Attach_17_-_Stormwater_1200C_Permit_Assignment_Letter_(ph__2-4)_0001.pdf

PDF 195 KB Posted

Attached to
OR-KLAMATH FALLS FWO-PHASE 3 CONSTRUCTIO Federal contract opportunity
Solicitation number
140FC323B0002
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document outlines a federal construction contract solicitation for the Klamath Falls Fish and Wildlife Service. The solicitation seeks a firm-fixed price contract to construct new fish sucker ponds and related infrastructure at the Klamath Falls National Fish Hatchery. Key details include that the contract value is estimated between $5-10 million, the period of performance is three years from notice to proceed, and the procurement is set aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million or less annually. The scope of work involves constructing up to twenty earthen aquaculture ponds, a stormwater detention pond, buildings, roads, pipelines for water distribution and drainage, and other supporting elements. The solicitation will utilize sealed bidding with award going to the responsive and responsible bidder providing the lowest total price.

View the file

Other files for this federal contract opportunity

Other files attached to OR-KLAMATH FALLS FWO-PHASE 3 CONSTRUCTIO, newest first.
File Type Posted
Amend_0005_-_Attach_1_-_site_vist_sign_sheet_attendees_140FC323B0002_0005.pdf PDF
Sol_140FC323B0002_Amd_0005.pdf PDF
Amend_4_-_Attach_1_-_Klamath_Falls_Phase_3_Considerations_0004.docx DOCX document
Sol_140FC323B0002_Amd_0004.pdf PDF
Amend_0003_-_Attach_3_-_KFNFH_Elec_Addendum_3_05_15_2023_0003.pdf PDF
Amend_0003_-_Attach_1_-_answers_to_questions_140FC323B0002_0003.docx DOCX document
Amend_0003_-_Attach_2_-_updated_33_10_00_Water_Utilities_0003.doc DOC document
Sol_140FC323B0002_Amd_0003.pdf PDF
Sol_140FC323B0002_Amd_0002.pdf PDF
Attach_16_-_ESCP_PH_2-4_ESCP_10112022_0001.pdf PDF
Attach_10_-_Klamath_Falls_Site_Photos_0001.pdf PDF
Attach_4_-_KFNFH_-_Phase_3_100__Specifications_20230316_0001.pdf PDF
Attach_3_-_updated_KFNFH_Phase_3_Scope_Narrative_v2_0001.pdf PDF
Attach_15-_Klamath_Falls_NFH_Final_FONSI_10-29-2020_signed_0001.pdf PDF
Attach_14_-_20200126_NPDES_Exemption_Hatchery_Operations_Letterhead_for_MEMO_Signed_0001.pdf PDF
Attach_13_-_USFWS-Klamath-Falls-NFH-Final-EA_0001.pdf PDF
Attach_9_-_Klamath_Falls_NFH-Geotech_Report_0001.pdf PDF
Attach_8_-_Controller_Alert_EnhancingTransparencyBipartisanInfrastructureLaw_(1)_(004)_(1)_(1)_0001.pdf PDF
Attach_2_-_updated_KFNFH_Phase_3_Bid_Form_v2_blank_0001.doc DOC document
Attach_18_-_Cover_letter_to_edit_for_140FC323B0002_0001.pdf PDF
Attach_12_-_Final_Lease_RECORDED_0001.pdf PDF
Attach_1_-_Clauses_and_provisions_for_140FC323B0002_0001.pdf PDF
Sol_140FC323B0002_Amd_0001.pdf PDF
Attach_11_Additional_photos_OneDrive_1_1-31-2023_0001.zip ZIP file
Attach_7_-_Building-A-Better-America-Brand-Guide_0001.pdf PDF
Attach_6_-_Wage_Dec_No_OR20230071_dated_031723_0001.pdf PDF
Attach_5_-_KFNFH_Phase_3_100__Drawings_20230316_0001.pdf PDF
Amend_0001_-_Attach_2_-_Updated_01_14_00_Work_Restrictions_add_1_0001.doc DOC document
Amend_0001_-_Attach_1_-_answers_to_questions_140FC323B0002_0001.docx DOCX document
Sol_140FC323B0002.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Environmental Quality Water Quality

Kate Brown, Governor

November 15, 2022

Mark Yost II US Fish and Wildlife Service - Klamath Falls National Fish Hatchery 3875 Lower Klamath Lake Road Klamath Falls, OR. 97603

Re: 1200-C National Pollutant Discharge Elimination System (NPDES) Registration

Permit/PLC No.: NGEN12C-ORR10H495 Project Location: 3875 Lower Klamath Lake Rd, Klamath Falls, Oregon, 97603 Klamath County

Dear Mark Yost II:

The Oregon Department of Environmental Quality (DEQ) has reviewed your application and approved your registration for coverage under the NPDES Construction Stormwater Discharge Permit 1200-C (permit). As the registrant, you are legally responsible for compliance with all permit conditions. See this link https://www.oregon.gov/deq/wq/wqpermits/Pages/Stormwater-Construction.aspx for a copy of the permit, technical assistance, and all relevant permit forms.

Registrant Obligations

• Comply with all permit conditions. DEQ strongly recommends that you read the permit.

• Fully implement your Erosion and Sediment Control Plan (ESCP). You may need to modify site control measures as site conditions change.

• Ensure that all appropriate contractors hired by you to implement the permit on your behalf have a copy of the ESCP and the permit. Keep a list of all contractors working on your site along with their contact information.

• Notify DEQ of significant projects changes, including ESCP revisions, inspectors, or project ownership changes.

• Perform & document visual monitoring according to Schedule B of the permit by a certified erosion and sediment control person.

• Terminate coverage at the end of the project. You will be charged an annual registration fee until registration is terminated.

The permit does not authorize excavation or fill in state waterways, including wetlands, and does not replace the requirement for receiving authorization to do this type of work under Section 404 of the Clean Water Act. If the authorized activity involves earthmoving in a known or suspected wetland condition you must contact the Department of State Lands at 503-986-5200 if you are west of the Cascades, or 541- 388-6112 if you are east of the Cascades, and request a wetland determination prior to earth moving.

The construction stormwater general permit, technical assistance manuals and other information is also available on DEQ Stormwater Program’s website.

Sincerely, DEQ Stormwater Permitting Program https://www.oregon.gov/deq/wq/wqpermits/Pages/Stormwater-Construction.aspx https://www.oregon.gov/deq/wq/wqpermits/Pages/Stormwater.aspx https://www.oregon.gov/deq/wq/wqpermits/Pages/Stormwater-Contacts.aspx

File details come from the government source that posted it. Updated .