B12_RFI_03_-_140P1325Q0027_-NPS_response_0003.pdf

PDF 85 KB Posted

Attached to
OSTB-REPLACE SECURITY SYSTEM CAMERAS/MON
Solicitation number
140P1325Q0027
Issued by

About this file

This document is a Request for Information (RFI) for a security system camera replacement project at a National Park Service facility. The RFI provides responses to five key questions from potential contractors regarding the project specifications. Key details include: power source for existing cameras is at the pole with breakers in the Annex Building, underground conduit will be provided only under paved areas, and the contractor must trench and install new conduit from pole to pavement as per drawings. The government will provide neutralizing primer, lime plaster, and paint for interior work, and will accept Point-To-Point network devices for signal transmission, provided the contractor uses hardened PTP and PoE boxes and devices. The RFQ deadline will not be extended, and the contractor is responsible for providing and installing junction and termination boxes as needed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 03 140P1325Q0027 - 0044007460_OSTB-REPLACE SECURITY SYSTEM CAMERAS

1. Is it possible to extend the due date to deliver final proposals?

The RFQ shall not be extended.

2. Where are the existing exterior cameras currently getting their power from? Out at the pole or inside the building? Power to existing cameras are at the pole with the breakers panel in the Annex Building.

3. What is the routing of the new exterior underground conduit that will be provided by the Government? Only under the paved areas. From the poles to the inside of the building? Underground conduit exists from the poles to the building, except where shown on the drawings. Which will require the contractor to trench and install new conduit from pole to pavement as per drawings. Will the government also provide junction boxes and termination boxes? No, contractor shall provide and install as needed.

4. Please confirm that Government will provide neutralizing primer and paint for the walls in case some areas need to be re-painted after work is completed. Yes, government will provide necessary materials such as lime plaster, neutralizing primer and paint for any interior work.

5. Will the government accept the use of Point-To-Point network devices to transmit the signals from new exterior cameras to the inside of the building? Yes, provided that the contractor provides hardened PTP and PoE boxes and devices.