This is a Questions and Answers (Q&A) document addressing contractor inquiries regarding a construction project involving log siding repair and mechanical system upgrades.

The document provides responses to four key contractor questions. First, regarding exterior log replacement due to rot, the purchaser estimates approximately 60 linear feet of damaged logs requiring replacement, with measurements noted as inexact due to snow drifts. Second, for pricing purposes, contractors are instructed to submit pricing as a lump sum with a detailed cost per linear foot breakdown to account for unknown log rot extent until extraction is performed. Third, the snow guards specified in the plan set shall be Rocky Mountain Snow Guards or approved equivalent. Fourth, the purchaser has furnished existing site photographs of the building exterior, mechanical room, and boiler system. The photographs included show representative log siding damage with visible rot and coating failure, various views of the mechanical room with existing boiler equipment (including a visible nameplate showing I.B.R. boiler number V-154 with serial number 22144375), heating system piping configurations, and an auxiliary water heating tank. These supporting images provide contractors with visual reference for scope assessment and equipment identification necessary for accurate project pricing and planning.

View the file

Other files

File Type Posted
Sol_140FGA26R0008_Amd_0001.pdf PDF
B08_SOW_with_drawings.pdf PDF
B03_WD_MT20260025.pdf PDF
Sol_140FGA26R0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Can the purchaser please provide an estimated LF (Linear Foot) measurement of exterior logs to be replaced due to log rot?

Approximately 60 linear feet – measurements not exact due to snow drifts.

2. The extent of log rot can be unknown until extraction is performed should contractors price as a LS as on the price schedule with an optional LF price?

Staff will attempt to provide an estimated LF of damaged logs that need to be replaced. Lump sum with a break out of cost per LF.

3. Can the purchaser provide the make and manufacturer of the snow guards listed in the plan set?

Rocky Mountain Snow Guards or approved Equivalent.

4. Can the purchaser furnish as existing site photos of the exterior of the building, boiler to include model and serial number and existing mechanical room?