Affected work area above

The area of roof to be repaired is roughly 36' along the eave and 21'-6" up the rake (true distance) for about 775 SF of roof area.

Remove roofing, underlayment, and any damaged roof sheathing as needed. Provide and install new roof sheathing to match existing, ice and water shield, roofing underlayment and metal roofing to match existing.

Remove and replace ridge and ridge vent as needed to tie into existing roofing as well as the new roofing replacement.

Affected work area above

Remove and replace ridge and ridge vent as needed to tie into existing roofing as well as the new roofing replacement.

Remove RTU's, platform and walkway.

Repair roof trusses and roof sheathing as needed after removal.

Approximate area of roof work, see note on A1.4

Remove RTU's, platform and walkway.

Repair roof trusses and roof sheathing as needed after removal.

Replace gutter as needed

Provide and install new screened intake hood on roof. The return air duct on MAU-1 is to be used as a fresh air intake.

Refer to notes on sheet M2.2

Remove RTU's, platform and walkway.

Repair roof trusses and roof sheathing as needed after removal.

Remove and replace ridge and vent vent as needed to allow to tie into new and existing roofing.

Roofing, underlayment and roof sheathing replacement/repair.

Remove and replace gutter as needed to allow to tie into new and existing roofing.

needed after removal.

Remove and replace ridge and vent vent as needed to allow to tie into new and existing roofing.

Roofing, underlayment and roof sheathing replacement/repair.

needed after removal.

Roofing, underlayment and roof sheathing replacement/repair.

Provide and install new screened intake hood on roof. The return air duct on needed after removal.

Provide and install new screened intake hood on roof. The return air duct on

Remove gas and water lines that serviced the removed RTU's. Remove piping back to the branch and cap there.

Remove electrical branch circuits lines back to the panelboard. Remove abandoned conduit, boxes, etc. which serviced the removed RTU's.