Attachment_J_Questions.Responses.docx
DOCX document 17 KB Posted
- Attached to
- FISH HOLDING CONSTRUCTION & UPGRADES Federal contract opportunity
- Solicitation number
- 140G0118R0016
About this file
Attachment J Questions.Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_K_Design_Addenda_1.pdf | ||
| Attachment_F_Interested_Parties_List.042718.xlsx | XLSX spreadsheet | |
| Sol_140G0118R0016_Amd_0002.pdf | ||
| Attachment_G.1_Photo.pdf | ||
| Attachment_G.3_Photo.pdf | ||
| Attachment_G.2_Photo.pdf | ||
| Attachment_H_As_Built_Piping.pdf | ||
| Attachment_I_Questions.Responses.docx | DOCX document | |
| Sol_140G0118R0016_Amd_0001.pdf | ||
| Attachment_F_Interested_Parties_List.032718.xlsx | XLSX spreadsheet | |
| Attachment_C_Wage_Decision_WI3.pdf | ||
| Attachment_F_Interested_Parties_List.xlsx | XLSX spreadsheet | |
| Attachment_A_Specifications.pdf | ||
| Attachment_D_Release_of_Claims.doc | DOC document | |
| Attachment_B_Drawings.pdf | ||
| Sol_140G0118R0016.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140G0118R0016, Amendment 0002, Questions and Responses
1. Question: Drawing S101 details 5 & 7 refer to a door hatch that is supposed to be shown on the architectural drawings. We have been unable to locate a detail for this hatch. Can you please provide one?
Response: Details on structural plan S101 call for a pit cover for a sewage ejector pit and the filter pit located just inside the overhead door in the north wall. The concrete formed foundations are detailed on sheet S101. The pit covers are specified under spec Section 08 31 10 – Floor Access Hatches and Frames.
Details and dimensions will be added under a forthcoming design Addendum No. 1 to be issued this week. The pit covers will be added to the architectural plans. (These changes have been incorporated into solicitation Amendment 0002.)
2. Question: The fish holding room C104 will the tanks be in the room or will it be wide open?
Response: The tanks will be removed by UMESC prior to start of construction.
3. Question: I noticed that the trench and sump pits are to be coated but RFI question 7 response said the trench channel would be 304 stainless steel which epoxy will not bond too and best to leave stainless. Please clarify.
Response: Disregard all references to epoxy coatings in the trenches and in the C104 main fish holding area.
4. Question: Does the facility have 480 volt, 3 phase power 30 amperes for shot blast or grinding equipment?
Response: There is not sufficient 480 volt power readily available in the fish holding area.
5. Question: Just to clarify which rooms would get the high performance coating? Per room finish I have: C104, C104a, C104b, C104c, C104d.
Response: All of the high performance floor coating will be eliminated except for Office C104-d. This change will be listed on design Addendum 1. (These changes have been incorporated into solicitation Amendment 0002.)
6. Question:
Response:
7. Question:
Response: