This is a Statement of Work (SOW) for the 7 Lakes 2026 Fence project located in Carbon County, Wyoming. The project requires the removal of approximately 19,000 linear feet of existing steel T-post barbed wire fence and replacement with 19,000 linear feet of new steel T-post fence featuring four wires (bottom wire barbless, top three wires barbed) with one 42-inch-long by 2.5-inch-diameter non-treated wood stay between each line post. The fence must be capable of detaining livestock during construction activities. The awardee is responsible for providing all materials, labor, and equipment necessary for fence removal, disposal of debris in a legal manner (burning prohibited), and new fence construction. A pre-bid site tour is optional but highly recommended. Payment is structured through multiple line items: Remove Existing Fence (Linear Foot), Construct New Fence (Linear Foot), 3-Post Corners (Each), H-Braces (Each), Wire Gate (Each), and Mobilization (Lump Sum). Mobilization payments are phased, with 50 percent paid when 5 percent of the original contract amount is earned from other bid items (or 5 percent of contract value, whichever is lesser), and 100 percent paid when 10 percent is earned (or 10 percent of contract value, whichever is lesser). No direct payment is made for general administrative requirements, minor drainage crossings, deadmen, figure fours, or rock jacks, which must be incorporated into other bid prices. The contractor must attend a mandatory pre-work conference and submit a work schedule showing estimated start and completion dates. Final inspection notification must occur at least three working days before completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Drawings.pdf | ||
| A06_Specifications.pdf | ||
| A06_Maps.pdf | ||
| Sol_140LL027Q0034.pdf | ||
| B03_DBA_Wage_Determination.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7 LAKES 2026 FENCE
SOW - 1
Statement of Work:
Introduction The 7 Lakes 2026 Fence project is located within Carbon County, WY. The proposed work includes the removal of an estimated 19,000 Liner Feet of existing fence and replacing it with new construction and like materials; all to be provided by the awardee.
New fence construction will consist of:
7 Lakes 2026 Fence:
Remove 19,000LF of typical steel T post, barbed wire fence. Replace with 19,000LF of typical 4 wire (bottom wire barbless, top 3 wires barbed) steel T post fence with 1 42”longX2.5”diameter non treated wood stay between each line post. The fence shall detain livestock during construction activities.
Project Location See Project Maps
Pre-Bid Tour A pre-bid tour of the project site will be scheduled, with agency personnel. Attendance of the pre-bid tour is optional, but highly recommended, to ensure a reasonable understanding of the scope of work and work site conditions.
SECTION 01009
GENERAL INFORMATION AND REQUIREMENTS
01009 - 1
PART 1: GENERAL
1.1 SUMMARY:
A. The 7 Lakes 2026 Fence project is located within Carbon County, WY. The proposed work includes the removal of an estimated 19,000 Liner Feet of existing fence and replacing it with new construction and like materials; all to be provided by the awardee.
New fence construction will consist of:
7 Lakes 2026 Fence:
Remove 19,000LF of typical steel T post, barbed wire fence. Replace with 19,000LF of typical 4 wire (bottom wire barbless, top 3 wires barbed) steel T post fence with 1ea. 42”long x 2.5”diameter non treated wood stay between each line post.
B. Location: Work under this Contract is located in Carbon County, Wyoming. Work locations are shown on the maps.
C. Work Data Sheet: Designates the type and quantity of work required at the project location, and dimensions required for typical drawings.
D. Debris: Debris consisting of wood posts, poles, steel posts, and wire shall become the property of the Contractor and shall be removed from the work site. The Contractor shall be responsible for disposal of construction debris in a legal manner, and for payment of any fees required. Burning of debris is not permitted on the work site.
1.2 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:
Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/ standards referred to herein may be procured by the Contractor, from the following:
ALSC American Lumber Standards Committee
PO Box 210 Germantown, MD 20875
ANSI American National Standards Institute 11 W 42nd St.
New York, NY 10036
01009 - 2
AWPA American Wood Preservers' Association P.O. Box 286 Woodstock MD 21163
AWPA C 1-95 All Timber Products, Pressure Treatment AWPA C 5-95 Fence Posts, Pressure Treatment AWPA M 4-95 Care of Pressure Treated Wood Products AWPA P 5-95 Waterborne Preservatives AWPA P 8-95 Oil-Borne Preservatives AWPA P 9-92 Solvents for Organic Preservative Systems
CFR Code of Federal Regulations (Available from the Government
Printing Office) N. Capitol St. between G and H St., NW Washington, DC 20402
FS Federal Standard General Services Administration
Specifications Branch Room 6039, GSA Building 7th and D Streets, S.W.
Washington, DC 20407
GSA General Services Administration
F St. and 18th St., NW Washington, DC 20405
OSHA Occupational Safety and Health Administration
US Department of Labor 200 Constitution Ave., NW Washington DC 20210
OSHA 2207-91 Construction Industry
WWPA Western Wood Products Association 522 SW 5th Avenue, Yeon Bldg.
Portland, OR 97204-2122
1.3 SUBMITTALS
(There are no applicable requirements)
1.4 DELIVERY, STORAGE, AND HANDLING:
01009 - 3
A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit to the site.
B. Storage: The Contractor shall provide temporary storage facilities for products.
Storage shall comply with the manufacturer’s instructions. The storage area shall permit access for inspection and handling.
C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage.
1.5 QUALITY ASSURANCE:
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.6 PROJECT/SITE CONDITIONS:
A. Access to the Work:
1. The work locations are shown on the drawings.
2. Access to the work shall be provided by and at the Contractors expense.
No roads shall be constructed by the Contractor or off-road driving permitted without prior written permission from the Contracting Officer.
3. Contractor shall exercise care to prevent unnecessary surface disturbance to existing grass, vegetation, and to existing roads and two-tracks.
4. Public, State, or private access roads damaged by the Contractor shall be restored, at the Contractor’s expense, to the same condition they were in at the commencement of work.
B. Environmental Considerations:
1. No blading will be allowed.
1.7 SEQUENCING AND SCHEDULING:
01009 - 4
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within three calendar days. As a minimum, the estimated start and completion dates shall be shown in the schedule.
PART 2: PRODUCTS
A. See material specifications section of these specifications.
PART 3: EXECUTION
3.1 PROJECT MEETINGS:
A. Pre-Work Conference:
1. A pre-work conference will be held prior to the start of work.
The Contractor will be notified in advance of meeting time, date and place.
The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. The Contractor shall be prepared to summarize and explain procedures planned for the project.
B. Progress Meetings:
1. Meetings shall be held at the project site, or as determined by the
Contracting Officer.
2. Meetings may be called by either the Contracting Officer or the Contractor.
Request shall state who should attend and include an agenda.
C. Final Inspection:
1. Meeting shall be held at the project site, or as determined by the Contracting Officer.
2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule
01009 - 5 final inspection.
3. The Contractor shall require the superintendent to be present during this inspection.
3.2 PREPARATION
A. Work Limits and Control Points: Will be established by the Contracting Officer.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.
END OF SECTION 01009
SECTION 01505
MOBILIZATION
01505 - 1
1.1 SUMMARY:
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site.
(There are no applicable requirements.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Progress payments will be made as follows:
1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
2. When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.
4.2 BASIS OF PAYMENT:
Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under:
Pay Item Pay Unit
Mobilization Lump Sum
01505 - 2
END OF SECTION 01505
SECTION 02824
WIRE FENCES AND GATES
02824 - 1
1.1 SUMMARY
A. Section Includes: Installing barbed wire, steel posts, 3-post corner braces, end panels, and stress panels.
B. Related Sections:
General Information and Requirements Section 01009
1.2 SUBMITTALS
A. General: Submittals shall be according to Section 01009 - General Information and Requirements.
1.3 QUALITY ASSURANCE
A. General: Contractor – All work will be inspected by the Contracting Officer’s Representative before acceptance.
2.1 CONTRACTOR - FURNISHED MATERIALS
A. General: Contractor – All building supplies and materials will be furnished by the contractor.
3.1 PREPARATION
A. Clearing: No blading will be allowed. Cutting and clearing shall be by brush hog or other comparable equipment. Clearing shall be limited to 8’ on one side of the fence line and 4’ on the other side of the fence line for a total cut swath of 12’. Clearing is required for the entire fence line other than places brush does not exist. Dispose of cut brush by scattering it evenly adjacent to the fence line.
3.2 INSTALLATION
A. General:
02824 - 2
1. Steel posts shall not be used for end-panel, corner-panel, gate-panel, or stress-panel posts.
2. When treated posts must be bored or cut during construction, thoroughly swab untreated surfaces with copper naphthenate.
