12 Front Range Areas 1 - 4 Existing Utility Plan and Testholes.pdf
PDF 10 MB Posted
- Attached to
- NIST Boulder Solar Lighting Upper Site Replacement Federal contract opportunity
- Solicitation number
- 1333ND26RNB190033
About this file
This document is a Utility Plan set for the NIST Front Range facility located at 325 Broadway in Boulder, Colorado, prepared by Recon Utility Services. The document comprises 17 sheets of detailed utility mapping and test hole information covering Areas 1-4 of the facility.
The utility plans document the locations and depths of existing water mains (ranging from 1 inch copper to 18 inches plastic), natural gas lines (2 to 6 inches in diameter), storm and sanitary sewers, electrical lines, telecommunications infrastructure, fiber optic lines, and other utility systems throughout the 325 Broadway site. The plans include 38 test holes excavated to verify utility locations, with detailed measurements showing depths to top and bottom of utilities, along with documentation of instances where utilities were not found or where excavation encountered unexpected conditions such as concrete caps, collapsing soil, and large rocks. Key utilities identified include main water valves (MV), fire hydrant valves (FHV), fire line valves (FLV), post indicator valves (PIV), and fire main valves (FMV). The document also notes specific challenges encountered during utility location work, including lost locate tones, metal braided wires on gas lines, and abandoned or removed infrastructure. A comprehensive legend on page 2 provides standardized symbols for all utility types, quality levels, and facility components depicted throughout the site plans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1333ND26RNB190033 0004 Ext Due and RFIs.pdf | ||
| 1333ND26RNB190033 0003 Minor Revisions.pdf | ||
| Solar Lighting Replacement Site Visit.pdf | ||
| Solar Ltg Upper Site Replacement - Additional Supplemental Info.pdf | ||
| 1333ND26RNB190033 0002 Inc RFIs.pdf | ||
| 07 B25 AsBuilts.pdf | ||
| 10 Laydown Yard Elec 1Line.pdf | ||
| 11 Existing Utility Plan and Testholes.pdf | ||
| 13 NIST Elec Site Standards.pdf | ||
| 14 RAB Exterior Fixture.pdf | ||
| 06 B22 AsBuilts.pdf | ||
| 1333ND26RNB190033 001.pdf | ||
| 05 B4 AsBuilts.pdf | ||
| 09 HighSpeedSwith Elec AsBuilts.pdf | ||
| 15 Solar Lighting Upper Site Replacement-Elec Specs.pdf | ||
| 08 B51 Elec AsBuilts.pdf | ||
| 1333ND26RNB190033.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIST - FRONT RANGE - AREAS 1 - 4
325 BROADWAY
TESTHOLE #1
WATER MAIN:
NOT FOUND, ENCOUNTERED
LARGE ROCK AT 90"
TESTHOLE #4
18" PLASTIC WATER MAIN:
67" TO TOP,
85" TO BOTTOM
TESTHOLE #2
18" PLASTIC WATER MAIN:
58" TO TOP,
76" TO BOTTOM
8"
MV
MV
14"
FLV
FHV
FLV
12"
FLV
FHV
MV FMV
12"
FMV
TESTHOLE #11
12" STEEL WATER MAIN:
103" TO TOP,
115" TO BOTTOM
TESTHOLE #5
18" PLASTIC WATER MAIN:
46" TO TOP,
64" TO BOTTOM
TESTHOLE #6
18" PLASTIC WATER MAIN:
55" TO TOP,
73" TO BOTTOM
MV
8"
12"
12"
FHV
MV
MV
FHV
TESTHOLE #3
NOT FOUND TO 120" DEPTH,
EXPLORED 18" NE AND SWMV
MV
MV
14"
MV
MV
8" STEEL
MV
12"
FLV
FLV
PIV
FLV
TESTHOLE #7
18" PLASTIC WATER MAIN:
56" TO TOP,
74" TO BOTTOM
TESTHOLE #8
3" PLASTIC GAS:
44" TO TOP,
47" TO BOTTOM
12"
MV
12"
MV
FHV
12"
FHV
TESTHOLE #9
NOT FOUND DUE TO
COLLAPSING SOIL.
MEASUREMENT AT
VALVE = 38"
8"
MV
TESTHOLE #35
6" PLASTIC WATER:
67" TO TOP
73" TO BOTTOM
TESTHOLE #34
6" STEEL WATER:
39" TO TOP
45" TO BOTTOM
PLACED MARKER BALL
TESTHOLE #33
6" STEEL WATER:
38" TO TOP
44" TO BOTTOM
TESTHOLE #32
8" WATER:
68" TO TOP
76" TO BOTTOM
12"
MV
FHV
FLV
MVPIV
MV
FHV
TESTHOLE #37
10" PLASTIC WATER:
70" TO TOP
80" TO BOTTOM
PLACED MARKER BALL
TESTHOLE #38
10" PLASTIC WATER:
69" TO TOP
79" TO BOTTOM
PLACED MARKER BALL
TESTHOLE #36
10" PLASTIC WATER:
69" TO TOP
79" TO BOTTOM
PLACED MARKER BALL
TESTHOLE #12
3" PLASTIC GAS:
70" TO TOP,
73" TO BOTTOM
12"
MV
FHV
6"
TESTHOLE #10
4" PLASTIC GAS:
61" TO TOP AT TEE,
65" TO BOTTOM,
55" TO TOP AT SW SIDE OF HOLE,
59" TO BOTTOM
PIV
MV
MV
FLV
MV
FHV
MV
6"
MV
MV
12"
FHV
12"
MV 6"
TESTHOLE #15
18" PLASTIC WATER:
62" TO TOP,
80" TO BOTTOM
TESTHOLE #14
18" PLASTIC WATER:
52" TO TOP,
70" TO BOTTOM
TESTHOLE #13
18" PLASTIC WATER:
77" TO TOP,
95" TO BOTTOM
12"
6"
8"
6"
FHV
FHVFHV
MV
MV
MV
MV
MV
MV
12"
8"
14"
TESTHOLE #16
10" STEEL WATER:
75" TO TOP,
85" TO BOTTOM
TESTHOLE #20
10" PLASTIC WATER:
50" TO TOP,
60" TO BOTTOM
TESTHOLE #19
2" COPPER WATER:
35" TO TOP,
37" TO BOTTOM
TESTHOLE #17
1" COPPER WATER:
45" TO TOP,
46" TO BOTTOM
TESTHOLE #18
1" COPPER WATER:
24" TO TOP,
25" TO BOTTOM
12"
6"
6"
MV
MV
12"
8"
6"
6"
6"
8"
6"
MV
PIV
MV
MV
6"
FHV
FLV
PIV
FLV
TESTHOLE #23
2" PLASTIC GAS:
33" TO TOP,
35" TO BOTTOM
TESTHOLE #21A
WATER:
NOT FOUND, EXCAVATED TO
6', 3' SPAN ON EACH SIDE
TESTHOLE #21
WATER:
NOT FOUND, EXCAVATED TO
7', 3' SPAN ON EACH SIDE
TESTHOLE
GAS:
NOT FOUND,
EXCAVATED TO 7', 4'
SPAN ON EACH SIDE
TESTHOLE #22
GAS:
NOT FOUND,
EXCAVATED TO 7', 3'
SPAN ON EACH SIDE
TESTHOLE #22A
GAS:
NOT FOUND,
EXCAVATED TO 6', 3'
SPAN ON EACH SIDE
TESTHOLE #23A
GAS:
NOT FOUND, EXCAVATED TO
10', 3' SPAN ON EACH SIDE
TESTHOLE #23
GAS:
NOT FOUND, EXCAVATED TO
10', 3' SPAN ON EACH SIDE
TESTHOLE #23A
2" PLASTIC GAS:
21" TO TOP,
23" TO BOTTOM
TESTHOLE #24
2" PLASTIC GAS:
54" TO TOP,
56" TO BOTTOMGAS DIVES UNDER
ROAD PER
LOCATE TONE METAL BRAIDED WIRE
DISCOVERED ON 9/3/21. BRAIDED
WIRE PROVIDES LOCATE TONE
EAST TO GAS VALVE AND WEST
TURNING NORTH INTO DRIVEWAY
GAS TONE AT 8'
DIGITAL DEPTH
GAS TONE AT 19'
DIGITAL DEPTH
LOST GAS LOCATE TONE IN
THIS AREA, DIGITAL DEPTH
RANGED FROM 35' TO 45'
TESTHOLE #25A
GAS:
NOT FOUND, EXCAVATED TO
7', 2' SPAN ON EACH SIDE
TESTHOLE #25
GAS:
NOT FOUND, EXCAVATED TO
7', 3' SPAN ON EACH SIDE
TESTHOLE #25
GAS:
NOT FOUND, EXCAVATED TO
7', 3' SPAN ON EACH SIDE
GAS NOT FOUND,
EXCAVATED TO 7'GAS NOT FOUND,
EXCAVATED TO 7'
GAS NOT FOUND,
EXCAVATED TO 6'
GAS NOT FOUND,
EXCAVATED TO 6'
TESTHOLE #24
GAS:
NOT FOUND, EXCAVATED TO
10', 3' SPAN ON EACH SIDE
TESTHOLE #24A
GAS:
NOT FOUND, EXCAVATED TO
10', 3' SPAN ON EACH SIDE
OPEN TRENCH 4'
TO VERIFY GAS
MAIN AND TEE
6"
TESTHOLE #21B
WATER:
NOT FOUND, EXCAVATED TO
6', 3' SPAN ON EACH SIDE
14"
8"
8"
MV
MV
MV
14"
LOST TONE ON UNKNOWN CONDUIT IN
THIS AREA BEFORE GAS CROSSING,
RING CLAMPED EXPOSED ORANGE
CONDUIT/LINE IN TRENCH
RING CLAMPED UNKNOWN
EXPOSED ORANGE
CONDUIT/LINE THIS AREA
DIRECT CONNECTED TO
GAS TEE, GAS LOCATED
WEST UP HILL INTO GAS
CROSSING NORTH
14"
MV
MV
8"
6"
FHV
MV
6"
FMV
6"
MV
MV
FHV
PIV
4"
2"
MV
MV
3"
TESTHOLE #28
8" PLASTIC WATER:
51" TO TOP,
59" TO BOTTOM TESTHOLE #27
8" PLASTIC WATER:
67" TO TOP,
75" TO BOTTOM
TESTHOLE #26
8" PLASTIC WATER:
54" TO TOP,
62" TO BOTTOM
8"
TESTHOLE ON WATER MAIN,
FOUND AT 66" TO TOP
MV
TESTHOLE #29
6" STEEL GAS:
55" TO TOP,
61" TO BOTTOM
PLACED
MARKER BALL,
LINE TONED TO
THE VALVES
MV
MV
MV
MV
34" TO TOP
14" 8"
2"
2"
FHV
8"
MV
34" TO TOP
TESTHOLE #30
WATER:
NOT FOUND
ENCOUNTERED
CONC. CAP AT 45"
8"
MV
6"
6"
8"
8"
6"
PIV
FHV
FHV
8"
TESTHOLE #31
WATER:
NOT FOUND, ENCOUNTERED
COLLAPSING SQUEEGEE AT 4'
File details come from the government source that posted it. Updated .