This is a Performance Work Statement (PWS) for Section 02824 – Wire Fences and Gates for the 7 Lakes 2026 Fence project. The contractor is responsible for furnishing all materials and installing a complete barbed wire fence system, including steel posts, 3-post corner braces, end panels, and stress panels.
Preparation work requires clearing vegetation using a brush hog or comparable equipment, limited to 8 feet on one side of the fence line and 4 feet on the other side (12-foot total cut swath), with scattered disposal of cut brush. Installation specifications mandate that wood posts (not steel) be used for end-panel, corner-panel, gate-panel, and stress-panel posts. Steel posts are driven to depth per drawings with anchor plates slightly below ground surface, or drilled 18 inches minimum when rock prevents driving and grouted in place. Wood posts for corners, end panels, and stress panels may be driven if undamaged and plumb or set in holes per the Work Data Sheet. Stress panels are required at hill crests and maximum 1,320-foot intervals center-to-center. Wire must be stretched tightly, stapled to wood posts or clipped to steel posts, with proper termination wrapping around posts two times and tying off with minimum four wraps. Brace wire is twisted tight with a lever consisting of dimension wood or minimum #4 rebar. Spiking requires predrilled lead holes at 3/4 spike diameter to no greater than 1/2 spike length. Wood fence stays measuring 42 inches long by 2.5 inches diameter are required between each line post. Wire gates must include two wooden fence stays spaced evenly, and wire gate closers are acceptable. All work is inspected by the Contracting Officer's Representative before acceptance.
Payment is made by the job for fence constructed, with separate line items for Remove Existing Fence (LF), Construct New Fence (LF), 3-Post Corners (EA), H-Braces (EA), and Wire Gate (EA). No direct payment is made for minor drainage crossings, deadmen, figure fours, or rock jacks; these costs must be incorporated into bid prices for other contract items. Fence removal is measured and paid as incidental work under this section.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140LL027Q0034_Amd_0001.pdf | ||
| A06_Updated_Material_Specifications_0001.pdf | ||
| A06_Drawings.pdf | ||
| A04_SOW.pdf | ||
| A06_Specifications.pdf | ||
| A06_Maps.pdf | ||
| Sol_140LL027Q0034.pdf | ||
| B03_DBA_Wage_Determination.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02824
WIRE FENCES AND GATES
7 LAKES 2026 FENCE
02824 - 1
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Installing barbed wire, steel posts, 3-post corner braces, end panels, and stress panels.
B. Related Sections:
General Information and Requirements Section 01009
1.2 SUBMITTALS
A. General: Submittals shall be according to Section 01009 - General Information and Requirements.
1.3 QUALITY ASSURANCE
A. General: Contractor – All work will be inspected by the Contracting Officer’s Representative before acceptance.
PART 2: PRODUCTS
2.1 CONTRACTOR - FURNISHED MATERIALS
A. General: Contractor – All building supplies and materials will be furnished by the contractor.
PART 3: EXECUTION
3.1 PREPARATION
A. Clearing: No blading will be allowed. Cutting and clearing shall be by brush hog or other comparable equipment. Clearing shall be limited to 8’ on one side of the fence line and 4’ on the other side of the fence line for a total cut swath of 12’. Clearing is required for the entire fence line other than places brush does not exist. Dispose of cut brush by scattering it evenly adjacent to the fence line.
3.2 INSTALLATION
A. General:
02824 - 2
1. Steel posts shall not be used for end-panel, corner-panel, gate-panel, or stress-panel posts.
2. When treated posts must be bored or cut during construction, thoroughly swab untreated surfaces with copper naphthenate.
B. Driving Posts:
1. Wood Posts: Driving wood posts shall be allowed for Stress Panels, Three Post
Corners and End Panels. Driving wood posts will be allowed if they drive without damaging the post and are plumb and tight.
2. Steel Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving, remove anchor plate and excavate or drill holes a minimum of 18-inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position.
C. Setting Posts:
Dig holes for setting wood posts to the depth as shown on the Work Data Sheet for Corners, End and Stress Panels. Set posts plumb and to the spacing and grades as shown on the drawings, unless staked otherwise. Space posts within 6-inches of the dimension shown on the drawings or specified on the Work Data Sheet. Holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Backfill with soil gradually and uniformly around each post. Holes shall be backfilled firmly, from the bottom of the hole to the top of ground surface.
D. Corner Post, Gate Post, Corner Panel, Brace, End Panel, and Stress Panel Assemblies:
Construct as shown on the drawings or as staked in the field. Construct stress panels on crests of hills, and a maximum of 1320 feet center-to-center for barbed wire sections. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence runs unless shown otherwise on the drawings.
E. Wire:
Stretch tightly and staple to wood posts or securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. Drive staples crosswise with the grain of the wood. The wire shall be free to move through the staples as it expands and contracts. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.
02824 - 3
F. Brace Wire:
Twist tight with a lever. Leave one end of the lever long enough to fasten behind the horizontal brace to prevent wire from unwinding.
1. The lever shall be a straight ridged rod, consisting of dimension wood ripped and cut to length or a minimum #4 rebar cut to length.
G. Spiking: For spikes predrilled lead holes shall be used. The hole diameter shall be 3/4 the diameter of the spike and drilled to a depth no greater than 1/2 the length of the spike.
H. Minor Drainage Crossings:
Additional steel posts shall be set at the top and bottom of breaks or the centerline of the drainage depending on the size and shape of the drainages. Additional wire shall start and end from the main fence. Shall be in locations staked in the field or as directed by the Contracting Officer.
I. Wire Gates: Construct wire gates with 2 wooden fence stays spaced evenly across opening. Wire Gate Closers are acceptable under this contract.
K. Fence Stays: Wood fence stays are required in this Contract. 1ea. 42”long x 2.5”diameter between each line post.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for by the job, for fence constructed.
B. No direct payment will be made for Minor drainage crossing, Deadman, figure fours, or rock jacks. The Contractor shall include consideration for these items in the bid price for other items of the contract.
C. Fence removal will be measured and paid for as incidental under this Section 02824.
4.2 BASIS OF PAYMENT
02824 - 4
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
Remove Existing Fence LF Construct New Fence LF 3 - Post Corners EA H-Braces EA Wire Gate EA
END OF SECTION 02824