Sol_140L3626Q0023_Amd_0002.pdf
PDF 290 KB Posted
- Attached to
- Pompey's Pillar Iron Filter Tanks Federal contract opportunity
- Solicitation number
- 140L3626Q0023
About this file
This is Amendment 0002 to a federal solicitation for the Pompey's Pillar Iron Filter, Media, and Tank Replacement project issued by the Bureau of Land Management (BLM) Montana State Office. The solicitation number is 140L3626Q0023, with an effective date of May 6, 2026, and the period of performance runs from May 11, 2026, to June 30, 2026. The amendment provides questions and answers from interested offerors regarding project specifications and requirements. Offerors must acknowledge receipt of this amendment by signing Section 15A-15C of the Standard Form 30 prior to the hour and date specified in the original solicitation.
The key technical details include: the treatment facility room dimensions are approximately 20' x 20'; the system serves the Pompey's Pillar Interpretive Center with average demand of 1,300 gallons per day and maximum demand of 6,000 gallons per day; the existing pump is a Goulds 33GS20 with Aquavara AVII Variable speed controller supplying 35 GPM; the well has a total depth of 33 feet with a static water level of 4.5 feet. Critical requirements established in the answers include: contractors must base quotes on existing system configuration with replacement in kind for filter media (no deviations permitted in initial proposals); both hydropneumatic tanks must be fully removed and replaced, with rehabilitation not acceptable; and all liquid waste disposal must occur at offsite licensed facilities in compliance with federal, state, and local regulations, with all costs the contractor's responsibility. The amendment clarifies that manganese concentrations currently exceed recommended levels, requiring proper treatment system design and waste management protocols.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3626Q0023_Amd_0003.pdf | ||
| Attachment_4_-_Water_System_Submittal_0003.pdf | ||
| Attachment_3_-_Pompeys_Water_System_0003.docx | DOCX document | |
| Sol_140L3626Q0023_Amd_0001.pdf | ||
| Sol_140L3626Q0023.pdf | ||
| Attachment_1_-_SOW_-_Pompey_s_Pillar_Tank_Replacement.pdf | ||
| Attachment_2_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jorge Alvarez
See continuation page
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
LMA
140L3626Q0023
05/06/2026
05/04/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3626Q0023/0002
See amendment information in the pages below
Period of Performance: 05/11/2026 to
06/30/2026
PROJECT DESCRIPTION: Pompey’s Pillar Iron Filter, Media, and Tank Replacement Solicitation No. 140L3626Q0023
Description of Changes - This amendment incorporates the following information:
1. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - Sign the SF30, Section 15A - 15C, to acknowledge this amendment.
PROJECT DESCRIPTION: Pompey’s Pillar Iron Filter, Media, and Tank Replacement Solicitation No. 140L3626Q0023
New Questions and Answers
Question 4. The current filter media type, required media quantity, bed depth, gravel support layers, and whether the Government requires the same media or will accept a contractor-recommended equivalent suitable for iron and manganese removal.
Answer 4. Contractors shall base their quote on the existing system configuration and assume replacement in kind, including the current filter media type, media quantity, bed depth, and gravel support layers, to the extent information is available in the contract documents or can be reasonably inferred from site conditions.
Where specific parameters are not defined, contractors shall assume industry-standard design criteria appropriate for iron and manganese removal in groundwater filtration systems. The intent is to establish a common basis for bidding; therefore, no deviations from the specified or assumed baseline design shall be included in the initial proposal.
Contractor-recommended alternatives (e.g., equivalent or enhanced filter media) may be submitted after contract award for Government consideration. Any such recommendations must:
• Include sufficient technical justification demonstrating equal or improved performance for iron and manganese removal
• Be compatible with the existing infrastructure (e.g., vessel configuration, hydraulic loading rates, backwash requirements)
• Not introduce increased operational complexity, maintenance burden, or lifecycle cost without clear benefit
Contractors are advised that any deviation from the existing system configuration may be subject to regulatory review and approval. As such, acceptance of proposed alternatives could result in additional review time and potential delays to implementation. The Contractor shall account for this risk, and no schedule or cost adjustments will be considered unless expressly authorized through a formal contract modification.
All deviations are subject to Government evaluation and approval, and no changes shall be implemented without prior written authorization from the Contracting Officer.
Question 5. Whether the two hydropneumatic tanks are required to be fully replaced, or whether rehabilitation is acceptable if inspection determines they are serviceable.
Answer 5. Both hydropneumatic tanks shall be fully removed and replaced under this contract. Rehabilitation, reuse, or continued service of the existing tanks is not acceptable, regardless of inspection results or perceived condition.
Contractors shall base their proposals on complete replacement and shall include all labor, materials, and incidental work necessary to provide fully operational and integrated tanks within the existing system.
PROJECT DESCRIPTION: Pompey’s Pillar Iron Filter, Media, and Tank Replacement Solicitation No. 140L3626Q0023
This requirement reflects the Government’s intent to ensure long-term reliability, regulatory compliance, and consistency of system performance. Accordingly, no deviations from this requirement shall be included in the contractor’s proposal.
Post-award requests to deviate from full replacement will not be routinely considered and would require compelling justification. Any such request, if submitted, remains subject to Government evaluation and approval at the sole discretion of the Contracting Officer through a formal contract modification.
Question 6. Analytical results further confirm treatment deficiencies, with manganese concentrations measured at 0.552 mg/L at the clearwell effluent - well above the recommended level of 0.05 mg/L - and 0.074 mg/L at the entry point to the system.
Can the effluent be discharged into the septic tank drain? Or will the high concentration of manganese discharged need to be sent into a separate holding tank and trucked off the site once full?
Answer 6. Use of the onsite septic system for disposal of liquid waste generated under this contract is not permitted.
All waste materials, including liquid waste, shall be managed, transported, and disposed of in accordance with all applicable federal, state, and local laws and regulations.
Disposal shall be the sole responsibility of the Contractor.
The Contractor shall assume that offsite disposal at an appropriately licensed facility is required and shall include all associated costs in their proposal, including handling, transportation, treatment, and disposal.
Questions and Answers
Question 1. What are the dimensions of the room where the tanks and treatment systems are located?
Answer 1. Approximately 20' X 20'
Question 2. What are the water demands of the system? Is the system supplying campgrounds?, housing?
Answer 2. Average demand of 1300 gallon per day with max demand of 6000 gallon per day. System supplies the Pompey's Pillar Interpretive Center.
Question 3. What are the specs on the current well and pump in place?
Answer 3. The existing pump is a Goulds 33GS20 with an Aquavara AVII Variable speed pump controller. The pump supplies 35GPM to the filtration system. The well has a total depth of 33 ft with a static water level of 4.5 ft.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .