Sol_140L0622R0018_Amd_0002.pdf

PDF 2 MB Posted

Attached to
Central OR Mechanical Hazardous Fuel Reduction Federal contract opportunity
Solicitation number
140L0622R0018
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This combined synopsis and solicitation requests proposals for multiple indefinite delivery/indefinite quantity contracts to provide mechanical fuels management services on public lands in Central Oregon. The Bureau of Land Management intends to award contracts with a five year period of performance to provide fuels reduction through mechanical treatments such as mowing, hand severing, mechanical piling, forwarding, slash busting, and mechanical severing and piling. The solicitation identifies evaluation factors of technical proposal, small business participation plan, past performance, and price. Proposals are due by August 5, 2022 and shall be submitted electronically. The associated North American Industry Classification System code is 115310-Fuels Management Services and the size standard is $20.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Central OR Mechanical Hazardous Fuel Reduction, newest first.
File Type Posted
Sol_140L0622R0018_Amd_0006.pdf PDF
Sol_140L0622R0018_Amd_0005.pdf PDF
Sol_140L0622R0018_Amd_0004.pdf PDF
Sol_140L0622R0018_Amd_0003.pdf PDF
Sol_140L0622R0018_Amd_0001.pdf PDF
Sol_140L0622R0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L0622R0018 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

DENVER CO 80225

LNI

POB 25047

BLDG. 50

DENVER FEDERAL CENTER

BLM OC NOC INFRASTR SEC (OC662)

07/14/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/06/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment 0002 answers the questions received by July 14, 2022 and includes the revised Mechanical Mock Task Order.

Please acknowledge this amendment with your proposal submission.

Period of Performance: 09/05/2022 to 09/04/2027

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Judith Chamberlin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Questions received by July 14, 2022

Question 1: I am wanting to know if we have to send out the PAST PERFORMANCE QUESTIONNAIRE for each zone or does one questionnaire (from any zone) work for all the different zones that we bid on?

Answer++ One Past performance questionnaire may be used for different IDIQ zones.

Question 2: Will the mock task orders be awarded? Or are they just for evaluation purposes only?

Answer The mock task order will not be awarded. They are for evaluation purposes.

Question 3: How many awards do you anticipate making per solicitation for each of the five manual fuels IDIQ's and the 5 mechanical IDIQ's?

Answer The BLM has not set a number of awards.

Per Section L.5: The BLM anticipates awards will be made to small businesses and large business and/or nonprofit organizations that provide the best value to the BLM.

Question 4: I'm trying to determine if all of the work for all of the solicitations is going to fall under NAICS 115310 $20.5 mil (11, 12, 13, 15, 16-20) or the 115310 $8 mil (#14)?

Answer All the work under all the IDIQ’s is NAICS code 115310 $20.5 mil.

Question 5: Are separate references required for each solicitation even though many are likely from the same source? That would entail the responder to submit 5 separate for manual and 5 separate for mechanical.

Answer:

One past performance questionnaire may be utilized for multiple IDIQ’s.

Question 6: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?

Answer: The solicitations are all new requirements. There is no incumbent.

Question 7: I am wanting to know if you have a map that shows each zone for the projects? If you do, could you email me one or direct me where I can get it?

Maps have been provided for all mock task orders. The maps are at the end of the mock task order and before the past performance questionnaire. The IDIQ Zone map has also been included as Attachment 1.

Question 8: I am hoping you can clarify a few things for the projects. I have noticed that for the Manual Hazardous Fuels solicitations, they have a few inconsistencies, for example, 140L0622R0011 and R0012 they have different task orders but R0013,R0014, R0015 all have the same task order. Can you please let me know if this is how is supposed to be?

Answer

The solicitations may have different mock task orders (140L0622R0011 & 140L0622R0012) or the same (140L0622R0013, 140L0622R0014, and 140L0622R0015) The mock task orders represent the type of work that may be required. The same mock task order is used because the work in those zones is similar in nature and represents the work that may be required.

Question 9: Same goes for the Mechanical Hazardous Fuels. Same task order for 140L0622R0016 and R0017. 140L0622R0018, R0019,R0020 all 3 have the same task order.

The mock task orders represent the type of work that may be required. The same mock task order is used because the work in those zones is similar in nature and represents the work that may be required.

Question 10: Also are you looking to award all task orders or are they just for evaluation?

The mock task order are for evaluation purposes and will not be awarded.

Questions 11: Being these IDIQ’s are reserved for $20.5 size standard businesses (small businesses), would the small business subcontracting plan/disadvantaged business utilization plans not be necessary? Why would a small business need to make accommodations/plans to utilize another small business? Being we are already considered "small business" can we leave out the subcontracting/small business utilization plan?

Answer:

These requirements are full and open and not reserved for small businesses.

Per L.10.3: A Small Business Subcontracting Plan is required from Large Business only.

A Small Business Commitment Document is required by both Large and Small Businesses.

Per M.5.2 FACTOR 2: SMALL BUSINESS PARTICIPATION Small business offerors will receive the maximum credit for this evaluation factor and do not need to submit any documentation supporting this evaluation factor.

Question 12: There are mock task orders in multiple IDIQ’s that are the same? For instance, 0013, 0014, and 0015 have the same mock task order. Can we submit one proposal or would you like the identical proposal for each mock task order for each solicitation?

Answer:

The requirements for each solicitation are specific for the solicitation. Please submit all the documentation for each solicitation.

Question 13: We noticed in the Eastern Washington solicitation, #0015, the included mock task order has locations in Oregon? Is that correct? Will the Eastern Washington IDIQ cover Oregon locations as well?

The Eastern Washington mock task order represents the requirements that will be required in Eastern Washington, which are the same for Eastern Oregon. The Eastern Washington IDIQ will not cover Oregon. Please see the IDIQ Zone Map-Attachment 1 for the Eastern Washington Zone.

Question 14: The page limits for each volume, especially the past performance/references volume, may prove to be limiting due to the various types of work that are covered under each IDIQ. Is there a way you can increase the page limits for the past performance volume to 20 or 30 pages?

Answer:

The past performance page limitation shall not exceed 20 pages.

Question 15: How many awards do you plan on making for each IDIQ? The amount of money for each IDIQ will clearly max out any small business for the 5 year duration, let alone if multiple IDIQ’s were awarded to the same company. For example, Sol. #0013 is $145,000,000, over 5 years. Will there be enough awardees to provide support for each IDIQ?

Answer:

The BLM has not set a number of awards.

Per Section L.5: The BLM anticipates awards will be made to small businesses and large business and/or nonprofit organizations that provide the best value to the BLM.

Question 16: We noticed in the mechanical IDIQ’s (0016-0020) there is an abundance of manual/hand work. For example, 0018, 0019, and 0020 have the same mock task order with 5 projects included. 3 of the 5 have manual work, even brush planting, yet there is no line item in the main IDIQ solicitation with any hand work or planting line items to provide prices for?

Will there be opportunities for contractors like us to bid on that work as well? Or are these strictly mechanical treatments?

Answer The manual work included in the mechanical mock task order is an error. The mechanical mock task orders have been revised to remove the manual work. The revised mock task orders are included in the mechanical solicitation amendments.

Question 17: I was wondering about the Mechanical and Manual IDIQ's that came out on SAM for both Oregon and Washington. I see that there are mock task orders in the back of the solicitations. Are there any actual seed orders we need to place pricing on or do we just fill out the pricing schedule for the Base and Option years? For the technical proposal if there are no seed orders then we address the material in the Mock Task order correct?

Answer: There are no seed orders that require pricing. The price schedule should be completed for the base and option years. Please address the requirements in the mock task orders.

BUREAU OF LAND MANAGEMENT

MECHANICAL HAZARDOUS FUELS

MOCK TASK ORDER

CENTRAL OREGON

REVISED July 14, 2022

Solicitation 140L0622R0018-Revised 7.14.2022

The U.S. Department of the Interior agencies and the U.S. Forest Service require fuel reduction services to support the fuels management program. Fuels management services and vegetation treatments have been proven as a means to mitigate wildfire hazards, to lessen catastrophic fires, lessen the threat to public and firefighter safety, and reduce damage to property. The objective of fuels management is to modify wildland vegetative fuel so that when a wildfire burns, it is less severe and can be more easily suppressed.

Project areas are reforestation areas, natural and managed stands of timber/woodlands of all ages, size, and species, shrub fields, or grass areas. Fuels shall consist of activity slash, natural fuels, live fuels, and slashed shrubs and trees. Historical fuel loadings range from less than ½ ton per acre to as high as 100 tons or more per acre. Treatments such as thinning, brushing, chipping, piling, and fuel break construction have been shown to reduce the risk of wildland fire and the severity of fires that occur.

PROJECT ONE-JACKIES BUTTE:

Services in this task order provide for wildfire hazard reduction and sage grouse habitat restoration by treating multiple units within the Tri-State project area. See table below for a summary of treatment units and acres.

See Table A below for a Total Project Treatment and Table B for the Project Treatment Breakdown.

1 SCOPE

The contractor shall furnish labor, equipment, supervision, transportation, operating supplies, and incidentals to mow the areas specified below and as outlined on the attached maps. The maps provide project areas and project access.

All Treatments (live and dead) junipers and other conifers according to the table below and following the specifications listed below. The map attached identifies access and the canopy cover levels in the project areas. Attachment 2-Schedule B in the solicitation provides further details and specifications.

Table A: TOTAL TREATMENT

All Units Line Item Number Item Description

Unit Price Acres Total

Jackie’s Butte Fuel Breaks

7A Mowing -Level I 2,177 7B Mowing -Level II 2,178 7C Mowing -Level III 4,355

Total Bid: 8,710

Table B: TREATEMENT BREAKDOWN

Unit Breakout

Number Item Description

Unit Price Acres Total

Jackie’s Butte Fuel Breaks Unit 1 7A Mowing -Level I 2,177 Jackie’s Butte Fuel Breaks Unit 2 7B Mowing -Level II 2,177 Jackie’s Butte Fuel Breaks Unit 3 7C Mowing -Level III 4,355

NOTE: Unit boundaries will be flagged for this project. PDF maps are available for smart devices.

1.1 Specifications-Mowing

The level of difficulty for mowing is identified in the statement of work of each individual task order. The level is based on the unit density or amount of the material to be mechanically mowed on slopes under 25 percent for the area to be treated, as follows:

1.1.1 Item 7A - Level I - Unit density of material to be treated is estimated to be from 0 to 30 percent total cover.

1.1.2 Item 7B - Level II -Unit density of material to be treated is estimated to be from 31 to 60 percent total cover.

1.1.3 Item 7C - Level III- Unit density of material to be treated is estimated to be greater than 60 percent total cover

1.1.3 Wildlife – Within Greater Sage-Grouse (GRSG) habitat, cutting of juniper can occur within 4.0 miles of an occupied or pending lek during the breeding season from two hours after sunrise and two hours before sunset; use local information to further refine this period.

There will be no disruptive activities two hours before sunset to two hours after sunrise from March 1 through June 30 within 1.0 mile of the perimeter of occupied leks; use local information to further refine this period.

1..1.4 Mechanically mow all slash and brush.

1.1.5 Brush mowing shall be accomplished with a wheeled or track machine with a powered mowing device. The fuel bed shall be treated such that down woody debris are broken up and lowered to the litter layer without visible air spaces. Brush fields shall be mowed within six inches of the ground unless otherwise specified in the task order. Maintain special treatment requirements as noted in section C Statement of Work

1.1.6 See Equipment Requirements in section C Statement of Work.

PROJECT TWO- CLARKS CREEK:

2. SCOPE

and incidentals to Hand Sever and Machine Pile (Track Mounted Swing) the areas specified below and as outlined on the attached maps. The maps provide project areas and project access.

All Treatments (live and dead) junipers and other conifers according to the table below and following the specifications listed below. The map attached identifies access and the canopy cover levels in the project areas. Attachment 2-Schedule B in the solicitation provides further details and specifications.

All Units

Number Item Description

Unit Price Acres Total

Clarks Creek

1E

Hand Sever and Machine Pile (Track Mounted Swing)- Level V 1,013

Total Bid: 1,013

Number Item Description

Unit Price Acres Total

Clarks Creek 1E

Hand Sever and Machine Pile (Track Mounted Swing)- Level V 1,013

NOTE: Unit boundaries will be flagged for this project. PDF maps are available for smart devices.

2.1 Specifications-Hand Sever and Mechanical Pile (Track Mounted Swing)

The level of difficulty for hand severing and mechanical piling is l is based on the canopy cover and slope of the area to be hand severed and mechanical piled on slopes under 51% as follows:

2.1.1 Item 1E - Level V – Canopy cover of the material to be severed is estimated to be greater than 60 percent total cover. Slope is under 30 percent.

2.1.2 Wildlife – Within Greater Sage-Grouse (GRSG) habitat, cutting of juniper can occur within 4.0 miles of an occupied or pending lek during the breeding season from two hours after sunrise and two hours before sunset; use local information to further refine this period.

