Amend_4_-_Attach_1_-_Klamath_Falls_Phase_3_Considerations_0004.docx

DOCX document 3 MB Posted

Attached to
OR-KLAMATH FALLS FWO-PHASE 3 CONSTRUCTIO Federal contract opportunity
Solicitation number
140FC323B0002
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document provides details on a federal solicitation for construction services. The U.S. Fish and Wildlife Service is seeking a firm-fixed-price contract to construct the third phase of a new fish sucker hatchery in Klamath Falls, Oregon, with an estimated value between $5-10 million. The scope of work includes constructing up to twenty earthen aquaculture ponds with associated infrastructure, a 0.6-acre stormwater detention pond, access roads, pressurized piping for geothermal water distribution, and a 370-foot-long concrete block retaining wall. The period of performance is three years from the anticipated June 2023 notice to proceed. The solicitation is set aside for small businesses under NAICS code 237990. The document outlines eight bid line items and provides site descriptions, geotechnical information, and design details to inform prospective offerors on the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to OR-KLAMATH FALLS FWO-PHASE 3 CONSTRUCTIO, newest first.
File Type Posted
Sol_140FC323B0002_Amd_0005.pdf PDF
Amend_0005_-_Attach_1_-_site_vist_sign_sheet_attendees_140FC323B0002_0005.pdf PDF
Sol_140FC323B0002_Amd_0004.pdf PDF
Sol_140FC323B0002_Amd_0003.pdf PDF
Amend_0003_-_Attach_2_-_updated_33_10_00_Water_Utilities_0003.doc DOC document
Amend_0003_-_Attach_3_-_KFNFH_Elec_Addendum_3_05_15_2023_0003.pdf PDF
Amend_0003_-_Attach_1_-_answers_to_questions_140FC323B0002_0003.docx DOCX document
Sol_140FC323B0002_Amd_0002.pdf PDF
Attach_11_Additional_photos_OneDrive_1_1-31-2023_0001.zip ZIP file
Attach_7_-_Building-A-Better-America-Brand-Guide_0001.pdf PDF
Attach_6_-_Wage_Dec_No_OR20230071_dated_031723_0001.pdf PDF
Attach_5_-_KFNFH_Phase_3_100__Drawings_20230316_0001.pdf PDF
Amend_0001_-_Attach_2_-_Updated_01_14_00_Work_Restrictions_add_1_0001.doc DOC document
Amend_0001_-_Attach_1_-_answers_to_questions_140FC323B0002_0001.docx DOCX document
Attach_18_-_Cover_letter_to_edit_for_140FC323B0002_0001.pdf PDF
Attach_17_-_Stormwater_1200C_Permit_Assignment_Letter_(ph__2-4)_0001.pdf PDF
Attach_12_-_Final_Lease_RECORDED_0001.pdf PDF
Attach_1_-_Clauses_and_provisions_for_140FC323B0002_0001.pdf PDF
Sol_140FC323B0002_Amd_0001.pdf PDF
Attach_16_-_ESCP_PH_2-4_ESCP_10112022_0001.pdf PDF
Attach_10_-_Klamath_Falls_Site_Photos_0001.pdf PDF
Attach_4_-_KFNFH_-_Phase_3_100__Specifications_20230316_0001.pdf PDF
Attach_3_-_updated_KFNFH_Phase_3_Scope_Narrative_v2_0001.pdf PDF
Attach_15-_Klamath_Falls_NFH_Final_FONSI_10-29-2020_signed_0001.pdf PDF
Attach_14_-_20200126_NPDES_Exemption_Hatchery_Operations_Letterhead_for_MEMO_Signed_0001.pdf PDF
Attach_13_-_USFWS-Klamath-Falls-NFH-Final-EA_0001.pdf PDF
Attach_9_-_Klamath_Falls_NFH-Geotech_Report_0001.pdf PDF
Attach_8_-_Controller_Alert_EnhancingTransparencyBipartisanInfrastructureLaw_(1)_(004)_(1)_(1)_0001.pdf PDF
Attach_2_-_updated_KFNFH_Phase_3_Bid_Form_v2_blank_0001.doc DOC document
Sol_140FC323B0002.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0004 Klamath Falls Phase 3 Considerations IFB No. 140FC323B0002 This amendment shall serve as notice to prospective bidders that the USFWS had identified additional utilities in the proposed Phase 3 construction area. Specifically, in/around the A1-A2 Pond area. The USFWS is working on a resolution to relocate or protect these utilities through a separate contract action. However, the winning bidder shall allow time for the USFWS and their contractor to complete resolution of this issue prior to being allowed to begin construction in this specific area. This is estimated to be completed by Dec 2023. A rough sketch is provided below for reference.

Figure 1 Yellow line shows approximate location as it relates to the project site

Figure 2 Black line indicates approx. utility location image1.png image2.png