About this file

This document is an Addendum #1 issued by the Oregon Department of Corrections for the OSPM Fire Alarm System Upgrade project (Solicitation #S-29100-000 13611). The addendum provides clarifications, revisions, and responses to contractor questions regarding the fire alarm system upgrade at the Oregon State Penitentiary Main (OSPM) facility. Key details include modifications to technical specifications, addressing queries about smoke detectors, HVAC units, gate control during fire alarms, and site access procedures. The document requires bidders to sign and return the addendum by the bid closing date, with potential bid rejection for non-compliance.

The addendum reveals critical project requirements, including the installation of combo smoke/CO detectors in the Main Housing and Recreation Buildings, confirmation of fuel-burning appliances in multiple buildings, and specific requirements for fire alarm boxes (to be painted red). Contractors must undergo background checks (LED's) and will be escorted by a Construction Escort during site access. The project involves upgrading fire alarm systems across multiple buildings, with specific attention to duct smoke detection for certain HVAC units. Notably, the document clarifies that a UUKL Listed Fire Alarm Control Panel is not required for this I-3 occupancy group project, and there is no dedicated smoke control system as previously questioned by potential bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Tina Kotek, Governor

Level 3 - Restricted

Department of Corrections Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

(503) 510-5285 Dustin.m.sculatti@doc.oregon.gov

6/5/2025

ADDENDUM #1

For # S-29100-000 13611

OSPM Fire Alarm System Upgrade

Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications. This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.

This addendum shall be added to and become part of the original Invitation to Bid.

Item #1: Owner Clarification/Revision: If a tariff related occurrence is imposed during the life of the contract that affects materials costs, the Owner may agree to an increase of cost via change order. Tariff increases must be verified and documented before acceptance.

Item #2: Contractor Question: “ Keynote 7 on sheet E2.2 mentions a front entry gate override. What is the intent in the event of an alarm? Are we supposed to unlock the gate? Lock the gate? Where is the power supply for the gate controller locate?

Answer: The fire alarm system automatically unlocks the main gate between the parking area and the Transportation Building, allowing egress during a fire alarm condition. The power supply is a control power transformer on the wall adjacent to the existing FACP.

Item #3: Contractor Question: “What will the phasing of this project be? Will we demo the existing system out of the building on day 1?

Answer: See proposed construction schedule; section 26 00 00 General Electrical Requirements, Part 1.5 Proposed Construction Schedule.

Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

Item #4: Contractor Question: “The spec only lists a part number for a smoke/CO combo head. Are we supposed to put smoke/CO combo heads everywhere a smoke is shown on the drawings? Are we supposed to put smoke detectors where they are shown and CO detectors where needed?

Answer: The Main Housing and Recreation Building are I-3 and require smoke/co.

Thus, the majority of the automatic smoke detectors require smoke/CO. Therefore, all smoke detectors on this job are to be combo smoke/CO.

Item #5: Contractor Question: “Are there any fuel burning appliances in the building?

Answer: Main Housing Building – Yes.

Recreation Building – Yes.

Item #6: Contractor Question: “Are any of the HVAC units over 2,000 CFM? If so, how many of them are and where are they located?

Answer: Transportation - There is an existing HRV unit which is over 2,000 CFM.

However, the unit does not function and will be replaced by OSPM. Therefore, no duct smoke required.

Main Housing - A duct smoke will be added for RAF-1. See addenda drawings.

Recreation - A duct smoke will be added for an HVAC unit. See addenda drawings.

Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

Item #7: Contractor Question: “Will we be required to do any kind of check in/check out procedures at the start and end of each day for tools and/or materials?

Answer: We will have a Construction Escort onsite to verify tools and material in and out each day.

Item #8: Contractor Question: “Does the conduit, boxes, and straps have to be painted? If so, what color?

Answer: "Fire alarm boxes to be red (see 28 05 33.B01). “No requirement to paint conduits or conduit straps".

Item #9: Contractor Question: “How do we get inspectors and or underground locate personnel for excavation/trenching work clearance into the building for visual inspections? Does a guard escort them or will they need a background check?

Answer: LED’s (Background check form) will be needed for access and a Construction Escort will be present when any personnel are onsite.

Item #10: Contractor Question: “ Is circuit isolation required of the P-Link cabling that will provide network capability and insure operational performance of the installed system in the event of a short occurrence within the P-Link cabling?

Answer: Surge arresters are shown on sheet E0.2 on underground p-link wiring between buildings. Isolation modules are shown on sheet E0.2 on SLC wiring.

No other isolation modules are required.

Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

Item #11: Contractor Question: “Does the specified Fire Alarm Control Unit (Potter #AFC-1000) and the NAC Booster Power Supply (Potter #PSN-1000E Series) have the required Underwriters Laboratory UUKL listing required for the Smoke Control System functionality required of the project?

Answer: OSSC Section 909 Smoke Control for I-3 occupancy groups. Therefore, a UUKL Listed FACP is not required.

Item #12: Contractor Question: “Define the intended usage of the existing Smoke Control System.

• Smoke Containment.

• Smoke Management.

Answer: See answer to #11. There is no OSSC Section 909 Smoke Control system.

Item #13: Contractor Question: “Per NFPA 92 during the commissioning of the Smoke Control System will pressure differences and airflow quantities, door forces be measured to ensure less than 30 lbs. of force can open the door?

Item #14: Contractor Question: “Please provide the certifications required of field technicians providing the commissioning testing of the Smoke Control System.?

Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

Item #15: Deletions and/or Additions: [OSPM Fire Alarm Plans section E0.2, E1.3, E1.6, E2.3 and E2.6] are deleted in its entirety and replaced with OSPM Fire Alarm Addendum #1-Plans E0.2, E1.3, E1.6, E2.3 and E2.6.

This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.

Company Name: ________________________________________________________

Authorized Signature: ____________________________________________________

Date: _______________________________________

6/5/2025
ADDENDUM #1
For # S-29100-000 13611