Building 101 - Leak Remediation Design Drawings Addenda.pdf
PDF 138 KB Posted
- Solicitation number
- 1333ND22QNB190089
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 101 – Leak Remediation Design Addenda
Drawing CS-101:
• Remove “Annual Planting Area – QTY: 870” from Plant Schedule
Drawing S-301:
• Add general note stating, “All work shall be in accordance with the latest version of the National Electric Code.”
• Add general note stating, "Contractor shall follow the requirements for modifying NFPA 14 Standard for the Installation of Standpipe and Hose Systems (Current edition) to include modification and testing. Testing shall be witnessed by COR."
• Add note 3 to 2/S301 stating, “Existing fire hydrant connections to be removed and reinstalled after retaining wall is complete.”
Drawing WP-506:
• Add general note stating, “Work at the main entrance sliding glass doors needs to be performed on weekends or federal holiday. Otherwise, access to the main entrance is to remain unimpeded.”
File details come from the government source that posted it. Updated .