Manufacturer Simplex
Model 4010
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - Duct M1-11 EC1 Boiler Room Manual 5/1/2023 1:18:55 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - Duct M1-12 EC2 Boiler Room Manual 5/1/2023 1:18:56 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-5 FACP Manual 5/1/2023 1:19:38 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-6 Transit Management Manual 5/1/2023 1:27:35 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-10 Work Room Manual 5/1/2023 1:27:37 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-8 Break Room Manual 5/1/2023 1:27:39 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-7 Break Room Manual 5/1/2023 1:27:40 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-13 Mechanical Room Manual 5/1/2023 1:27:44 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-3 South Lobby Exit Manual 5/1/2023 1:27:45 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-1 North Lobby Manual 5/1/2023 1:27:47 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-15 Men's Vestibule Manual 5/1/2023 1:27:48 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-30 Mechanical Room by Men's Restroom Manual 5/1/2023 1:27:50 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-14 Janitor Room Manual 5/1/2023 1:27:52 PM
Visual Inspection Passed (Manual)
Page 4 of 8Systems Northwest
Heat Detector M1-28 Men's Restroom Manual 5/1/2023 1:27:53 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-32 Men's Restroom Manual 5/1/2023 1:27:59 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-17 Family Restroom Manual 5/1/2023 1:28:01 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-20 Women's Restroom Manual 5/1/2023 1:28:02 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-25 Women's Restroom Manual 5/1/2023 1:28:03 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-24 Women's Restroom Manual 5/1/2023 1:28:05 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-23 Attic Access Manual 5/1/2023 1:28:08 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-26 Women's Restroom Manual 5/1/2023 1:28:09 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-27 Women's Restroom Manual 5/1/2023 1:28:11 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-22 East Storage Manual 5/1/2023 1:28:13 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-19 Plumbing Room Manual 5/1/2023 1:28:14 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-21 Women's Restroom Manual 5/1/2023 1:28:17 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-18 Family Restroom Manual 5/1/2023 1:28:21 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-16 Men's Vestibule Manual 5/1/2023 1:28:23 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector M1-29 Men's Restroom Manual 5/1/2023 1:28:26 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Pull Station M1-31 Mechanical Room Men's Restroom Manual 5/1/2023 1:28:28 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-4 Counting Room Manual 5/1/2023 1:28:31 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General M1-9 West Side Storage Manual 5/1/2023 1:28:33 PM
Visual Inspection Passed (Manual)
Page 5 of 8Systems Northwest
Beam M1-2 Lobby Manual 5/1/2023 1:28:35 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/1/2023 1:38:43 PM
Comment: 14 Ah
Manufacturer Duracell
Model Dura12-14F2
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 14
Battery Location FACP
Charger Voltage 27.49
Load Voltage 13.19
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/1/2023 1:39:36 PM
Comment: 13 Ah
Manufacturer Duracell
Model Dura12-14F2
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 14
Battery Location FACP
Charger Voltage 27.49
Load Voltage 13.25
Nominal Voltage 12
Water-Based Fire Protection Systems
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Supervisory Low Air Switch M1-38 Low Air Manual 5/1/2023 1:19:28 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Water Flow M1-37 Water Flow Manual 5/1/2023 1:19:31 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory Tamper Switch M1-36 Back Flow Tamper Manual 5/1/2023 1:19:33 PM
Visual Inspection Passed (Manual)
Page 6 of 8Systems Northwest
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP FACP Simplex 4010
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Manual Pull Station
M1-1 North Lobby
M1-3 South Lobby Exit
M1-7 Break Room
M1-16 Men's Vestibule
M1-18 Family Restroom
M1-21 Women's Restroom
M1-31 Mechanical Room Men's Restroom
Beam
M1-2 Lobby
Smoke Detector - General
M1-4 Counting Room
M1-5 FACP
M1-6 Transit Management
M1-8 Break Room
M1-9 West Side Storage
M1-10 Work Room
M1-13 Mechanical Room
M1-15 Men's Vestibule
M1-19 Plumbing Room
M1-22 East Storage
M1-23 Attic Access
M1-30 Mechanical Room by Men's Restroom
Smoke Detector - Duct
M1-11 EC1 Boiler Room
M1-12 EC2 Boiler Room
Heat Detector
M1-14 Janitor Room
M1-17 Family Restroom
M1-20 Women's Restroom
M1-24 Women's Restroom
M1-25 Women's Restroom
M1-26 Women's Restroom
M1-27 Women's Restroom
M1-28 Men's Restroom
M1-29 Men's Restroom
M1-32 Men's Restroom
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 Duracell Dura12-14F2
Battery 2 FACP Battery 2 Duracell Dura12-14F2
Page 7 of 8Systems Northwest
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Supervisory Tamper Switch
M1-36 Back Flow Tamper
Water Flow
M1-37 Water Flow
Supervisory Low Air Switch
M1-38 Low Air
Page 8 of 8Systems Northwest
Glacier National Park
For
Archive Building #37 (Museum Office)
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Tuesday, May 02, 2023
Test Session :02 May 2023 09:23
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY Archive Building #37 (Museum Office)
CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
6 6(100%) 5(83%) 1(17%)
2 2(100%) 2(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Tuesday, May 02, 2023
ACCEPTED BY 05/02/2023 TESTED BY 05/02/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
DESCRIPTION FACPADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER Ademco
LAST UPDATEMODEL Vista-33FB
S/W LOCATIONSERIAL NUMBER
INSTALL DATE 04/25/2021
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.94 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Above FACP CHARGER VOLTAGE 13.64
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.88 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Above FACP CHARGER VOLTAGE 13.64
The following 1 corrective action(s) remain open following the system inspection, testing or maintenance activities
EQUIPMENT TYPE ADDRESS DESCRIPTION
Smoke Detector - General 1-6 Vault
Created By: Luke Salewsky
Creation Date: 05/02/2023
Corrective Action: Device is not programmed correctly to report as smoke detector. Device will not Annunciate locally as well.
Proposed Solution:
Manufacturer:
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP FACP Manual 5/2/2023 9:26:52 AM
Manufacturer Ademco
Model Vista-33FB
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Manual Pull Station 1-2 Office Manual 5/2/2023 9:26:55 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General 1-1 FACP Office Smoke Manual 5/2/2023 9:32:13 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Valve Tamper Switch 1-5 Riser Tamper Manual 5/2/2023 9:33:11 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Waterflow 1-3 Water Flow Manual 5/2/2023 9:33:14 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory - High/Low Air Pressure Switch
1-4 Riser Low Air Manual 5/2/2023 9:33:15 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Failed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General 1-6 Vault Manual 5/2/2023 9:30:30 AM
Functional Inspection Failed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/2/2023 9:35:17 AM
Comment: 6.4 Ah
Manufacturer PowerSonic
Model PS-1270
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Battery Location Above FACP
Charger Voltage 13.64
Load Voltage 12.88
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/2/2023 9:36:26 AM
Comment: 5.0 Ah
Manufacturer PowerSonic
Model PS-1270
Visual Inspection Passed (Manual)
Amp Hours 7
Battery Location Above FACP
Charger Voltage 13.64
Load Voltage 12.94
Nominal Voltage 12
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP FACP Ademco Vista-33FB 04/26/2021
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
1-1 FACP Office Smoke 04/26/2021
1-6 Vault 04/26/2021
Manual Pull Station
1-2 Office 04/26/2021
Waterflow
1-3 Water Flow 04/26/2021
Supervisory - High/Low Air Pressure Switch
1-4 Riser Low Air 04/26/2021
Valve Tamper Switch
1-5 Riser Tamper 04/26/2021
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 PowerSonic PS-1270 04/26/2021
Battery 2 FACP Battery 2 PowerSonic PS-1270 04/26/2021
Glacier National Park
For
B#215 Community Building
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Tuesday, May 02, 2023
Test Session :02 May 2023 16:22
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY B#215 Community Building CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
18 16(89%) 16(89%) 0(0%)
2 2(100%) 2(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Tuesday, May 02, 2023
ACCEPTED BY 05/02/2023 TESTED BY 05/02/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
DESCRIPTIONADDRESS / SCAN ADDRESS FACP
S/W VERSIONMANUFACTURER Honeywell
LAST UPDATEMODEL GWF-7075
S/W LOCATIONSERIAL NUMBER
INSTALL DATE 05/01/2023
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION
ADDRESS / SCAN ADDRESS FACP Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.9 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION CHARGER VOLTAGE 27.52
TYPE Battery - Sealed Lead-acid DESCRIPTION
ADDRESS / SCAN ADDRESS FACP Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.96 AMP HOURS 7
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION CHARGER VOLTAGE 27.52
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Control Panel FACP Manual 5/2/2023 4:33:03 PM
Manufacturer Honeywell
Model GWF-7075
Visual Inspection Passed (Manual)
Functional Inspection Passed
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General S001 Above FACP Manual 5/2/2023 4:34:40 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S008 Meeting Hall Manual 5/2/2023 4:34:46 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S009 Meeting Hall East Manual 5/2/2023 4:34:57 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Pull Station M018 Meeting Hall Manual 5/2/2023 4:35:52 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S011 Storage Room Manual 5/2/2023 4:36:02 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S012 Corridor Manual 5/2/2023 4:36:11 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S004 Stage Manual 5/2/2023 4:36:49 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S002 in I/T Room Manual 5/2/2023 4:36:59 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S010 Day Room Manual 5/2/2023 4:37:37 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Pull Station M019 Day Room Manual 5/2/2023 4:38:01 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S006 Fouer Manual 5/2/2023 4:38:17 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Pull Station M016 Fouer Manual 5/2/2023 4:38:32 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector - Restorable Spot
S007 Warming Kitchen Manual 5/2/2023 4:38:41 PM
Visual Inspection Passed (Manual)
Pull Station M017 Warming Kitchen Manual 5/2/2023 4:38:49 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General S003 In Storage Room Manual 5/2/2023 4:39:52 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector - Restorable Spot
S005 Under Stage Manual 5/2/2023 4:52:40 PM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Skipped
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Smoke Detector - General S013 Basement Entry Manual 5/2/2023 4:30:00 PM
Comment: No access
Smoke Detector - General S014 Basement Main Manual 5/2/2023 4:30:00 PM
Comment: No access
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid FACP Battery 2 Manual 5/2/2023 4:56:45 PM
Comment: 7 Ah
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Charger Voltage 27.52
Load Voltage 12.9
Nominal Voltage 12
Battery - Sealed Lead-acid FACP Battery 1 Manual 5/2/2023 4:57:47 PM
Comment: 7.4 Ah
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 7
Charger Voltage 27.52
Load Voltage 12.96
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Control Panel
FACP Honeywell GWF-7075 05/02/2023
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
S001 Above FACP 05/02/2023
S002 in I/T Room 05/02/2023
S003 In Storage Room 05/02/2023
S004 Stage 05/02/2023
S006 Fouer 05/02/2023
S008 Meeting Hall 05/02/2023
S009 Meeting Hall East 05/02/2023
S010 Day Room 05/02/2023
S011 Storage Room 05/02/2023
S012 Corridor 05/02/2023
S013 Basement Entry 05/02/2023
S014 Basement Main 05/02/2023
Heat Detector - Restorable Spot
S005 Under Stage 05/02/2023
S007 Warming Kitchen 05/02/2023
Pull Station
M016 Fouer 05/02/2023
M017 Warming Kitchen 05/02/2023
M018 Meeting Hall 05/02/2023
M019 Day Room 05/02/2023
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
FACP Battery 1 03/02/2020
FACP Battery 2 03/02/2020
Glacier National Park
For
Building # 686
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Wednesday, May 03, 2023
Test Session :03 May 2023 09:22
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY Building # 686 CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTRY United States EMAIL lukes@snwmt.com
Testing Summary
EQUIPMENT TYPE TOTAL TESTED PASSED FAILED
1 1(100%) 1(100%) 0(0%)
17 17(100%) 17(100%) 0(0%)
2 2(100%) 2(100%) 0(0%)
Certification The equipment specified herein was inspected and tested according to the NFPA 72 standard for fire alarm and signaling systems, with the inspection completed on Wednesday, May 03, 2023
ACCEPTED BY 05/03/2023 TESTED BY 05/03/2023
Jon Murphy Luke Salewsky
Building Representative Technician
Fire Control Panel
Initiating Device
DESCRIPTION PANELADDRESS / SCAN ADDRESS N0
S/W VERSION V1MANUFACTURER FireLite
LAST UPDATEMODEL NFW-50X
S/W LOCATIONSERIAL NUMBER
INSTALL DATE 04/29/2021
Secondary Power TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 1
ADDRESS / SCAN ADDRESS Battery 1 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.78 AMP HOURS 8
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.49
TYPE Battery - Sealed Lead-acid DESCRIPTION FACP Battery 2
ADDRESS / SCAN ADDRESS Battery 2 NOMINAL VOLTAGE 12
LOAD VOLTAGE 12.16 AMP HOURS 8
STANDBY HOURS ALARM MINUTES
BATTERY LOCATION Battery - Nickel-cadmium CHARGER VOLTAGE 27.49
The following 1 corrective action(s) remain open following the system inspection, testing or maintenance activities
EQUIPMENT TYPE ADDRESS DESCRIPTION
N/A General General
N/A
Created By: Luke Salewsky
Creation Date: 05/03/2023
Corrective Action: Control valve is not monitored
Proposed Solution: Install monitor module to monitor control valve
Manufacturer:
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Fire Alarm Panel N000 N000 PANEL Manual 5/3/2023 9:23:34 AM
Manufacturer FireLite
Model NFW-50X
Visual Inspection Passed (Manual)
Functional Inspection Passed
Software Version V1
Initiating Device
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Manual Fire Box N000 L1M008 MECHANICAL ROOM Manual 5/3/2023 9:23:23 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D001 PANEL SMOKE Manual 5/3/2023 9:23:28 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D005 UNIT 59A LIVING ROOM Manual 5/3/2023 9:47:07 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D006 UNIT 59A BEDROOM Manual 5/3/2023 9:47:23 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D004 UNIT 59B LIVING ROOM Manual 5/3/2023 9:48:18 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D007 UNIT 59B BEDROOM Manual 5/3/2023 9:48:34 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D009 UNIT 59C LIVING ROOM Manual 5/3/2023 9:49:28 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D010 UNIT 59D LIVING ROOM Manual 5/3/2023 9:50:05 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D014 UNIT 59E LIVING ROOM Manual 5/3/2023 9:50:34 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D013 UNIT 59E BEDROOM Manual 5/3/2023 9:51:25 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D011 UNIT 59F LIVING ROOM Manual 5/3/2023 9:52:08 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Smoke Detector - General N000 L1D012 UNIT 59F BEDROOM Manual 5/3/2023 9:52:26 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Manual Fire Box N000 L1M003 LAUNDRY ROOM Manual 5/3/2023 9:53:29 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Heat Detector - Restorable Spot
N000 L1D002 LAUNDRY HEAT Manual 5/3/2023 9:53:30 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Supervisory N000 L1M017 LOW PRESSURE Manual 5/3/2023 9:55:00 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Mechanical, Electrosonic, or Pressure Waterflow Device
N000 L1M016 SPRINKLER WATERFLOW Manual 5/3/2023 9:55:02 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Valve Tamper Switch N000 L1M015 SHUTOFF VALVE TAMPER Manual 5/3/2023 9:55:20 AM
Visual Inspection Passed (Manual)
Functional Inspection Passed
Power Supplies
Passed
EQUIPMENT TYPE ADDRESS DESCRIPTION METHOD DATE/TIME
Battery - Sealed Lead-acid Battery 1 FACP Battery 1 Manual 5/3/2023 9:28:58 AM
Comment: 5 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 8
Battery Location FACP
Charger Voltage 27.49
Load Voltage 12.78
Nominal Voltage 12
Battery - Sealed Lead-acid Battery 2 FACP Battery 2 Manual 5/3/2023 9:31:20 AM
Comment: 5.4 Ah
Manufacturer Premium Power
Model UB1280-ER
Visual Inspection Passed (Manual)
Functional Inspection Passed
Amp Hours 8
Battery Location FACP
Charger Voltage 27.49
Load Voltage 12.16
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Fire Alarm Panel
N000 N000 PANEL FireLite NFW-50X 04/30/2021
Initiating Device
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Smoke Detector - General
N000 L1D001 PANEL SMOKE 04/30/2021
N000 L1D004 UNIT 59B LIVING ROOM 04/30/2021
N000 L1D005 UNIT 59A LIVING ROOM 04/30/2021
N000 L1D006 UNIT 59A BEDROOM 04/30/2021
N000 L1D007 UNIT 59B BEDROOM 04/30/2021
N000 L1D009 UNIT 59C LIVING ROOM 04/30/2021
N000 L1D010 UNIT 59D LIVING ROOM 04/30/2021
N000 L1D011 UNIT 59F LIVING ROOM 04/30/2021
N000 L1D012 UNIT 59F BEDROOM 04/30/2021
N000 L1D013 UNIT 59E BEDROOM 04/30/2021
N000 L1D014 UNIT 59E LIVING ROOM 04/30/2021
Heat Detector - Restorable Spot
N000 L1D002 LAUNDRY HEAT 04/30/2021
Manual Fire Box
N000 L1M003 LAUNDRY ROOM 04/30/2021
N000 L1M008 MECHANICAL ROOM 04/30/2021
Valve Tamper Switch
N000 L1M015 SHUTOFF VALVE TAMPER 04/30/2021
Mechanical, Electrosonic, or Pressure Waterflow Device
N000 L1M016 SPRINKLER WATERFLOW 04/30/2021
Supervisory
N000 L1M017 LOW PRESSURE 04/30/2021
Power Supplies
ADDRESS DESCRIPTION MANUFACTURER MODEL SERIAL INSTALL DATE
Battery - Sealed Lead-acid
Battery 1 FACP Battery 1 Premium Power UB1280-ER
Battery 2 FACP Battery 2 Premium Power UB1280-ER
Glacier National Park
For
Building #217 Library/Facilities Management Office
128 W Glacier
West Glacier, Montana 59936
United States
This site has been inspected and tested in compliance with applicable standards.
Completed Monday, May 01, 2023
Test Session :01 May 2023 08:51
ACCEPTED BY TESTED BY
Jon Murphy
Glacier National Park
128 W Glacier West Glacier, Montana 59936 United States
Luke Salewsky
Systems Northwest
PO Box 5390, Kalispell, MT,US 59903
PROPERTY Building #217 Library/Facilities Management Office
CONTACT
ADDRESS 128 W Glacier PHONE
CITY/STATE/ZIP West Glacier, Montana 59936 MOBILE
COUNTRY United States EMAIL
Inspector Information
COMPANY Systems Northwest CONTACT Luke Salewsky
ADDRESS
PO Box 5390, Kalispell, MT,US 59903
LICENSE NUMBER FPL-IEL-LIC-001176
PHONE +1 406-309-4518
COUNTR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .