This statement of work outlines technical support services required by the Indian Affairs Division of Energy and Mineral Development. The contractor shall provide qualified personnel across various disciplines including energy engineering, earth sciences, information technology, and GIS services. Key tasks involve resource assessment, data collection and management, software development and administration, renewable energy evaluation, and administrative support. The period of performance is one base year with four option years. Services will take place onsite in Lakewood, Colorado and Fort Berthold, North Dakota, with some travel required. The contract type is an IDIQ and deliverables include annual progress reports, project reviews, and final reports. An estimated initial 50 professional staff are needed across disciplines such as engineering, GIS, database management, and administration.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indian Affairs Office of Indian Energy and Economic Development

Division of Energy and Mineral Development

Statement of Work (SOW)

Document Created: 7 April 2011 Last Updated: 27 January 2022

Version:

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development i

Table of Contents

1 GENERAL

1.1 PURPOSE/OBJECTIVE

1.2 BACKGROUND

1.3 SCOPE OF WORK

1.4 CURRENT ENVIRONMENT

1.4.1 Conventional Energy, Renewable Energy and Mineral Development

1.4.2 NIOGEMS oil and gas management system

1.5 CONTRACT TYPE

1.6 PERIOD OF PERFORMANCE

1.7 PLACE OF PERFORMANCE

1.7.1 Remote Site Work Performance

1.8 HOURS OF PERFORMANCE

1.8.1 Normal Business Hours

1.8.1.1 List of Federal Holidays:

1.8.2 Unplanned Closures, Delayed, and Continued Performance

1.9 PRIVACY ACT AND CONTRACTOR LIABILITY FOR PERSONALLY IDENTIFIABLE INFORMATION

(PII) 6

1.10 SECURITY

1.10.1 Personal Identity Verification of Contractor Personnel

1.10.2 Background clearances – Additional Information

1.10.3 Data Integrity and Data Rights

CONTRACTOR PERSONNEL CAPABILITIES

1.10.4 Qualified Personnel:

1.10.5 Conflict of Interest

1.10.6 Changes in Personnel

1.10.7 Project Manager

1.10.8 On-Site Lead(s)

1.11 IDENTIFICATION OF CONTRACTOR PERSONNEL

1.12 CONTRACTOR TRAINING

1.13 HEALTH AND SAFETY

1.14 POST-AWARD KICK-OFF MEETING

1.15 TRANSITION OF SERVICES

1.15.1 Phase-in (if required)

1.15.2 Phase out (if required)

1.16 MEETINGS

1.17 GOVERNMENT POINTS OF CONTACT

2 APPLICABLE DOCUMENTS

3 GOVERNMENT FURNISHED PROPERTY / INFORMATION

4 CONTRACTOR FURNISHED PROPERTY

5 REQUIREMENTS

5.1 TASK AREAS

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development ii

5.1.1 Administrative Services

5.1.2 Administrative Services: ............................................ Error! Bookmark not defined.

5.1.3 Financial Management:

5.1.4 Records Management:

5.1.5 Editor / Public Relations

5.1.6 Marketing:

5.1.7 Systems Administration

5.1.8 Petroleum and Mining Engineering Services

5.1.9 Seismic Database Management and Data Processing Services

5.1.9.1 5.1.1.1 Collect and Store Seismic Data Acquired on Indian Lands:

5.1.9.2 Seismic Data Processing:

5.1.9.3 Seismic Data Interpretation and Mapping:

5.1.10 Geologic and Geophysical Interpretation and Mapping of Exploration Data:

5.1.10.1 Geologic Interpretation and Mapping

5.1.11 Renewable Energy Program:

5.1.11.1 Renewable Energy Resource Mapping:

5.1.11.2 Economic Analyses:

5.1.11.3 Tribal Resource Management Planning:

5.1.12 Software Applications Support

5.1.12.1 Development of NIOGEMS (National Indian Oil/Gas Evaluation and Management System)

5.1.13 Development and Management of GIS Data

5.1.14 Indian Energy and Mineral Database:

5.1.15 Civil Engineering Services

5.1.16 Environmental and Regulatory Support

5.1.17 Contractor Project Manager

5.2 TRAVEL

6 PLACES OF PERFORMANCE

7 PERIOD OF PERFORMANCE

8 DELIVERABLES AND DELIVERABLES SCHEDULE

8.1 DELIVERABLES

8.2 TECHNICAL DELIVERABLE PRODUCTS AND SERVICES

9 STAFFING REQUIREMENTS

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development iii

Table of Figures

Figure 2: Level of Effort ............................................................... Error! Bookmark not defined.

Figure 3: Deliverables Figure 4: DEMD Job Titles and Estimated Hours ........................ Error! Bookmark not defined.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 1

1 GENERAL

1.1 Purpose/Objective

The Indian Affairs, Division of Energy and Mineral Resources (IA-DEMD) has a continued need to acquire technical personnel support services by a Contractor who can support a variety of personnel skills in the fields of energy (both conventional and renewable) engineering and earth sciences (exploration and production), information technology, and Graphical Information Services (GSI) services. Because DEMD does not possess the quantity of manpower with the associated expertise required to completely fulfill its mission, this Statement of Work (SOW) identifies the Contractor tasks to be performed to assist DEMD in meeting the Government’s mission objectives.

1.2 Background

The Division of Energy and Mineral Development (DEMD) is under the Office of Indian Energy and Economic Development (Assistant Secretary – Indian Affairs). DEMD provides technical and economic advisory support to all Indian mineral owners, the Regional and Agency Bureau of Indian Affairs (BIA) Offices, and to the Department of the Interior (DOI).

DEMD also acquires and collects a variety of scientific data which is used in the exploration and development of conventional energy and mineral resources, and in the assessment and evaluation of developing renewable energy systems on Indian lands located in the continental U.S., including one reservation in Alaska.

Within the past few years, DEMD’s major objective is more focused on the development of the Tribes’ resources and achieving the ultimate goal of producing income and jobs for the Tribal community. DEMD is now expected to function over a much greater spectrum of scientific and engineering responsibilities that exceed those of energy or mineral assessment projects and include competence and performance on a combination of services: technical proficiency, marketing, liaison, and participation at the negotiating table where Tribal councils decide on commercial development contracts.

1.3 Scope of Work

In support of DEMD activities, the Contractor will provide full life-cycle technical support services that include, but are not limited to, the following:

1. Assessment of Energy and Mineral Resource Potential: Perform geologic field studies, laboratory analysis, interpretation of geophysical and geological data.

Assessment activities include the interpretation of geologic data, such as well logs, rock cores and field studies of outcrops. Activities also include the interpretation of various types of exploration data, the primary method being seismic reflection data. Other exploration data types include refraction seismic, magnetic, gravity, and electromagnetic measurements or resistivity. Assessment activities also include engineering studies, such as the evaluation of a oil or natural gas reservoirs in a producing field to determine the

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 2 amount of remaining reserves and where bypassed oil or gas may reside, or if a field may exist.

2. Geologic and Geophysical Interpretation and Mapping of Exploration Data:

Performs energy and mineral resource evaluation for Indian mineral owners. Energy and mineral resource evaluation requires detailed resource-specific geologic mapping and interpretation using commercial industry software.

3. Seismic Database Management and Data Processing Services. To provide technical expertise to assist Tribes in managing Tribal seismic exploration resource data. Seismic is the main tool of exploration for oil and gas deposits. Contractor required to have skills to collect, analyze, and manage geophysical exploration data.

4. Petroleum and Mining Engineering Services. Provide engineering support to apply petroleum engineering methodologies and principles to oil and gas projects, and to apply mining engineer methodologies to hard rock or mineral projects. Formulate exploration and development strategies.

5. National Indian Oil and Gas Evaluation and Management System (NIOGEMS):

Provides the Tribal resource manager with software management tools to more efficiently supervise Tribal energy or mineral assets and increase revenue streams.

6. Indian Energy and Mineral Resources Databases: To collect, inventory, and archive all Indian energy and mineral resource data in a retrievable digital database system. To assist Tribes pursuing oil and gas development by managing Indian-owned seismic exploration data.

7. Marketing / Promotion: To provide opportunities for Tribes to present and promote their resource information to industry and government agencies to stimulate interest.

Sponsor tribal representatives to attend trade shows and serve as technical representatives for tribes at industrial trade shows, industry forums where tribes can interact directly with prospective industry partners. Construct technical presentations and displays showing the geology, geophysics, engineering and resource potential of tribal lands to potential partners;

8. Economic Evaluation: To provide expert advice in the economic review of energy and mineral development projects, including the different types of business scenarios available to Tribes under the Indian Mineral Development Act. Generate economic analyses adjusted for risk for Indian mineral owners to utilize as frameworks for negotiating agreements with potential business partners.

9. Renewable Energy Assessment and Development: Renewable energy projects being supported by DEMD include solar, wind, biomass, waste-to-energy, hydro-electric, tidal, and geothermal resources. DEMD provides expert technical advice and guidance in area

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 3 reservation energy assessment, data collection, business planning, engineering studies, economic evaluation, and Tribal entity structure. Proposed leases and business agreements with outside parties are critically reviewed with the objective of ensuring that Tribes maximize income while providing for environmental and reclamation protection.

10. Administrative Services and Records Management: To provide those administrative services that are not deemed inherently governmental functions, including filing and records management. Administrative duties are defined, approved and assigned from DEMD administrative staff.

11. IT Systems Administration. IT systems administrative duties are defined, approved and assigned from DEMD management staff. Analyzes customer needs, and determines equipment and software requirements for solutions to problems by means of IT systems.

Perform backup or recovery of data and systems as prescribed by DOI IT standards, and maintain systems based on government standards.

12. Civil Engineering Services. Apply civil engineering methodologies and principles, primarily to renewable energy projects. Apply techniques, theory precepts and practices in the civil engineering field and related sciences and disciplines. Provide engineering support to apply architectural engineering methodologies and principles to renewable energy projects. Serve as technical specialist and liaison between Indian tribes, agencies and commercial contractors on engineering projects involving architectural engineering methods.

13. Environmental and Regulatory Support. Provide engineering support to apply environmental engineering methodologies and principles to projects. Serve as technical specialist and liaison between Indian tribes, agencies and commercial contractors on complex project issues, processes or methods. Provide the knowledge for tribes and their partners to meet the regulatory requirements associated with the planning and execution of resource development on reservations. Understand and apply the required compliance with all local, state, and federal rules and regulations.

1.4 Current Environment

1.4.1 Conventional Energy, Renewable Energy and Mineral Development

1.4.2 NIOGEMS oil and gas management system

1.5 Contract Type

This Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract will be awarded as Time and Materials and may include travel costs and incidental Other Direct Cost (ODC) items where authorized by the DEMD COR.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 4

1.6 Period of Performance

The Period of Performance is for one base period and four option years. The base period will be from March 13th 2022 through March 12th 2023 In addition, FAR Clause 52.217-8, Option to Extend Services (Nov 1999), will be included in the RFP and resultant IDIQ contract.

1.7 Place of Performance

Performance shall take place at the DOI, DEMD at 13922 Denver West Parkway, Suite200, Lakewood, Colorado, unless otherwise agreed to in advance by both parties. See 1.7.1 for Remote Site Work Performance.

The ability to work remotely, referred to as telecommute, is authorized for the Contractor.

Exceptions to this may include, but are not limited to:

• Remote work does not comply with Federal regulations or guidance and DOI IT Security Control Standards, privacy policies and other related guidance.

• Remote work does not comply with Federal and DOI regulations and guidance regarding the properly handling and protection of Sensitive Information.

• Support of work activities which do not have the supporting technologies or capabilities for remote accessibility.

1.7.1 Remote Site Work Performance.

At the COR’s discretion and upon COR authorization, the Contractor may be allowed to provide services from a remote location. The number of hours, labor categories or positions, and the location will be mutually agreed upon between the COR and the Contractor in advance of the specified services.

The following applies to Remote Site Work Performance:

Hourly rates will be at the rates set forth in the IDIQ contract.

• Work at the remote location will be subject to all relevant DOI and AS-IA security requirements and is contingent on the Government’s approval of the remote site (including, but not necessarily limited to, telecommunications, computer equipment, etc.

to be used for the Remote Work).

• The frequency of and dates of on-site work is at the sole discretion of the Government.

The Government will provide the Contractor 5 business days’ notice when other than previously agreed to on-site work is required.

• Remote Site Work will be the same as described in this SOW.

• Remote Site Work will be clearly described in the required status reports submitted by the Contractor to help ensure the accuracy of billings to the Government.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 5

• Any and all costs associated with Remote Site Work are the responsibility of the Contractor; the Government will not pay or approve of any cost associated with Remote Site Work except as required by DOI or AS-IA policy.

• The Government will not provide any software, equipment, furnishings, telecommunications, phones, or any other materials necessary to perform the remote work except as required by DOI or AS-IA policy.

• The Government reserves the right to make exceptions at its discretion and/or to comply with changes in the Government’s policies.

1.8 Hours of Performance

1.8.1 Normal Business Hours

DEMD’s normal business hours are from 6:00 a.m. to 6:00 p.m. Mountain Time, Monday through Friday, except for Federal holidays identified in section 1.8.1.1. The Contractor shall provide services during normal business hours except as provided for elsewhere in this SOW or as agreed to in writing between the Contracting Officer (CO)/COR and the Contractor’s Project Manager.

Due to the nature of the services, deliverables will generally be identified on a daily or weekly basis. As a result, when Contractor employees are going to be absent from the work site, the Contractor is required to apprise the Government (COR and/or Work Assignment Manager)at the earliest opportunity. This will facilitate the ability of both parties to make alternate arrangements for work which must be completed.

The Government will typically order hours sufficient to cover each period of performance for each position in each labor category, assuming an 8-hour workday five days per week, with adjustments for positions with on-call duties or part-time positions. Contractor personnel will generally be expected to work an 8-hour day during normal business hours, with a varying workload, except for part-time positions where hours will be by mutual agreement. Exceptions will be directed and mutually agreed to in writing by the OCO or COR.

1.8.1.1 List of Federal Holidays:

New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving, and Christmas Day. If the holiday falls on Sunday, it is observed on the following Monday. If the holiday falls on Saturday, it is observed on the preceding Friday.

1.8.2 Unplanned Closures, Delayed, and Continued Performance

DEMD offices may be closed for various reasons, including local or national emergencies. In the event of a closure, only mission-critical personnel are allowed on-site. The COR will notify the Contractor in writing who, if anyone, of the Contractor’s

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 6 personnel are mission-critical. This designation will persist until further notice from the COR or OCO. The COR, or work assignment manager, may identify Contractor personnel as mission-critical on a case-by-case basis depending on circumstances.

Mission-critical personnel will make a reasonable effort to perform needed activities during emergencies whether on-site or from an alternate location. The Contractor will notify the COR or work assignment manager if mission-critical personnel cannot perform as required or requested.

During adverse weather or other emergency situations, the Contractor shall be responsible for verifying whether DEMD offices are operating under normal conditions, there is delayed reporting, or the offices are closed. The government will provide established policies or other guidance on how to address DEMD office operations. When required to continue operations, the Contractor may be required to continue performance at locations other than the primary government facility.

The Contractor shall have a plan in place to handle short-term disruptions. This plan must include information dissemination, key personnel responsibilities, work priorities and other elements enabling employees to be safe, informed and productive. The Contractor shall notify the CO and/or COR as soon as possible in writing when the plan is activated during an emergency event. In cases of moderate-term disruptions (weeks in duration), the Contractor and DEMD will work collaboratively to determine how critical operations can continue via alternate work locations or telework.

1.9 Privacy Act and Contractor Liability for Personally Identifiable Information (PII) FPPS is a System of Records as defined under the Privacy Act (Privacy Act of 1974, 5 U.S.C. § 552a (2000)). 48 CFR 1452.224.1 outlines the prescription for FAR 52.224-1:

Privacy Act Notification. The Contractor’s liability for loss of PII is described in FAR 52.224-02 Privacy Act which will be incorporated into this IDIQ contract. Contractor personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.

1.10 Security

The Contractor shall comply with all Federal, Office of Management and Budget (OMB), DOI and AS-IA policies, directives, and procedures related to information security. All Contractor personnel will be subject to AS-IA security policies and procedures for access to facilities and parking. All Contractor personnel requiring access to the Internet from AS-IA facilities will comply with AS-IA security policies and procedures.

All Contractor personnel will sign a non-disclosure agreement. DEMD considers information obtained and used in providing these services to generally be Controlled Unclassified Information and sensitive. The Contractor will take all reasonable precautions not to divulge sensitive information about DEMD or its clients or to use this information for the Contractor’s gain and will not divulge any such information to any organization outside

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 7

DEMD without DEMD’s written permission. The risk/sensitivity level designation of the activities performed under this IDIQ contract is moderate risk.

Contractor Personnel Security and Suitability Requirements

Performance of this IDIQ contract requires contractor personnel to have a Federal government-issued personal identification card before being allowed unsupervised access to a DOI facility and/or information system. The COR will be the sponsoring official, and will make the arrangements for personal identity verification and card issuance.

Background investigations will be performed by the OPM unless otherwise specified by OPM. The Government will bear the cost of the background investigations.

Before starting work under this IDIQ contract, a National Agency Check (NAC) will be conducted to verify the identity of the individual applying for clearance. Upon successful completion of the NAC process, an identification card will be issued and access granted.

Simultaneously, a NAC with Inquiries (NACI) will be initiated to determine the individual’s suitability for the position. If the NACI adjudication is favorable, nothing more needs to be done. If the adjudication is unfavorable, the credentials will be revoked. In the event of a disagreement between the Contractor and the Government concerning the suitability of an individual to perform work under this IDIQ contract, DOI will have the right of final determination.

At least two weeks before the start of IDIQ contract performance, the Contractor will identify all contractor and subcontractor personnel who will require physical and/or logical access for performance of work under this IDIQ contract. The Contractor must make their personnel available at the place and time specified by the COR in order to initiate screening and background investigations. The following forms, or their equivalent, may be used to initiate the credentialing process:

• Copies of two (2) forms of the Contractor’s legal identification (See http://www/fedidcard.gov/credget.aspx for acceptable forms of ID)

• e-QIP (Electronic Questionnaire for Investigations Processing

• I-9 Employment Eligibility Verification document from vendor, completed and signed

• Release to Obtain Credit Information

• Optional Form 306 (OF-306) - Declaration for Federal Employment

• Fingerprints – acceptable location will be identified by the Government

• Personal Identity Verification (PIV) card application (web-based)

• OPM Standard Form (SF)-85, Questionnaire for Non-Sensitive Positions

Contractor employees are required to give, and to authorize others to give, full, frank, and truthful answers to relevant and material questions needed to reach a suitability determination. Refusal or failure to furnish or authorize provision of information may

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 8 constitute grounds for denial or revocation of credentials. Government personnel may contact the contractor personnel being screened or investigated in person, by telephone or in writing, and the Contractor agrees to make them available for such contact.

Alternatively, if an individual has already been credentialed by another agency through OPM, and that credential has not yet expired, further investigation may not be necessary.

However, AS-IA HR Security will still require a full background investigation application package to confirm the individual’s clearance.

During performance of the IDIQ contract , the Contractor will keep the COR apprised of changes in personnel to ensure that performance is not delayed by compliance with credentialing processes. Cards that have been lost, damaged, or stolen must be reported to the COR and Issuing Office within 24 hours. Replacement will be at the contractor’s expense. If reissuance of expired credentials is needed, it will be coordinated through the COR.

At the end of IDIQ contract performance, or when a contractor employee is no longer working under this IDIQ contract, the Contractor will ensure that all identification cards are returned to the COR.

This requirement must be incorporated into any subcontracts that require subcontractor personnel to have routine and regular unsupervised access to a Federally-controlled facility for more than 180 calendar days or unsupervised access to a federally controlled Level 3 or 4 information systems.

1.10.1 Personal Identity Verification of Contractor Personnel

(a) The Contractor will comply with agency PIV procedures that implement HSPD-12, Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b) The Contractor will insert this clause (FAR 52.204-9 PIV of Contractor Personnel) in all subcontracts when the subcontractor is required to have physical access to a federally-controlled facility or access to a Federal information system.

1.10.2 Background clearances – Additional Information

Contractor staff with the ability to view DEMD-held data will be required to complete a Moderate Background Investigation which is also referred to as a NACI. Staff will be able to work with DEMD data once the NAC initial check is completed; usually in two weeks or less. As noted above, the full background check (NACI) can then take months longer.

Background Clearances Not Billable to the Government: Hours spent by any individual, Contractor employee or otherwise, to complete the forms and any other paperwork required by the Government to process background clearances, or for the purpose of obtaining required fingerprints, are not billable to the Government. Time spent by any individual to participate in interviews conducted by OPM, or its designees, for the

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 9 purpose of completing background investigations is not billable to the Government. The Government considers these costs to be overhead and estimates that between 3 and 10 hours may be required on the part of an individual to complete background clearance processing.

1.10.3 Data Integrity and Data Rights

Data pertaining to other contracts/services may reside on information systems used by the Contractor. The Contractor shall not divulge this information or use this information for gain or for personal reasons. All documents, records, and data generated and all applications created/utilized in performance of this IDIQ contract are Government owned and are the property of the Government and may not be used for any other purpose.

Contractor Personnel Capabilities

1.10.4 Qualified Personnel:

The Contractor shall provide qualified personnel with the appropriate skills and experience to perform the work described herein. All labor category descriptions and accompanying supplemental qualifications/responsibilities for each labor category under this IDIQ contract are provided in Appendix A. The Government will confirm staffing requirements at Task Order level.

1.10.5 Conflict of Interest

The Contractor shall not employ any person who is an employee of the United States Government if that employment would, or could appear to, cause a conflict of interest.

1.10.6 Changes in Personnel

The Contractor shall notify the COR prior to any personnel changes at least 10 calendar days in advance of the anticipated change. The contractor will provide a resume to the COR upon request, for any new contractor employee proposed to provide services under this agreement. The COR will only use the resume information to assist the Contractor in matching skills to Government requirements and to ensure replacement qualifications for key personnel are met.

1.10.7 Project Manager

The Contractor shall provide a Project Manager who shall be responsible for the performance of the work and has authority to act on behalf of the Contractor on matters related to daily operations of the IDIQ contract .

1.10.8 On-Site Lead(s)

In addition to the Project Manager, the Contractor shall identify a minimum of a primary and an alternate as “On-site Lead(s)”. This person(s) will be responsible for managing the distribution of specific task assignments to contractor employees. The

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 10 on-site lead will also provide specific technical direction to contractor employees.

The Government expects the on-site lead function can be accommodated within existing labor categories and hours.

In addition to the COR, the Government will assign Work Assignment Managers for the Contractor On-site Leads. Work Assignment Managers will be assigned in each respective IBC work area to manage day to day operational requirements and work activities.

1.11 Identification of Contractor Personnel

While on the Government work site, Contractor personnel shall be required to visibly display their access credentials at all times.

1.12 Contractor Training

Contractor personnel are expected to possess the described and required knowledge, skills, and expertise to fulfill the requirements of this IDIQ contract. Training of contractor staff to maintain current knowledge, skills, and expertise will be at the Contractor’s expense, except as follows:

a. When the COR recommends to the OCO for authorization and approval for training to meet special requirements not foreseen in the IDIQ contract.

b. When the COR recommends training that is only available to Federal Employees or Contractors i.e. trainings made available through Defense Acquisition University (DAU), DOI Talent, or other Federal Training Facilities.

c. When the OCO/COR authorizes the training of Contractor employees where software and/or hardware described in the IDIQ contract is changed during the course of the IDIQ contract and it is determined to be in the best interest of the Government. “Changes” is not meant to include version upgrades to existing software/hardware and similar foreseeable changes.

d. The Contractor is not authorized to attend, during billable working hours, seminars, symposiums, and the like unless pre-approved by the COR and where attendance is necessary for the performance of IDIQ contract requirements.

When the OCO/COR authorizes training under (a), (b), or (c) above, the Government will reimburse the Contractor for tuition, travel and per diem (in accordance with Section R, Travel), and labor hours at the rate specified in the IDIQ contract for that labor category.

1.13 Health and Safety

The Government desires to maintain a healthy and safe working environment for all personnel. Therefore, for contractor employees working at a government facility, the Government reserves the right to refuse a contractor employee access to the government facility if the individual is displaying symptoms of a contagious illness, such as the flu. If

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 11 such a situation arises, the COR will communicate the Government’s decision regarding the employee to the Contractor's Project Manager.

1.14 Post-Award Kick-off Meeting

The Government intends to hold a post-award orientation meeting with the Contractor after award of the IDIQ contract and prior to the initiation of performance. The purpose of the meeting is to ensure a clear and mutual understanding of all IDIQ contract requirements, identify the roles and responsibilities of Government and Contractor staff, procedures, and points of contact.

1.15 Transition of Services

DEMD has an ongoing need for the required services. The Contractor shall develop a transition plan to accomplish a smooth transition of services as follows:

1.15.1 Phase-in (if required)

Should the incumbent not be awarded the IDIQ contract, an orderly and efficient transition from the incumbent contractor to a new contractor is required. Any transition will be accomplished in such a way that adverse impact to the continuity of DEMD operations is minimized to the maximum extent possible.

In the event a transition is required, within 10 working days after IDIQ contract award, a phase-in plan shall be provided by the incoming Contractor providing detailed information on all phase-in tasks and time frames. The plan shall be approved by the COR before the Contractor begins phase-in activities. The incoming Contractor shall accomplish phase-in tasks in an orderly manner in full cooperation with the outgoing Contractor, prior to expiration of the prior IDIQ contract, in accordance with the approved phase-in plan.

The Government will pay for transition effort only in the Project Manager labor category.

1.15.2 Phase out (if required)

At the end of this IDIQ contract, should the Contractor not be awarded the follow on requirement, a phase-out plan shall be provided by the Contractor, providing detailed information on all phase-out activities. The plan shall be approved by the COR before the Contractor begins phase-out activities. The outgoing Contractor shall accomplish phase-out tasks in an orderly manner in full cooperation with the incoming Contractor. Phase out tasks shall be completed prior to the expiration of the prior IDIQ contract and in accordance with the approved phase-out plan.

1.16 Meetings

The Government will have meetings which require attendance by the Contractor.

Meetings may include, but not limited to:

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 12

• The Government will conduct a meeting with the Contractor prior to the start of performance to discuss the function of the On-site Lead position and its interaction with the Government Work Assignment Manager(s). The Government and the Contractor may evaluate the effectiveness of the On-site Lead function during the Period of Performance and may make changes as necessary and agreed to.

• The Government and the Contractor Program Manager may hold a standing monthly meeting to discuss the contract status, upcoming activities, and potential improvement opportunities.

1.17 Government Points of Contact

Ordering Contracting Officer (OCO):

Jeffrey Pearson Jeffrey.Pearson.Bia.gov

2 APPLICABLE DOCUMENTS

Documents applicable to this requirement such as policies, procedures, and technical manuals will be provided by the Government to the Contractor, as needed.

3 GOVERNMENT FURNISHED PROPERTY / INFORMATION

The Government will provide access to the facilities and furnished working space for contractor personnel at DEMD and any remote offices. The Government will also provide adequate telephones for official use, tables, file cabinets, containers suitable for storage and other normal computer and office supplies. All government furnished equipment is subject to Federal, DOI, and AS-IA restrictions on personal use.

Computer access will be provided by the Government as required. Access to computer hardware and applicable software will also be provided by the Government as required. Program and system documentation required for specific change requests and/or problem reports will be provided by the Government at the time the requests are issued.

Contractor access to AS-IA systems and applications must only be made using Government Furnished Equipment. The Government will provide any equipment needed for such access, including cell phones, pagers, PDAs, tablets, laptops, etc.

4 CONTRACTOR FURNISHED PROPERTY

The Contractor shall supply all items required to perform this IDIQ contract except for the Government Furnished Property provided under Section 3.0 of this SOW.

5 REQUIREMENTS

The Contractor shall manage and organize resources and personnel needed to efficiently and effectively meet task objectives in a timely manner. Contractor shall perform work in support of

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 13 or related to DEMD technical programs. Performance shall be in compliance with all Federal government, DOI, and Indian Affairs trust relationship requirements.

The Contractor will provide the necessary staff to perform the work described herein. The Government will confirm staffing requirements at IDIQ contract award.

5.1 Task Areas

The Contractor shall provide technical and support services which includes, but is not limited to, the following functional areas:

5.1.1 Administrative Services

The Contractor shall perform those administrative services that are not deemed inherently governmental functions. Administrative duties are defined, approved and assigned from DEMD administrative staff. Administrative services include, but are not limited to, the following:

• Performs administrative tasks in functional areas including Finance, Human Resources, Purchasing and Records.

• Prepares and processes correspondence, reports, proposals, records, and related documentation. Develops charts, tables, graphs, and diagrams to assist in analyzing problems.

• Supports preparation of reports, budgets, and project schedules.

• Provides logistical support for projects. Prepares and processes correspondence, reports, proposals, records, and related documentation.

• Generates documentation of contractual requirements, customer specifications, design changes and project deliverables. Prepares user manuals and information to support projects.

• Maintains files and processes requests for information and support meetings.

5.1.2 Financial Management:

• Perform budgeting documentation, resource assessment, and financial reporting.

Supports preparation of reports, budgets, and project schedules. Services shall include but not be limited to the following contractor-performed tasks.

• Performs complex evaluations of existing procedures, processes, techniques, and/or systems related to office management problems or contractual issues, which would require a report and recommend solutions.

5.1.3 Records Management:

Inventory and management of trust, general, office and personnel records based on federal records management guidelines. Services shall include but not be limited to the following contractor-performed tasks:

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 14

• Perform scanning of hardcopy records, documents, illustrations, etc. to digital formats

• Knowledgeable in federal records practices and procedures.

5.1.4 Editor / Public Relations

Compose, in a clear and concise language, procedure manuals and related technical publications (bulletins, articles, display materials, marketing) concerned with customer goals and objectives. Publish these manuals and technical publications into both print and for the web.

5.1.5 Marketing:

Determine the business/marketing demand for products and services. Services shall include but not be limited to the following contractor-performed tasks:

• Identify potential customers and develop strategies for marketing to these customers.

• Monitor trends for commodities markets, pricing, and communicate to DEMD management where new markets are emerging.

• Creates initial designs and end-products for marketing and promotional material. Provide marketing materials suitable for publishing on the DEMD web site.

5.1.6 Systems Administration

IT systems administrative duties are defined approved and assigned from DEMD management staff. Administrative services include, but are not limited to:

• Research and review all DEMD’s software and hardware needs and compatibility.

Maintain up to date knowledge of federal IT system requirements and procedures.

• Analyzes internal or external customer needs, and determines equipment and software requirements for solutions to problems by means of automated systems; develops customized solutions to customer/user problems

• Perform backup or recovery of data and systems as prescribed by DOI IT standards.

• Maintain systems based on government standards

• Provide technical input for the procurement of software or hardware.

• Provide support and management of network, including network attached storage devices.

5.1.7 Petroleum and Mining Engineering Services

• Provide engineering support to apply petroleum engineering methodologies and principles to oil and gas projects. Services shall include but not be limited to the following contractor-performed tasks:

• Applies appropriate software and hardware to support projects and emerging technology solutions.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 15

• Use techniques, theory precepts and practices in the petroleum engineering field and related sciences and disciplines.

• Services shall include but not be limited to the following contractor-performed tasks:

Minerals (Precious minerals, base minerals, rare earths, sand and gravel, aggregate):

• The Contractor shall provide mineral development related services that facilitate the development of a wide range of solid mineral trust assets. Services shall include but not be limited to the following contractor-performed tasks:

• Formulate exploration and development strategies.

• Design exploration programs based on risk assessment, ultimate potential, and economic analysis.

• Assimilate geological and geochemical data for base, precious, and industrial minerals to generate high-quality prospects.

• Develop geological models for mine plans using Vulcan™ software products.

• Integrate mineral resource studies on producing properties to serve as model for identifying new exploration areas and future development opportunities in diverse geological environments.

• Evaluate mineral properties employing inter-disciplinary geological and geochemical data to determine structural and geochemical controls of minerals deposition.

• Apply geo-statistical applications to evaluate the quality and quantity of mineral deposits.

• Serve as technical specialist and liaison between Indian tribes, agencies and commercial contractors on complex project issues, processes or methods.

Fluids (oil, natural gas, geothermal):

• Generate well decline forecasts, future production forecasts, remaining reserve analysis, stimulation recommendations, well work-over supervision, pipeline design analysis, facility design, and assistance on potential field expansion.

• Generate economic evaluations and sensitivity analyses concerning oil and gas operations; provide potential income forecasts and negotiating information for potential Indian Mineral Development Act (IMDA) agreements.

• Provide oil, gas, and mineral training and education to the Tribes.

• Perform well log analysis on wells to evaluate possible bypassed production and to research potential additional production capabilities.

• Perform reservoir simulations and characterizations to maximize oil and gas production.

• Apply petroleum engineering principles to the production of coal bed methane wells, shallow low pressure wells, tight gas wells, resource plays, and unconventional wells.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 16

• Serve as technical specialist and liaison between Indian tribes, agencies and commercial contractors on complex project issues, processes or methods.

5.1.8 Seismic Database Management and Data Processing Services The Division provides technical expertise to assist Tribes in managing Tribal seismic exploration resource data. Seismic is the main tool of exploration for oil and gas deposits. Staff should have skills to collect, analyze, and manage geophysical exploration data. Seismic database management and data processing services include, but are not limited to:

5.1.8.1 5.1.1.1 Collect and Store Seismic Data Acquired on Indian Lands:

• Copy seismic field data from field tapes onto DEMD hard disk drive. Assist DEMD in managing their central repository of seismic data.

5.1.8.2 Seismic Data Processing:

Perform processing of seismic data and modeling of seismic data in order to improve resolution and quality of older seismic data sets owned by Tribes.

5.1.8.3 Seismic Data Interpretation and Mapping:

Interpret seismic data to identify reflectors representing rocks that are capable of producing oil or gas, and produce maps of prospective areas. Interpretation of seismic data helps Tribes in planning their lease sales and in negotiations with industry, as well as assisting in the development of their petroleum resources.

5.1.9 Geologic and Geophysical Interpretation and Mapping of Exploration Data:

The Division performs energy and mineral resource evaluation for Indian mineral owners. Energy and mineral resource evaluation requires detailed resource-specific geologic mapping and interpretation using commercial industry software. Services shall include but not be limited to the following contractor-performed tasks:

5.1.9.1 Geologic Interpretation and Mapping

Perform geologic interpretation and mapping, including resource-specific, structural and/or various isopach maps, cross-sections, and production maps.

• Geologic structure and stratigraphic maps for petroleum and mineral exploration.

Produce maps of field and reservoir data, such as production information by formation

• Interprets geologic and mineral resource data using DEMD computer software and prepares oil, gas or mineral resource reports. Create maps from Sample collection, descriptions, results of laboratory analysis

• Perform assessment reports of oil, gas, coal, and mineral potential existing on Indian lands

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 17

• Convert results from field work (measurements of stratigraphic sections and outcrop descriptions which were entered digitally into data loggers and GPS units) into map form.

• Convert results from laboratory analysis of rock samples obtained in field work into a digital database suitable for interpretation and mapping by DEMD geologic staff.

• Convert data collected in the field into an integrated Geographic Information Systems (GIS) format for mapping.

• Research literature of published geologic reference materials for conversion into digital format.

• Generate geologic displays and other display materials— DVDs, CDs, posters, videos, etc.—for industry trade shows. Generate digital presentations; e.g., PowerPoint.

• Responsible for formulating and recommending plans for development of oil, gas, coal and other mineral deposits.

• Plans, organizes, and develops marketing and promotional programs to inform industry of the mineral potential on Indian lands. Marketing in this context includes forums, symposiums; technical discussions associated with major petroleum or minerals professional meetings.

• Develops and prepares poster sessions and invites Tribes to participate in the poster sessions. Participates in DEMD’s energy and mineral grant program to provide technical assistance and advice to Tribes.

• Supports DEMD’s energy and mineral resource database by including results of energy and mineral assessment studies. Makes trips to the field to collect data such as rock samples, analyzing the outcrop and correlation to geologic maps.

5.1.10 Renewable Energy Program:

This program function serves to support American Indian and Alaska Native communities on the development of their renewable energy resources, which ultimately would result in economic development opportunities for their communities. The support would include both commercial- and local-scale development of solar, biomass, geothermal, hydro, and wind power. Tasks would include the following types of activities:

5.1.10.1 Renewable Energy Resource Mapping:

Perform assessment studies to determine the potential for renewable energy development on Indian lands by acquiring digital data from sources (such as DOE and others) and displaying in map form.

• This would include such data as wind speeds over time, solar intensity, forest data for wood biomass energy projects, geothermal resource data and hydroelectric data.

Division of Energy and Mineral Development (DEMD) Statement of Work Version 1.0 27 January 2022

Prepared by the Indian Affairs - Division of Energy and Mineral Development 18

5.1.10.2 Economic Analyses:

Perform economic analyses using renewable energy econometric analysis software to provide Tribes with information for negotiating with private investors or industry partners.

• Determine the cost effectiveness of developing an energy resource in a particular market (including demand for power, potential generating resources, availability of cost effective interconnection with power grid, and control of potential project sites).

5.1.10.3 Tribal Resource Management Planning:

Assist DEMD staff in the identification of areas of potential energy development that need accurate cadastral information (public records, survey, or maps of the value, extent, and ownership of land) and establish a prioritized plan for…