This is an attachment containing technical specifications and procedural requirements for an iron filtration system replacement project at Pompey's Pillar, Montana. The document provides details regarding the existing iron filter tank, including manufacturer information, model specifications, dimensions, pressure ratings, and connection sizes, along with system design parameters such as flow rate, operating pressure, backwash flow rate, and piping layout. All referenced information is contained within an accompanying water system design submittal and supporting photographs.

The contractor is required to verify all existing conditions, dimensions, and system parameters in the field prior to final design, procurement, or installation, as the provided documentation represents the best available information but may not reflect current field conditions. Any discrepancies between contract documents and actual field conditions must be promptly reported to the Contracting Officer. The contractor bears responsibility for adequate site investigation, and no adjustments to contract price or schedule will be granted for failure to identify discrepancies that could have been reasonably identified during initial site verification.

View the file

Other files for this federal contract opportunity

Other files attached to Pompey's Pillar Iron Filter Tanks, newest first.
File Type Posted
Sol_140L3626Q0023_Amd_0003.pdf PDF
Attachment_4_-_Water_System_Submittal_0003.pdf PDF
Sol_140L3626Q0023_Amd_0002.pdf PDF
Sol_140L3626Q0023_Amd_0001.pdf PDF
Sol_140L3626Q0023.pdf PDF
Attachment_1_-_SOW_-_Pompey_s_Pillar_Tank_Replacement.pdf PDF
Attachment_2_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Existing Iron Filter Tank Details Available information regarding the existing iron filter tank (including manufacturer, model, dimensions, pressure rating, and connection sizes) is provided in the referenced water system design submittal and accompanying photos.

2. Existing System Design Information Available system design information, including flow rate, operating pressure, backwash flow rate, and general piping layout, is also provided in the referenced water system design submittal and accompanying photos.

The provided documentation is intended to represent the best available information on the existing system; however, it may not reflect current field conditions. The Contractor shall be responsible for verifying all existing conditions, dimensions, and system parameters in the field prior to final design, procurement, or installation.

Any discrepancies identified between the contract documents and actual field conditions shall be promptly brought to the attention of the Contracting Officer. No adjustments to contract price or schedule will be considered for failure to adequately verify existing conditions that could have been reasonably identified during site investigation.