Attachment_J_Questions.Responses.docx

DOCX document 17 KB Posted

Attached to
FISH HOLDING CONSTRUCTION & UPGRADES Federal contract opportunity
Solicitation number
140G0118R0016
Issued by
Department of the Interior US Geological Survey

About this file

Attachment J Questions.Responses

View the file

Other files for this federal contract opportunity

Other files attached to FISH HOLDING CONSTRUCTION & UPGRADES, newest first.
File Type Posted
Attachment_K_Design_Addenda_1.pdf PDF
Attachment_F_Interested_Parties_List.042718.xlsx XLSX spreadsheet
Sol_140G0118R0016_Amd_0002.pdf PDF
Attachment_G.1_Photo.pdf PDF
Attachment_G.3_Photo.pdf PDF
Attachment_G.2_Photo.pdf PDF
Attachment_H_As_Built_Piping.pdf PDF
Attachment_I_Questions.Responses.docx DOCX document
Sol_140G0118R0016_Amd_0001.pdf PDF
Attachment_F_Interested_Parties_List.032718.xlsx XLSX spreadsheet
Attachment_C_Wage_Decision_WI3.pdf PDF
Attachment_F_Interested_Parties_List.xlsx XLSX spreadsheet
Attachment_A_Specifications.pdf PDF
Attachment_D_Release_of_Claims.doc DOC document
Attachment_B_Drawings.pdf PDF
Sol_140G0118R0016.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0118R0016, Amendment 0002, Questions and Responses

1. Question: Drawing S101 details 5 & 7 refer to a door hatch that is supposed to be shown on the architectural drawings. We have been unable to locate a detail for this hatch. Can you please provide one?

Response: Details on structural plan S101 call for a pit cover for a sewage ejector pit and the filter pit located just inside the overhead door in the north wall. The concrete formed foundations are detailed on sheet S101. The pit covers are specified under spec Section 08 31 10 – Floor Access Hatches and Frames.

Details and dimensions will be added under a forthcoming design Addendum No. 1 to be issued this week. The pit covers will be added to the architectural plans. (These changes have been incorporated into solicitation Amendment 0002.)

2. Question: The fish holding room C104 will the tanks be in the room or will it be wide open?

Response: The tanks will be removed by UMESC prior to start of construction.

3. Question: I noticed that the trench and sump pits are to be coated but RFI question 7 response said the trench channel would be 304 stainless steel which epoxy will not bond too and best to leave stainless. Please clarify.

Response: Disregard all references to epoxy coatings in the trenches and in the C104 main fish holding area.

4. Question: Does the facility have 480 volt, 3 phase power 30 amperes for shot blast or grinding equipment?

Response: There is not sufficient 480 volt power readily available in the fish holding area.

5. Question: Just to clarify which rooms would get the high performance coating? Per room finish I have: C104, C104a, C104b, C104c, C104d.

Response: All of the high performance floor coating will be eliminated except for Office C104-d. This change will be listed on design Addendum 1. (These changes have been incorporated into solicitation Amendment 0002.)

6. Question:

Response:

7. Question:

Response: