This document contains the Harris County Contractor and Worksite Safety Policies for Construction Projects, adopted by Harris County Commissioners Court and applicable to all construction, rehabilitation, expansion, reconstruction, and maintenance work contracts valued at $500,000 or more (or subcontracts valued at $50,000 or more) with Harris County, Texas, including work performed by the Harris County Flood Control District, Harris County Toll Road Authority, and precinct-led projects. The Contractor Safety Record Policy, effective February 1, 2026, requires prime contractors and subcontractors to meet specific safety certification requirements including no listing on OSHA's Severe Violator Enforcement Program within three years, no sanctioned OSHA citations classified as "Serious" with high gravity findings within twenty-four months, no "Willful or Repeated" or "Failure to Abate" citations within three years, no criminal convictions related to workplace incidents resulting in serious bodily harm or death within ten years, and mandatory OSHA 10 certification for manual workers and OSHA 30 certification for managers prior to job site entry. The Worksite Safety Policy, effective February 1, 2026 (with certain sections implementing July 1, 2026), establishes mandatory safety standards requiring compliance with OSHA regulations, provision of personal protective equipment at no cost to workers, paid rest breaks, heat illness prevention and emergency response plans, site-specific safety plans submitted at least ten days before mobilization, weekly safety meetings with documented attendance, daily worksite safety inspections using a sixteen-point checklist, and comprehensive accident reporting and investigation procedures.
The policies exempt interlocal government agreements, cooperative purchasing agreements, emergency contracts, goods-only suppliers, property sales, contracts using funds that prohibit policy application, professional and consulting services under Texas Government Code 2254, and contracts expressly waived by Commissioners Court. Prime contractors bear full responsibility for jobsite safety, must ensure all subcontractors meet policy requirements through binding contractual provisions, and must maintain records including OSHA 300 logs for three years and other safety documentation for four years post-contract. Harris County will deploy County Safety Inspectors beginning July 1, 2026, to conduct weekly inspections for high-hazard projects, bi-weekly for moderate-hazard projects, and monthly for lower-hazard projects, with authority to issue immediate stop work orders for imminent danger violations such as unprotected falls over six feet, trenching without cave-in protection, electrical hazards, confined space violations, unstable scaffolding, and inadequate traffic control. Violations may result in written notices, corrective action plans, work suspension, payment withholding, liquidated damages, contract termination, or debarment from future County contracts. Workers may report safety concerns through the Harris County Auditor's confidential Fraud, Waste, and Abuse hotline (866-556-8181 or ethicspoint.com), directly to County Safety Inspectors, or through worker representatives, with full whistleblower protections and non-retaliation provisions allowing workers to bring claims for back pay, reinstatement, and attorney's fees.
View the file
Other files for this state and local contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARRIS COUNTY SAFETY POLICIES
FOR CONSTRUCTION PROJECTS
APPROVED: November 13, 2025
Table of Contents
I. Contractor Safety Record Policy II. Worksite Safety Policy
PART 1: Contractor Safety Record Policy
Construction Projects Under Contract with Harris County, Texas
Effective Date: February 1, 2026
TABLE OF CONTENTS
1. FINDINGS
2. PURPOSE
3. SCOPE, APPLICABILITY, AND EFFECTIVE DATE
4. DEFINITIONS
5. CERTIFICATION REQUIREMENTS
6. ADMINISTRATION
7. COMPLAINTS
8. RECORDKEEPING, NON-COMPLIANCE, AND ENFORCEMENT
9. APPEALS
10. MISCELLANEOUS
SAFETY RECORD QUESTIONNAIRE
A. SAFETY RECORD QUESTIONNAIRE FOR PRIME CONTRACTORS
B. SAFETY RECORD QUESTIONNAIRE FOR SUBCONTRACTORS
SECTION 1: FINDINGS
Whereas, more than 5,000 working people are killed on the job every year, and nearly three million suffer a serious injury or illness;
Whereas, a serious injury or workplace fatality takes an enormous emotional and physical toll on workers, their families, and their communities;
Whereas, the total cost of work injuries in 2020 was $163.9 billion, including, but not limited to, wage and productivity losses of $44.8 billion, medical expenses of $34.9 billion, and administrative expenses of $61.0 billion;
Whereas, the total days lost due to work-related injuries in 2020 was 99,000,000, including 65,000,000 days lost due to injuries that occurred in 2020 and 34,000,000 days lost to injuries that occurred in previous years;
Whereas, safety programs result in higher productivity and employee morale, lower insurance cost, and lower employee turnover;
Whereas, this policy will substantially improve the quality of Harris County construction projects by reducing direct and indirect costs, minimizing employee absences and other time lost as a result of injury, and increase productivity;
Whereas, proactive safety and health programs are an effective way to prevent workplace injuries, illnesses, and deaths, and also reduce the costs of doing business;
Whereas, this policy will result in higher quality work; and
Whereas, Texas Government Code Chapter 2269 and Texas Local Government Code Chapter 262 authorize Harris County to take the action outlined in this policy.
SECTION 2: PURPOSE
The Harris County Contractor Safety Record Policy (the “Safety Record Policy” or “Policy”) is adopted by Harris County Commissioners Court to ensure that Harris County engages prime contractors and subcontractors that prioritize the health and safety of th eir workers. The Safety Record Policy is the result of two Harris County Commissioners Court Orders, dated August 27, 2019, and January 25, 2022, requiring a policy recommendation to implement the consideration of Harris County contractor safety records in awarding contracts.
SECTION 3: SCOPE, APPLICABILITY, AND EFFECTIVE DATE
This Policy applies to prime contractors as well as subcontractors for all contracts that (1) are for construction, rehabilitation, expansion, reconstruction, or maintenance work (2) have a total contract value of at least $500,000 and, for subcontracts, a contract value of at least $50,000; (3) and are not exempted by this Section. Prime contractors must include in all contracts with https://injuryfacts.nsc.org/glossary/ https://injuryfacts.nsc.org/glossary/ https://injuryfacts.nsc.org/glossary/ https://injuryfacts.nsc.org/glossary/ https://injuryfacts.nsc.org/glossary/ subcontractors binding provisions that flow down Harris County’s requirements of prime contractors in the Policy onto their respective subcontractors. Prime contractors must fully apply these binding contractual provisions to subcontractors, including, but not limited to, terminating subcontractor relationships for noncompliance.
The following types of contracts are exempt from this policy:
• Interlocal Government Agreements
• Cooperative Purchasing Agreements
• Emergency Contracts
• Contracts for purchases of goods and services considered to be ancillary to the purchases of goods. A business entity that only supplies goods (bricks, paper, fuel, office supplies, tools, clothing, food, etc.,) and such transportation services as may be incident to delivering those goods to County Property (including the use of common carriers (e.g., truck drivers)) is considered a “Supplier” and Suppliers are not subject to the Safety Record Policy.
• Contracts for the sale of County Property or Goods
• Contracts paid for using funds where condition of those funds is that this policy’s application is prohibited
• Contracts procured under the discretionary exemptions found in Texas Local Government
Code § 262.024
• Services procured under Texas Government Code § 2254 (Professional and Consulting
Services)
• Contracts expressly waived by Harris County Commissioners Court if determined to be necessary
The evaluation of contractor safety violations shall include any OSHA findings or citations, regardless of location.
This policy does not limit, or impact in any way, the County’s ability to consider in the manner it deems appropriate any relevant factor specifically listed in any particular request for bids, proposals, or qualifications.
SECTION 4: DEFINITIONS
1. “County” means Harris County, Texas, a political subdivision organized and existing under the laws of the State of Texas. For the purpose of the Policy, and for avoidance of doubt, construction work done by the “County” includes work done by all County departments, Harris County Flood Control District, Harris County Toll Road Authority, as well as all Precinct-led construction projects.
2. “Contractor” or “Prime Contractor” means any individual, firm, or other entity contracted to provide services to the County under a County contract. This definition applies to regional subdivisions of national and international companies.
3. “Contractor Employee” means a full-time, part-time, temporary or seasonal employee of the Prime Contractor or any Subcontractor who are Directly Assigned to the Contract.
4. “Directly Assigned” means a Contractor Employee who provides services to the County under a contract between a Contractor and the County, which includes:
• the Contractor Employee is named in the Contractor’s contract with the County;
• the Contractor Employee is named or is uniquely identified in a deliverables document from the Contractor; or
• any other evidence that reasonably establishes the Contractor Employee’s relationship to the Contractor’s contract with the County; for example, payroll records.
5. “Goods” means physical items sold to the County by the Contractor, such as bricks, paper, fuel, office supplies tools, clothing, food, etc.
6. “Services” means work or labor performed by Contractor Employees.
7. “Subcontractor” means any individual, firm or entity engaged by the Contractor (including Subcontractor to Sub-subcontractor regardless of tier) to perform any element of the contract between the County and the Contractor.
SECTION 5: CERTIFICATION REQUIREMENTS
The Harris County Commissioners Court desires to avail itself of the benefits of §262.0275 of the Texas Local Government Code and §§ 2269.055 and 2269.056 of the Texas Government Code and consider the offeror’s experience and reputation, the quality of the offeror’s goods or services, the offeror’s safety record, the offeror’s proposed personnel, and any other relevant factor specifically listed in the request for bids, proposals, or qualifications by adopting the Safety Record Policy. The County will evaluate Contractors and Subcontractors through the Safety Record Questionnaire that is found within the Safety Record Policy.
The bid/proposal/qualification requirements for each County contract that is impacted by this policy will include a safety record questionnaire. Under the Safety Record Policy, the Contractor must certify each of the items on that questionnaire (which is provided below) and submit the certification with its materials to be considered for the work. Subcontractors must certify each of the items on their questionnaire (which is also provided below) and submit the certification to the Contractor. The Contractor or Subcontractor is not required to provide supporting documentation to the County unless the County specifically requests it.
The Contractor/Subcontractor will be required to certify the following conditions:
1. The Contractor/Subcontractor has not been listed on OSHA’s Severe Violator Enforcement Program (SVEP) Log at any time within the three (3) years preceding the date of this certification;
2. The Contractor/Subcontractor has not been sanctioned with an OSHA Citation and Notification of Penalty classified as one of the following types (if the OSHA Citation is contested,1 then its classification is based on the Settlement with OSHA or OSHA Final Order) within the twenty-four (24) months preceding2 the date of this certification:
(1)“Serious” with a Gravity3 finding of “High”; and (2) “Posting Requirements” with a Gravity finding of “High”;4
3. The Contractor/Subcontractor has not been sanctioned with an OSHA Citation and
Notification of Penalty classified as one of the following types (if the OSHA Citation is contested5, then its classification is based on the Settlement with OSHA or OSHA Final Order) and within three (3) years preceding6 the date of this certification:(1)“Willful or Repeated”; and (2) “Failure to Abate”; and/or,
4. The Contractor/Subcontractor (i.e., the company itself, not the company’s employees) has not been convicted of a criminal offense within the past ten (10) years in connection with a workplace incident that resulted in serious bodily harm or death;
5. Each of the Contractor/Subcontractor’s employees that will be doing manual work on the
1 If the OSHA Citation is contested, no sanction under this policy will apply until the matter is resolved; as such, the bidder may truthfully represent that it has never been sanctioned with an OSHA Citation that would otherwise fall within the certification language during the pendency of the contest. If the contest does not result in a change to the sanction and the sanction continues to fall within the certification language, then the bidder must immediately notify Harris County that the contest was unsuccessful. Harris County is also under no obligation to award the bid to said bidder whether the contest is successful or not.
2 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the twenty-four (24) months preceding.
3 “Gravity” is used in this policy as it is explained in the most recent OSHA Field Operations Manual, as determined by the relevant OSHA Information System (OIS) code. The Policy does not depend on the monetary amounts of the penalties assessed by OSHA in association with citations.
4 As noted in Section III, this policy does not limit, or impact in any way, the County’s ability to consider in the manner it deems appropriate any relevant factor specifically listed in any request for bids, proposals, or qualifications. Thus, for example, even though this policy does not deem as nonresponsive bidders with OSHA violation types that are not listed, or requires certain thresholds with regard to “Serious” or “Posting Requirement” type of violations, the County may still consider any OSHA violation type, Severity finding, or Probability finding in the scoring of bids, proposals, or qualifications as specified in the bid, proposal, or qualification request documents.
5 If the OSHA Citation is contested, no sanction under this policy will apply until the matter is resolved; as such, the bidder may truthfully represent that it has never been sanctioned with an OSHA Citation that would otherwise fall within the certification language during the pendency of the contest. If the contest does not result in a change to the sanction and the sanction continues to fall within the certification language, then the bidder must immediately notify Harris County that the contest was unsuccessful. Harris County is also under no obligation to award the bid to said bidder whether the contest is successful or not.
6 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the three
(3) years preceding.
project or other work that directly impacts workplace safety is OSHA 10 certified prior to starting work on the job site.
6. Each of the Contractor/Subcontractor’s managers who manage at least one employee that will be doing manual work on the project or other work that directly impacts workplace safety, is OSHA 30 certified prior to starting work on the job site.
7. Contractor/Subcontractor will not require their managers or employees to pay for training associated with their OSHA 10 or OSHA 30 certification;
8. The Contractor/Subcontractor will compensate its managers and employees at their normal hourly rate for time spent obtaining their OSHA 10 or OSHA 30 certification; and
9. The Contractor/Subcontractor will provide access to all records, and take whatever steps necessary (e.g., obtain and disclose Gravity findings from OSHA with respect to an OSHA citation, waive any confidentiality (only to the extent necessary to comply wit h the Policy), etc.), to demonstrate compliance with the requirements of the Policy.
If the Contractor/Subcontractor fails to certify that it has met the above requirements, the County will deem the company’s bid nonresponsive. If every question on the certification is not marked “True,” a response to a question in the Safety Record Questionnaire is found to be false, the bid will be deemed nonresponsive. This determination will disqualify the Contractor/Subcontractor from only the bid at issue—the entity will not be prohibited from bidding on other County projects.
SECTION 6: ADMINISTRATION
The Harris County Purchasing Department (“Purchasing”) will administer all solicitation instructions, contract clauses, and compliance requirements before the award is made. Once the award is made, the Harris County Department of Economic Equity and Opportunity (“DEEO”) in conjunction with the Harris County Department overseeing the contract at issue will administer all remaining aspects of the Policy, including setting forth rules, regulations, and additional guidance to give effect to the Policy, including monitoring compliance with this policy and informing County Departments of findings as needed.
SECTION 7: COMPLAINTS
Complaints of noncompliance with this policy should be submitted in writing, via mail or email, to the DEEO at:
Attn: Assistant Director Stakeholder Engagement and Strategic Programs Harris County Department of Economic Equity and Opportunity
1010 Lamar St., Ste. 300 Houston, Texas 77002
Compliance@eeo.hctx.net mailto:Compliance@eeo.hctx.net
The written complaint must contain the name of the complainant and a brief description of the alleged noncompliance with this policy. The DEEO will notify the Contractor/Subcontractor that a complaint has been submitted and provide the Contractor/Subcontractor an opportunity to respond (with supporting documentation). The DEEO will determine whether the Contractor/Subcontractor is in noncompliance and notify the Contractor/Subcontractor and the complainant.
DEEO shall notify the parties involved (including the complainant) of its findings not later than the 60th day after receipt of the complaint. If the noncompliance determination is made, Purchasing (before the award), the DEEO, and/or the County Attorney’s Office shall have the authority to pursue any and all remedies as described in Section VIII and the Contractor/Subcontractor shall have the right to appeal set forth in Section IX below.
Employees, contractors, and stakeholders are encouraged to report any unsafe practices, hazards, or violations of safety policies without fear of retaliation. All reports will be treated confidentially to the extent possible, and no individual who in good faith reports a safety concern will suffer adverse employment action, disciplinary measures, or any form of retaliation.
Reports can be made through via mail or email, to the DEEO at Compliance@eeo.hctx.net. The County is committed to promptly investigating all reported concerns and taking appropriate corrective action to ensure a safe work environment.
SECTION 8: RECORDKEEPING, NON-COMPLIANCE, AND
ENFORCEMENT
Contractors (not subcontractors) shall maintain all records, reports, and other documents or items that demonstrate compliance with the requirements of the Policy, including, but not limited to, all documents that demonstrate that subcontractors meet the requirements of this policy. Contractors shall ensure Harris County has access to all records, reports and other documents or items of contractor and/or subcontractors that are maintained to demonstrate compliance with the requirements of this policy.
Harris County may conduct compliance reviews before the award of contracts or whenever it deems it necessary after the award of the contract. Documentation must be provided within ten (10) business days of the request. Upon request, the awarded vendor must also submit OSHA 300 and 300A logs for the past three years. If every question on the certification is not marked “True”, or a response to a question in the Safety Record Questionnaire is found to be false, the bid will be deemed nonresponsive.
Contractors found to have violated the requirements of the Policy during the term of their contract with the County, shall be subject to:
A. Remedies set forth in their contract with the County, up to and including withholding payment under the contract or contract termination;
mailto:Compliance@eeo.hctx.net
B. Negative impact on submissions of future County solicitations and possibly denial of award of a contract;
C. Probation, suspension, or debarment in accordance with applicable County policies;
D. Damages, including compensating Contractor’s Employees the amount(s) found to be owed to these individuals under the County Contract; and/or
E. The County pursuing all options available under the law. 7
SECTION 9: APPEALS
A Contractor or Subcontractor may appeal a finding of a violation of the Policy to the following authority:
• Pre-Contract Award: To the DEEO
• Post-Contract Award: To Purchasing
SECTION 10: MISCELLANEOUS
A. Nothing in this order shall be construed to impair or otherwise affect:
a. The authority granted by law to a Harris County Department, or the head thereof; or
b. The functions of the County Administrator or the Office of Budget Management relating to budgetary, administrative, or legislative proposals;
B. This policy shall be implemented consistent with applicable law and subject to the availability of appropriations; and
C. The Policy is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the County, its
7 If the OSHA Citation is contested, no sanction under this policy will apply until the matter is resolved; as such, the bidder may truthfully represent that it has never been sanctioned with an OSHA Citation that would otherwise fall within the certification language during the pendency of the contest. If the contest does not result in a change to the sanction and the sanction continues to fall within the certification language, then the bidder must immediately notify Harris County that the contest was unsuccessful. Harris County is also under no obligation to award the bid to said bidder whether the contest is successful or not.
If an OSHA Citation is contested, no sanctions under this policy apply until it is resolved. During that time, the bidder may truthfully state it has not been sanctioned under the certification language. The bidder must notify Harris County within ten (10) business days of the OSHA decision and provide documentation of the outcome. Harris County is not obligated to award the bid, regardless of the result.
departments, agencies, or entities, its officers, employees, agents, or any other person.
Version History
• The original version of this policy was adopted by Harris County Commissioners Court on January 10, 2023.
• Version 2 of the policy was adopted on November 13, 2025, to be effective for solicitations released after February 1, 2026.
SAFETY RECORD QUESTIONNAIRE
PART A – SAFETY RECORD QUESTIONNAIRE FOR PRIME CONTRACTORS
(Part A must be submitted by prime contractor with its bid)
Pursuant to Harris County’s Safety Record Policy, this certification must be submitted in conjunction with this bid, as the project for which your company is bidding (1) for construction, rehabilitation, expansion, reconstruction, or maintenance work; (2) have a total contract value of at least $500,000 and, for subcontracts, a contract value of at least $50,000; (3) and are not exempted from the Safety Record Policy.
If every question on the certification is not marked “True,” or a response to a question in the Safety Record Questionnaire is found to be false, the bid will be deemed nonresponsive.
This determination will disqualify your company from only this bid—your company is not prohibited from bidding on other County projects.
CERTIFICATION ONE
The Contractor, or the firm, corporation, partnership, or institution represented by the Contractor, or anyone acting for such firm, corporation, partnership or institution, has not been listed on OSHA’s Severe Violator Enforcement Program (SVEP) Log at any time within the three (3) years preceding the date of this certification.
TRUE_____ FALSE_____
CERTIFICATION TWO
The Contractor, or the firm, corporation, partnership, or institution represented by the Contractor, has not been sanctioned with an OSHA Citation and Notification of Penalty classified as one of the following types (if the OSHA Citation is contested8 then its classification is based on the Settlement with OSHA or OSHA Final Order) within the twenty-four (24) months preceding9 the date of this certification:
8 If an OSHA Citation is contested, no sanctions under this policy apply until it is resolved. During that time, the bidder may truthfully state it has not been sanctioned under the certification language.
The bidder must notify Harris County within ten (10) business days of the OSHA decision and provide documentation of the outcome. Harris County is not obligated to award the bid, regardless of the result.
9 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the twenty-four (24) months preceding.
(1)“Serious” with a Gravity10 finding of “High” (2) “Posting Requirements” with a Gravity finding of “High”11.
Disclosure: Do you currently have any open/contested violations that fall under this certification?
YES_____ NO_____
CERTIFICATION THREE
The Contractor/Subcontractor has not been sanctioned with an OSHA Citation and Notification of Penalty classified as one of the following types (if the OSHA Citation is contested12, then its classification is based on the Settlement with OSHA or OSHA Final Order) and within three (3) years preceding13 the date of this certification:(1)“Willful or Repeated”; (2) “Failure to Abate”; and/or , TRUE_____ FALSE_____
Disclosure: Do you currently have any open/contested violations that fall under this certification?
YES_____ NO___
CERTIFICATION FOUR
The Contractor, or the firm, corporation, partnership, or institution represented by the Contractor, (i.e., the company itself, not the company’s employees) within the ten (10)
10 “Gravity” is used in this policy as it is explained in the most recent OSHA Field Operations Manual, as determined by the relevant OSHA Information System (OIS) code. The Policy does not depend on the monetary amounts of the penalties assessed by OSHA in association with citations.
11 As noted in Section III, this policy does not limit, or impact in any way, the County’s ability to consider in the manner it deems appropriate any relevant factor specifically listed in any request for bids, proposals, or qualifications. Thus, for example, even though this policy does not deem as nonresponsive bidders with OSHA violation types that are not listed, or requires certain thresholds with regard to
“Serious” or “Posting Requirement” type of violations, the County may still consider any OSHA violation type, Severity finding, or Probability finding in the scoring of bids, proposals, or qualifications as specified in the bid, proposal, or qualification request documents.
12 If an OSHA Citation is contested, no sanctions under this policy apply until it is resolved. During that time, the bidder may truthfully state it has not been sanctioned under the certification language.
The bidder must notify Harris County within ten (10) business days of the OSHA decision and provide documentation of the outcome. Harris County is not obligated to award the bid, regardless of the result.
13 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the three (3) years preceding years preceding the date of this certification, has not been convicted of a criminal offense in connection with a workplace incident that resulted in serious bodily injury or death.
TRUE_____ FALSE_____
Disclosure: Do you currently have any pending court cases or litigation for violations that fall under this certification?
YES_______ NO______
CERTIFICATION FIVE
Contractor employees that will be doing manual work under a contract with the County or other work that directly impacts workplace safety has received the OSHA 10 certification, and managers that manage at least one employee that will be doing manual work on the project or other work that directly impacts workplace safety received the OSHA 30 certification, prior to entering the job site and before the commencement of construction.
TRUE_____ FALSE_____
CERTIFICATION SIX
Contractor employees are compensated for the cost of their OSHA 10 certification (workers) or OSHA 30 certification (managers) if they received such certification while employed by you. Contractor employees are also compensated at their normal hourly rate for the time workers and managers spend toward those certifications.
TRUE_____ FALSE_____
It is the sole responsibility and obligation of the Contractor to ensure that all Subcontractors performing any part of the work on this project disclose to the Contractor their safety records and meet the County’s requirements under the Safety Record Policy. The Contractor may fulfill this obligation by distributing the “Safety Record Questionnaire for Subcontractors” form included in this policy as Part B to all subcontractors and verifying to the County that the forms have been satisfactorily completed (i.e., every response is a “True”) and returned to the Contractor. All Safety Record Questionnaires are subject to the County’s review upon request.
Prime Contractor must maintain subcontractor certifications for every subcontractor it uses to perform work on the project throughout the life of the project. Prime Contractor must also collect completed questionnaires from all subcontractors at least 30 days prior to the commencement of work and attest that this will be completed.
PRIME CONTRACTOR SAFETY RECORD CERTIFICATION
Project Title:
Name:
Title:
Business or Entity Name:
Business or Entity Address:
County of Contracting Entity:
THE STATE OF TEXAS
COUNTY OF HARRIS
I, ________________________________, certify that:
1. I am the _____________________________(position) of ________________________ __ (“Contracting Entity”) and have the authority to execute this Certification on behalf of Contracting Entity.
2. The information provided in this Safety Record Questionnaire is true and correct.
3. I have made no willful misrepresentations, nor have I withheld information in my statements and answers to questions in this Safety Record Questionnaire.
4. I acknowledge and understand that the Contracting Entity will be disqualified from participating in this project if the Contracting Entity is unable to confirm as “True” each question in the Safety Record Questionnaire.
5. I will ensure that all subcontractors that will work on this project will have satisfactorily completed and submitted to the Contracting Entity their Safety Record Questionnaires by 30 days before work begins.
6. The Contracting Entity will provide access to all records, and take whatever steps necessary (e.g., obtain and disclose Gravity findings from OSHA with respect to an OSHA citation, waive any confidentiality (only to the extent necessary to comply with this policy), etc.) to substantiate the responses in the Safety Record Questionnaire.
7. I am aware that the information I have provided in this Safety Record Questionnaire will be investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected or the County to pursue any of the remedies foun d in Section VIII of the Safety Record Policy.
Signature
Date
PART B – SAFETY RECORD QUESTIONNAIRE FOR SUBCONTRACTORS
(Part B must be submitted by all subcontractors and submitted to the Prime Contractor with their bids. Prime Contractor is NOT required to submit this Part B with their bid.)
Pursuant to Harris County’s Safety Record Policy, this certification must be submitted in conjunction with this bid, as the project for which your company is bidding (1) for construction, rehabilitation, expansion, reconstruction, or maintenance work; (2) have a total contract value of at least $500,000 and, for subcontracts, a contract value of at least $50,000; (3) and are not exempted from the Safety Record Policy.
If every question on the certification is not marked “True,” or a response to a question in the Safety Record Questionnaire is found to be false, the Prime Contractor will not be able to use your services under its contract with the County. This determinat ion will disqualify your company from only this bid—your company is not prohibited from bidding on other County projects.
CERTIFICATION ONE
The Subcontractor, or the firm, corporation, partnership, or institution represented by the Subcontractor, or anyone acting for such firm, corporation, partnership or institution, has not been listed on OSHA’s Severe Violator Enforcement Program (SVEP) Log at any time within the three (3) years preceding the date of this certification.
TRUE_____ FALSE_____
CERTIFICATION TWO
The Subcontractor, or the firm, corporation, partnership, or institution represented by the Contractor, has not been sanctioned with an OSHA Citation and Notification of Penalty classified as one of the following types (if the OSHA Citation is contested14 then its classification is based on the Settlement with OSHA or OSHA Final Order) within the twenty-four (24) months preceding15 the date of this certification:
(1)“Serious” with a Gravity16 finding of “High” (2) “Posting Requirements” with a Gravity finding of “High”17.
14 If an OSHA Citation is contested, no sanctions under this policy apply until it is resolved. During that time, the bidder may truthfully state it has not been sanctioned under the certification language. The bidder must notify
Harris County within ten (10) business days of the OSHA decision and provide documentation of the outcome.
Harris County is not obligated to award the bid, regardless of the result.
15 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the twenty-four
(24) months preceding.
16 “Gravity” is used in this policy as it is explained in the most recent OSHA Field Operations Manual, as determined by the relevant OSHA Information System (OIS) code. The Policy does not depend on the monetary amounts of the penalties assessed by OSHA in a ssociation with citations.
17 As noted in Section III, this policy does not limit, or impact in any way, the County’s ability to consider in the
Disclosure: Do you currently have any open/contested violations that fall under this certification?
YES_____ NO_____
CERTIFICATION THREE
The Subcontractor has not been sanctioned with an OSHA Citation and Notification of Penalty classified as one of the following types (if the OSHA Citation is contested 18, then its classification is based on the Settlement with OSHA or OSHA Final Order) and within three
(3) years preceding19 the date of this certification:(1)“Willful or Repeated”; (2) “Failure to Abate”; and/or , TRUE_____ FALSE_____
Disclosure: Do you currently have any open/contested violations that fall under this certification?
YES___ NO___
CERTIFICATION FOUR
The Subcontractor, or the firm, corporation, partnership, or institution represented by the Subcontractor (i.e., the company itself, not the company’s employees), within the ten (10) years preceding the date of this certification, has not been convicted of a criminal offense in connection with a workplace incident that resulted in serious bodily injury or death.
TRUE_____ FALSE_____
Disclosure: Do you currently have any pending court cases or litigation for violations that fall under this certification?
YES_____ NO_____
manner it deems appropriate any relevant factor specifically listed in any request for bids, proposals, or qualifications. Thus, for example, even though this policy does not deem as nonresponsive bidders with OSHA violation types that are not listed, or requires certain thresholds with regard to “Serious” or “Posting Requirement” type of violations, the County may still consider any OSHA violation type, Severity finding, or Probability finding in the scoring of bids, proposals, or qualifications as specified in the bid, proposal, or qualification request documents.
18 If an OSHA Citation is contested, no sanctions under this policy apply until it is resolved. During that time, the bidder may truthfully state it has not been sanctioned under the certification language. The bidder must notify
Harris County within ten (10) business days of the OSHA decision and provide documentation of the outcome.
Harris County is not obligated to award the bid, regardless of the result.
19 The Issuance Date of the Citation and Notification of Penalty is the relevant date when calculating the three (3) years preceding
CERTIFICATION FIVE
Subcontractor employees that will be doing manual work under contract between the County and the Prime Contractor or other work that directly impacts workplace safety has received the OSHA 10 certification, and managers that manage at least one employee that will be doing manual work on the project or other work that directly impacts workplace safety has received the OSHA 30 certification, by the first day of work on the project (if you are hired as a subcontractor on the project).
TRUE_____ FALSE_____
CERTIFICATION SIX
Subcontractor employees are compensated for the cost of their OSHA 10 certification (workers) or OSHA 30 certification (managers) if they received such certification while employed by you. Subcontractor employees are also compensated at their normal hourly rate for the time workers and managers spend toward those certifications.
It is the sole responsibility and obligation of the Contractor to ensure that all Subcontractors performing any part of the work on this project disclose to the Contractor their safety records and meet the County’s requirements under the Safety Record Policy. The Contractor may fulfill this obligation by distributing the “Safety Record Questionnaire for Subcontractors” form included in this policy as Part B to all subcontractors and verifying to the County that the forms have been satisfactorily completed (i.e., every response is a “True”) and returned to the Contractor.
Subcontractors should submit the Safety Record Questionnaire to the Contractor as soon as they are able to. Contractor shall have until 30 days before the start of work on the project to obtain certifications from its Subcontractors.
All safety records are to be submitted by the prime contractor as instructed on the first page of this Safety Record Questionnaire, and all such records are subject to Harris County’s review upon request.
SUBCONTRACTOR SAFETY RECORD CERTIFICATION
Project Title:
Name:
Title:
Business or Entity Name:
Business or Entity Address:
County of Contracting Entity:
THE STATE OF TEXAS
COUNTY OF HARRIS
I, ________________________________, certify that:
1. I am the ____________________________(position) of _________________________ _ (“Subcontracting Entity”) and have the authority to execute this Certification on behalf of Subcontracting Entity.
2. The information provided in this Safety Record Questionnaire is true and correct.
3. I have made no willful misrepresentations, nor have I withheld information in my statements and answers to questions in this Safety Record Questionnaire.
4. I acknowledge and understand that the Subcontracting Entity will be disqualified from participating in this project if the Subcontracting Entity is unable to confirm as “True” each question in the Safety Record Questionnaire.
5. I will ensure that the prime contractor on the project will receive this Safety Record Questionnaire by 30 days before work begins.
6. Subcontracting Entity will provide access to all records, and take whatever steps necessary (e.g., obtain and disclose Gravity findings from OSHA with respect to an OSHA citation, waive any confidentiality (only to the extent necessary to comply with this policy), etc.) to demonstrate compliance with the requirements of this policy.
7. I am aware that the information I have provided in this Safety Record Questionnaire will be investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected or the County to pursue any of the remedies foun d in Section VIII of the Safety Record Policy.
Signature
Date
PART 2: WORKSITE SAFETY POLICY
Construction Projects Under Contract with Harris County, Texas
TABLE OF CONTENTS
1. PURPOSE AND SCOPE
2. PRIME CONTRACTOR RESPONSIBILITIES
3. MANDATORY SAFETY STANDARDS
4. SITE-SPECIFIC SAFETY PLAN
5. SAFETY MEETINGS AND TRAINING
6. SAFETY INSPECTIONS AND AUDITS
7. ACCIDENT REPORTING AND INVESTIGATION
8. MULTI-EMPLOYER WORKSITE COORDINATION
9. ADDITIONAL SPECIFIC REQUIREMENTS
10. KNOW YOUR RIGHTS AND SAFETY TRAINING FOR WORKERS
11. COMPLAINTS
12. INVESTIGATION AND RESOLUTION
13. VIOLATIONS AND PENALTIES
14. CONTRACTOR DOCUMENTATION AND RECORDKEEPING
15. REPORTING AND DATA ON WORKSITE SAFETY
16. COUNTY WORKSITE SAFETY COMMITTEE
17. POLICY REVIEW AND UPDATES
18. MISCELLANEOUS
APPENDICES:
A. DAILY WORKSITE SAFETY INSPECTION CHECKLIST
B. OSHA MANDATORY REQUIREMENTS
C. SPECIALIZED OPERATIONS
D. HEALTH HAZARDS
E. ENVIRONMENTAL PROTECTION
F. DEFINITIONS
G. HARRIS COUNTY CONTACT INFORMATION
1. PURPOSE AND SCOPE
1.1 Purpose
This Worksite Safety Policy ensures compliance with:
• Federal Occupational Safety and Health Administration (OSHA) regulations (29 CFR 1926 - Safety and Health Regulations for Construction)
• Texas state construction safety requirements
• Section 107 of the Contract Work Hours and Safety Standards Act
• Texas Labor Code Section 411
1.2 Scope and Applicability
This Policy applies to (1) are for construction, rehabilitation, expansion, reconstruction, or maintenance work (2) have a total contract value of at least $500,000 and, for subcontracts, a contract value of at least $50,000; (3) and are not exempted by this Section. Prime contractors must include in all contracts with subcontractors binding provisions that flow down Harris County’s requirements of prime contractors in the Policy onto their respective subcontractors. Prime contractors must fully apply these binding contractual provisions to subcontractors, including, but not limited to, terminating subcontractor relationships for noncompliance.
The following types of contracts are exempt from this policy:
• Interlocal Government Agreements
• Cooperative Purchasing Agreements
• Emergency Contracts
• Moving Contracts
• Contracts for purchases of goods and services considered to be ancillary to the purchases of goods. A business entity that only supplies goods (bricks, paper, fuel, office supplies, tools, clothing, food, etc.,) and such transportation services as may be incident to delivering those goods to County Property (including the use of common carriers (e.g., truck drivers)) is considered a “Supplier” and Suppliers are not subject to the Safety Record Policy.
• Contracts for the sale of County Property or Goods
• Contracts paid for using funds where condition of those funds is that this policy’s application is prohibited
• Contracts procured under the discretionary exemptions found in Texas Local Government
Code § 262.024
• Services procured under Texas Government Code § 2254 (Professional and Consulting
Services)
• Contracts expressly waived by Harris County Commissioners Court if determined to be necessary
1.3 Authority
This policy is established under the authority of Harris County Commissioners Court , and contractors agree to full compliance as a condition of contract award and continued eligibility to perform work.
1.4 Effective Date
1.4.1 Policy Effective Date
Except for the sections mentioned in Section 1.4.2 below, this policy is effective as of February 1, 2026.
1.4.2 County Implementation Effective Date
The following sections are effective as of July 1, 2026:
• 6.3
• 6.4
• 6.5
• 12
• 15.3
The County will submit final proposals for Commissioners Court’s consideration by February 1, 2026, regarding the topics in the following sections:
• 11.3.2
• 13.1
• 13.2
The Worksite Safety committee established in Section 16 of this policy shall review the preceding sections and make recommendations on any adjustments by May 1, 2026.
2. PRIME CONTRACTOR RESPONSIBILITIES
Prime contractors shall:
• Maintain sole responsibility for overall jobsite safety and health
• Maintain site security
• Ensure all work is performed in surroundings and under conditions that are sanitary, not hazardous, and not dangerous to workers' health or safety
• Initiate and maintain comprehensive safety programs necessary to comply with all applicable OSHA standards
• Provide frequent and regular inspections of job sites, materials, and equipment by designated competent persons
• Maintain authority to stop work immediately when imminent danger conditions exist
• Report all accidents, injuries, and near-misses to Harris County within 24 hours
• Ensure all employees and subcontractors follow these same responsibilities
3. MANDATORY SAFETY STANDARDS
3.1 OSHA Safety Standards
Contractors must comply with all mandatory OSHA safety standards. Please see Appendix B for additional details about mandatory OSHA safety standards.
3.2 Additional Health and Safety Requirements
All contractors, including subcontractors, performing work on Harris County construction projects must:
• Comply with federal and state health and safety laws, including but not limited to the Occupational Safety and Health Act, which requires safe working practices and procedures on all projects
• Respect a worker’s right under the Occupational Health and Safety Act to refuse dangerous and unsafe work
• Provide their employees with Personal Protective Equipment (PPE) required for employees to conduct their work safely at no cost to the worker
• Provide a paid 10-minute rest break for every four hours worked
▪ When worksite temperatures are above 90 degrees Fahrenheit, provide a paid
15-minute rest break every two (2) hours to allow workers to drink water and cool off and prevent heat illnesses such as heat strokes that could have fatal consequences
▪ Contractors may use alternative rest break methods if approved by the applicable overseeing department
• Develop plans to mitigate heat hazards at their worksites and protect workers from rising temperatures (see Section 3.3.1 for detailed requirements)
• Develop emergency response plans for situations in which a worker is actively experiencing heat illness (see Section 3.3.2 for detailed requirements)
• Submit a Safety and Health Plan (SHP) before project mobilization (see Section 4.3 for detailed requirements)
3.3 Heat Illness Prevention and Emergency Response Plans
All construction employers must develop and implement written health illness prevention and emergency response plans. Such plans shall adhere to the parameters in Sections 3.3.1 and 3.3.2 below; contractors may also use alternative plans if approved by the applicable overseeing department.
3.3.1 Heat Illness Prevention Plans
Heat illness prevention plans must include:
• Identification of heat hazard conditions and affected work areas
• Measures to mitigate heat hazards at worksites and protect workers from rising temperatures
• Access to an unlimited supply of adequate, cool drinking water
• Access to shaded rest areas
• Work/rest schedules during extreme heat conditions
• Acclimatization procedures for new workers and workers returning from absence
• Education for workers and supervisors on mitigating heat hazards and recognizing heat illness symptoms and administering relevant first aid procedures
All construction employers must provide supervisors and workers with education on mitigating heat hazards as well as recognizing the symptoms of heat illness (heat exhaustion, heat stroke, heat cramps, heat syncope (fainting and dizziness)).
3.3.2 Emergency Response Plans
Emergency response plans must address situations in which a worker is actively experiencing heat illness, including:
• Immediate notification procedures (911 and site supervision)
• Designated personnel trained in first aid response
• Location of first aid supplies and cooling resources
• Site access information for emergency responders
• Procedures for monitoring affected worker until emergency services arrive
3.4 Integration with Existing Standards
The requirements in subsections 3.2 and 3.3 supplement and do not replace the mandatory safety standards in subsection 3.1 of this policy. Where requirements overlap, the more stringent standard shall apply.
4. SITE-SPECIFIC SAFETY PLAN
4.1 Pre-Construction Safety Planning
Before work begins, contractors must:
• Conduct a comprehensive hazard assessment of the project
• Develop a written site-specific safety plan addressing identified hazards
• Submit the site-specific safety plan to Harris County for review (minimum 10 days before mobilization)
• Identify project-specific safety representatives and emergency contacts
• Develop and post site-specific layout showing emergency evacuation routes, assembly points, and emergency equipment locations
• Maintain and update the site-specific safety plan per project progress
4.2 Required Elements of Site-Specific Safety Plan
The site-specific safety plan must include:
• Project description and scope
• Hazard assessment and analysis
• Site-specific safety procedures for identified hazards
• Emergency action plan and evacuation procedures
• Accident reporting and investigation procedures
• Safety inspection schedule and checklist
• Designated competent persons for specific operations
• Training requirements and records management
• Subcontractor coordination procedures
• Stop work authority procedures
4.3 Safety and Health Plan
In addition to the site-specific safety plan requirements above, contractors must submit a Safety and Health Plan (SHP) before project mobilization that includes:
• Contractor's safety record
• OSHA 300 logs for the past three years
• Workforce training certifications (OSHA 10/30, specialized training)
• Written plan for how workplace injuries will be prevented, including:
▪ Specific control measures for identified hazards
▪ Roles and responsibilities for safety management
▪ Methods for ensuring subcontractor compliance
▪ Procedures for incident investigation and corrective action
5. SAFETY MEETINGS AND TRAINING
5.1 Pre-Construction Safety Conference
A mandatory pre-construction safety conference shall be held before work begins, attended by:
• Harris County representatives
• Prime contractor management and safety personnel
• Invited subcontractor representatives
• Designated competent persons
Topics shall include:
• Review of this Work Safety Policy
• Project-specific hazards
• Emergency procedures
• Reporting requirements
• Coordination of multi-employer worksites
• Worker rights under this policy, including non-retaliation protections
• Complaint reporting mechanisms (Fraud, Waste, & Abuse hotline and direct reporting)
• County monitoring and enforcement procedures
5.2 Weekly Safety Meetings
Contractors must hold weekly safety meetings in adherence with the following requirements:
• Conducted weekly at minimum per shift
• All workers must attend
• Topics must address current and upcoming work hazards
• Attendance must be documented with signatures
• Safety sheet must include safety topic and PPE requirements for topic
• Meeting minutes retained for project duration
5.3 Task-Specific Training
Before performing any skilled tasks, workers must receive training on:
• Specific hazards associated with the task and SDS training to work safely with hazardous chemicals, hazardous chemical identification, proper storing and handling, PPE, and emergency procedures
• Required PPE and how to use it
• Safe work procedures
• Emergency procedures
5.4 New Employee Orientation
All workers must complete site orientation covering:
• Site-specific hazards and safety rules
• Emergency procedures and evacuation routes
• PPE requirements
• Accident reporting procedures
• Location of first aid and emergency equipment
6. SAFETY INSPECTIONS AND AUDITS
6.1 Daily Worksite Safety Inspection Checklist - Contractor Requirement
Mandatory Daily Inspections:
Contractors shall complete the Daily Worksite Safety Inspection Checklist (Appendix A) on a daily basis before work commences and whenever site conditions change in a manner that could create potential hazards or unsafe working conditions. The checklist must be completed by a designated competent person who has the knowledge, training, and authority to identify hazards and take corrective action.
Daily Inspection Coverage:
The daily inspection using the checklist shall assess the following, as applicable:
1. Fall Protection (29 CFR 1926.501)
2. Scaffolding Safety (29 CFR 1926.451)
3. Ladder Safety (29 CFR 1926.1053)
4. Personal Protective Equipment (29 CFR 1910.132-138)
5. Electrical Safety (29 CFR 1926.404)
6. Hazard Communication (29 CFR 1910.1200)
7. Machine Guarding (29 CFR 1910.212)
8. Lockout/Tagout (29 CFR…