This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the GAOA Devil's Elbow Courtesy Dock Replacement, Solicitation No. 140L3625Q0092. The amendment makes three key changes: 1) The requirement is now a supply contract for delivery only, with no installation component, 2) The government has provided questions and answers from interested offerors, and 3) The solicitation has been extended to 18 September 2025 at 1PM MDT.

The Q&A section addresses technical specifications, including potential alternatives for dock construction. Specifically, the government will consider an aluminum dock design if the offeror can demonstrate prevention of galvanic corrosion, and requires a single 6ft-3inch wide continuous dock surface rather than multiple connected smaller sections. The contract is being issued by the Bureau of Land Management (BLM) Montana State Office, located in Billings, MT, and will follow FAR 52.212-4 for warranty if any issues are identified after delivery.

View the file

Other files

File Type Posted
Sol_140L3625Q0092_Amd_0001.pdf PDF
Attachment_1_-_SOW.pdf PDF
Attachment_3_-_Pictures.pdf PDF
Sol_140L3625Q0092.pdf PDF
Attachment_4_-_Price_Schedule.docx DOCX document
Attachment_2_-_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3625Q0092 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT STATE OFC(MT935)

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT-STATE OFC(MT935)

09/16/20250002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/25/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See amendment information in the pages below

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jorge Alvarez

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

PROJECT DESCRIPTION: GAOA Devil’s Elbow Courtesy Dock Replacement Solicitation No. 140L3625Q0092

Description of Changes - This amendment incorporates the following information:

1. The Government is removing the installation aspect. This requirement will be a supply requirement that needs to be delivered to the site.

2. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.

3. The solicitation has been extended to 18 September 2025, 1PM MDT.

Acknowledgement - Sign the SF30, Section 15A - 15C, to acknowledge this amendment.

PROJECT DESCRIPTION: GAOA Devil’s Elbow Courtesy Dock Replacement Solicitation No. 140L3625Q0092

New Questions and Answers

1) This seems to be a supply contract, yet when you read the inspection guide lines it could mean you want the docks installed.

This requirement is for the supply and delivery. No installation. The Government will install and inspect after delivery. If issues are identified, the Government will follow FAR 52.212-4 to warranty the item.

Questions and Answers

1) Would the BLM allow for the construction of this dock to be from an equal strength aluminum design versus a full metal design? We believe we can achieve equal strength while having a slightly lighter dock to move in and out of the water when necessary?

Yes, only if the quote explains how the proposed aluminum will prevent galvanic corrosion due to dissimilar metals. Particularly in areas where the dock will be in contact with steel such as the hinge points and metal piling.

If the offeror is planning on replacing the galvanized steel hinges including the hinges in the concrete abutment to address the issue it must be stated in the quote as well as what material will be used to replace the galvanized steel hardware.

2) We can meet the 20' length, Unfortunately our docking paneling comes in 3.4.or 5' widths. We can provide you with (2) 3' wide docks that connect side- by- side. Would this be an acceptable alternative?

Unfortunately, connecting side by side 3ft wide docks is not going to be an acceptable alternative to a single 6ft-3inch wide continuous dock surface. The dock is removed in the fall to prevent ice damage and having to dissemble additional multiple pieces then put them back together in the spring requires more maintenance. We want to avoid more maintenance at this time.