This is Amendment 0004 to Solicitation No. 140L3626Q0021 for the Soap Gulch Road Re-Surfacing and Re-Construction project issued by the Bureau of Land Management (BLM) Montana State Office in Billings, Montana. The amendment is effective June 4, 2026, with a period of performance from July 1, 2026, to August 31, 2027.
The amendment removes the retaining wall requirement from the project entirely and updates Attachment 1 (Supplemental Specs) and Attachment 2 (Drawings). It also updates the evaluation criteria in Section M, Factor 2 (Prior Demonstrated Experience), such that projects including retaining wall construction or repair will no longer be evaluated more favorably. The price schedule has been updated to reflect 34 line items covering mobilization, clearing and grubbing, tree removal, drainage excavation, culvert installation and cleaning, roadway reconditioning, fence work, cattle guard replacement, equipment rental, and kiosk removal and installation. Unit prices must be provided by offerors for each line item; the total price is left blank for offeror completion. Offerors must acknowledge receipt of this amendment by completing items 8 and 15 on the form, returning it with their offer, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Acknowledgement must be received at the designated receipt location prior to the offer closing date and time, or the offer may be rejected.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| New_Attachment_1_-_Supplemental_Specs_0004.pdf | ||
| New_Attachment_2_-_Drawings_0004.pdf | ||
| Sol_140L3626Q0021_Amd_0003.pdf | ||
| Sol_140L3626Q0021_Amd_0002.pdf | ||
| Sol_140L3626Q0021_Amd_0001.pdf | ||
| Sol_140L3626Q0021.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_1_-_Supplemental_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jorge Alvarez
See continuation page
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
LMA
140L3626Q0021
06/04/2026
04/28/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3626Q0021/0004
Below are the details of the amendment.
Period of Performance: 07/01/2026 to
08/31/2027
PROJECT DESCRIPTION: Soap Gulch Road Re-Surfacing and Re-Construction Solicitation No. 140L3626Q0021
Description of Changes - This amendment incorporates the following information:
1. The retaining wall requirement has been taken out of the project completely.
2. Attachment 1 – Supplemental Specs has been updated. See new attachment.
3. Attachment 2 – Drawings has been updated. See new attachment.
4. The Price Schedule has been updated. See below.
5. Updating Section M – Factor 2, PRIOR DEMOSTRATED EXPERIENCE. Projects that include retaining wall construction or repair will no longer be evaluated more favorably.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
New Price Schedule
Item Pay Item
Description Unit Quantity Unit Price
Total Cost
1 15101 Mobilization Each 1.00 2 20204 Selective Clearing and
Grubbing, disposal method a,f,g Mile 3.56
3 20207 Removal of Individual Trees, disposal method: Logs (i), Limbs/tops (a,f,g), Stumps (j)
Each 19.00
4 20209 Roadside Brushing, disposal method a,f,g
Mile 2.09
5 20302A Removal of Minor Culvert, Disposal Method A
Each 10.00
6 20402A Roadway excavation and embankment turnout, To Widen, compaction placement method
3, tolerance class F
Feet 500.00
7 20402B Roadway excavation and embankment, To Widen, compaction placement method 3, tolerance class D
Mile 0.54
8 20424A Drainage Excavation, type Construct Ditch
Foot 625.00
9 20425A Drainage Excavation, type Construct Drain Dip
Each 6.00
10 20425B Drainage Excavation, type Reshape Drain Dip
Each 3.00
11 20425C Drainage Excavation, type Construct Catch basin
Each 3.00
12 20425D Drainage Excavation, type Construct Rock Ford Dip
Each 2.00
13 20425E Surface water deflector, Earthen, placement method 6
Each 1.00
14 20405 Class 1 RipRap protection face.
150 Linear feet, (Includes all equipment, labor, haul, material to complete job)
Cubic Yard
95.00
15 30207 Aggregate surface course, Placement Method 2
Cubic Yard
100.00
16 30315 Roadway Reconditioning, Compaction Placement Method
Mile 7.71
17 30319 Construct 4% Outslope for 50' with 25' Tapers
Each 6.00
18 60201A 18 inch pipe culvert, CMP - Compaction Placement 6
Foot 110.00
19 60201B 24 inch pipe culvert, CMP - Compaction Placement 6
Foot 128.00
20 60201D 36 inch pipe culvert, CMP - Compaction Placement 6
Foot 118.00
21 60201E 46"x36" inch arch pipe culvert, CMP - Compaction Placement 6
Foot 168.00
22 60212A Surface water deflector, Open Top, placement method 6
Foot 108.00
23 60708 Cleaning culverts in place Each 5.00 24 60712 Cleaning Cattle guard in place, repair or replace wingwalls.
Each 2.00
25 61901A Fence removal, buck and pole disposal method (a).
Feet 75.00
26 61901B Fence construction, buck and pole
Feet 80.00
27 61901C Fence construction, post and rail Feet 30.00 28 61903 Remove and Replace Cattle guard and base, 14' wide with sign package, Disposal method
A
Each 1.00
29 62201A Rental Equipment, Hydraulic Excavator or equivalent
Hour 35.00
30 62201B Rental Equipment, Dump Truck Hour 10.00 31 62201C Rental Equipment, Grader or equivalent Hour 22.00
32 62201D Rental Equipment, Road Roller or equivalent
Hour 12.00
33 63301 Sign Package, Cattle guard Each 2.00 34 64601 Removal of Kiosk, disposal method A. Install New government furnished Kiosk.
Each 1.00
Total Price ________________________
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .