Overall Bid

PROJECT DESCRIPTION:
There are several small facility update and maintenance projects included in this overall larger project. The facility is nearly 20 years old and this project is meant to update and repair items that have weathered, worn out and had their original mission change and need to be updated.
SUMMARY FOR OUTDOOR HOLDING PENS PACKAGE (Project 18-033Pens)
New Pens
New block of 12 pens - Block E$

New block of 12 pens - Block F $

Access Road $

Site Electrical $

Site Water $

SUMMARY OF COST BREAKDOWN FOR STATION REHAB (Project 18-033)

Admin Building/Entry - Lump Sum (Sheets A10, A11) $

Breeding Building Parking - Lump Sum (Sheets A20, A21) $

Breeding Building - Lump Sum (Sheet A30) $

Holding Building - Lump Sum (Sheet A40) $

Maintenace Building - Lump Sum (Sheets A50, A51) $

Residence - Lum Sum (Sheets A60, A61) $

Mechanical Buidling - Lump Sum (Sheet A70) $

Quarantine Building - Lump Sum (Sheet A80) $ 0.00

Total for Rehab Project $ 0.00

BREEDING BUILDING HVAC (Project 18-015) $ 0.00

(This is the sum of the costs from the division breakdown on worksheet 2)

QUARANTINE BUIDLING RTU REMOVAL (Project 18-019) $ 0.00

(This is the sum of the costs from the division breakdown on worksheet 3)

SUBTOTAL $ 0.00

OVERHEAD AND PROFIT (percentage) % 10% $ 0.00

BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0.00

OPTIONS

Option 1: Build out Block G (with electric, water; include OH&P) $ 0.00

Option 2: Build out Block H (with electric, water; include OH&P) $ 0.00

Option 3: Demo Block A and Rebuild (including OH&P) $ 0.00

Option 4: Demo Block B and Rebuild (including OH&P) $ 0.00

OPTIONS TOTAL PLUS OVERHEAD AND PROFIT $ 0.00

BASE PLUS OPTION

BASE PLUS OPTION (WITH O, H & P) $ 0.00

&"Times New Roman,Regular"&12BIDDING SCHEDULE

STATION REHAB

18-033

NAT'L BLACK FOOTED FERRET CONSERVATION CENTER

CARR, COLORADO

BB HVAC

PROJECT DESCRIPTION:
Provide and install new HVAC package units for each of the (4) Breeding Rooms in the Breeding Buidling. Installation includes, but is not limited too, HVAC equipment, controls, programming, ductwork for distribution, building penetrations, support structure for equipment, utility tie-in for the new equipment and removal of exisitng equipment, ductwork and controls.

SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Div. 2 Existing Conditions $

Div. 3 Concrete $

Div. 5 Metals $

Div. 6 Wood & Plastics $

Div. 7 Thermal & Moisture $

Div. 8 Openings $

Div. 9 Finishes $

Div. 10 Specialties $

Div. 11 Equipment $

Div. 21 Fire Suppression $

Div. 22 Plumbing $

Div. 23 HVAC $

Div. 26 Electrical $

Div. 28 Electronic Safety $

Div. 31 Earthwork $

Div. 32 Exterior Improvements $

Div. 33 Utilities $

TOTAL $ 0.00

BREEDING BUILDING HVAC

PROJECT 18-015

NAT'L BLACK FOOTED FERRET

CONSERVAITON CENTER

Quar RTU Removal

PROJECT DESCRIPTION:
Provide the equipment, personnel, and materials to remove the HVAC rooftop units (RTU’s) and repair the damaged roof, building systems and structure in and around the units on the Quarantine Building. The RTU’s have been decommissioned and are no longer operating as intended. The roof flashing and mechanical connections have deteriorated and leaks have developed in and around the area of the RTU’s.

SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Div. 2 Existing Conditions $

Div. 3 Concrete $

Div. 5 Metals $

Div. 6 Wood & Plastics $

Div. 7 Thermal & Moisture $

Div. 8 Openings $

Div. 9 Finishes $

Div. 10 Specialties $

Div. 11 Equipment $

Div. 21 Fire Suppression $

Div. 22 Plumbing $

Div. 23 HVAC $

Div. 26 Electrical $

Div. 28 Electronic Safety $

Div. 31 Earthwork $

Div. 32 Exterior Improvements $

Div. 33 Utilities $

TOTAL $ 0.00

QUARANTINE BUILDING RTU REMOVAL

PROJECT 18-019

NAT'L BLACK FOOTED FERRET

CONSERVAITON CENTER