2A04_-_SOW_(REVISED)_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab_0005.pdf

PDF 72 KB Posted

Attached to
Saratoga NFH Water Treatment Rehabilitation - WY
Solicitation number
140FC124R0001
Issued by

About this file

This statement of work outlines requirements for a water treatment rehabilitation project at the Saratoga National Fish Hatchery in Wyoming. The contractor shall provide all materials, equipment, and labor to complete the work using the government-provided specifications and drawings. Notable aspects of the work include repairing concrete masonry damage in two locations, replacing various piping systems, removing drum filters and covering holes in associated pedestals with grating, and replacing the lower sealed end of one degassing column with a Water Spike device. The contractor must also provide final as-built drawings and the Hatchery Manager and Contracting Officer Representative are identified as points of contact for the project. This work is solicited under Solicitation Number 140FC124R0001 issued by the Department of the Interior Fish and Wildlife Service for the Saratoga NFH Water Treatment Rehabilitation in Wyoming.

View the file

Other files

File Type Posted
Sol_140FC124R0001_Amd_0012.pdf PDF
Sol_140FC124R0001_Amd_0011.pdf PDF
Clarifications_AMD_010_0010.pdf PDF
Sol_140FC124R0001_Amd_0010.pdf PDF
Interested_Vendor_List_V7_0009.pdf PDF
Sol_140FC124R0001_Amd_0009.pdf PDF
Clarifications_AMD_009_0009.pdf PDF
Sol_140FC124R0001_Amd_0008.pdf PDF
2A04_-_SOW_V5_20-027_Saratoga_NFH_Water_Treatment_Rehab_0008.pdf PDF
2A04_-_SOW_V4_20-027_Saratoga_NFH_Water_Treatment_Rehab_0007.pdf PDF
Sol_140FC124R0001_Amd_0007.pdf PDF
Sol_140FC124R0001_Amd_0006.pdf PDF
Clarifications_Amendment_006_0006.pdf PDF
Interested_Vendor_List_V6_0006.pdf PDF
2A04_-_SOW_V3_20-027_Saratoga_NFH_Water_Treatment_Rehab_0006.pdf PDF
Interested_Vendor_List_V5_0005.pdf PDF
Sol_140FC124R0001_Amd_0005.pdf PDF
Interested_Vendor_List_V4_0004.pdf PDF
Amendment_0004_Clarifications_0004.pdf PDF
Sol_140FC124R0001_Amd_0004.pdf PDF
Interested_Vendor_List_V3_0003.pdf PDF
Sol_140FC124R0001_Amd_0003.pdf PDF
Interested_Vendor_List_V2_0002.pdf PDF
Sol_140FC124R0001_Amd_0002.pdf PDF
Interested_Vendor_List_0001.pdf PDF
Sol_140FC124R0001_Amd_0001.pdf PDF
1A04_-_Specification_(Construction)_Saratoga_Rehab_of_Water_Trtmt.pdf PDF
Sol_140FC124R0001.pdf PDF
3A04_-_Drawings_(Construction)-_Saratoga_NFH_Rhb_Wtr_Trtmnt.pdf PDF
2A04_-_SOW_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab.pdf PDF
4A04_-_Saratoga_Bid_Schedule_Water_Treatment.pdf PDF
5A04_-__Submittals.pdf PDF
6A04_-_DOL_Wage_Determination_(10-2-23).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

STATEMENT OF WORK

TO

20-027 WATER TREATMENT REHAB

AT

SARATOGA NATIONAL FISH HATCHERY

I. GENERAL CONDITIONS

A. The Contractor shall provide all material, equipment, and labor required to complete the work as described in all the attached Government provided documents and changes mentioned in Section II.

II. CHANGES IN REQUIREMENTS

A. Changes to Government Furnished Documents. The referenced items have drawings numbers listed for association.

1. The A/E shall utilize all Government furnished documents to complete the project. The baseline project shall be considered the specifications package and drawing number 6R-WY-75-17-041. The items listed below are non-inclusive and the Contractor shall consider all minor changes based on this list.

2. Only work to be included in contract, excluding changes

a. Repair CMU damage in two locations (outside corner and near degassing columns)

i. A01

b. Monitoring, sensors, or any other mechanisms to assist in maintenance/monitoring.

i. C01, C10, and E01

c. All piping replacements

i. C04, C05, C06, and C07

d. Degassing columns, see “Changes” below

e. Generator

i. E02

f. All relevant demolition

i. C02, C03, C08, C09, A02, and S01

g. General Construction

i. S00, S02, S03, S04, E03, and V01

3. Removal

a. Drum filters

i. Any hole in the pedestal shall be covered by grating from the removal of the drum filter.

ii. E03

b. All other major components not listed.

i. A03

4. Changes

a. Lower sealed column end replacement with Water Spike

i. https://warrenwaterbroom.com/water-spike/

ii. C06

b. The existing UV system shall remain unchanged and not included in this contract.

i. E03

B. Complete final as-builts as constructed. USFWS can approve red lines if the deviation is minimal.

III. POINTS OF CONTACT

A. Hatchery Manager

1. Lee Bender (307-326-5662)

B. Contracting Officer Representative / Technical Representative

1. Michael Wandersee (303-236-4479)

END OF STATEMENT OF WORK

https://warrenwaterbroom.com/water-spike/ ckindsvater Cross-Out The Drum Filters are removed from the requirement

File details come from the government source that posted it. Updated .