13414 ADDENDA 1.pdf
PDF 423 KB Posted
- Solicitation number
- S-29100-00013414
- Issued by
- Lake County, Oregon
About this file
This is Addendum 1 for the Oregon Department of Corrections' solicitation S-29100-00013414 for the Warner Creek Correctional Facility (WCCF) Boiler Replacement project. The addendum formally modifies the original Invitation to Bid (ITB) and includes a substitution request for a heat exchanger, specifically approving a Hexonic heat exchanger in place of the originally specified Alpha Laval model. The substitution request was submitted by Pac West Sales Inc. on 6/3/25 and was approved by Jesse Swanson on 6/11/25. The technical documentation provided includes detailed calculation sheets and technical specifications for the Hexonic AJFB-015-P150-29 heat exchanger, which is designed for water-to-water heat exchange with specific performance parameters.
The heat exchanger specifications indicate a heat load of 537,421.8 BTU/h, with water inlet temperatures of 165°F and 55°F, and outlet temperatures of 100°F and 162.70°F. The unit is designed with a heat transfer area of 50.3 ft², can handle maximum pressures up to 150 psi, and is constructed with stainless steel 2" external thread connections. The design meets ASME BPVC Section VIII, Division 1 standards, with plates made of 0.5 mm 316L material and NBR HT gaskets. The addendum requires bidders to sign and return the document by the bid closing date, with failure to do so potentially resulting in bid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 252301_WCCF-Boiler Replacement BID Set 2-24-25.pdf | ||
| 13414 SPECS.pdf | ||
| 1314 Plan Holders List~1.pdf | ||
| 13414 Bid Tab.pdf | ||
| 13414 ITB GTC SC.pdf | ||
| 7007 NOIA.pdf | ||
| 13414 ADDENDA 2.pdf | ||
| 25-022-PSC Bid Tab - filled.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oregon
Department of Corrections Purchasing Section
3723 Fairview Industrial Dr SE Salem, OR 97302
(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov
06/16/2025
ADDENDUM 1
For S-29100-00013414
WCCF Boiler Replacement
Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.
This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.
This addendum shall be added to and become part of the original Invitation to Bid.
1. Revision; Substitution request approved, see attached.
This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.
Company Name: __________________________________________________________
Authorized Signature: ______________________________________________________
Date:_______________________________________
SUBSTITUTION REQUEST
TO: Ryan Kirtley
PROJECT: Warner Creek Correctional
SPECIFIED ITEM: Alpha Laval
Section 23 57 00 Page 1 Paragraph 2.1 Description: Water-to Water Heat Exchangers
PROPOSED SUBSTITUTION: Hexonic
Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.
Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.
The undersigned certifies that the following paragraphs, unless modified by attachments, are correct:
1. The proposed substitution does not affect dimensions shown on Drawings.
2. The undersigned will pay for changes to the building design, including engineering design.
3. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements.
4. Maintenance and service parts will be locally available for the proposed substitution.
The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item.
Submitted by: Thomas Szklarz
Signature: ______________________
Firm: Pac West Sales Inc
Address: 11112 47th Avenue West
Mukilteo, WA 98275
Date: 6/3/25
Telephone: 425-493-9680_____
For use by the A/E
Approved Approved as noted
Not Approved Received too late
By: ______________________
Date: ______________________ Remarks: ______________________ jesse.swanson Text Box X jesse.swanson Text Box Jesse Swanson jesse.swanson Text Box 6/11/2025
HEAT EXCHANGERS CALCULATION SHEET
Project US.25.06.000025 Warner Creek Correctional Calculation US2506000041.001 New selection 1 Prepared 2025-06-03 Prepared by Alex Matrunich HEX type AJFB-015-P150-29 Catalog Number Total no. of units 1 No. of units in series/parallel 1 / 1
PROJECT DATA SHEET
INPUT DATA Side 1 Side 2 UNITS Heat load 537421,8 BTU/h
LMTD 14,4 °F
Min oversizing 0,00 % Fluid Water Water Inlet temperature 165,00 55,00 °F Outlet temperature 100,00 162,70 °F Mass flow 138,24 83,40 lb/min Inlet volume flow 16,99 10,00 USGal/min Outlet volume flow 16,70 10,24 USGal/min Max pressure drop 3,6 3,6 psi HEAT EXCHANGER Side 1 Side 2 UNITS Heat transfer area 50,3 ft² Fouling factor 0,00001468 ft²h°F/BTU OHTC clean 751,8 BTU/ft²h°F OHTC fouling 743,6 BTU/ft²h°F Oversize 1,1 % Calc. press. drop 1,7 0,7 psi Connections velocity 1,58 0,95 ft/s Internal velocity 0,51 0,30 ft/s Internal Reynolds No. 1490 703 Heat transfer coefficient 1381,8 877,9 BTU/ft²h°F
NTU 4,6 7,6
PHYSICAL PROPERTIES Side 1 Side 2 UNITS Fluid Water Water Ref. temperature 132,5 108,9 °F Density 61,44 61,79 lb/ft³ Heat capacity 1,00 1,00 BTU/lb°F Thermal conductivity 0,375 0,366 BTU/fth°F Dynamic viscosity 0,4964 0,6218 cP Prandtl No. 3,16 4,20
CAIRO
HEXONIC Inc., 34-18 Northern Blvd, FL 1, Long Island City, NY 11101, + 1 (347) 667-9045, + 1 (347) 849-1580, info.us@hexonic.com www.hexonic.com ver. 1.0.1.0, build 060525 Page 1 of 3 http://www.hexonic.com
HEAT EXCHANGERS TECHNICAL DATA SHEET
Project US.25.06.000025 Warner Creek Correctional Calculation US2506000041.001 New selection 1 Prepared 2025-06-03 Prepared by Alex Matrunich HEX type AJFB-015-P150-29 Catalog Number
CAIRO
HEXONIC Inc., 34-18 Northern Blvd, FL 1, Long Island City, NY 11101, + 1 (347) 667-9045, + 1 (347) 849-1580, info.us@hexonic.com www.hexonic.com ver. 1.0.1.0, build 060525 Page 2 of 3 http://www.hexonic.com
WORKING CONDITIONS
Max pressure 150 psi
Test pressure 195 psi
Max temperature 250 °F
Min temperature -4 °F
Fluid group 2
CONNECTION TYPES
4 x External thread 2" Stainless steel
CONNECTIONS LOCATION
Counter-current flow
K1 - side 1 inlet
K2 - side 2 outlet
K3 - side 2 inlet
K4 - side 1 outlet
DESIGN DATA
Side 1 flow arrangement 14 x 1 + 0 x 0
Side 2 flow arrangement 14 x 1 + 0 x 0
Total number of plates 29
Max no. of plates 51
Expansion capacity 76 %
Channel mixing H
Fluid volume 3,1 USGal
Weight 319,0 / 325,7 lb
Frame STD 150 psi Carbon steel
Frame colour RAL 2004
Plates 0,5 mm 250 psi 316L
Gaskets NBR HT
Design code ASME BPVC Sec.VIII, Div. 1, Ed. 2023
Inspection code ASME BPVC Sec.VIII, Div. 1, Ed. 2023, UM
DIMENSIONS
L 15,7 inch
L1 5,3 inch
Assembly Measurement 3,3 inch
CAIRO
HEXONIC Inc., 34-18 Northern Blvd, FL 1, Long Island City, NY 11101, + 1 (347) 667-9045, + 1 (347) 849-1580, info.us@hexonic.com www.hexonic.com ver. 1.0.1.0, build 060525 Page 3 of 3 http://www.hexonic.com
| 13414 ADDENDA 1 |
| 06/16/2025 |
| ADDENDUM 1 |
| Heat exchanger Sub request-1 |