There will be no disruptive activities two hours before sunset to two hours after sunrise from March 1 through June 30 within 1.0 mile of the perimeter of occupied leks; use local information to further refine this period.

2.1.3 All juniper shall be treated except for juniper that meet the following specifications:

2.1.3.1 Any tree having survey/monument signs or survey marks on it.

2.1.3.2 All trees along fence lines that have fence wire attached to them.

2.1.3.3 Trees with cultural significance; obvious wildlife occupation, i.e., cavities or raptor nests; and Trees showing old growth characteristics (see contract for old growth juniper definition).

2.1.4 All juniper trees shall be completely severed from the stump. No live limbs shall be left on the stump of cut trees.

2.1.5 Slash shall be reduced to the extent that is 12 inches of the ground at all points. All limbs must be severed flush to the bole of the cut trees and limbs shall be cut less than 4 feet in length.

2.1.6 Lop and scatter all existing slash so that all top and side branches are free of the central stem so that ALL the slash is reduced to ground level at all points.

2.1.7 All juniper trees with unit boundary ribbon or paint shall be cut and piled.

2.1.8 Any dead and down, or pre-existing red/grey and/or partially burnt slash shall be piled.

2.1.9 Contractor shall protect from damage any bearing trees, corner posts and monuments within or adjacent to the project area(s).

2.1.10 Cut trees shall not be left blocking any roads.

2.1.11 Avoid cutting trees, which have cavity nests (holes for nesting) or stick nests

3. PROJECT THREE-BRYANT MOUNTAIN

and incidentals to Mechanical Sever and Pile, Mechanical Pile and Forwarding the areas specified below and as outlined on the attached maps. The maps provide project areas and project access.

All treatments consist of treating live junipers following the specifications listed below. The map attached identifies access and the canopy cover levels in the project areas. Attachment 2- Schedule B in the solicitation provides further details and specifications.

Number Item Description Unit Price Acres Total

FY22 Bryant Mountain Fuels 9A

Forwarding Level I 23

FY22 Bryant Mountain Fuels 2C

Mechanical Sever and Pile (Track Mounted Swing) Level III

FY22 Bryant Mountain Fuels 4C

Mechanical Pile (Swing Grapple and Wheeled Carriage) Level III 91

FY22 Bryant Mountain Fuels 7B

Mowing Level II 15

FY22 Bryant Mountain Fuels 5C

Slashbusting Level III 94

Total TO Acres = 393

Line-Item Number Item Description Unit Price Acres Total

Bryant Mtn. MocK Forwarding 9A

Forwarding Level I 23

Bryant Mtn. MocK Mechhanical Sever and Pile 2C

Mechanical Sever and Pile (Track Mounted Swing) Level III

Bryant Mtn. MocK Mechanical Pile

4C

Mechanical Pile (Swing Grapple and Wheeled Carriage) Level III 91

Bryant Mtn. Mock Mowing 7B

Mowing Level II 15

Bryant Mtn. Mock Slashbusting 5C

Slashbusting Level III 94

NOTE: Unit boundaries will be flagged in orange flagging for this project. PDF maps are available for smart devices.

Schedule B items on this TO

3.1 Forwarding

Level of difficulty is based on the number of severed trees to be forwarded per acre, on slopes less than 30 percent for the area, and an average forwarding distance of 1000 feet as follows:

3.1.1 Stems Per Acre and Slope Percentage

Item 9A - Level I – The severed tree count per acre is from 0 to 50 stems per acre. Slope is less than 30 percent.

Item 9B - Level II – The severed tree count per acre is from 51 to 100 stems per acre. Slope is less than 30 percent.

Item 9C - Level III – The severed tree count per acre is greater than 100 stems per acre. Slope is less than 30 percent.

3.1.2 Forwarding shall be accomplished with a wheeled tractor which is capable of transporting the material off of the ground. Forwarding described in Sub-Items P1, P2 and P3, shall only be accomplished during dry soil conditions (as defined as 20 percent or less soil moisture at a depth of 6 inches) or on soil that has been frozen to a depth of 6 inches for a period of at least 3 days or 20 inches of snow cover.

3.1.3 Maintain special treatment requirements contained in section C Statement of Work.

3.1.4 See Equipment Requirements in section C Statement of Work.

3.2. Mechanical Sever and Pile (Track Mounted Swing)

The level of difficulty for mechanically severing and mechanical piling is identified in the statement of work of each individual task order. The level is based on the canopy cover and slope of the area to be mechanically severed and piled on slopes under 51% as follows:

3.2.1 Canopy Cover and Slope Percent

Item 2A - Level I – Canopy cover of the material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30 percent.

Item 2B - Level II – Canopy cover of the material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 50 percent.

Item 2C - Level III – Canopy cover of the material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30 percent.

Item 2D - Level IV – Canopy cover of the material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 50 percent.

Item 2E - Level V – Canopy cover of the material to be severed is estimated to be greater than 60 percent total cover. Slope is under 30 percent.

Item 2F - Level VI – Canopy cover of the material to be severed is estimated to be greater than 60 percent total cover. Slope is from 30 to 50 percent.

3.2.2 Sever surplus vegetation including all western juniper not exhibiting old growth characteristics, using a mechanical shear or saw at the lowest stump height, followed by piling of the severed material.

3.2.3 Leave trees maybe requested to be left on each acre treated. The task order will specify number of leave trees, spacing and type. All areas greater than 45 percent slope shall be left as reserve areas.

3.2.4 See Treatment Requirements in section B.2 A-Q.

3.2.5 See Equipment Requirements in section C Statement of Work.

3.3 Mowing

The level of difficulty for mowing is identified in the statement of work of each individual task order. The level is based on the unit density or amount of the material to be mechanically mowed on slopes under 25 percent for the area to be treated, as follows:

3.3.1 Canopy Cover Percent

Item 7A - Level I - Unit density of material to be treated is estimated to be from 0 to 30 percent total cover.

Item 7B - Level II -Unit density of material to be treated is estimated to be from 31 to 60 percent total cover.

Item 7C - Level III- Unit density of material to be treated is estimated to be greater than 60 percent total cover.

3.3.2 Mechanically mow all slash and brush.

3.3.3 Brush mowing shall be accomplished with a wheeled or track machine with a powered mowing device. The fuel bed shall be treated such that down woody debris are broken up and lowered to the litter layer without visible air spaces. Brush fields shall be mowed within six inches of the ground unless otherwise specified in the task order. Maintain special treatment requirements as noted in section C Statement of Work.

3.3.4 See Equipment Requirements in section C Statement of Work.

3.4. Slash Busting

The level of difficulty for slash busting is identified in the statement of work of each individual task order. The level is based on the total percent cover of material to be ground (chipped) and slope of the area to be treated by mechanical grinding on slopes below 51 percent, as follows:

3.4.1 Canopy Cover and Slope Percent

Item 5A - Level I – Percent cover of material to be treated is estimated to be between 0 and 30 percent total cover. Slope is under 30 percent.

Item 5B - Level II – Percent cover of material to be treated is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 50 percent.

Item 5C - Level III – Percent cover of material to be treated is estimated to be between 31 and 60 percent total cover. Slope is under 30 percent.

Item 5D - Level IV – Percent cover of material to be treated is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 50 percent.

Item 5E - Level V – Percent cover of material to be treated is estimated to be greater than 60 percent total cover. Slope is under 30 percent.

Item 5F - Level VI – Percent cover of material to be treated is estimated to be greater than 60 percent total cover. Slope is from 30 to 50 percent.

Item 5G - Level VII - Mechanical Pre-commercial Thinning with Group Selection. Slope is less than 51 percent.

Item 5H - Level VIII - Mechanical Woodland Maintenance. Slope is less than 51 percent.

Item 5I - Level IX - Mechanical Plantation Maintenance. Slope is less than 51 percent.

3.4.2 Each task order will specify the level of difficulty, the specifications, the ranking of preferred species and the size range limits for treatment, whether hardwoods and/or conifers are included, and if any individual species are reserved from treatment.

3.4.3 Accomplish slash busting throughout the entire unit, excluding areas identified by the task order or by excessive slope as reserved from treatment.

3.4.4 Mechanically grind all slash and brush under this line item. All slash not ground shall be piled under Hand Piling and Cover and Mechanical Piling (Swing Grapple and Dozer) as specified in the individual task order.

3.4.5 All surplus vegetation and slash shall be ground or cut, such that no woody piece is greater than 3 feet in length.

3.4.6 Chip depth shall not be more than 12 inches above the normal plane of the ground.

3.4.7 Cut trees, hardwoods or brush lodged in or covering a leave tree shall be dislodged or removed before slash busting.

3.4.8 See Equipment Requirements in section C Statement of Work.

3.5 Project Area Locations, Estimated Start Work Dates, Directions

Project Area: Bryant Mtn Area Project Location: 5 miles east of Malin, Oregon. See attached maps for specific Township, Range and Section.

3.6 Wildlife – There is a winter closure from November 1st to April 15th to protect mule deer winter range and protect roads from resource damage due to wet soils. These areas can be treated within these dates depending on soil moisture COR will make this decision.

3.7 All juniper shall be treated except for juniper that meet the following specifications:

3.7.1 Any tree having survey/monument signs or survey marks on it.

3.7.2 All trees along fence lines that have fence wire attached to them.

3.7.3 Trees with cultural significance; obvious wildlife occupation, i.e., cavities or raptor nests;

and Trees showing old growth characteristics (see contract for old growth juniper definition).

3.7.4 All juniper trees shall be completely severed from the stump. No live limbs shall be left on the stump of cut trees.

3.8. All juniper trees with unit boundary ribbon or paint shall not be cut and piled.

3.9 Contractor shall protect from damage any bearing trees, corner posts and monuments within or adjacent to the project area(s).

3.10 Cut trees shall not be left blocking any roads.

3.11 Avoid cutting trees, which have cavity nests (holes for nesting) or stick nests

4. ENVIRONMENTAL CONDITIONS

6.1 Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work.

6.2 Noxious Weeds and Invasive Plants-All contractor equipment and machinery working in the project area will be power washed/cleaned and free of soil, vegetation, seeds, and other debris to prevent the spread of weeds and invasive plants prior to being mobilized to the project area.

7 ARCHEOLOGY

If a cultural site(s) is discovered, avoid the site(s) and notify the COR immediately.

8 WORK LIMITS

Only the area shown on the Project Map will be treated. The treatment units are generally identifiable with flagging, roads, and fenced boundaries, changes in vegetation/topography.

Untreated areas within these boundaries shall be identified with flagging and/or verbally.

9 PROJECT/SITE CONDITIONS

9.1 Access to Work Access into the project sites is restricted to driving and/or walking over county, state, and Bureau of Land Management land/roads (see unit maps). Stay on designated routes and do not cross private lands unless BLM has permission from the landowner(s). Respect private property boundaries, only cut and fall trees on public lands. Any access through private lands must be approved in advance by the COR.

9.2 Environmental Considerations:

9.2.1 Clean-up: Project site shall be cleaned up, and all refuse removed by the Contractor.

The Contractor shall be responsible for disposal of materials in a manner consistent with State, Federal and local laws and for all expenses incurred with disposal.

9.2.2 Ground Surface: Project terrain is flat to moderately steep slopes with areas that are bare to rocky.

9.3 Crew Supervision:

9.3.2 Contractor shall maintain an adequate workforce at all times to ensure timely completion of the work.

9.3.3 Contractor shall designate one English literate supervisor for each crew. No more than 12 persons shall be supervised by one supervisor. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Contracting Officers Representative (COR) at least 24 hours prior to the change taking effect.

9.3.4 Person designated by the Contractor as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew’s work,

(2) advising them as to improper work methods, (3) providing instructions for correcting any improper work methods encountered.

9.3.5 Emergency transportation will be provided by the Contractor at all times.

Crewmembers shall not be allowed to work alone.

9.4 Work Camps: Work camps may be established only in locations authorized in advance by the Contracting Officer Representative (COR). Base camps, spike camps, coyote camps, or other temporary infrastructure in areas that lack invasive plant populations.

Should such a camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. Upon the direction of the COR, sanitation facilities such as portable toilets and wash stations may be required with each work camp. Upon vacating a camp and prior to the final payment, the Contractor shall remove all refuse and other signs of occupancy to the satisfaction of the COR or Project Inspector. Locate base camps, spike camps, coyote camps, or other temporary infrastructure in areas that lack invasive plant populations

10 SCHEDULE: All work within this project may begin on October 1 and must be completed no later than September 30.

11 GOVERNMENT FURNISHED PROPERTY

None

12 CONTRACTOR FURNISHED PROPERTY

Contractor is responsible for all equipment and incidentals necessary to complete the data collection projects in accordance with the following specifications/directions.

13 CONTRACTOR PERFORMANCE ASSESSEMENT

After completion of a task order, a task order evaluation will be completed in the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/ . A CPARS shall be done for task orders over $250,000.00.

14 QUALITY:

All work shall be inspected in accordance with the IDIQ standard: 19.0 Quality Assurance Plan/Inspection.

15 IDENTIFICATION OF CONTRACT EMPLOYEES: All contract personnel are required to identify themselves as contractors where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees.

16 BLM CONTACTS

Bureau of Land Management Denver Federal Center, Bldg 50 National Operations Center 6th & Kipling Denver, CO 80225

Task Order Contact Judy Chamberlin-Contracting Officer BLM National Operations Center Acquisitions, (OC-662) E-Mail:

jchamberlin@blm.gov https://www.cpars.gov/ mailto:jchamberlin@blm.gov

17. EVALUATION COMMERCIAL ITEMS

The mock task order shall be evaluated to determine if the Offeror provides a sound, compliant approach that meets the requirements of the specifications and demonstrates a thorough knowledge and understanding of those requirements.

The following factors shall be used to evaluate offers:

Factor 1: Safety Plan Factor 2: Work Plan Factor 3: Price

18.0 EVALUATION FACTORS

Factor 1: SAFETY PLAN: The offeror shall submit a safety plan. The Safety Plan shall be available to all employees and subcontractors working on the task order. The Safety Plan should cover at a minimum:

A. Safety briefings covering the area working in, equipment being used, and any special considerations for the work under the task order.

B. Personal Protective Equipment required for the work under the contract.

C. Weather considerations for the time of year of the contract.

D. Information on back country travel.

E. Communication issues and locations of the nearest medical facilities to the job site.

F. Emergency numbers to contact if an accident happens.

Factor 2: WORK PLAN: The offeror shall submit a work plan. The work plan shall include equipment owned and equipment needed, hiring plan, training plan and the overall project approach, project assumptions and or project risks. The work plan shall not exceed six pages.

Factor 3: PRICE: The offeror shall submit pricing for the mock task order.

This mock task order is part of Evaluation Factor 1: Technical Proposal, Criterion 3-Task

Order and Factor 4: Price Solicitation 140L0622R0018-BLM Central OR Mechanical Hazardous Fuels.

Offeror’s responses to the mock task order evaluation factors shall be included with the offeror’s technical proposal (Volume I1) and price (Volume V) for Solicitation 140L0622R0018.

39-11E-26.0 Bryant Mountain

John McFall Reservoir

T40S R12E

0 0.40.2 Miles

USDI/BLM KLMATH FALLS RESOURCE AREA

T40S R12E, Section 2 T40S R12E, Section 3 T40S R12E, Section 10 T40S R12E, Section 11 UNIT NAME: Mock TO Bryant

CONTRACT #:

TASK ORDER #:

ITEM #:

5C-Slashbusting 94 ac.

7B- Mowing 15 ac.

DATE: June 22, 2022

Ü

Legend Slashbusting Level 3 Roadside Mowing Level 2 Section township/range

Ownership BLM Lands State Lands Private Lands

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources and may be updated without notification.

Prepared By: jpyle Current Date: 06/22/2022 02:22:04 PM

-11E-26.0

Brya nt

Mou nt ain

T41S R13E

0 0.50.25 Miles

USDI/BLM KLMATH FALLS RESOURCE AREA

T41S R13E, Section 17 T41S R13E, Section 18 T41S R13E, Section 19 T41S R13E, Section 20 UNIT NAME: Mock TO Bryant

CONTRACT #:

TASK ORDER #:

ITEM #:

4C-Mecahnical Piling Level 3 91 ac.

2C- Mechanical Sever and piling Level 3 170 ac.

9A- Forwarding Level 1 23ac.

DATE: June 22, 2022

Ü

Legend Mechanical_pile_level_3 Mechanical_sever_pile_level_3 Forwarding_level_1 2018_Bryant_Taskoreder 2018_Bryant_Juniper_FINAL Section township/range

Ownership BLM Lands State Lands Private Lands

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources and may be updated without notification.

Prepared By: jpyle Current Date: 06/22/2022 02:22:04 PM

T13S R42ET13S R41E

T12S R42ET12S R41E

1813 16

3231 3336

1924 21

20 20

BRUSH SPRAY SPRING

COTTONWOOD CREEK SPRING

SOUTH BRIDGEPORT

PEDRO MOUNTAIN

MORMON BASIN

DEVILS CANYON

LOG CREEK

BRINKER CREEK

SOUTH BRIDGEPORT

BRUSH SPRAY

THORNTON

MORMON BASIN

PEDRO

DEVILS CANYON

LOG CREEK

BRINKER CREEK

ELDORADO

ROOSTER COMB

North Fork Dixie Creek

Clarks Ck Rd

Burnt Cabin

Cave Creek

Tater Patch Spur

Tub Spring

Sunday Hill

French Gulch

Tuesday Gulch

Sampson Gulch

Brinker Creek

Glengarry Gulch Puget Sound Gulch

Cottonwood Spring

Brush Spray Spring

Overshot Group Mine

Monohon Tunnel Mine

Legend County route Bureau of Land Management Not Known Clark_Creek_Springs Rivers Creeks

Juniper_Treatments Mech_Type, Tree_Type

Machine Piling, Juniper = 1,013 ac Bureau of Land Management Private

0 480 960240 Meters

0 0.3 0.60.15 Miles

6/23/2022 No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data of individual or aggregate use with other data.

Original data were complied from various sources.

This information may not meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notificiation.

OREGONOREGON

P:\val\Projects\MormonBasin_PedroMt_Fuels_EA\Implementation\Data\Treatments\2023\Clarks_Creek_JUOC_20190219\MXDs\8x11_port_Clarks_Creek_Machine_Pile_JUCO_20220228.mxd

Clarks Creek JUOC Treatments Juniper Machine Piling 1,013 acres

Total acres = 1,013 acres

U.S. Department of Interior Bureau of Land Management

Vale District

Durkee

Weatherby

Baker City

Pleasant Valley

Legend Juniper_Treatments Mech_Type, Tree_Type

Machine Piling, Juniper = 1,013 ac Bureau of Land Management Private

0 3,800 7,6001,900 Meters

0 2 41 Miles

6/23/2022 No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data of individual or aggregate use with other data.

Original data were complied from various sources.

This information may not meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notificiation.

OREGONOREGON

P:\val\Projects\MormonBasin_PedroMt_Fuels_EA\Implementation\Data\Treatments\2023\Clarks_Creek_JUOC_20190219\MXDs\8x11_port_Clarks_Creek_Machine_Pile_Vicinity_Map_20220228.mxd

Clarks Creek JUOC Treatments Juniper Machine Piling 1,013 acres

Total acres = 1,013 acres

U.S. Department of Interior Bureau of Land Management

Vale District

Treatment Area

Rome

Burns Junction

Red Hills

Lava Butte

Black Hills

Black Butte

Scott Butte

Coyote Butte

Bowden Hills

Garlow Butte

Grahams Hill

Owyhee Butte

Saddle Butte

Clarks Butte

Deadman Butte

Jackies Butte

Mustang Butte

Iron Mountain

Round Mountain

Threemile Hill

Grassy Mountain

Water Hole Butte

Mouse Trap Butte

Dead Horse Butte

Little Owyhee Butte

Little Grassy Mountain

4828 5038

46524229

42654211

4233 4600

47464641

Legend Treatment Area - 8,710 acres Rivers Creeks Wilderness Study Area Bureau of Land Management Private State Lands

0 8,000 16,0004,000 Meters

0 5 102.5 Miles

6/24/2022 No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data of individual or aggregate use with other data.

Original data were complied from various sources.

This information may not meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notificiation.

U.S. Department of Interior Bureau of Land Management

Vale District

P:\val\Projects\Rome_WUI_2006_CX\Implementation\Data\Treatments\2022\MXDs\8x11_port_Jackies_Butte_Mock_Mowing_TO_20220216.mxd

Jackie's Butte Fuel Breaks

Questions answered on July 14, 2022
B08 Attachment 7 - Central OR Mechanical Mock Task order 140L0622R0018-revised
B08 Attachment 7 -Central OR Mechanical Mock Task order 140L0622R0018 revised
CENTRAL OREGON
REVISED July 14, 2022
1 SCOPE
1.1 Specifications-Mowing
2. SCOPE
2.1 Specifications-Hand Sever and Mechanical Pile (Track Mounted Swing)
11 GOVERNMENT FURNISHED PROPERTY
12 CONTRACTOR FURNISHED PROPERTY
16 BLM CONTACTS
B08 Attachment 7 Bryant Mtn Mow_slashbust_Map
B08 Attachment 7-Bryants Mtn Map
B08 Attachment 7-Clarks_Creek_Machine_Pile Map
B08 Attachment 7-Clarks_Creek_Machine_Pile_Vicinity_Map_20220228
B08 Attachment 7-Jackies_Butte Map