Sol_140L1726Q0043_Amd_0002.pdf

PDF 227 KB Posted

Attached to
GAOA CANM MUSEUM HVAC CHILLER REPAIR
Solicitation number
140L1726Q0043
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Bureau of Land Management (BLM) New Mexico State Office in Santa Fe. The amendment addresses solicitation 140L1726Q0043 dated August 10, 2026, and provides corrections and clarifications based on contractor questions.

The solicitation is for heating, refrigeration, and air-conditioning maintenance services under NAICS Code 238220, classified as a Total Small Business Set-Aside under FAR 19.502-2(a). The contract type is Firm-Fixed-Price (FFP) per FAR 16.202, utilizing FAR Part 13 (Simplified Acquisition) and FAR Part 12 (Commercial Services) procurement authority. The applicable wage determination is SCLS WD 2015-5435 Revision 30 (dated 05/13/2026) for Montezuma County, Colorado, with the labor classification of Heating, Refrigeration & Air Conditioning Mechanic. The correct business size standard is $19.0 million in average annual receipts. Quotes are due Monday, August 17, 2026 at 10:00 AM ET, submitted via email to Deronda_Chevanes@ios.doi.gov and Paul_Grant@ios.doi.gov. The period of performance is 30 calendar days from award, with an expected award date of August 31, 2026, and performance running through September 30, 2026. The amendment includes responses to nine contractor questions clarifying component specifications (genuine OEM York components required), circuit designations, scope of work for diagnostic services, and line item numbering conventions, along with a detailed chiller inspection report documenting system findings and recommended corrective actions for two separate refrigeration circuits.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Paul Grant

See continuation page

BLM NM-STATE OFC-SANTA FE(NM916)

301 DINOSAUR TRAIL

SANTA FE NM 87508

LXA

140L1726Q0043

08/10/2026

08/10/2026

1 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L1726Q0043/0002

Purpose of Amendment 01 - (Solicitation

Corrections based on Questions)

Quotes Due: Monday, August 17, 2026 at 10:00AM

ET

Submit Quote via email to:

Deronda_Chevanes@ios.doi.gov and

Paul_Grant@ios.doi.gov

1. Complete SF1449 and the Price Schedule to include total price. (Please ensure totals match on both documents)

Contract Type Firm-Fixed-Price (FFP) FAR

16.202

Procurement Authority FAR Part 13 (Simplified

Acquisition) / FAR Part 12 (Commercial

Services)

Competition Open Market - Total Small Business

Set-Aside per FAR 19.502-2(a)

NAICS Code 238220 - Plumbing, Heating, and

Air-Conditioning Contractors

Size Standard $19.0 Million (Average Annual

Receipts)

PSC J045 - Maint/Repair/Rebuild of equipment-plumbing, heating, and waste disposal equipment

SCLS Wage Determination WD 2015-5435 Revision

30 (05/13/2026) - Montezuma County, Colorado

Labor Classification Heating, Refrigeration &

Air Conditioning Mechanic (SCA Dir.

Occupations)

1Q. The period of performance is stated three different ways. The Continuation Sheet states

08/31/2026 to 09/30/2026 and elsewhere references 30 calendar days from award, while

Section F.1 and PWS Section 1.2 both state 90 calendar days from date of award. Which period governs?

1A. The period of performance will be 30 calendar days. We are looking to award by

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

8/31/2026.

2Q. Section A.8 and Section E.2 incorporate

SCLS Wage Determination 2015-5415, Revision 26, dated 07/08/2025. The wage determination actually attached to the solicitation is WD

2015-5435, Revision 29, dated 12/03/2025. Which wage determination applies to this acquisition?

2A. Revised 5/13/2026 ¿ WD 2015-5435

3Q. The SF-1449 cover page states a size standard of $19.0 million under NAICS 238220, while Sections A.1 and G state $22.0 million.

Which size standard applies?

3A. The correct business size is $19.0 million.

4Q. The Continuation Sheet identifies the line items as 00010, 00020, and 00030, while Section

C and Section A.3 identify them as 0001, 0002, and 0003. Would the Government please confirm which numbering should be used on the SF-1449 and the Price Schedule?

4A. 00010 = 0001, 00020 = 0002, and 00030 =

5Q. Will responses to questions be issued as an amendment posted to SAM.gov, and will the quotation due date be adjusted?

