About this file

This solicitation describes a federal contract opportunity to construct a new Hydrologic Instrumentation Facility (HIF) for the U.S. Geological Survey. The project magnitude is estimated between $30-40 million. Proposals are being requested under Solicitation 140G0121R0015, which will be posted on Fedbizopps.gov and FedConnect.net on or about May 14, 2021. The facility will replace an existing HIF located at NASA Stennis Space Center in Mississippi and provide new capabilities to meet the needs of the Next Generation USGS Water Observing System. The HIF provides hydrologic instrumentation, equipment services, sales, rentals, servicing, and evaluation and development of new instrument technologies for the Water Resources Mission Area and numerous federal partners. The solicitation will utilize full and open competition procedures. The NAICS code is 236220 with a small business size standard of $39.5 million. Interested offerors are responsible for monitoring the posting sites for release of the solicitation and any amendments.

View the file

Other files for this federal contract opportunity

Other files attached to HIF CONSTRUCTION, newest first.
File Type Posted
Attachment_C_Price_Breakout_0011.xlsx XLSX spreadsheet
Sol_140G0121R0015_Amd_0011.pdf PDF
Attachment_P_Questions_Responses_0010_0010.xlsx XLSX spreadsheet
Sol_140G0121R0015_Amd_0010.pdf PDF
Attachment_U_Unit_Price_Schedule_0010.xlsx XLSX spreadsheet
Sol_140G0121R0015_Amd_0009.pdf PDF
Attachment_P_Questions_Responses_0008_0008.xlsx XLSX spreadsheet
Sol_140G0121R0015_Amd_0008.pdf PDF
Attachment_P_Questions_Responses_0007_0007.xlsx XLSX spreadsheet
Attachment_S_Addendum_2_0007.pdf PDF
Sol_140G0121R0015_Amd_0007.pdf PDF
Sol_140G0121R0015_Amd_0006.pdf PDF
Attachment_R_Addendum_1_0006.pdf PDF
Attachment_R_Addendum_1_0005.pdf PDF
Attachment_P_Questions_Responses_0005_0005.xlsx XLSX spreadsheet
Sol_140G0121R0015_Amd_0005.pdf PDF
Attachment_P_Questions_Responses_0004_0004.xlsx XLSX spreadsheet
Attachment_Q_Site_Visit_Sign-In_Sheet_0004.pdf PDF
Sol_140G0121R0015_Amd_0004.pdf PDF
Attachment_N_Interested_Parties_List_0003.xlsx XLSX spreadsheet
Attachment_O_Questions_Responses_0003_0003.docx DOCX document
Sol_140G0121R0015_Amd_0003.pdf PDF
Sol_140G0121R0015_Amd_0002.pdf PDF
Attachment_O_Questions_Responses_0002_0002.docx DOCX document
Sol_140G0121R0015_Amd_0001.pdf PDF
Attachment_N_Interested_Parties_List.xlsx XLSX spreadsheet
Attachment_M_Sample_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_F_Bid_Bond_SF24.pdf PDF
Attachment_E_AL_Dept_of_Revenue_Purch_Agent_Appt_ST_PAA-1.pdf PDF
Attachment_C_Price_Breakout.xlsx XLSX spreadsheet
Attachment_B_2_Vol_2_Drawings.zip ZIP file
Sol_140G0121R0015.pdf PDF
Attachment_L_Past_Performance_Questionnaire.doc DOC document
Attachment_J_Payroll_WH-347.pdf PDF
Attachment_I_Statement_and_Acknowledgement_of_Subcontractor_SF1413.pdf PDF
Attachment_B_1_Vol_I_Drawings.zip ZIP file
Attachment_B_3_Vol_3_Drawings.zip ZIP file
Attachment_B_4_Vol_4_Drawings.zip ZIP file
Attachment_K_Release_of_Claims.pdf PDF
Attachment_H_Performance_Bond_SF25.pdf PDF
Attachment_G_Payment_Bond_SF25A.pdf PDF
Attachment_D_Wage_Decision_AL20210098.pdf PDF
Attachment_A_Specification.zip ZIP file
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice. Properly destroy documents when no longer needed.

Addendum No. 3

Hydrologic Instrumentation Facility (HIF) Construction Documents Submission

US Geological Survey University of Alabama; Tuscaloosa, AL August 18, 2021

Addendum No. 3 ms2097 29435.01.00

ADDENDUM NO. 3

August 18, 2021

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

CONSTRUCTION DOCUMENTS SUBMISSION

US GEOLOGICAL SURVEY

UNIVERSITY OF ALABAMA; TUSCALOOSA, AL

1. SECTION 04 40 00 - STONE ASSEMBLIES

Add Section 04 40 00, pages 1 through 6, attached hereto.

2. DRAWINGS

The following Drawings have been revised, as indicated by revision number, and are reissued herewith:

Drawing No. Title Rev. No.

GENERAL

G001 SHEET INDEX 3

G002 SHEET INDEX 3

VOLUME 1

LANDSCAPE

L-07 LANDSCAPE PLAN - DETAILS 2

VOLUME 3

PLUMBING

P300 PLUMBING SECTIONS 0

P301 PLUMBING SECTIONS 0

P302 PLUMBING SECTIONS 0

P303 PLUMBING SECTIONS 0

P602 PLUMBING SCHEDULES 2

END OF ADDENDUM NO. 3

1) C. Chamberlin, T. Hickey, R. Duzan

2) R. McReynolds

29435.01.00 STONE ASSEMBLIES

ms2097 SECTION 04 40 00 - Page 1

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Limestone veneer and trim

B. Anchored and supports

C. Accessories.

1.02 RELATED REQUIREMENTS

A. Section 04 05 00 – Common Work Results for Masonry.

B. Section 07 11 00 – Dampproofing.

C. Section 07 27 26 – Fluid-Applied Membrane Air Barriers.

D. Section 07 60 00 – Flashing and Sheet Metal.

E. Section 07 90 00 – Joint Protection.

1.03 COORDINATION

A. Coordinate stonework with masonry veneer, metal frames backup, installation of window and door anchors.

1.04 PREINSTALLATION MEETING

A. Convene minimum 1 week prior to commencing work of this section.

1.05 SUBMITTALS

A. Product Data: Submit data for limestone units, wall ties, anchors, and other accessories.

B. Quality assurance data:

1. Submit design calculations for anchors and lintels.

2. Manufacturer’s certificate: Certify products meet or exceed specified requirements.

1.06 ACTION SUBMITTALS

A. Shop Drawings:

1. Indicate stonework layout, profile, cross-sections, exposed faces, joint arrangement, and anchoring methods, anchors.

2. Indicate stonework types and location.

B. Samples:

1. Submit 2 of each stonework item, 12” x 12” in size illustration profiles, finish, texture and color range.

2. Submit 1 full size sample of entablature for approval.

3. Submit 2 of each anchor and illustrating material, configuration, and finish.

STONE ASSEMBLIES 29435.01.00

Page 2 - SECTION 04 40 00 ms2097

1.07 SUSTAINABLE DESIGN SUBMITTALS

A. Product Data.

1. Recycled content:

a. Indicate recycled content; indicate percentage of pre-consumer and post-consumer recycled content per unit of product.

b. If recycled content product is part of assembly, indicate percentage of recycled content product in assembly by weight.

c. Submit environmental data in accordance with Table 1 of ASTM E2129 for products provided under work of this Section.

B. Manufacturer's certificate: Certify products meet or exceed specified sustainable design requirements.

1.08 PROJECT CONDITIONS

A. Protection of Stonework: During construction, cover tops of walls, projections, and sills with waterproof sheeting at end of each day's work.

B. Cold-Weather Requirements: Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen substrates. Comply with cold-weather construction requirements contained in ACI 530.1/ASCE 6/TMS 602.

1. Cold-Weather Cleaning: Use liquid cleaning methods only when air temperature is 40⁰F and above and will remain so until masonry has dried.

C. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in

ACI 530.1/ASCE 6/TMS 602.

1.09 QUALITY ASSURANCE

A. Single Source Responsibility for Mortar Materials:

1. Obtain mortar ingredients of uniform quality and from one manufacturer for each cementitious and admixture component and from one source or producer for each aggregate.

B. Single source Responsibility for Other Materials:

1. Obtain each type of stone accessory, sealants, and other materials from one manufacturer for each product.

C. Information on Drawings and in Specifications establishes requirements for both aesthetic effects and performance of the limestone cladding. Aesthetic effects are indicated by dimensions, arrangement, alignment and profiles of components and assemblies as they relate to sight lines and relationships to one another and to adjoining work. Performance is indicated by criteria that is subject to verification by either preconstruction or field test, if applicable, or by in service experience.

1. Do not modify intended aesthetic effects, as judged solely by architect, except with architect’s approval and only to the extent exclusively needed to comply with performance requirements.

Where modifications are proposed, submit comprehensive explanatory data to architect for review and approval.

D. Installer Qualifications: Engage an installer with not less than 10 years experience and who has successfully completed stonework similar in material, design and extent to that indicated for this project. Submit list of completed projects; include project names, addresses, and names of architects and owners.

E. Preconstruction Tests: Contractor shall obtain material tests as noted below:

1. Preconstruction Testing Service: Contractor shall employ and pay qualified independent testing laboratories to perform preconstruction testing indicated.

ms2097 SECTION 04 40 00 - Page 3

a. Test limestone for compliance with physical property requirements for Limestone Building Stone, Type II, as listed in ASTM C568. Conduct tests using specimens randomly selected from, and representative of, actual materials proposed for incorporation in the work.

b. The following test reports shall be submitted:

1) ASTM C99 Modulus of Rupture

2) ASTM C170 Compressive Strength

F. Sustainable design requirements:

1. Products shall meet the following requirements where applicable:

a. RCRA section 6002.

b. FSRIA section 9002

c. GSA Green Procurement Compilation as applicable.

2. Products shall avoid use of ozone depleting compounds (ODC) and high global warming potential (GWP) chemicals.

G. Field Constructed Mock-up:

1. Construct mockup 4’-0” x 4’-0”, including veneer wall panels, lintel, sill and stonework units with mortar, sealant and other accessories.

2. Obtain Engineer’s approval of mockup prior to proceeding with Work.

3. Incorporate accepted mockup as part of Work.

4. Remove mockup when directed by Engineer, Owner.

1.10 DELIVERY, STORAGE AND HANDLING

A. Accept stonework on site in manufacturer’s protective packaging. Inspect for damage.

B. Store stonework on site covered and elevated above grade. Protect stonework from damage, soiling, and staining.

PART 2 PRODUCTS

2.01 MATERIALS

A. Provide stone from single quarry.

2.02 LIMESTONE

A. Comply with ASTM C568.

B. Manufacturer: Indiana Limestone or equal

C. Finish Indiana Limestone to match approved samples and/or mock-up for type, variety, grade, and color.

D. Color: Buff gray.

2.03 DESIGN REQUIREMENTS

A. Wind loads: Design anchors to withstand positive and negative wind loads acting normal to plane of wall, including increased loads at building corners.

1. Design wind load: As calculated in accordance with applicable code and ASCE 7 with 115 mph basic wind speed, Exposure C.

B. Design anchor attachment to limestone with factor of safety of 5:1.

C. Design each individual anchor with factor of safety in vertical dead-load-bearing direction of 4:1 and in horizontal lateral-load-bearing direction of 2:1.

Page 4 - SECTION 04 40 00 ms2097

D. Design lintels to resist dead loads with 1/360 maximum deflection. Dead loads: Actual weight of materials incorporated into Work.

2.04 COMPONENTS

A. Portland cement: ASTM C150, Type I - Normal or Type III - High Early Strength; gray color.

B. Coarse aggregates: ASTM C33, except grading requirements; granite, quartz or limestone.

C. Fine aggregates: ASTM C33, except grading requirements; manufactured or natural sand.

D. Colors: ASTM C979; inorganic iron oxide pigments.

E. Admixtures: ASTM C494.

F. Fly ash: ASTM C618.

G. Water: Potable.

H. Reinforcing steel: type, specified in Section 03 20 00. Use galvanized or epoxy finish when concrete cover for reinforcing is less than 1-1/2” thick to protect reinforcing from corrosion.

2.05 ACCESSORIES

A. Wall ties: Formed steel wire, 9-gage/ minimum, adjustable, eye and pintle type, hot dip galvanized to ASTM A153/A153M B2 finish.

B. Anchors and supports: Stainless steel, ASTM A666, Type 304.

C. Sizes and configurations: As required for vertical and horizontal support of limestone and resisting specified loads.

D. Mortar: As specified in Section 04 05 00.

E. Flashings: As specified in Section 07 60 00.

F. Copper/kraft paper flashings: 5 oz/sq ft rolled sheet copper bonded to fiber reinforced asphalt treated Kraft paper; manufactured by Spycor Building Products.

G. Copper: ASTM B370, cold rolled 20 oz/sq ft thick; natural finish.

H. Pre-coated galvanized steel: ASTM A653/A653M, G90 (Z275); gage core steel, shop pre-coated with galvanizing coating of color as selected.

I. Galvanized steel: ASTM A653/A653M, G90 (Z275) finish, 24 gage core steel.

J. Stainless steel: ASTM A666, Type 304, soft temper; smooth finish.

K. Self-adhering flashing.

L. Sealant: Type specified in Section 07 90 00 color as selected to match limestone color.

M. Weeps: cotton wick filled vents with cotton.

N. Cavity vents: Aluminum, insect resistant.

O. Cleaning solution: Consult limestone manufacturer for recommended cleaning materials and methods.

ms2097 SECTION 04 40 00 - Page 5

2.06 MORTAR MATERIALS

A. Portland Cement: ASTM C150, Type I or II, except Type III may be used for cold-weather construction. Provide natural color or white cement as required to produce mortar color indicated.

1. Low-Alkali Cement: Not more than 0.60 percent total alkali when tested according to ASTM C114.

B. Hydrated Lime: ASTM C 207, Type S. Aggregate: ASTM C144 and as follows:

C. Colored Aggregates: Natural-colored sand or ground marble, granite, or other sound stone; of color necessary to produce required mortar

2.07 FABRICATION

A. Cut stone to produce pieces of thickness, size, and shape indicated, or required and within fabrication tolerances recommended by ILIA including details on Drawings. Dress joints (bed and vertical) straight and at right angle to face unless otherwise indicated.

B. Fabricate stonework in sizes and shapes required to comply with the requirements as shown on approved drawings.

C. Comply with recommendations of the Indiana Limestone Institute of America, Inc. (ILIA) as published in the Indiana Limestone Handbook (latest edition).

PART 3 EXECUTION

3.01 PREPARATION

A. Examine surfaces to receive stonework and conditions under which stonework will be installed and report in writing any conditions which are not in compliance with requirements. Do not proceed with installation until surfaces and conditions comply with requirements indicated in specifications or elsewhere for execution of other work which affects stonework.

