Attachment_14_-_Financial_Responsibility_Required_Documentation_0003.pdf

PDF 175 KB Posted

Attached to
GAOA Statewide Radio Infrastructure Federal contract opportunity
Solicitation number
140L3624R0011
Issued by
Department of the Interior Bureau of Land Management

About this file

This document is the Attachment 14 - Financial Responsibility Required Documentation related to Solicitation No. 140L3624R0011 for the GAOA Statewide Radio Infrastructure project.

The solicitation is for a construction contract to remediate seven existing communications facilities across the state of Montana. The contract is a firm-fixed price, single award construction contract with an estimated value between $250,000 and $500,000. The procurement is set-aside for small business concerns.

The required financial responsibility documentation includes a letter from the contractor's bank providing information on the length of the business relationship, the contractor's average account balance, the bank's rating of the contractor as a customer, the extent of available credit, and contact information for bank representatives. This financial information will be used to assess the contractor's responsibility to perform the contract, but will not be evaluated as part of the technical proposal.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Statewide Radio Infrastructure, newest first.
File Type Posted
Attachment_12_-_Updated_Reference_List_0004.pdf PDF
Sol_140L3624R0011_Amd_0004.pdf PDF
Attachment_1_-_Updated_Statewide_Specification_Package_5_9_2024_0004.pdf PDF
Sol_140L3624R0011_Amd_0003.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire_0003.pdf PDF
Attachment_12_-_Reference_List_0003.pdf PDF
Sol_140L3624R0011_Amd_0002.pdf PDF
Attachment_18_-_Photos_of_Sites_0002.pdf PDF
Sol_140L3624R0011_Amd_0001.pdf PDF
Attachment_11_-_Wage_Determination_-_Yellowstone_County.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-_Grizzly_Peak_-_Layout_Drawings.pdf PDF
Sol_140L3624R0011.pdf PDF
Attachment_15_-_SF_24_Bid_Bond.pdf PDF
Attachment_16_-_SF25_Performance_Bond.pdf PDF
Attachment_5_-_Ekalaka_Fire_Station_-_Layout_Drawing.pdf PDF
Attachment_8_-_Sheep_Mountain_-_Layout_Drawings.pdf PDF
Attachment_9_-_Wage_Determination_-_Carbon_County.pdf PDF
Attachment_10_-_Wage_Determination_-_Custer_and_Garfield_County.pdf PDF
Attachment_17_-_SF25A_Payment_Bond.pdf PDF
Attachment_2_-_Billings_Fire_Station_-_Layout_Drawings.pdf PDF
Attachment_3_-_Billings_Interagency_Fire_Dispatch_-_Layout_Drawings.pdf PDF
Attachment_4_-_Cohagen_-_Layout_Drawings.pdf PDF
Attachment_1_-_Statewide_Specification_Package.pdf PDF
Attachment_7_-_Pine_Grove_-_Layout_Drawings.pdf PDF
Attachment_12_-_Reference_List.pdf PDF
Attachment_14_-_Financial_Responsibility_Required_Documentation.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140L3624R0011 PROJECT DESCRIPTION: GAOA Statewide Radio Infrastructure

FINANCIAL RESPONSIBLITY REQUIRED DOCUMENTATION

The contractor shall attach a letter from a bank stating the following:

• How long have you been conducting business with your bank?

• Average balance (state in general terms based on the table shown below)

General Figure Range Key:

3 Figures = from $100 - $999 4 Figures = from $1,000 - $9,999 5 Figures = from $10,000 - $99,999 6 Figures = from $100,000 - $999,000 7 Figures = from $1,000,000 - $9,999,000 8 Figures = from $10,000,000 - $99,999,999 9 Figures = from $100,000,000 - $999,000,000

• Bank’s rating of the contractor as a customer based on the Risk Management Association (RMA).

• Extent of credit available and terms of availability

• Name and telephone number and/or email address of person(s) at bank who can be contacted by BLM evaluators.

The above information may be used to supplement the determination of contractor responsibility as defined in FAR 9.1. This information will not be evaluated as part of the evaluation process but will only be utilized in the determination of adequate financial resources to perform the contract or the ability to obtain them to establish contractor responsibility.

FINANCIAL RESPONSIBLITY REQUIRED DOCUMENTATION

File details come from the government source that posted it. Updated .