B. Driving Posts:
1. Wood Posts: Driving wood posts shall be allowed for Stress Panels, Three Post
Corners and End Panels. Driving wood posts will be allowed if they drive without damaging the post and are plumb and tight.
2. Steel Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving, remove anchor plate and excavate or drill holes a minimum of 18-inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position.
C. Setting Posts:
Dig holes for setting wood posts to the depth as shown on the Work Data Sheet for Corners, End and Stress Panels. Set posts plumb and to the spacing and grades as shown on the drawings, unless staked otherwise. Space posts within 6-inches of the dimension shown on the drawings or specified on the Work Data Sheet. Holes shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Backfill with soil gradually and uniformly around each post. Holes shall be backfilled firmly, from the bottom of the hole to the top of ground surface.
D. Corner Post, Gate Post, Corner Panel, Brace, End Panel, and Stress Panel Assemblies:
Construct as shown on the drawings or as staked in the field. Construct stress panels on crests of hills, and a maximum of 1320 feet center-to-center for barbed wire sections. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence runs unless shown otherwise on the drawings.
E. Wire:
Stretch tightly and staple to wood posts or securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. Drive staples crosswise with the grain of the wood. The wire shall be free to move through the staples as it expands and contracts. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.
02824 - 3
F. Brace Wire:
Twist tight with a lever. Leave one end of the lever long enough to fasten behind the horizontal brace to prevent wire from unwinding.
1. The lever shall be a straight ridged rod, consisting of dimension wood ripped and cut to length or a minimum #4 rebar cut to length.
G. Spiking: For spikes predrilled lead holes shall be used. The hole diameter shall be 3/4 the diameter of the spike and drilled to a depth no greater than 1/2 the length of the spike.
H. Minor Drainage Crossings:
Additional steel posts shall be set at the top and bottom of breaks or the centerline of the drainage depending on the size and shape of the drainages. Additional wire shall start and end from the main fence. Shall be in locations staked in the field or as directed by the Contracting Officer.
I. Wire Gates: Construct wire gates with 2 wooden fence stays spaced evenly across opening. Wire Gate Closers are acceptable under this contract.
K. Fence Stays: Wood fence stays are required in this Contract. 1ea. 41”long x 2.5”diameter between each line post.
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for by the job, for fence constructed.
B. No direct payment will be made for Minor drainage crossing, Deadman, figure fours, or rock jacks. The Contractor shall include consideration for these items in the bid price for other items of the contract.
C. Fence removal will be measured and paid for as incidental under this Section 02824.
4.2 BASIS OF PAYMENT
02824 - 4
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Remove Existing Fence LF Construct New Fence LF 3 - Post Corners EA H-Braces EA Wire Gate EA
END OF SECTION 02824
SECTION 02827
FENCE REMOVAL
02827 - 1
1.1 SUMMARY
A. Section Includes: Removing existing wire fence, including all wood, Tee posts, stress and end panels and minor drainage crossings.
B. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officers Representative. Cross-country travel with wheeled or tracked vehicles shall be only to and along fence lines.
C. Do not damage adjoining pasture fences. Leave any posts shared by adjoining fences.
2.1 Not Applicable
3.1 REMOVAL
A. Removal of Existing Fence: Furnish all labor and equipment necessary to completely remove all fencing.
B. Disposal of debris shall be according to Section 01009 – General
Information and Requirements.
4.1 METHOD OF MEASUREMENT
A. Units: Fence removal will be measured and paid for by the linear foot
SECTION 02827
FENCE REMOVAL
02827 - 2 removed as measured along the ground surface next to the fence prior to removal, including distance across gate openings, end, stress, and corner panels and drainage crossings.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Fence Removal Linear Foot
END OF SECTION 02827
| 02_SOW_as7.9.26 |
| 03_01009 general.as7.9.26 |
| 04_01505 Mobilization.as7.9.26 |
| 05_02824 Wire Fence and Gates.as7.9.26 |
| 06_02827 fence removal.as7.9.26 |
| PART 1: GENERAL |
| PART 2: PRODUCTS |
| PART 3: EXECUTION |
| PART 4: MEASUREMENT AND PAYMENT |
| END OF SECTION 02827 |