Clarifications_AMD_009_0009.pdf

PDF 99 KB Posted

Attached to
Saratoga NFH Water Treatment Rehabilitation - WY
Solicitation number
140FC124R0001
Issued by

About this file

This document contains clarification questions and answers regarding solicitation number 140FC124R0001 for the Saratoga NFH Water Treatment Rehabilitation project in Wyoming. Key details include clarification that toothing or alternating vertical joints will be allowed for CMU installation, equivalent products meeting Buy American requirements are acceptable, the contractor determines alternative construction methods if existing equipment does not fit, and model number replacements for discontinued catch basin and sensor items are acceptable. The document also clarifies bid items and specifications for electrical components, plumbing, radon mitigation, and sensor calibration capabilities.

View the file

Other files

File Type Posted
Sol_140FC124R0001_Amd_0012.pdf PDF
Sol_140FC124R0001_Amd_0011.pdf PDF
Clarifications_AMD_010_0010.pdf PDF
Sol_140FC124R0001_Amd_0010.pdf PDF
Interested_Vendor_List_V7_0009.pdf PDF
Sol_140FC124R0001_Amd_0009.pdf PDF
Sol_140FC124R0001_Amd_0008.pdf PDF
2A04_-_SOW_V5_20-027_Saratoga_NFH_Water_Treatment_Rehab_0008.pdf PDF
2A04_-_SOW_V4_20-027_Saratoga_NFH_Water_Treatment_Rehab_0007.pdf PDF
Sol_140FC124R0001_Amd_0007.pdf PDF
Sol_140FC124R0001_Amd_0006.pdf PDF
Clarifications_Amendment_006_0006.pdf PDF
Interested_Vendor_List_V6_0006.pdf PDF
2A04_-_SOW_V3_20-027_Saratoga_NFH_Water_Treatment_Rehab_0006.pdf PDF
Interested_Vendor_List_V5_0005.pdf PDF
Sol_140FC124R0001_Amd_0005.pdf PDF
2A04_-_SOW_(REVISED)_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab_0005.pdf PDF
Interested_Vendor_List_V4_0004.pdf PDF
Amendment_0004_Clarifications_0004.pdf PDF
Sol_140FC124R0001_Amd_0004.pdf PDF
Interested_Vendor_List_V3_0003.pdf PDF
Sol_140FC124R0001_Amd_0003.pdf PDF
Interested_Vendor_List_V2_0002.pdf PDF
Sol_140FC124R0001_Amd_0002.pdf PDF
Interested_Vendor_List_0001.pdf PDF
Sol_140FC124R0001_Amd_0001.pdf PDF
1A04_-_Specification_(Construction)_Saratoga_Rehab_of_Water_Trtmt.pdf PDF
Sol_140FC124R0001.pdf PDF
3A04_-_Drawings_(Construction)-_Saratoga_NFH_Rhb_Wtr_Trtmnt.pdf PDF
2A04_-_SOW_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab.pdf PDF
4A04_-_Saratoga_Bid_Schedule_Water_Treatment.pdf PDF
5A04_-__Submittals.pdf PDF
6A04_-_DOL_Wage_Determination_(10-2-23).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarifications Amendment 009

Key:

• Question o Clarification

• In the demo and replacement of the failing CMU, specification 042200- 3.4.C does not allow for toothing when laying out the wall. Will toothing be allowed or alternatively, would it be acceptable to alternate sections during layout with vertical head joints?

• Yes. The joint needs to be tied into the existing wall.

• If the GE Distribution Panel (EDP from E01 Detail 1) under FAR 52.225-10 cannot be ordered, will an exception be made to use FAR 52.225-11 for NAFTA countries?

• No exception will be provided to waive the Buy American Act for materials, meaning products that meet the requirements in FAR 52.225-9 and FAR 52.225-10.

• NOTE: Equivalent products that meet the buy American Act and by extension FAR

52.225-9 and 52.225-10 are acceptable.

• E01 Work note 3 states the reuse of existing breakers in the new EDP, however, GE has stated this isn’t going to be possible as their panel designs have changed and now use ABB XT breakers.

The existing breakers will not be able to be mounted in it. Please advise.

• The construction methods are determined by the contractor. If government equipment does not fit the new equipment, then the government equipment needs to be replaced.

• For the new 300A Breaker shown for MDC on E01 Detail 1, it is shown going into an “SCP” Style distribution panelboard, however, ABB does not offer mounting hardware or breakers for this style any longer. Please advise.

• The construction methods are determined by the contractor. The alternative method of mounting or breakers are to be determined by the contractor.

• Where can specifications for the new Distribution Board, Panelboard and Transformer be found.

• The electrical component details can be found in the drawings and specifications. The distribution board and panelboard can be found in these documents. The transformer for the electrical pole is handled by the local utility company. The Contractor is responsible for communication, logistics, and any cost associated with upgrading a transformer.

• Bid Schedule indicates for bid item 13 Division 28, the Table of Contents indicates not used, assumption this should be Division 40

• Correct

• The Bid Schedule also includes “Division 28: Data Logging”, however, Division 28 is not part of the specifications. Is this to be excluded from the bid?

• Yes

• The bid schedule lists “Water Spike” as a bid item. Is this item to include materials and labor for installation or is the labor to be included under bid item Division 22: Plumbing?

• All labor and materials shall be included in the “Water Spike” bid item.

• Given the Gas Management Columns are replaced with the Water Spikes, are degassing fans still required in the Headtank Room?

• Yes

• P01 shows a Catch Basin (CB-1) for the sump pump as Jay R Smith 9860 however this item is discontinued. The replacement is Model #9935. This model comes with a 4'' outlet instead of 2'' and differing grate options from what is specified in schedule note 1. Is this an acceptable replacement?

• Yes. Any materials that are called out can be substituted as equal.

• S05 Details 3&4 show structural details for the new stairs, however, there are references to "See

Arch" regarding the actual stair elevation, but no such pages exist. Does FWS plan on providing architectural details for these stairs?

• The tread death shall be 10”.

• Section L Factor 3 requests Past Performance. Is a Past performance questionnaire acceptable.

And if so, would FWS be able to provide the requisite form? Also are CPARS acceptable.

• There is no past performance requirement to submit for technical evaluation. Past performance is reviewed separate from the technical requirement.

• There is no need to provide CPARS information, as this information will be gathered and reviewed internally for the responsibility determination.

• The bid schedule lists Division 2: Radon Mitigation, however, there is no Division 2 in the specifications. Is this bid schedule item no longer relevant as the radon fans are included in Division 23?

• The project still requires radon mitigation. Please submit the price to the bid schedule Division 2 knowing that the work is called out in a different division.

• The Sensor Schedule lists M4KNICK SE715\1.MS which is a "Clark style" digital sensor, however, the specifications call for an Optical sensor. Will the M4KNICK SE740 be an acceptable replacement?

• Yes

• Specification 221433-2.1.F.2 calls for the automatic calibration without manual intervention of the sensor, however, the manufacturers have stated there is no such sensor as the electrolyte solution must be manually replaced in order for recalibration to take place. Please advise.

• The sensor shall have recalibration capabilities.