Building 101 – Leak Remediation Design Addenda

Drawing CS-101:

• Remove “Annual Planting Area – QTY: 870” from Plant Schedule

Drawing S-301:

• Add general note stating, “All work shall be in accordance with the latest version of the National Electric Code.”

• Add general note stating, "Contractor shall follow the requirements for modifying NFPA 14 Standard for the Installation of Standpipe and Hose Systems (Current edition) to include modification and testing. Testing shall be witnessed by COR."

• Add note 3 to 2/S301 stating, “Existing fire hydrant connections to be removed and reinstalled after retaining wall is complete.”

Drawing WP-506:

• Add general note stating, “Work at the main entrance sliding glass doors needs to be performed on weekends or federal holiday. Otherwise, access to the main entrance is to remain unimpeded.”