This statement of work outlines requirements for the Saratoga NFH Water Treatment Rehabilitation project. The contractor shall provide all materials, equipment, and labor to complete the work using government-provided specifications and drawings. Key scope items include repairing CMU damage, installing monitoring sensors, replacing all piping, rehabilitating the drum filter and degassing columns by replacing the lower sealed end with a Water Spike device, maintaining the existing UV system, demolishing relevant components, general construction, and developing as-built drawings. The contracting officer representative is Michael Wandersee, and the hatchery manager is Lee Bender. This work is solicited under opportunity number 140FC124R0001 from the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FC124R0001_Amd_0012.pdf PDF
Sol_140FC124R0001_Amd_0011.pdf PDF
Clarifications_AMD_010_0010.pdf PDF
Sol_140FC124R0001_Amd_0010.pdf PDF
Interested_Vendor_List_V7_0009.pdf PDF
Sol_140FC124R0001_Amd_0009.pdf PDF
Clarifications_AMD_009_0009.pdf PDF
Sol_140FC124R0001_Amd_0008.pdf PDF
2A04_-_SOW_V4_20-027_Saratoga_NFH_Water_Treatment_Rehab_0007.pdf PDF
Sol_140FC124R0001_Amd_0007.pdf PDF
Sol_140FC124R0001_Amd_0006.pdf PDF
Clarifications_Amendment_006_0006.pdf PDF
Interested_Vendor_List_V6_0006.pdf PDF
2A04_-_SOW_V3_20-027_Saratoga_NFH_Water_Treatment_Rehab_0006.pdf PDF
Interested_Vendor_List_V5_0005.pdf PDF
Sol_140FC124R0001_Amd_0005.pdf PDF
2A04_-_SOW_(REVISED)_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab_0005.pdf PDF
Interested_Vendor_List_V4_0004.pdf PDF
Amendment_0004_Clarifications_0004.pdf PDF
Sol_140FC124R0001_Amd_0004.pdf PDF
Interested_Vendor_List_V3_0003.pdf PDF
Sol_140FC124R0001_Amd_0003.pdf PDF
Interested_Vendor_List_V2_0002.pdf PDF
Sol_140FC124R0001_Amd_0002.pdf PDF
Interested_Vendor_List_0001.pdf PDF
Sol_140FC124R0001_Amd_0001.pdf PDF
1A04_-_Specification_(Construction)_Saratoga_Rehab_of_Water_Trtmt.pdf PDF
Sol_140FC124R0001.pdf PDF
3A04_-_Drawings_(Construction)-_Saratoga_NFH_Rhb_Wtr_Trtmnt.pdf PDF
2A04_-_SOW_V2_20-027_Saratoga_NFH_Water_Treatment_Rehab.pdf PDF
4A04_-_Saratoga_Bid_Schedule_Water_Treatment.pdf PDF
5A04_-__Submittals.pdf PDF
6A04_-_DOL_Wage_Determination_(10-2-23).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

STATEMENT OF WORK

TO

20-027 WATER TREATMENT REHAB

AT

SARATOGA NATIONAL FISH HATCHERY

I. GENERAL CONDITIONS

A. The Contractor shall provide all material, equipment, and labor required to complete the work as described in all the attached Government provided documents and changes mentioned in Section II.

II. CHANGES IN REQUIREMENTS

A. Changes to Government Furnished Documents. The referenced items have drawings numbers listed for association.

1. The A/E shall utilize all Government furnished documents to complete the project. The baseline project shall be considered the specifications package and drawing number 6R-WY-75-17-041. The items listed below are non-inclusive and the Contractor shall consider all minor changes based on this list.

2. Only work to be included in Contract (excluding Changes IIA3 below): See Specifications (1A04 – Specification Saratoga Rehab of Water Trtmt) Page number references have been removed as some were not accurate.

a. Repair CMU damage in two locations (outside corner and near degassing)

b. Monitoring, sensors, or any other mechanisms to assist in maintenance/monitoring

c. All piping replacements

d. Drum filter

e. Degassing Columns = SEE Changes in bullet 3 below.

f. Generator

g. All Relevant Demolition

h. General Construction

3. Changes

a. Lower sealed column end replacement with Water Spike

i. https://warrenwaterbroom.com/water-spike/

ii. P03

b. The existing UV system shall remain unchanged.

B. Complete final as-builts as constructed. USFWS can approve red lines if the deviation is minimal.

III. POINTS OF CONTACT

A. Hatchery Manager

1. Lee Bender (307-326-5662)

B. Contracting Officer Representative / Technical Representative

1. Michael Wandersee (303-236-4479)

END OF STATEMENT OF WORK

https://warrenwaterbroom.com/water-spike/

A. Changes to Government Furnished Documents. The referenced items have drawings numbers listed for association.
1. The A/E shall utilize all Government furnished documents to complete the project. The baseline project shall be considered the specifications package and drawing number 6R-WY-75-17-041. The items listed below are non-inclusive and the Contractor sh...
2. Only work to be included in Contract (excluding Changes IIA3 below): See Specifications (1A04 – Specification Saratoga Rehab of Water Trtmt) Page number references have been removed as some were not accurate.
a. Repair CMU damage in two locations (outside corner and near degassing)
b. Monitoring, sensors, or any other mechanisms to assist in maintenance/monitoring
c. All piping replacements
d. Drum filter
e. Degassing Columns = SEE Changes in bullet 3 below.
f. Generator
g. All Relevant Demolition
h. General Construction
3. Changes
a. Lower sealed column end replacement with Water Spike
i. https://warrenwaterbroom.com/water-spike/
ii. P03
b. The existing UV system shall remain unchanged.
B. Complete final as-builts as constructed. USFWS can approve red lines if the deviation is minimal.
A. Hatchery Manager
1. Lee Bender (307-326-5662)
B. Contracting Officer Representative / Technical Representative
1. Michael Wandersee (303-236-4479)
END OF STATEMENT OF WORK