B. Coat concrete and unit masonry backup with asphalt damp proofing and or fluid applied vapor barrier.

3.02 SETTING OF STONEWORK, GENERAL

A. Sort stone before it is placed in wall to remove stone that does not comply with requirements relating to aesthetic effects, physical properties, or fabrication, or that is otherwise unsuitable for intended use.

B. Arrange stones with color and size variations uniformly dispersed for an evenly blended appearance.

C. Maintain uniform joint widths except for variations due to different stone sizes and where minor variations are required to maintain bond alignment if any. Lay walls with joints not less than 3/8” at narrowest points or more than 5/8” at widest points.

D. Set stone to comply with requirements indicated on Drawings and shop drawings. Install supports, fasteners, and other attachments indicated or necessary to secure stone masonry in place. Set stone accurately in locations indicated with edges and faces aligned according to established relationships and indicated tolerances

3.03 CONSTRUCTION TOLERANCES

A. Variation from Plumb: For vertical lines and surfaces, do not exceed 1/4" in 10’ or more. For external corners, expansion joints, control joints, and other conspicuous lines, do not exceed 1/4” in 20’ or more.

Page 6 - SECTION 04 40 00 ms2097

B. Variation from Level: For bed joints and lines of exposed lintels, sills, parapets, horizontal grooves, and other conspicuous lines, do not exceed 1/4" in 20’ or more.

3.04 ADJUSTING AND CLEANING

A. In-Progress Cleaning: Clean stonework as work progresses. Remove mortar fins and smears before tooling joints.

B. Final Cleaning: After mortar is thoroughly set and cured, clean stonework as follows:

C. Clean limestone masonry to comply with recommendations in ILI's "Indiana Limestone Handbook."

END OF SECTION

1) C. X Hua

2) C. M. Chamberlin

NO. REVISIONS DSGN CHKD APVD DATE

DESIGNED

DRAWN

CHECKED

APPROVED

APPROVED

DATE

SCALE:

NO. REV.

A

B

C

D

E

F

G

A

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

STANLEY CONSULTANTSC

C A

D D

D -R

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com

NOTES:

AT FULL SIZE

1 2 3 IN

1 2 3 4 5 6 7 8 cm

NONE

FINAL CONSTRUCTION DOCUMENTS

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,

PLANS, OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.

Do not remove this notice. Properly destroy documents when no longer needed.

USGS

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

TUSCALOOSA, AL.

29435.01

G001

C.X. HUA

D.M. SMITH

J.L. OLSON

APRIL 26, 2021

R.L. MCREYNOLDS

USGS

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

TUSCALOOSA, AL.

SHEET INDEX

GENERAL

CXH JLO RLM

CXH JLO RLM

CXH JLO RLM

SHEET INDEX:

ARCHITECTURALSTRUCTURAL

GENERAL

G000 COVER SHEET

G001 SHEET INDEX

G002 SHEET INDEX

G003 ABBREVIATIONS

G004 ABBREVIATIONS

G005 GENERAL LEGEND

G006 MOUNTING HEIGHTS

A300 BUILDING SECTIONS

A301 BUILDING SECTIONS

A302 BUILDING SECTIONS

A303 BUILDING SECTIONS

A304 BUILDING SECTIONS

A305 BUILDING SECTIONS

A306 WALL SECTIONS

A307 WALL SECTIONS

A308 WALL SECTIONS

A309 WALL SECTIONS

A310 WALL SECTIONS

A311 WALL SECTIONS AND DETAILS

A400 ENLARGED FLOOR PLANS

A401 ENLARGED FLOOR PLANS

A403 ENLARGED FLOOR PLANS

A404 INTERIOR ELEVATIONS

A405 INTERIOR ELEVATIONS

A407 INTERIOR ELEVATIONS

A500 DETAILS

A501 DETAILS

A502 DETAILS

A503 DETAILS

A504 DETAILS

A505 DETAILS

A506 DETAILS

A507 DETAILS

A508 DETAILS

A509 DETAILS

A510 DETAILS

A511 DETAILS

A512 DETAILS

A513 DETAILS

A514 DETAILS

A515 DETAILS

A516 DETAILS

A517 DETAILS

A600 DOOR SCHEDULE AND ELEVATIONS

A601 WINDOW SCHEDULE AND ELEVATIONS

A701 LEVEL 1 - REFLECTED CEILING PLAN

A701A LEVEL 1 - REFLECTED CEILING PLAN

A701B LEVEL 1 - REFLECTED CEILING PLAN

A701C LEVEL 1 - REFLECTED CEILING PLAN

A701D LEVEL 1 - REFLECTED CEILING PLAN

A701E LEVEL 1 - REFLECTED CEILING PLAN

A701F LEVEL 1 - REFLECTED CEILING PLAN

A702 LEVEL 2 - REFLECTED CEILING PLAN

A702A LEVEL 2 - REFLECTED CEILING PLAN

A702B LEVEL 2 - REFLECTED CEILING PLAN

A702D LEVEL 2 - REFLECTED CEILING PLAN

A101 LEVEL 1 - FLOOR PLAN

A101A LEVEL 1 - FLOOR PLAN

A101B LEVEL 1 - FLOOR PLAN

A101C LEVEL 1 - FLOOR PLAN

A101D LEVEL 1 - FLOOR PLAN

A101E LEVEL 1 - FLOOR PLAN

A101F LEVEL 1 - FLOOR PLAN

A102 LEVEL 2 - FLOOR PLAN

A102A LEVEL 2 - FLOOR PLAN

A102B LEVEL 2 - FLOOR PLAN

A102D LEVEL 2 - FLOOR PLAN

A102E LEVEL 2 - FLOOR PLAN

A103 CATWALK PLAN AND DETAILS

A104 CLERESTORY PLAN

A105 ROOF PLAN

A106 ROOF PLAN AREA A AND AREA D

A107 ROOF PLAN AREA B AND AREA E

A108 ROOF PLAN AREA C AND AREA F

A109 CANOPY PLAN

A200 BUILDING ELEVATIONS

A201 BUILDING ELEVATIONS - SOUTH ENLARGED

A202 BUILDING ELEVATIONS - SOUTH ENLARGED

A203 BUILDING ELEVATIONS - NORTH ENLARGED

A204 BUILDING ELEVATIONS - NORTH ENLARGED

A205 BUILDING ELEVATIONS - EAST ENLARGED

A206 BUILDING ELEVATIONS - WEST ENLARGED

A207 BUILDING ELEVATIONS - CLERESTORY

A208 BUILDING ELEVATIONS - CLERESTORY

V100 SURVEY EXISTING CONDITIONS KEY PLAN SHEET 1

V101 SURVEY EXISTING CONDITIONS NOTES SHEET 2

V102 SURVEY EXISTING CONDITIONS PLAN SHEET 3

V103 SURVEY EXISTING CONDITIONS PLAN SHEET 4

V104 SURVEY EXISTING CONDITIONS PLAN SHEET 5

V105 SURVEY EXISTING CONDITIONS PLAN SHEET 6

V106 SURVEY EXISTING CONDITIONS UTILITY PLAN SHEET 7

V107 SURVEY EXISTING CONDITIONS UTILITY PLAN SHEET 8

V108 SURVEY EXISTING CONDITIONS UTILITY PLAN SHEET 9

V109 SURVEY EXISTING CONDITIONS UTILITY PLAN SHEET 10

C001 CIVIL LEGEND

C100 CIVIL CONSTRUCTION ACCESS ROUTE

CD100 SITE DEMOLITION PLAN

CS100 CIVIL SITE KEYPLAN

CS101 CIVIL SITE PLAN

CS102 CIVIL SITE PLAN

CS103 CIVIL SITE PLAN

CS104 CIVIL SITE PLAN

CS301 CIVIL SITE TYPICAL SECTIONS

CS501 CIVIL SIDEWALK & CURB DETAILS

CS502 CIVIL CURB RAMP DETAILS

CS503 CIVIL SITE FENCING DETAILS

CS504 CIVIL SITE FENCING DETAILS

CS505 CIVIL TRASH/EQUIPMENT ENCLOSURE

CS506 CIVIL SITE ENLARGED PLAN OF EAST TEST AREA

CS507 CIVIL SITE PAVEMENT MARKING DETAILS

CG100 CIVIL GRADING & DRAINAGE KEYPLAN

CG102 CIVIL GRADING & DRAINAGE PLAN

CG103 CIVIL GRADING & DRAINAGE PLAN

CG104 CIVIL GRADING & DRAINAGE PLAN

CG201 CIVIL GRADING PROFILES

CG202 CIVIL GRADING PROFILES

CG301 CIVIL GRADING SECTIONS

CG501 CIVIL SITE GRADING DETAILS

CG502 CIVIL SITE GRADING DETAILS

CG503 MODULAR UNDERGROUND DRAINAGE SYSTEM MODIFICATIONS

CP101 CIVIL JOINT LAYOUT PLAN

CP501 CIVIL PCC JOINT DETAILS

CP502 JOINT SEALANT DETAILS

CP503 WELDED WIRE FABRIC DETAILS

CE101 CIVIL JOINT ELEVATION PLAN

CU100 CIVIL UTILITY KEYPLAN

CU101 CIVIL UTILITY PLAN

CU102 CIVIL UTILITY PLAN

CU103 CIVIL UTILITY PLAN

CU104 CIVIL UTILITY PLAN

CU201 CIVIL UTILITY PROFILES - SEWER

CU202 CIVIL UTILITY PROFILES - WATER

CU501 CIVIL SITE UTILITY DETAILS

CU502 CIVIL SITE UTILITY DETAILS

CU503 CIVIL SITE UTILITY DETAILS

CU504 CIVIL SITE UTILITY DETAILS

CU505 CIVIL SITE UTILITY DETAILS

CU506 CIVIL SITE UTILITY DETAILS

CU507 CIVIL SITE UTILITY DETAILS

A800 FINISH SCHEDULE

A801 FINISH SCHEDULE COLOR LEGEND

A802 FIRST FLOOR FINISH PLAN - COMPOSITE

A803 FIRST FLOOR FINISH PLAN - BLOCK A

A804 FIRST FLOOR FINISH PLAN - BLOCK B

A805 FIRST FLOOR FINISH PLAN - BLOCK C

A806 FIRST FLOOR FINISH PLAN - BLOCK D

A807 FIRST FLOOR FINISH PLAN - BLOCK E

A808 FIRST FLOOR FINISH PLAN - BLOCK F

A809 SECOND FLOOR FINISH PLAN - COMPOSITE

A810 SECOND FLOOR FINISH PLAN - BLOCK A

A811 SECOND FLOOR FINISH PLAN - BLOCK B

A812 SECOND FLOOR FINISH PLAN - BLOCK D

A813 SECOND FLOOR FINISH PLAN - BLOCK E

A814 SECOND FLOOR FINISH PLAN - BLOCK F

A815 INTERIOR ELEVATIONS - LOBBY AND BREAK

ROOMS

A816 INTERIOR ELEVATIONS-AUDITORIUM

A817 PANEL DETAILS AND CABINET SECTIONS

A818 CUSTOM MILLWORK AND CABINET SECTIONS

A819 FIRST FLOOR SIGNAGE PLAN - AREA A

A820 FIRST FLOOR SIGNAGE PLAN - AREA B

A821 SECOND FLOOR SIGNAGE PLAN - AREA A

A822 SECOND FLOOR SIGNAGE PLAN - AREA B

A823 SIGNAGE SCHEDULE AND DETAILS

A824 SIGNAGE DETAILS

A825 FIRST FLOOR FURNITURE PLAN - COMPOSITE

A826 FIRST FLOOR FURNITURE PLAN - BLOCK A

A827 FIRST FLOOR FURNITURE PLAN - BLOCK B

A828 FIRST FLOOR FURNITURE PLAN - BLOCK C

A829 FIRST FLOOR FURNITURE PLAN - BLOCK D

A830 SECOND FLOOR FURNITURE PLAN -

COMPOSITE

A831 SECOND FLOOR FURNITURE PLAN - BLOCK A

A832 SECOND FLOOR FURNITURE PLAN - BLOCK B

A833 SECOND FLOOR FURNITURE PLAN - BLOCK D

A834 WAREHOUSE EQUIPMENT PLAN

A835 WAREHOUSE EQUIPMENT PLAN

A836 WAREHOUSE EQUIPMENT PLAN

CIVIL

VOLUME ONE VOLUME TWO CONT. VOLUME TWO CONT.

LINER

SSB1 PIPE LOCATION PLAN (FOUNDATION)

SSB2 PIPE VETILATION PLAN (HYDRO LAB & ADMIN BLDG)

SSB3 PIPE VENTILATION PLAN (HYDRO LAB & MECH BLDG)

SSB4 PIPE VENTILATION PLAN (HYDRO LAB & CONF RM)

SSB5 VACUUM MONITORING LOCATION PLAN & DETAILS

SSB6 PIPE VENTILATION PLAN (ROOF)

SSB7 DETAILS

SRW 1.1 RETAINING WALL PROFILE EAST WALL - UPPER

SRW 1.2 RETAINING WALL PROFILE EAST WALL - UPPER

SRW 2.1 RETAINING WALL PROFILE EAST WALL - LOWER

SRW 3.1 RETAINING WALL PROFILE WEST WALL

SRW 3.2 RETAINING WALL PROFILE WEST WALL

DETAILS

STRUCTURAL

VOLUME TWO

ARCHITECTURAL

GENERAL

G000 COVER SHEET

G001 SHEET INDEX

G002 SHEET INDEX

L-01 LANDSCAPE PLAN

L-02 LANDSCAPE PLAN - TRAIL PLAN

L-03 LANDSCAPE PLAN - LEGEND AND NOTES

L-04 LANDSCAPE PLAN - PLANTING DETAILS

L-05 LANDSCAPE PLAN - DETAILS

L-06 LANDSCAPE PLAN - DETAILS

L-07 LANDSCAPE PLAN - DETAILS

LANDSCAPING

1 DESIGN ADDENDUM #1

2 DESIGN ADDENDUM #2

3 DESIGN ADDENDUM #3

JULY 15,2021

JULY 22, 2021

AUG 18, 2021

S102B SECOND LEVEL FRAMING PLAN

S102D SECOND LEVEL FRAMING PLAN

S102E SECOND LEVEL FRAMING PLAN

S103 ROOF FRAMING PLAN

S103A ROOF FRAMING PLAN

S103B ROOF FRAMING PLAN

S103C ROOF FRAMING PLAN

S103D ROOF FRAMIMG PLAN

S103E ROOF FRAMING PLAN

S103F ROOF FRAMING PLAN

S104 SNOW LOADING DIAGRAM

S105 WIND LOAD UPLIFT

S106 MECHANICAL LOADING

S200 ENLARGED CATWALK PLANS AND DETAILS

S201 ENLARGED CATWALK PLANS AND DETAILS

S202 ENLARGED TORNADO SHELTER ROOF PLAN AND

DETAILS

S203 ENLARGED ENTRY CANOPY DOME PLANS AND DETAILS

S301 BRACING ELEVATIONS

S302 BRACING ELEVATIONS

S303 BRACING ELEVATIONS

S304 BRACING ELEVATIONS

S305 BRACING ELEVATION

S401 ENLARGED STAIR PLANS AND SECTIONS

S402 ENLARGED STAIR PLANS AND SECTIONS

S403 ENLARGED STAIR PLANS AND SECTIONS

S530 FOUNDATION DETAILS - SHEET 1

S531 FOUNDATION DETAILS - SHEET 2

S532 FOUNDATION DETAILS - SHEET 3

S533 FOUNDATION DETAILS - SHEET 4

S534 FOUNDATION DETAILS - SHEET 5

S535 FOUNDATION DETAILS - SHEET 6

S536 FOUNDATION DETAILS - SHEET 7

S537 FOUNDATION DETAILS - SHEET 8

S538 FOUNDATION DETAILS - SHEET 9

S539 FOUNDATION DETAILS - SHEET 10

S540 FOUNDATION DETAILS - SHEET 11

S541 FOUNDATION DETAILS - SHEET 12

S542 FOUNDATION DETAILS - SHEET 13

S543 FOUNDATION DETAILS - SHEET 14

S544 FOUNDATION DETAILS - SHEET 15

S545 FOUNDATION DETAILS - SHEET 16

S546 FOUNDATION DETAILS - SHEET 17

S547 FOUNDATION DETAILS - SHEET 18

S548 ENTRY CANOPY FOUNDATION DETAILS

S550 MASONRY DETAILS - SHEET 1

S551 MASONRY DETAILS - SHEET 2

S552 MASONRY DETAILS - SHEET 3

S553 MASONRY DETAILS - SHEET 4

S554 MASONRY DETAILS - SHEET 5

S555 MASONRY DETAILS - SHEET 6

S556 TORNADO SHELTER DETAILS

S560 STEEL DETAILS - SHEET 1

S561 STEEL DETAILS - SHEET 2

S562 STEEL DETAILS - SHEET 3

S563 STEEL DETAILS - SHEET 4

S564 STEEL DETAILS - SHEET 5

S565 STEEL DETAILS - SHEET 6

S566 STEEL DETAILS - SHEET 7

S567 STEEL DETAILS - SHEET 8

S568 STEEL DETAILS - SHEET 9

S569 STEEL DETAILS - SHEET 10

S570 STEEL DETAILS - SHEET 11

S575 STAIR DETAILS - PAN TREADS

S576 STAIR DETAILS - KICK PLATES

S577 STAIR DETAILS-NON-INDUSTRIAL

S580 ENTRY CANOPY STEEL DETAILS - SHEET 1

S581 ENTRY CANOPY STEEL DETAILS - SHEET 2

S582 ENTRY CANOPY STEEL DETAILS - SHEET 3

S001 GENERAL STRUCTURAL NOTES AND LEGEND - SHEET 1

S002 GENERAL STRUCTURAL NOTES AND LEGEND - SHEET 2

S100 FOUNDATION PLAN

S100A FOUNDATION PLAN

S100B FOUNDATION PLAN

S100C FOUNDATION PLAN

S100D FOUNDATION PLAN

S100E FOUNDATION PLAN

S100F FOUNDATION PLAN

S101 FIRST LEVEL SLAB PLAN

S101A FIRST LEVEL SLAB PLAN

S101B FIRST LEVEL SLAB PLAN

S101C FIRST LEVEL SLAB PLAN

S101D FIRST LEVEL SLAB PLAN

S101E FIRST LEVEL SLAB PLAN

S101F FIRST LEVEL SLAB PLAN

S102 SECOND LEVEL FRAMING PLAN

S102A SECOND LEVEL FRAMING PLAN

NO. REVISIONS DSGN CHKD APVD DATE

DESIGNED

DRAWN

CHECKED

APPROVED

APPROVED

DATE

SCALE:

NO. REV.

A

B

C

D

E

F

G

A

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

STANLEY CONSULTANTSC

C A

D D

D -R

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com

NOTES:

AT FULL SIZE

1 2 3 IN

1 2 3 4 5 6 7 8 cm

FINAL CONSTRUCTION DOCUMENTS

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,

PLANS, OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.

Do not remove this notice. Properly destroy documents when no longer needed.

USGS

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

TUSCALOOSA, AL.

29435.01

G002

C.X. HUA

D.M. SMITH

J.L. OLSON

APRIL 26, 2021

R.L. MCREYNOLDS

USGS

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

TUSCALOOSA, AL.

SHEET INDEX

GENERAL

CXH JLO RLM

CXH JLO RLM

CXH JLO RLM

QL001 ABBREVIATIONS AND NOTES

QL002 LEGENDS

QL101 FIRST FLOOR OVERALL LAB PLAN

QL102 SECOND FLOOR OVERALL LAB PLAN

QL401 ENLARGED PLAN - WET TRAINING

QL402 ENLARGED PLAN - WATER QUALITY, ENV RM, & PT LAB

QL403 ENLARGED PLAN - ELECTRONICS REPAIR & CLEAN SHOP

QL404 ENLARGED PLAN - SENSOR INNOVATION LAB

QL407 ENLARGED PLAN - WAREHOUSE, SHIPPING, & DECON

QL408 ENLARGED PLAN - HYDRAULIC LAB

QL409 ENLARGED PLAN - HYDRAULIC LAB (CONTINUED)

QL421 ENLARGED PLAN - DRY TRAINING AND STORAGE/PREP

QL451 INTERIOR ELEVATIONS

QL452 INTERIOR ELEVATIONS

QL453 INTERIOR ELEVATIONS

QL460 HYDRAULIC LAB SECTIONS - EAST AND WEST

QL461 HYDRAULIC LAB SECTIONS - NORTH AND SOUTH

QL501 TYPICAL LABORATORY CASEWORK SECTIONS

QL502 LABORATORY DETAILS

QL503 LABORATORY DETAILS

QL504 LABORATORY DETAILS

QL505 ENVIRONMENTAL ROOM DETAILS

QL601 LABORATORY EQUIPMENT MATRIX

QL602 LABORATORY EQUIPMENT MATRIX (CONTINUED)

QL610 SCHEDULES

QL611 SCHEDULES

QL630 LAB CASEWORK TYPES, LEGENDS AND NOTES

M704 DIGITAL CONTROLS

M705 DIGITAL CONTROLS

M706 DIGITAL CONTROLS

M707 DIGITAL CONTROLS

M708 DIGITAL CONTROLS

M709 DIGITAL CONTROLS

M710 DIGITAL CONTROLS

M711 DIGITAL CONTROLS

M712 DIGITAL CONTROLS

M713 DIGITAL CONTROLS

M714 DIGITAL CONTROLS

M715 DIGITAL CONTROLS

M716 DIGITAL CONTROLS

M717 NETWORK DIAGRAM

M000 LEGEND

M001 LEGEND

M101 FIRST LEVEL HVAC DUCTWORK OVERALL

M101A FIRST LEVEL HVAC DUCTWORK

M101B FIRST LEVEL HVAC DUCTWORK

M101C FIRST LEVEL HVAC DUCTWORK

M101D FIRST LEVEL HVAC DUCTWORK

M101E FIRST LEVEL HVAC DUCTWORK

M101F FIRST LEVEL HVAC DUCTWORK

M102 SECOND LEVEL HVAC DUCTWORK OVERALL

M102A SECOND LEVEL HVAC DUCTWORK

M102B SECOND LEVEL HVAC DUCTWORK

M102D SECOND LEVEL HVAC DUCTWORK

M102E SECOND LEVEL HVAC DUCTWORK

M102F SECOND LEVEL HVAC DUCTWORK

M103 ROOFTOP HVAC DUCTWORK OVERALL

M201 FIRST LEVEL HVAC PIPING - OVERALL PLAN

M201A HVAC PIPING FIRST LEVEL

M201B HVAC PIPING FIRST LEVEL

M201C HVAC PIPING FIRST LEVEL

M201D HVAC PIPING FIRST LEVEL

M201F HVAC PIPING FIRST LEVEL

M202 HVAC PIPING SECOND LEVEL OVERALL PLAN

M202A HVAC PIPING SECOND LEVEL

M202B HVAC PIPING SECOND LEVEL

M202D HVAC PIPING SECOND LEVEL

M202E HVAC PIPING SECOND LEVEL

M202F HVAC PIPING SECOND LEVEL

M300 MECHANICAL YARD PLAN VIEW

M301 EMERGENCY STORM SHELTER PLAN

M302 BOILER ROOM ENLARGED DUCTWORK PLAN

M303 BOILER ROOM ENLARGED PIPING PLAN

M401 BOILER ROOM SECTIONS

M402 EMERGENCY MECHANICAL ROOM SECTIONS

M403 COMM CABINET SECTIONS

M500 HVAC DETAILS

M501 HVAC DETAILS

M502 HVAC DETAILS

M503 HVAC DETAILS

M601 HVAC SCHEDULES - SHEET 1

M602 HVAC SCHEDULES - SHEET 2

M603 HVAC SCHEDULES - SHEET 3

M604 HVAC SCHEDULES - SHEET 4

M605 HVAC SCHEDULES - SHEET 5

M606 VENTILATION SCHEDULE

M700 DIGITAL CONTROLS

M701 DIGITAL CONTROLS

M702 DIGITAL CONTROLS

M702A DIGITAL CONTROLS

M703 DIGITAL CONTROLS

P101 FIRST FLOOR DOMESTIC PIPING PLAN OVERALL

P101A FIRST FLOOR DOMESTIC PIPING PLAN AREA 'A'

P101B FIRST FLOOR DOMESTIC PIPING PLAN AREA 'B'

P101C FIRST FLOOR DOMESTIC PIPING PLAN AREA 'C'

P101D FIRST FLOOR DOMESTIC PIPING PLAN AREA 'D'

P101E FIRST FLOOR DOMESTIC PIPING PLAN AREA 'E'

P101F FIRST FLOOR DOMESTIC PIPING PLAN AREA 'F'

P102 SECOND FLOOR DOMESTIC PIPING PLAN OVERALL

P102A SECOND FLOOR DOMESTIC PIPING PLAN AREA 'A'

P102B SECOND FLOOR DOMESTIC PIPING PLAN AREA 'B'

P102C SECOND FLOOR DOMESTIC PIPING PLAN AREA 'C'

P102D SECOND FLOOR DOMESTIC PIPING PLAN AREA 'D'

P102E SECOND FLOOR DOMESTIC PIPING PLAN AREA 'E'

P102F SECOND FLOOR DOMESTIC PIPING PLAN AREA 'F'

P103 FIRST FLOOR SANITARY PLUMBING PLAN OVERALL

P103A FIRST FLOOR SANITARY PLUMBING PLAN AREA 'A'

P103B FIRST FLOOR SANITARY PLUMBING PLAN AREA 'B'

P103C FIRST FLOOR SANITARY PLUMBING PLAN AREA 'C'

P103D FIRST FLOOR SANITARY PLUMBING PLAN AREA 'D'

P103E FIRST FLOOR SANITARY PLUMBING PLAN AREA 'E'

P103F FIRST FLOOR SANITARY PLUMBING PLAN AREA 'F'

P104 SECOND FLOOR SANITARY PLUMBING PLAN OVERALL

P104A SECOND FLOOR SANITARY PLUMBING PLAN AREA 'A'

P104B SECOND FLOOR SANITARY PLUMBING PLAN AREA 'B'

P104D SECOND FLOOR SANITARY PLUMBING PLAN AREA 'D'

P105 OVERALL LAB PLAN

P106 COMPRESSED AIR PLAN

P107 COMPRESSED AIR - COMPRESSOR ROOM

P108 DRAINS - OVERALL PLAN

P109 DRAINS - WEST LAB

P110 DRAINS - EAST LAB

P111 DRAINS - ROOF

P300 SECTIONS

P301 SECTIONS

P302 SECTIONS

P303 SECTIONS

P401 ENLARGED FIRST FLOOR DOMESTIC PIPING PLAN AREA 'A'

P402 ENLARGED FIRST FLOOR DOMESTIC PIPING PLAN AREA 'C'

P403 ENLARGED SECOND FLOOR DOMESTIC PIPING PLAN AREAS A & B

P404 ENLARGED SECOND FLOOR DOMESTIC PIPING PLAN AREA 'D'

AND 'F'

P405 ENLARGED FIRST FLOOR SANITARY PLUMBING PLAN AREA 'A'

P501 MISCELLANEOUS PIPING DETAILS

P502 MISCELLANEOUS PIPING DETAILS

P601 SCHEDULES

P602 SCHEDULES

T001 LEGEND, ABBREVIATIONS, AND GENERAL NOTES

T100 ROOM BOUNDARIES AND CABLE TRAY PLANS

T101A FIRST FLOOR PLAN

T101B FIRST FLOOR PLAN

T101C FIRST FLOOR PLAN

T101D FIRST FLOOR PLAN

T101E FIRST FLOOR PLAN

T101F FIRST FLOOR PLAN

T201A SECOND FLOOR PLAN

T201B SECOND FLOOR PLAN

T201C SECOND FLOOR PLAN

T201D SECOND FLOOR PLAN

T201E SECOND FLOOR PLAN

T201F SECOND FLOOR PLAN

T300 TELECOM SITE PLAN

T400 ENLARGED PLANS - SHEET 1

T401 ENLARGED PLANS - SHEET 2

T402 ENLARGED PLAN - SHEET 3

T501 DETAILS - SHEET 1

T502 DETAILS - SHEET 2

T503 DETAILS - SHEET 3

T504 DETAILS - SHEET 4

T505 DETAILS - SHEET 5

T506 DETAILS - SHEET 6

T507 DETAILS - SHEET 7

T508 DETAILS - SHEET 8

T509 DETAILS - SHEET 9

T510 DETAILS - SHEET 10

T600 TELECOM SCHEMATIC DIAGRAM

T601 TELECOM AND SECURITY DATA SWITCHES

T602 TELECOM GROUNDING SCHEMATIC DIAGRAM

T603 ACCESS CONTROL SCHEMATIC DIAGRAM

T604 INTRUSION DETECTION SCHEMATIC DIAGRAM

T605 CABINET ELEVATIONS - SHEET 1

T606 CABINET ELEVATIONS - SHEET 2

T607 CABINET ELEVATIONS - SHEET 3

T608 CABINET ELEVATIONS -SHEET 3

VOLUME THREE CONT. VOLUME THREE CONT.