5A. The responses will be posted on SAM.gov ¿

No, there is no plan to extend the due date at this time.

6Q. PWS Section 2.6 states that the listed work is the result of a previous troubleshooting effort. Would the Government please provide the service notes, diagnostic findings, or contractor report from that effort? Prospective offerors and their technicians are being asked to install a specified list of components without the underlying basis for the diagnosis, and access to those findings would materially improve pricing accuracy.

6A. Answer: Yes, please see chiller inspection report below.

7Q. Are OEM York components required for the

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) pressure transducers, temperature sensors, and liquid line filter drier cores, or are functionally equivalent components acceptable?

This question has a significant effect on the price of CLIN 0001.

7A. Answer: Yes. Pursuant to existing equipment manufacturer specifications and system compatibility requirements, genuine OEM York components are required.

8Q. PWS Section 2.3 states that System 1

(Circuit 1) is displaying low suction pressure.

However, PWS Section 2.4.2 assigns the refrigerant recovery, filter drier core replacement, triple evacuation, and recharge to

System 2 (Circuit 2) only. Would the Government please confirm that this assignment is correct as written, or advise whether the circuit designations should be reversed?

8A. Answer: Yes, the PWS is written correctly.

Please review the attached report; review section labeled ¿Additional Notes¿ and

¿recommendation¿ for additional guidance

9Q. Would the Government please confirm the scope and intent of CLIN 0003? Section C.1 and

PWS Section 2.6 describe the deliverable as troubleshooting, a written assessment of findings, recommended corrective repairs, and a cost estimate for additional work. We read this as a diagnostic and reporting deliverable rather than a guarantee that the chiller will be restored to operation within the not-to-exceed amount, with any additional corrective repairs handled by separate authorization. Please confirm.

9A. Answer: Correct. CLIN 0003 is a diagnostic, assessment, and reporting deliverable only.

Any additional corrective repairs identified in the resulting report will be addressed separately by the Government.

Chiller Inspection Report

System 1 (Circuit 1):

o The unit operates normally under warmer ambient conditions but trips on low suction/low charge alarms during colder weather.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) o No signs of leaks or oil staining were observed on coils, headers, or service valves.

o Based on these findings, the most probable cause is drifting sensors, particularly the suction pressure transducer and liquid line temperature sensor. To eliminate nuisance alarms and stabilize control logic, I recommend replacing both pressure transducers (suction and discharge) as well as the suction and liquid line temperature sensors.

o While current behavior points more strongly toward sensor error, a weak or failing compressor could also present as low suction.

At this time there is not enough evidence to confirm compressor failure. After sensor replacement, compressor performance should be monitored, and replacement considered if abnormal suction conditions continue.

System 2 (Circuit 2):

o The sight glass was observed flashing with large bubbles when one compressor staged off, which indicates borderline refrigerant charge or a possible restriction at the liquid line filter-drier.

o When both compressors run, the sight glass clears, suggesting the charge is close but not holding a consistent liquid column under reduced load.

o Recommended corrective action is to replace the liquid line filter-drier cores, pull a deep vacuum, and recharge to factory nameplate specification. After recharging, sensors should be verified and replaced if readings remain inconsistent.

Additional Notes:

o Both systems show low suction alarms in history, though the root cause differs (sensors on System 1 vs refrigerant/drier issue on

System 2).

o Running System 2 alone places extra strain on that circuit and reduces system redundancy.

Once corrective actions are completed, both systems should share the load to extend equipment life and maintain efficiency.

Recommendation:

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

After reviewing System 1 and System 2 with the crew on site, the consensus is to begin with the less expensive corrective path. For System

1, that means replacing the suction and discharge pressure transducers along with the suction and liquid line temperature sensors.

These components are the most likely cause of the low charge/low suction alarms observed in cooler weather. If, after replacement, System 1 continues to show abnormal suction readings, the next step would be to evaluate compressor health and consider replacement at that point.

For System 2, the plan is to replace the liquid line filter-drier cores, perform a deep triple evacuation, and recharge to the factory-specified charge weight. Sensor accuracy will be re-verified after recharge.

Period of Performance: 08/31/2026 to

09/30/2026

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet