1333ND26QNB190292 Generator and ATS PM NIST Boulder CO.pdf

PDF 6 MB Posted

Attached to
Generator and ATS Preventative Maintenance Federal contract opportunity
Solicitation number
1333ND26QNB190292
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Solicitation/Contract for Commercial Items (Standard Form 1449) for Generator and Automatic Transfer Switch (ATS) Preventative Maintenance services at National Institute of Standards and Technology (NIST) facilities. The solicitation is designated as Women-Owned Small Business (WOSB) eligible and issued by NIST Boulder, Colorado. The contract is a Firm-Fixed-Price (FFP) award with a base year beginning August 16, 2026, and extending through August 15, 2027, with four one-year option periods available through August 15, 2031. The solicitation number is 1333ND26QNB190292, with a pre-proposal site visit required on July 6, 2026, and questions due by July 14, 2026 at 3:00 PM Mountain Time.

The contractor must provide annual preventative maintenance services for sixteen emergency generators and sixteen automatic transfer switches located at NIST Boulder, Fort Collins Radio Station, and Kauai Radio Station. Specific Contract Line Items (CLINs) include: annual preventative maintenance for FMD-B generators (CLIN 0001), repair and replacement services not-to-exceed $30,000 annually (CLIN 0002), time and frequency PM services (CLIN 0003), time and frequency repair and replacement not-to-exceed $2,500 annually (CLIN 0004), NTIA annual PM (CLIN 0005), annual load bank testing (CLIN 0006), and five-year ATS inspections (CLIN 0007), with identical CLINs for option years. The contractor must submit a detailed Plan of Approach (maximum 20 pages), project schedule in Gantt chart format, past performance questionnaire for one to three recent projects, and a complete price proposal with detailed cost breakdown by discipline, labor rates for regular and overtime, materials, bonding, insurance, and profit. All work must be completed within 365 calendar days of notice to proceed, with maintenance records submitted within 14 days of completion. The evaluation emphasizes technical approach and schedule as relatively equal and more important than past performance, with all non-price factors combined being more important than price.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ IFB RFP

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODEFACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

17a CONTRACTOR/

OFFEROR.

CODE

8 (A)

SIZE STANDARD:

NAICS:

% FOR:SET ASIDE:UNRESTRICTED OR

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

10. THIS ACQUISITION IS

EDWOSB

SMALL BUSINESS PROGRAM

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

Attachment Page

PAGE 3 OF 109 1333ND26QNB190292

GENERAL AWARD INFORMATION

1. Contract Type: Firm-Fixed-Price (FFP)

2. Contractor’s Point of Contact:

Name: ___________________________________ Phone: __________________________________ Email: ___________________________________

3. Designated Government Official:

_XX____ Contracting Officer _______ Contracting Officer’s Representative (COR) Name: To Be Determined at Award Phone: To Be Determined at Award Email: To Be Determined at Award

_______ Other, Alternate Contracting Officer Representative (ACOR):

4. The contractor shall submit invoices to invoice@nist.gov.

5. Additional Information:

Invoices shall require Contracting Officer approval for payment.

PAGE 4 OF 109 1333ND26QNB190292

ADDENDUM TO FAR 52.212-1 1 Instructions to Offerors—Commercial Products and Commercial Services (DEVIATION January 2026)

Instructions, Conditions, Notices to Offerors

Proposal Submission, Pre-Proposal Site Visit and Questions and Answer Requirements:

a. Factor 1 - Technical Approach:

Submittal Requirement: The offeror shall submit a Plan of Approach (use diagrams, tables, etc., when appropriate) describing the Offeror’s approach to accomplishing the requirements of the solicitation. The technical approach shall include a clear approach to completing aspect of work, means/methods of accomplishing tasks to be performed, material data/information specific to replacement item(s), details specific to support the offeror’s proposed schedules, quality control and safety process(es), Communications diagram, and a complete listing of anticipated subcontractors by discipline.

(a) The plan of approach shall not exceed 20 single-sided pages (8.5” x

11”) in length using no smaller than 11-point font. *Please note, material data / information cut sheets do not count toward the 3-page limit.

(b) The plan of approach shall also include the offeror’s approach to quality control and safety.

b. Factor 2 – Schedule:

Submittal Requirements: The Offeror shall submit a proposed period of performance and corresponding schedule for all definable features of work to perform the preventative maintenance for portions of the statement of work. See attached statement of work document for additional details. The Offeror shall complete and submit the following:

(a) A project schedule in Gantt chart format, sufficiently detailed to show all the definable features of work, sequence of events pertinent to the attached work statement. The schedule should illustrate the Offeror’s capability and understanding of completing the work requirement for all performance periods. Note that ALL material lead time and shut down coordination shall be included in the period of performance and corresponding schedule. Schedule is not required to be cost loaded.

(b) The period of performance should be prepared to begin on August 16, 2026.

c. Factor 3 – Past Performance The past performance evaluation will assess the relative risks associated with an Offeror’s likelihood of success in fulfilling the solicitation’s requirements as indicated by the Offeror’s record of past performance. In this context, “offeror” refers to the prime contractor. Present and past performance shall be evaluated as a measure of the Government’s confidence in the Offeror’s ability to successfully perform based on previous and current contract efforts.

The Offeror shall submit a complete Past Performance Questionnaire (PPQ) for a minimum of one (1) and up to three (3) recent and relevant projects.

PAGE 5 OF 109 1333ND26QNB190292

d. Factor 4 - Price:

Submittal Requirements: The Offeror shall submit a complete price proposal. Price proposals shall include the information identified below:

(a) Offer shall complete and submit Pages 1 through 4 of the

Solicitation, Standard Form (SF) 1442. Complete Blocks 14, 15, 17, 18, 19, and 20A through 20C of the SF 1442. An official having the authority to contractually bind the Offeror's company must sign the

SF 1442.

(b) Return a completed, Representations and Certifications included in the solicitation.

(c) Complete and submit Price Proposal identifying lump sum price provided on Page 4 of the Solicitation.

(d) In addition to the lump sum pricing, a detailed cost breakdown for

CLINs X001 through X007 is also required. Details should be sufficient to identify each offeror’s major disciplines of work, labor, materials, bonding/insurance, profit, overhead, and include the relevant divisions listed in Section X, Submittals, of the statement of work. Profit and overhead details must be listed separately.

PAGE 6 OF 109 1333ND26QNB190292

1. The Government shall not be liable for any costs incurred by the offeror attending the site visit or submitting a proposal in response to this solicitation.

2. In the event there are any inconsistencies between the base contract requirements and the Task Order SOW(s), the contractor shall bring these to the attention of the contracting officer not later than the site visit.

3. List of individuals attending the site visit is due to the POC listed in Block 9 of the SF 1442 no later than 2:00 PM (MT) / 05 JUL 2026. Submitted names shall be first, middle, and last name.

The site visit is scheduled for 2:00 PM (MT) / 06 JUL 2026. Meet at the entrance of building number 25 and from there will be various locations.

4. Any questions related to this solicitation must be received by the POC listed in Block 9 of the SF 1442 no later than 3:00 PM (MT) / 14 JUL 2026.

PAGE 7 OF 109 1333ND26QNB190292

ADDEMDUM TO 52.212-2 Evaluation—Commercial Products and Commercial Services (DEVIATION January 2026)

EVALUATION FACTORS FOR AWARD

1. BASIS FOR AWARD:

a. The Contracting Officer intends to award a Firm Fixed-Price (FFP) contract to the responsible Offeror whose proposal the Contracting Officer determines represents the best value, price and other factors considered.

2. EVALUATION

a. Relative Importance of Evaluation Factors:

i. The evaluation factors include: Factor 1 – Technical Approach, Factor 2 – Schedule, Factor 3 – Past Performance, Factor 4 – Price.

The non-price factors are Factors 1, 2, and 3. Factors 1, and 2 are relatively equal, and when combined more important than Factor 3.

All non-price factors (1 – 3) when combined are more importance than Factor 4 (price factor)

ii. The Contracting Officer intends to award a contract to the Offeror whose proposal they determine represents a technically acceptable and fair and reasonable price to the government. The Contracting Officer reserves the right to make no award.

b. Factor 1 – Technical Approach Evaluation of this factor is a subjective evaluation of the Offeror’s understanding of the solicitation requirements (clauses, provisions, and the SOWs) and demonstrates ability to meet contract requirements and SOWs based on the offeror’s proposed technical approach. A technical proposal that demonstrates a thorough understanding of all solicitation and project requirements will be rated higher than a proposal that does not clearly detail an approach, does not adequately address all aspects of the solicitation and project, and/or does not demonstrate the offeror’s technical capability to perform the work. Offerors must demonstrate the ability to mobilize and commence work within 10 calendar days of notice to proceed. This may include evidence of current operations, personnel availability, or other resources sufficient to perform the work in the project location. Additionally, if the Contracting Officer determines a technical proposal is primarily a copy and paste version of a SOW and solicitation requirements it may be removed from any further consideration for award.

c. Factor 2 – Schedule Evaluation of this factor is a subjective evaluation of the Offeror’s understanding of the work. A schedule offering a shorter period of performance while demonstrating understanding of the requirements of the statement of work may receive a higher rating. The schedule will be evaluated in terms of completeness, timeliness of completion, and to ensure it presents a thorough understanding of the work required.

PAGE 8 OF 109 1333ND26QNB190292

d. Factor 3 – Past Performance

Evaluation of this factor is a subjective evaluation and will assess the relative risks associated with an Offeror’s likelihood of success in fulfilling the solicitation requirements as indicated by the Offeror’s record of past performance. In the absence of past performance the Offeror shall be rated as neutral in rating.

e. Factor 4 – Price Price will be evaluated based on the total price. The Government has requested, and shall evaluate, each Offeror’s detailed cost breakdown to determine the reasonableness and completeness of the price proposals.

The Government will not conduct price realism as a part of price evaluation. One or more of the following techniques will be used to ensure a fair and reasonable price:

i. Comparison of proposed prices/costs received in response to the solicitation.

ii. Comparison of proposed prices/costs with the Independent Government

Estimate.

iii. Comparison of proposed prices/costs with available historical information.

PAGE 9 OF 109 1333ND26QNB190292

f. ADJECTIVAL RATINGS

The following adjectival ratings will be used to evaluate timely received Offerors submissions in response to this solicitation:

Adjectival Rating Description

Excellent (E) Proposal meets requirements and indicates an exceptional approach and understanding of the requirements.

Good (G)

Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. The quote includes strengths that will benefit the Government.

And identified weakness has little potential to cause disruption of schedule or degradation of performance. Risk of unsuccessful performance is low.

Satisfactory (S)

Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. The proposal has no deficiencies but may include some weaknesses that can potentially cause disruption of schedules or degradation of performance. Risk of unsuccessful performance is no worse than moderate.

Marginal (M)

Proposal has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. The proposal has some weakness the will likely cause disruption of schedules or degradation of performance.

Risk of unsuccessful performance is high.

Unacceptable (U)

Proposal does not meet requirements. Weaknesses may outweigh strengths or quote contains one or more deficiencies. The proposal presents an unacceptable risk and cannot meet the requirements without revisions.

Proposal is unawardable.

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Year (BY), FMD-B, Annual PM Service

0001 Base Year (BY), FMD-B, perform one (1) annual preventative maintenance service in accordance with the SOW and attached generator job plans for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, and 01-EMG-W5-001

Period of Performance: 08/16/2026 to 08/15/2027

1.00 JB

Base Year (BY), FMD-B, Repair and Replacement

NTE NTE

0002 Base Year (BY), FMD-B, Repair and Replacement.

The contractor shall provide all labor, equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments.

Please provide the following labor rates:

Regular Time: $________Hour Overtime/Non-Regular Time $______ Hour

The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $30,000.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Base Year (BY), Time and Frequency, PM

0003 Base Year (BY), Time and Frequency, perform one

(1) annual preventive maintenance service, and one

(1) semi-annual operational check on the WWVB and WWV generators EMG-W-018 and EMG-W-019 in Fort Collins Colorado. The three Boulder time and frequency generators: 01-P-EMG-029, EMG-005, 81-EMG-026 and Kauai EMG-H-016 only require an annual service.

EMG-W-018, EMG-W-019. EMG-005, 81-EMG-026,

EMG-H-016, and 01-P-EMG-029

Base Year (BY), Time & Frequency, Repair and Replacement.

NTE NTE

0004 Base Year (BY), Time & Frequency, Repair and

Replacement. The contractor shall provide all labor equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments. Please provide the following labor rates:

Regular Time: $_____Hour Overtime/Non-Regular Time: $_____Hour The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

PAGE 10 OF 109 1333ND26QNB190292

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $2,500.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Base Year (BY), NTIA, Annual PM

0005 Base Year (BY), NTIA, perform one (1) annual preventative maintenance service in accordance with the SOW and attached Generator Job Plans for Boulder generator EMG-020 and EMG-027.

Base Year (BY), FMD-B, NTIA, and Time & Frequency, Annual Load Bank Testing

0006 Base Year (BY), FMD-B, NTIA, and Time & Frequency, perform one (1) annual load bank testing in accordance with the SOW and attached job plan for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, 01-EMG-W5-001, EMG-W-018,

EMG-W-019, EMG-005, 81-EMG-026, EMG-H-016, 01-

P-EMG-029, EMG-020, and EMG-029

Base Year (BY), FMD-B, 1 5-year ATS Inspection

0007 Base Year (BY), FMD-B, perform one (1) five (5)-year ATS inspection in accordance with the SOW and attached job plan for the Boulder generators. EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025, EMG-028, 03-EMG-001, and 01-EMG-W5-001.

Option Year 1 (OY1), FMD-B, Annual PM Service

OPT

1001 Option Year 1 (OY1), FMD-B, perform one (1) annual preventative maintenance service in accordance with the SOW and attached generator job plans for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, and 01-EMG-W5-001

Period of Performance: 08/16/2027 to 08/15/2028

Option Year 1 (OY1), FMD-B, Repair and Replacement

NTE NTE/OPT

1002 Option Year 1 (OY1), FMD-B, Repair and Replacement.

The contractor shall provide all labor, equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments.

Please provide the following labor rates:

Regular Time: $________Hour Overtime/Non-Regular Time $______ Hour

The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

PAGE 11 OF 109 1333ND26QNB190292

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $30,000.00. ONLY PROPOSE LABOR HOURS ON

Option Year 1 (OY1), Time and Frequency, PM

1003 Option Year 1 (OY1), Time and Frequency, perform one

(1) annual preventive maintenance service, and one

(1) semi-annual operational check on the WWVB and WWV generators EMG-W-018 and EMG-W-019 in Fort Collins Colorado. The three Boulder time and frequency generators: 01-P-EMG-029, EMG-005, 81-EMG-026 and Kauai EMG-H-016 only require an annual service.

EMG-W-018, EMG-W-019. EMG-005, 81-EMG-026,

EMG-H-016, and 01-P-EMG-029

Option Year 1 (OY1), Time & Frequency, Repair and

NTE NTE/OPT

1004 Option Year 1 (OY1), Time & Frequency, Repair and

Replacement. The contractor shall provide all labor equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments. Please provide the following labor rates:

Regular Time: $_____Hour Overtime/Non-Regular Time: $_____Hour The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $2,500.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Option Year 1 (OY1), NTIA, Annual PM

1005 Option Year 1 (OY1), NTIA, perform one (1) annual preventative maintenance service in accordance with the SOW and attached Generator Job Plans for Boulder generator EMG-020 and EMG-027.

Option Year 1 (OY1), FMD-B, NTIA, and Time & Frequency, Annual Load Bank Testing

OPT

1006 Option Year 1 (OY1), FMD-B, NTIA, and Time &

Frequency, perform one (1) annual load bank testing in accordance with the SOW and attached job plan for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, 01-EMG-W5-001, EMG-W-018,

EMG-W-019, EMG-005, 81-EMG-026, EMG-H-016, 01-

P-EMG-029, EMG-020, and EMG-029

PAGE 12 OF 109 1333ND26QNB190292

Option Year 2 (OY2), FMD-B, Annual PM Service

2001 Option Year 2 (OY2), FMD-B, perform one (1) annual preventative maintenance service in accordance with the SOW and attached generator job plans for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, and 01-EMG-W5-001

Period of Performance: 08/16/2028 to 08/15/2029

Option Year 2 (OY2), FMD-B, Repair and Replacement

2002 Option Year 2 (OY2), FMD-B, Repair and Replacement.

The contractor shall provide all labor, equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments.

Please provide the following labor rates:

Regular Time: $________Hour Overtime/Non-Regular Time $______ Hour

The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $30,000.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Option Year 2 (OY2), Time and Frequency, PM

2003 Option Year 2 (OY2), Time and Frequency, perform one

(1) annual preventive maintenance service, and one

(1) semi-annual operational check on the WWVB and WWV generators EMG-W-018 and EMG-W-019 in Fort Collins Colorado. The three Boulder time and frequency generators: 01-P-EMG-029, EMG-005, 81-EMG-026 and Kauai EMG-H-016 only require an annual service.

EMG-W-018, EMG-W-019. EMG-005, 81-EMG-026,

EMG-H-016, and 01-P-EMG-029

Option Year 2 (OY2), Time & Frequency, Repair and

NTE NTE/OPT

2004 Option Year 2 (OY2), Time & Frequency, Repair and

Replacement. The contractor shall provide all labor equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments. Please provide the following labor rates:

Regular Time: $_____Hour Overtime/Non-Regular Time: $_____Hour The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the

PAGE 13 OF 109 1333ND26QNB190292

repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $2,500.00. ONLY PROPOSE LABOR HOURS ON

Option Year 2 (OY2), NTIA, Annual PM

2005 Option Year 2 (OY2), NTIA, perform one (1) annual preventative maintenance service in accordance with the SOW and attached Generator Job Plans for Boulder generator EMG-020 and EMG-027.

Option Year 2 (OY2), FMD-B, NTIA, and Time &

OPT

2006 Option Year 2 (OY2), FMD-B, NTIA, and Time &

Frequency, perform one (1) annual load bank testing in accordance with the SOW and attached job plan for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, 01-EMG-W5-001, EMG-W-018,

EMG-W-019, EMG-005, 81-EMG-026, EMG-H-016, 01-

P-EMG-029, EMG-020, and EMG-029

Option Year 3 (OY3), FMD-B, Annual PM Service

3001 Option Year 3 (OY3), FMD-B, perform one (1) annual preventative maintenance service in accordance with the SOW and attached generator job plans for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, and 01-EMG-W5-001

Period of Performance: 08/16/2029 to 08/15/2030

Option Year 3 (OY3), FMD-B, Repair and Replacement

3002 Option Year 3 (OY3), FMD-B, Repair and Replacement.

The contractor shall provide all labor, equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments.

Please provide the following labor rates:

Regular Time: $________Hour Overtime/Non-Regular Time $______ Hour

The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $30,000.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

PAGE 14 OF 109 1333ND26QNB190292

Option Year 3 (OY3), Time and Frequency, PM

3003 Option Year 3 (OY3), Time and Frequency, perform one

(1) annual preventive maintenance service, and one

(1) semi-annual operational check on the WWVB and WWV generators EMG-W-018 and EMG-W-019 in Fort Collins Colorado. The three Boulder time and frequency generators: 01-P-EMG-029, EMG-005, 81-EMG-026 and Kauai EMG-H-016 only require an annual service.

EMG-W-018, EMG-W-019. EMG-005, 81-EMG-026,

EMG-H-016, and 01-P-EMG-029

Option Year 3 (OY3), Time & Frequency, Repair and

NTE NTE/OPT

3004 Option Year 3 (OY3), Time & Frequency, Repair and

Replacement. The contractor shall provide all labor equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments. Please provide the following labor rates:

Regular Time: $_____Hour Overtime/Non-Regular Time: $_____Hour The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $2,500.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Option Year 3 (OY3), NTIA, Annual PM

3005 Option Year 3 (OY3), NTIA, perform one (1) annual preventative maintenance service in accordance with the SOW and attached Generator Job Plans for Boulder generator EMG-020 and EMG-027.

Option Year 3 (OY3), FMD-B, NTIA, and Time &

OPT

3006 Option Year 3 (OY3), FMD-B, NTIA, and Time &

Frequency, perform one (1) annual load bank testing in accordance with the SOW and attached job plan for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, 01-EMG-W5-001, EMG-W-018,

EMG-W-019, EMG-005, 81-EMG-026, EMG-H-016, 01-

P-EMG-029, EMG-020, and EMG-029

Option Year 4 (OY4), FMD-B, Annual PM Service

4001 Option Year 4 (OY4), FMD-B, perform one (1) annual preventative maintenance service in accordance with the

PAGE 15 OF 109 1333ND26QNB190292

SOW and attached generator job plans for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, and 01-EMG-W5-001

Period of Performance: 08/16/2030 to 08/15/2031

Option Year 4 (OY4), FMD-B, Repair and Replacement

4002 Option Year 4 (OY4), FMD-B, Repair and Replacement.

The contractor shall provide all labor, equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments.

Please provide the following labor rates:

Regular Time: $________Hour Overtime/Non-Regular Time $______ Hour

The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $30,000.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

Option Year 4 (OY4), Time and Frequency, PM

4003 Option Year 4 (OY4), Time and Frequency, perform one

(1) annual preventive maintenance service, and one

(1) semi-annual operational check on the WWVB and WWV generators EMG-W-018 and EMG-W-019 in Fort Collins Colorado. The three Boulder time and frequency generators: 01-P-EMG-029, EMG-005, 81-EMG-026 and Kauai EMG-H-016 only require an annual service.

EMG-W-018, EMG-W-019. EMG-005, 81-EMG-026,

EMG-H-016, and 01-P-EMG-029

Option Year 4 (OY4), Time & Frequency, Repair and

NTE NTE/OPT

4004 Option Year 4 (OY4), Time & Frequency, Repair and

Replacement. The contractor shall provide all labor equipment, and materials to perform necessary repair, rental, and/or replacement in accordance with the SOW and attachments. Please provide the following labor rates:

Regular Time: $_____Hour Overtime/Non-Regular Time: $_____Hour The contractor shall coordinate with the appointed COR and CO immediately upon discovering potential repair work. The contractor shall present all options to the Government and provide a firm-fixed price quote for the repair work. Work shall not commence without approval from the CO.

THIS IS A NTE LINE ITEM AND SHALL BE AWARDED

AT $2,500.00. ONLY PROPOSE LABOR HOURS ON

THIS CLIN

PAGE 16 OF 109 1333ND26QNB190292

Option Year 4 (OY4), NTIA, Annual PM

4005 Option Year 4 (OY4), NTIA, perform one (1) annual preventative maintenance service in accordance with the SOW and attached Generator Job Plans for Boulder generator EMG-020 and EMG-027.

Option Year 4 (OY4), FMD-B, NTIA, and Time &

OPT

4006 Option Year 4 (OY4), FMD-B, NTIA, and Time &

Frequency, perform one (1) annual load bank testing in accordance with the SOW and attached job plan for the Boulder generators.

EMG-001, EMG-003, EMG-013, EMG-014, 81-EMG-025,

EMG-028, 03-EMG-001, 01-EMG-W5-001, EMG-W-018,

EMG-W-019, EMG-005, 81-EMG-026, EMG-H-016, 01-

P-EMG-029, EMG-020, and EMG-029

PAGE 17 OF 109 1333ND26QNB190292

Table of Contents

Statement of Work

52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

52.203-11CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP

2024)

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017) 26

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

52.222-3 CONVICT LABOR (JUN 2003)

52.222-18CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2021)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT (MULTIPLE YEAR

AND OPTION CONTRACTS) (AUG 2018)

52.222-55MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022)

52.222-62PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

52.223-4RECOVERED MATERIAL CERTIFICATION (MAY 2008)

52.226-8ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024)

52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.229-11Tax on Certain Foreign Procurements--Notice and Representation (JUN 2020)

52.229-12TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)

1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

1352.228-70 INSURANCE COVERAGE (APR 2010)

1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

52.204-13System for Award ManagementMaintenance

52.204-14Service Contract Reporting Requirements

52.204-7System for Award ManagementRegistration

52.209-6Protecting the Governments Interest When S

52.209-10Prohibition on Contracting With Inverted

52.212-1Instructions to OfferorsCommercial Product

52.212-2EvaluationCommercial Products and Commerci

52.212-4Terms and ConditionsCommercial Products an

52.217-5Evaluation of Options

52.217-9Option to Extend the Term of the Contract

52.219-6Notice of Total Small Business Set-Aside

52.219-28Postaward Small Business Program Rerepres

52.222-35Equal Opportunity for Veterans

52.222-37Employment Reports on Veterans

52.222-50Combating Trafficking in Persons

52.222-54Employment Eligibility Verification

52.222-90Addressing DEI Discrimination by Federal

52.223-2Reporting of Biobased Products Under Servi

52.233-3Protest after Award

52.240-90Security Prohibitions and Exclusions Repr

52.240-91Security Prohibitions and Exclusions

PAGE 18 OF 109 1333ND26QNB190292

Table of Contents

52.244-6Subcontracts for Commercial Products and C

1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)

1352.233-70 AGENCY PROTESTS (APR 2010)

1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

NIST LOCAL-33U.S. DEPARTMENT OF LABOR WAGE DETERMINATION

NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS

NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS

NIST LOCAL-56INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)

Wage Determination

PAGE 19 OF 109 1333ND26QNB190292

CLAUSES

Statement of Work

PAGE 20 OF 109 1333ND26QNB190292

STATEMENT OF WORK

Generator and Automatic Transfer Switch Preventative Maintenance

NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY

United States Department of Commerce

325 Broadway Boulder, CO 80305

April 17, 2026

I. BACKGROUND INFORMATION

The National Institute of Standards and Technology Facility Maintenance Division Boulder (FMD-B) require services to perform preventative maintenance and repair of generators and automatic transfer switches at NIST locations in Boulder, Fort Collins Radio Station, and Kauai Radio Station.

II. PURPOSE

The Contractor shall provide maintenance services required to maintain NIST Owned Generators and Automatic Transfer Switches. The work is to be performed in accordance with this Statement of Work (SOW).

II. SPECIAL REQUIREMENTS

2.1.1 Pre-proposal site visit required.

2.1.2 Coordination of daily vehicle traffic lane shutdowns for the maintenance work with the COR.

2.1.3 Post-award meeting required

2.1.4 Provide repairs as separate line item in proposal

PLACE OF PERFORMANCE

The project is to be performed on the NIST Boulder campus, FT Collins Radio Station, and Kauai Radio Station.

REGULAR BUSINESS HOURS

See Attachment 1 - NIST Boulder General Contractor Requirements – Rev C, included in the contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder and Ft. Collins, Colorado.

PERIOD OF PERFORMANCE

The Project shall take one year to complete.

III. SPECIFIC REQUIREMENTS

The contractor is responsible for the following:

1. Performing the work as described in this SOW.

PAGE 21 OF 109 1333ND26QNB190292

2. Performing a site walk to fully understand the work required and the local conditions

3. Preparing and following a site-specific safety plan to be reviewed and accepted by

NIST Safety Staff.

4. Performing a daily Job Hazard Analysis (JHA) for maintenance activities.

5. Coordinating all work with the Contracting Officer’s Representative (COR)

Task 1 – Summary of the Work

1.3.1. General

1.3.1.1. Preventative maintenance and management shall include, but is not limited to the following:

1.3.1.2. Provide all labor, furnish and install materials, equipment and supplies to accomplish the preventative maintenance in accordance with the Performance Work Statement.

1.3.1.3. Delivery Schedule: This project must be completed 365 calendar days after NTP. With initial proposal and prior to commencement of work, the contractor must provide a proposed PM schedule to the COR for acceptance. Final schedule shall be agreed upon after NTP at post-award meeting.

1.3.1.4. Provide maintenance management and field supervision throughout the project duration.

1.3.1.5. Contractor must be familiar with the work required and local conditions affecting the work.

1.3.1.6. Ensure that the safety of the project is a top priority. Submit a site-specific safety plan with project proposal prior to commencement of work to the COR for acceptance.

1.3.1.7. Ensure due diligence and timely delivery of the project.

1.3.1.8. Correct errors and deficiencies in the series provided.

1.3.1.9. Cooperate with NIST Police and Security regarding site security. Contractor is responsible for ensuring its personnel meet all site access requirements. Provide a list of all anticipated employees at least two weeks in advance of their arrival. All employees must fill out specified background check forms for review by NIST Security before security badges will be issued. These forms will be typed.

1.3.1.10. Maintain a record set of all inspections, or other authorizations necessary for the work to proceed.

1.3.1.11. If “Hot Work” will be performed the contractor must pull a hot work permit through the COR twenty-four (24) hours in advance of beginning associated work.

1.3.1.12. Notify the COR of the work progress.

PAGE 22 OF 109 1333ND26QNB190292

1.3.1.13. The contractor is responsible for correcting any damage caused to the NIST Boulder side and field sites as a result of their maintenance work and returning the site to previous conditions at no cost to the Government.

1.3.1.14. The contractor shall perform clean-up of work areas after preventative maintenance is completed.

1.3.1.15. Contractor is responsible for scheduling work.

1.3.1.16. See COR for any conflicts associated with this Performance Work Statement, drawing and any appendixes.

1.3.2. Specification Section

1.3.2.1. The Contractor shall provide all labor, supervision, materials, tools, and equipment necessary to perform preventive maintenance and repair services for the National Institute of Standards and Technology (NIST) emergency generators and automatic transfer switches (ATS). The equipment covered under this Contract, along with the specific tasks to be performed, are identified in the Job Plans for Generators and Automatic Transfer Switches, which is hereby incorporated by reference. The required services shall include, but are not limited to, manufacturer-recommended preventive maintenance, diagnostic troubleshooting, routine repairs, and emergency repair services as needed to ensure continuous and reliable operation of the equipment. This Contract currently includes a total of sixteen (16) emergency generators and sixteen (16) automatic transfer switches. The generators vary in size, manufacturer, and kilowatt (kW) rating, and the Contractor shall be responsible for servicing all equipment in accordance with applicable manufacturer specifications and industry standards.

1.3.2.2. Pursuant to the requirements outlined in the Job Plans for Generators and Automatic Transfer Switches, the Contractor shall furnish the Government with a preventive maintenance schedule. The schedule shall, at a minimum, include the following information:

equipment identification, specific task to be performed, scheduled date for each task, and estimated duration for completion of each task. All preventive maintenance activities shall be performed in accordance with the approved schedule and completed in a timely manner, consistent with the frequencies and intervals specified for each task in the Job Plans.

1.3.2.3. The Job Plans and Equipment List, which includes the location of each piece of equipment, are attached hereto as Attachment 1 (Annual Job Plan), Attachment 1A (Semi Annual Job Plan), Attachment 2 (Five Year ATS Inspection Job Plan), Attachment 3 (Load Bank Testing), Attachment 4 (Equipment List), and Attachment 5 (Contract List). NIST shall provide the Contractor with a list of all generators, which shall include, at a minimum, the model, manufacturer, and serial number for each generator.

1.3.2.4. A line item CLIN for repair, rental, and replacement is established under this Contract. Funding for this CLIN is provided; however, work under this CLIN is not guaranteed to the Contractor. Upon identification of a required repair, the Contracting Officer’s Representative (COR) shall request a quote from the Contractor to perform the

PAGE 23 OF 109 1333ND26QNB190292

necessary repair(s). The COR shall submit the completed quote, verification of available funds, and a Work Order Approval package to the Contracting Officer (CO). No repair work shall commence until written approval is received from the CO. All labor performed under this CLIN shall be compensated in accordance with the rates established in this Contract. The Government reserves the right to separately procure any repairs it determines to be outside the scope of this Contract, beyond the Contractor’s capabilities, and/or if the submitted pricing exceeds the Government’s cost estimate.

1.3.2.5. NIST operates various generators of differing brands and sizes. The Contractor shall perform one (1) semi-annual (six-month) and one (1) annual preventive maintenance service on generators located at the following sites: Fort Collins, Colorado at the WWVB and WWV radio stations, NIST Boulder Campus, and the Kauai radio station site. The specific generators to be serviced, including location and applicable preventive maintenance requirements, are identified in Attachment 4, “EMG Equipment List,” which is incorporated herein by reference.

1.3.2.6. NIST shall provide the Contractor with an asset list of all generators, automatic transfer switches, and associated Job Plans. Annual preventive maintenance on the sixteen

(16) generators shall be scheduled to commence on the first working day of the month, as determined by NIST. The Contractor shall complete all preventive maintenance for that month by the last day of the month in which the preventive maintenance was issued. All maintenance checklists, including those generated from annual preventive maintenance and semi-annual operational testing, shall be submitted to the Contracting Officer’s Representative (COR) within fourteen (14) calendar days following completion of the respective maintenance or testing activities.

1.3.2.7. The Contractor shall promptly report to the Contracting Officer’s Representative (COR) any deficiencies identified during preventive maintenance activities. The COR shall determine whether such deficiencies are to be corrected by the Contractor, by Government personnel, or by another subcontractor. For deficiencies assigned to the Contractor, the COR shall request an itemized quote. The quote shall include, at a minimum, the cost of materials, estimated labor hours, applicable labor rates, and any additional charges, including but not limited to mileage or other miscellaneous expenses. No corrective work shall commence without prior approval from the Contracting Officer.

INSEPECTIONS & ACEPTANCE

In addition to the inspection and acceptance terms articulated in the specific FAR clause that allows the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

IV. REQUIREMENTS FOR CONTRACTOR PERSONNEL

SAFETY: The Contractor employee must be responsible for knowing and complying with Attachment 1 - NIST Boulder General Contractor Requirements – Rev C, included in the

PAGE 24 OF 109 1333ND26QNB190292

contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder and Ft. Collins, Colorado.

SECURITY: See Attachment 1 - NIST Boulder General Contractor Requirements – Rev C, included in the contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder and Ft. Collins, Colorado.

IDENTIFICATION BADGES: The Contractor employee must be responsible for knowing and complying with Attachment 1 - NIST Boulder General Contractor Requirements – Rev C, included in the contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder and Ft. Collins, Colorado.

REFERENCE STANDARDS

The Contractor shall, without addition expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

V. SCHEDULE OF DELIVERABLES

Deliverable Number Description Format Due Date

Quantity

1 Final Schedule Microsoft Project After Award and prior to Service

2 Site-Specific Safety Plan

PDF After Award and prior to Service

3 JHA PDF Before Maintenance

Begins

4 Preventative Maintenance

Records

PDF 14 Days After Work Is

Completed

STANDARDS OF ACCEPTANCE: See Attachment 1 - NIST Boulder General Contractor Requirements – Rev C, included in the contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder, Ft. Collins, Colorado, and Kauai, Hawaii.

PAGE 25 OF 109 1333ND26QNB190292

VI. ATTACHMENTS:

01 Annual Job Plan.pdf 02 Semi-Annual Job Plan.pdf 03 Five Year ATS Job Plan.pdf 04 Load Bank Test Job Plan.pdf 05 EMG Equipment List.xlxs 06 EMG Contract List.xlxs 07 NIST Boulder General RequirementsRev C 2020.pdf 08 Safety Plan Checklist.pdf 09 JHA.xlxsAttachment 1 Annual Job Plan 10 PPQ Performance.pdf

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(Reference 52.203-6)

52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(SEP 2024)

(Reference 52.203-11)

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

(Reference 52.203-18)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017) (Reference 52.203-19)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(Reference 52.204-9)

52.222-3 CONVICT LABOR (JUN 2003)

(Reference 52.222-3)

52.222-18 CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2021) (Reference 52.222-18)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) (Reference 52.222-40)

52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)

(Reference 52.222-41)

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

(Reference 52.222-42)

52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT (MULTIPLE

YEAR AND OPTION CONTRACTS) (AUG 2018)

(Reference 52.222-43)

52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026. (JAN 2022) (Reference 52.222-55)

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

(Reference 52.222-62)

52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

(Reference 52.223-4)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) (Reference 52.226-8)

52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(Reference 52.228-5)

52.229-11 Tax on Certain Foreign Procurements--Notice and Representation (JUN 2020) (Reference 52.229-11)

52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

(Reference 52.229-12)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018) (Reference 52.232-33)

PAGE 26 OF 109 1333ND26QNB190292

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023) (Reference 52.232-40)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(Reference 52.233-4)

1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010) (Reference 1352.201-70)

1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

(Reference 1352.209-73)

1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

(Reference 1352.209-74)

1352.228-70 INSURANCE COVERAGE (APR 2010)

(Reference 1352.228-70)

1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

(Reference 1352.237-71)

PAGE 27 OF 109 1333ND26QNB190292

52.204-13System for Award ManagementMaintenance.

PAGE 28 OF 109 1333ND26QNB190292

52.204-13 System for Award Management—Maintenance (DEVIATION January 2026)

(a) Definitions. As used in this clause—

Commercial and Government Entity code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location (referred to as “CAGE code”); or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency to entities located outside the United States and its outlying areas that the DLA CAGE Branch records and maintains in the CAGE master file (referred to as “NCAGE code”).

Unique Entity Identifier (UEI) means an identifier used to identify a specific commercial, nonprofit, or Government entity.

(b) Active registration.

(1) The Contractor shall maintain an active Federal Government contracts registration in the System for Award Management (SAM) at during contract performance and through final payment under this contract. To maintain an active registration in SAM, the Contractor shall review at least annually its registration in SAM and validate that the information is current, accurate, and complete.

(2) The Contractor is responsible for the currency, accuracy, and completeness of the information provided within SAM, and for any liability resulting from the Government’s reliance on inaccurate or incomplete information.

This is the start of the file's text. The full file is on GovTribe.