MECHANICAL

PLUMBING

ELECTRICAL

AV001 AV SYMBOL LEGEND

AV002 AV INSTALLATION DETAILS

AV101A LEVEL 1 DEVICE PLAN AREA A

AV101B LEVEL 1 DEVICE PLAN AREA B

AV101C LEVEL 1 DEVICE PLAN AREA C

AV101D LEVEL 1 DEVICE PLAN AREA D

AV101E LEVEL 1 DEVICE PLAN AREA E

AV101F LEVEL 1 DEVICE PLAN AREA F

AV102A LEVEL 2 DEVICE PLAN AREA A

AV102B LEVEL 2 DEVICE PLAN AREA B

AV102D LEVEL 2 DEVICE PLAN AREA D

AV102E LEVEL 2 DEVICE PLAN AREA E

AV102F LEVEL 2 DEVICE PLAN AREA F

AV301 WIRING DIAGRAM

AV302 WIRING DIAGRAM

AV303 WIRING DIAGRAM

AV304 WIRING DIAGRAM

AV305 WIRING DIAGRAM

AV306 WIRING DIAGRAM

AV401 DEVICE INSTALLATION

AV402 DEVICE INSTALLATION

AV403 DEVICE INSTALLATION

VOLUME FOUR

TELECOMMUNICATIONS

AUDIO VISUAL SYSTEMS

FIRE PROCTECTION

E201A FIRST LEVEL POWER PLAN

E201B FIRST LEVEL POWER PLAN

E201C FIRST LEVEL POWER PLAN

E201D FIRST LEVEL POWER PLAN

E201E FIRST LEVEL POWER PLAN

E201F FIRST LEVEL POWER PLAN

E202A SECOND LEVEL POWER PLAN

E202B SECOND LEVEL POWER PLAN

E202C SECOND LEVEL POWER PLAN

E202D SECOND LEVEL POWER PLAN

E202E SECOND LEVEL POWER PLAN

E202F SECOND LEVEL POWER PLAN

E203A ROOF POWER PLAN

E203B ROOF POWER PLAN

E203C ROOF POWER PLAN

E203D ROOF POWER PLAN

E203E ROOF POWER PLAN

E203F ROOF POWER PLAN

E301A GROUNDING PLAN

E301B GROUNDING PLAN

E301C GROUNDING PLAN

E301D GROUNDING PLAN

E301E GROUNDING PLAN

E301F GROUNDING PLAN

E302A LIGHTNING PROTECTION PLAN

E302B LIGHTNING PROTECTION PLAN

E302C LIGHTNING PROTECTION PLAN

E302D LIGHTNING PROTECTION PLAN

E302E LIGHTNING PROTECTION PLAN

E302F LIGHTNING PROTECTION PLAN

E400 ENLARGED ELECTRICAL ROOMS POWER PLANS

E401 ENLARGED EMER ELEC & BOILER ROOM PLANS

E500 ONE-LINE DIAGRAM

E501 ONE-LINE DIAGRAM

E502 ONE-LINE DIAGRAM

E503 ONE-LINE DIAGRAM

E504 ONE-LINE DIAGRAM

E505 PV ONE LINE DIAGRAM

E506 GROUNDING SYSTEM RISER DIAGRAM

E507 TYPICAL BUILDING LIGHTING CONTROL DIAGRAM - BACNET

E600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE - SHEET 1

E601 MECHANICAL EQUIPMENT CONNECTION SCHEDULE - SHEET 2

E602 LIGHT FIXTURE SCHEDULES - SHEET 1

E603 LIGHTING FIXTURE SCHEDULE - SHEET 2

E604 LIGHTING FIXTURE SCHEDULE - SHEET 3

E605 LIGHTING CONTROL SCHEDULE - SHEET 1

E606 LIGHTING CONTROL SCHEDULES - SHEET 2

E607 PANELBOARD SCHEDULES - SHEET 1

E608 PANELBOARD SCHEDULES - SHEET 2

E609 PANELBOARD SCHEDULES - SHEET 3

E610 PANELBOARD SCHEDULES - SHEET 4

E611 PANELBOARD SCHEDULES - SHEET 5

E612 PANELBOARD SCHEDULES - SHEET 6

E613 PANELBOARD SCHEDULES - SHEET 7

E614 PANELBOARD SCHEDULES - SHEET 8

E615 PANELBOARD SCHEDULES - SHEET 9

E616 PANELBOARD SCHEDULES - SHEET 10

E617 PANELBOARD SCHEDULES - SHEET 11

E618 PANELBOARD SCHEDULES - SHEET 12

E619 PANELBOARD SCHEDULES - SHEET 13

E620 PANELBOARD SCHEDULES - SHEET 14

E621 PANELBOARD SCHEDULES - SHEET 15

E622 PANELBOARD SCHEDULES - SHEET 16

E623 PANELBOARD SCHEDULES - SHEET 17

E624 PANELBOARD SCHEDULES - SHEET 18

E625 PANELBOARD SCHEDULES - SHEET 19

E626 PANELBOARD SCHEDULES - SHEET 20

E627 PANELBOARD SCHEDULES - SHEET 21

E628 PANELBOARD SCHEDULES - SHEET 22

E629 PANELBOARD SCHEDULES - SHEET 23

E630 PANELBOARD SCHEDULES - SHEET 24

E631 PANELBOARD SCHEDULES - SHEET 25

E632 PANELBOARD SCHEDULES - SHEET 26

E701 ELECTRICAL DETAILS - SHEET 1

E702 ELECTRICAL DETAILS - SHEET 2

E703 ELECTRICAL DETAILS - SHEET 3

E704 ELECTRICAL DETAILS - SHEET 4

E705 ELECTRICAL DETAILS - SHEET 5

E706 ELECTRICAL DETAILS - SHEET 6

E707 ELECTRICAL DETAILS - SHEET 7

E708 ELECTRICAL DETAILS - SHEET 8

E709 ELECTRICAL DETAILS - SHEET 9

E710 ELECTRICAL DETAILS - SHEET 10

E711 ELECTRICAL DETAILS - SHEET 11

E712 LIGHTING CONTROL DIAGRAMS - SHEET 1

E713 LIGHTING CONTROL DIAGRAMS - SHEET 2

E714 LIGHTING CONTROL DIAGRAMS - SHEET 3

E101A FIRST LEVEL LIGHTING PLAN

E101B FIRST LEVEL LIGHTING PLAN

E101C FIRST LEVEL LIGHTING PLAN

E101D FIRST LEVEL LIGHTING PLAN

E101E FIRST LEVEL LIGHTING PLAN

E101F FIRST LEVEL LIGHTING PLAN

E102A SECOND LEVEL LIGHTING PLAN

E102B SECOND LEVEL LIGHTING PLAN

E102C SECOND LEVEL LIGHTING PLAN

E102D SECOND LEVEL LIGHTING PLAN

E102E SECOND LEVEL LIGHTING PLAN

E102F SECOND LEVEL LIGHTING PLAN

F001 LIFE SAFETY CODE NARRATIVE

F002 LIFE SAFETY CODE NARRATIVE

F101 LIFE SAFETY OCCUPANCY CLASSIFICATION PLAN - LEVEL 1

F102 LIFE SAFETY OCCUPANCY CLASSIFICATION PLAN - LEVEL 2

F103 LIFE SAFETY PLAN - LEVEL 1

F104 LIFE SAFETY PLAN - LEVEL 1

F105 LIFE SAFETY PLAN - LEVEL 1

F106 LIFE SAFETY PLAN - LEVEL 1

F107 LIFE SAFETY PLAN - LEVEL 1

F108 LIFE SAFETY PLAN - LEVEL 1

F109 LIFE SAFETY PLAN - LEVEL 2

F110 LIFE SAFETY PLAN - LEVEL 2

F111 LIFE SAFETY PLAN - LEVEL 2

FA001 FIRE ALARM GENERAL NOTES, LEGEND, AND RISER DIAGRAM

FA002 FACU INPUT/OUTPUT MATRIX

FA101 FIRE ALARM AUDIBILITY PLAN - LEVEL 1

FA102 FIRE ALARM AUDIBILITY PLAN - LEVEL 2

FA103 FIRE ALARM PLAN - LEVEL 1

FA104 FIRE ALARM PLAN - LEVEL 1

FA105 FIRE ALARM PLAN - LEVEL 1

FA106 FIRE ALARM PLAN - LEVEL 1

FA107 FIRE ALARM PLAN - LEVEL 1

FA108 FIRE ALARM PLAN - LEVEL 1

FA109 FIRE ALARM PLAN - LEVEL 2

FA110 FIRE ALARM PLAN - LEVEL 2

FA111 FIRE ALARM PLAN - LEVEL 2

FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND

FX101 FIRE SUPPRESSION HAZARD CLASSIFICATION PLAN - LEVEL 1

FX102 FIRE SUPPRESSION HAZARD CLASSIFICATION PLAN - LEVEL 2

FX301 FIRE SUPPRESSION SECTIONS

VOLUME THREE

EQUIPMENT LABORATORY

GENERAL

G000 COVER SHEET

G001 SHEET INDEX

G002 SHEET INDEX

GENERAL

SHEET INDEX:

G000 COVER SHEET

G001 SHEET INDEX

G002 SHEET INDEX

1 DESIGN ADDENDUM #1

2 DESIGN ADDENDUM #2

3 DESIGN ADDENDUM #3

JULY 15,2021

JULY 22, 2021

AUG 18, 2021

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS/GENERAL NOTES

E002 ELECTRICAL SYMBOLS AND ABBREVIATIONS/GENERAL NOTES

ED100 ELECTRICAL SITE DEMOLITION PLAN

ES100 ELECTRICAL SITE DEYPLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES103 ELECTRICAL SITE PLAN

ES104 ELECTRICAL SITE PLAN

ES501 ELECTRICAL SITE DETAILS

ES502 ELECTRICAL SITE DETAILS

PI00 INSTRUMENTATION AND CONTROLS LEGEND

PI01 PIPING AND INSTRUMENTATION DIAGRAM LEGEND - SHEET 1

PI02 PIPING AND INSTRUMENTATION DIAGRAM LEGEND - SHEET 2

PI700 PROCESS AND INSTRUMENTATION DIAGRAM - TEST BASIN

PROCESS PIPING

MECHANICAL

CONTROL SYSTEMS

II100 INSTRUMENT INSTALLATION DETAILS - EXECUTION REQUIREMENTS

II101 INSTRUMENT INSTALLATION DETAILS - SHEET 1

II102 INSTRUMENT INSTALLATION DETAILS - SHEET 2

IA100 CONTROL PANEL DETAILS - TB-CP-01

IP100 INSTRUMENT LOCATION PLAN - TEST BASIN AREA

Cap Unit

Block Unit

Finished Grade

Total Wall Height

Embedment

24" 6"

12" (Min.) of Free Draining Aggregate

4" Ø (Min) Drain Tile (Elevation Varies)

4" Ø (Min) Drain Tile (Elevation Varies)

- or -

6" (Min) Compacted Granular Base Leveling Pad

Low Permeable Soil

1/4"

6"

Cap Unit

Block Unit

Finished Grade

18"+/-

Steel Fence or Railing

" M in

Geosynthetic Reinforcement (Typ)

Concrete Filled Tube or Form 8' o.c. Max.

18"

12"

8"

18"

4"

13.5"

18"

2"

3'-1"

1'

3" 2"

4"

6"

3"

LOGO TO BE ECHED or SANDBLASTED

INTO THE CAST STONE, 18". PRECAST

STONE TO MATCH CAP STONE,

ANCHOR TO CMU THROUGH CAST

STONE CAP

LETTERS TO BE SHEET METAL

CUT-OUTS. PROVIDE SHOP

DRAWINGS. COLOR TO BE WHITE.

ANCHOR TO CMU THROUGH CAST

STONE CAP.

CAP STONE TO BE CAST

STONE TO MATCH BLDG.

BRICK VENEER TO MATCH

BLDG.

LETERS WALL

MOUNTED. METAL

CUT-OUTS. COLOR

WHITE.

NOTE: SIGN TO BE LIGHTED WITH

FLUID LIGHTS. PHOTOCELL.

12'

1" 2"11"

8" CMU

1'-4"

#4 @ 8, ALTERNATE HOOK

DIRECTION, GROUT ALL CMU CORES.

PROVIDE HORIZONTAL JOINT

REINFORCING IN CMU AND BRICK AT

1'-4" OC VERTICAL SPACING.

CONCRETE FOOTING

3- #5, TOP TO BOT

95% COMPACTED SUBGRADE (TYP.)1'-6"

2'-101 2"

CONCRETE FOOTING

95% COMPACTED SUBGRADE (TYP.)

(FOUR) #4 REBAR, CONTINUOUS

2'

2'-8"

L-07

DETAILS

BLOCK WALL

R DUZAN

R DUZAN

B ROUSSEL

B VEAL

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,

PLANS, OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.

Do not remove this notice. Properly destroy documents when no longer needed.

D

A

1 2

C A

D

R

C

B

3 4 5

F

E

G

D

6 7 8 9 10 11

A

B

C

E

F

G

C STANLEY CONSULTANTS

AT FULL SIZE

IN

cm0 1 2 3 4

SHEET FORMAT IS 22" X 34". IF PRINTED SHEET IS NOT 22" X 34", THEN IT IS NOT TO SCALE

L O

G I N

A u t o

C A

D

I m p e r i a l

O n

T a l o n

F

I L E

N

A M

S

C I G

F S

P r o j e c t s A

C A

D L a n d s c a p e S h e e t s L

D e t a i l s d w g

P L O

T T

A T

E

M

L O

T T

B

Y

D u z a n

R a n d y

APVDCHKDDSGNNO. DATEREVISIONS

APPROVED

DATE

CHECKED

DRAWN

APPROVED

DESIGNED

SCALE:

NO. REV.

225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com

FINAL CONSTRUCTION DOCUMENTS

DSGN CHKD APVD

USGS

HYDROLOGIC INSTRUMENTATION FACILITY (HIF)

TUSCALOOSA, AL.

29435.01

APRIL 26, 2021

CAP WALL ELEVATION LAYOUT

BLOCK WALL TOP VIEW

USGS SIGN

RLD RLD BSR

ST

ATE OF ALABAMA

REG

I STERED LANDSCAPE ARC

H I T

EC

T

NUMBER

RANDOLPH L.

DUZAN

DESIGN ADDENDUM #2

RLD BR JULY 22, 2021RLD

DESIGN ADDENDUM #3

RLD BR AUG 18, 2021RLD

8/18/2021

AutoCAD SHX Text

%%UFRONT ELEVATION

AutoCAD SHX Text

%%USIDE ELEVATION

AutoCAD SHX Text

BLOCK WALL

AutoCAD SHX Text WALL with FENCE

COVER
SIGNATURE SHEET
ADDENDUM NO. 3
SECTION 04 40 00 - STONE ASSEMBLIES
DRAWINGS

File details come from the government source that posted it. Updated .