This amendment modifies a solicitation for fire protection systems inspection, testing, maintenance, repair and impairment coordinator services for facilities in Boulder and Fort Collins, Colorado. The services include preventative maintenance for fire alarm systems, including battery replacements; replacement of approximately 27 multi-criteria smoke detectors with carbon monoxide elements during the five-year contract period; and wet chemical extinguishing system maintenance in accordance with NFPA 17A, including hydrostatic testing of containers and hose assemblies due every 12 years. The Department of Commerce National Institute of Standards and Technology is the contracting agency. The contractor questions and answers section provides additional details on the services and equipment.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Attachment Page

PAGE 2 OF 6 1333ND21QNB1501360002

The purpose of this amendment is to incorporate the following changes:

A. Contractor Questions and Answers are incorporated.

B. No other changes occur as a result of this amendment.

Table of Contents

Contractor Questions & Answers

PAGE 3 OF 6 1333ND21QNB1501360002

CLAUSES

Contractor Questions & Answers

PAGE 4 OF 6 1333ND21QNB1501360002

Solicitation No. 133ND21QNB150136 Questions & Answers

Q1. Pg. 28, Section 1, e. I. – Are batteries that fail prior to their scheduled replacement or prior to the annual inspection qualify as preventative maintenance replacements for the purpose of this bid?

A1. Response: As indicated in the section identified, “Failed batteries on the system and failed batteries as a result of testing shall be replaced.” This section is identified as “fire alarm system preventative maintenance items”. So, yes, batteries that fail are considered preventative maintenance and should be replaced as part of this service (bid).

Q2. Pg. 28, Section 1, e. III. – What is the count of multi-criteria smoke detectors with CO elements that are expected to be replaced within this 5-year contract cycle?

A2. Response: The multi-criteria smoke detectors for Notifier are the I-Quad Smoke Acclimate Detectors identified in Attachment 1 – Appendix A on the NIST Boulder/Fort Collins Sites - Total Device Count spreadsheet with a date of 12/2020. The spreadsheet identifies a quantity of 33 I-Quad Smoke Acclimate Detectors. As of 1/13/2021 this quantity is 39 I-Quad Smoke Acclimate Detectors. During this contract 5-year period a quantity of 27 of these I-Quad Smoke Acclimate Detectors will need to be replaced due to the expiration of the CO element in each.

Q3. Pg. 33, Section 4, b. Does “maintenance” of the wet chemical extinguishing system in the hydrostatic testing and recharge?

(Elaboration of question) We understand that the wet chemical system will be due for hydrostatic testing (once every 12 years) during this next contract cycle. Our question is whether the definition of “maintenance” in this section would mean that the successful bidder would need to include that testing on the containers and hose assemblies or if this will be a chargeable call that will be billed against the T&M service CLIN.

A3. Response: The referenced section identifies maintenance to be performed in accordance with the 2021 edition of NFPA 17A, Section 8.3. This section of NFPA 17A indicates the following:

8.3.3.2 * Where maintenance of any wet chemical containers reveals conditions such as, but not limited to, corrosion or pitting in excess of the manufacturer’s limits; structural damage; fire damage; or repairs by soldering, welding, or brazing, the affected container shall be hydrostatically tested in accordance with Section 8.5 or replaced in accordance with the instructions of the manufacturer or the listing agency.

All of Chapter 8 in NFPA 17A is titled Inspection, Maintenance, and Recharge. Section

8.5 addresses hydrostatic testing. Specifically, section 8.5.1 indicates the following:

8.5.1 The following parts of wet chemical extinguishing systems shall be subjected to a hydrostatic pressure test at intervals not exceeding 12 years:

1) Wet chemical containers

2) Auxiliary pressure containers

P a g e 1 | 2

PAGE 5 OF 6 1333ND21QNB1501360002

Solicitation No. 133ND21QNB150136 Questions & Answers

3) Hose assemblies

8.5.1.1 Parts of wet chemical extinguishing systems that meet the following criteria shall be exempt from the hydrostatic pressure test requirement of 8.5.1:

1) Auxiliary pressure containers not exceeding 2 in. (0.05 m) outside diameter and less than 2 ft (0.6 m) in length

2) Auxiliary pressure containers bearing the DOT “3E” marking

In summary, any of this required hydrostatic testing is considered maintenance and is included in the testing and maintenance services of this contract as part of the appropriate

CLIN.

Q4. Appendix C – When are the 12-year hydros due for the CO2 tanks listed within attachment C?

A4. Response: The 12-year hydrostatic tests for the CO2 cylinders are due during Option Year 1 (7/1/2022 – 6/30/2022) of the contract. This is shown as CLIN 1001FC on page 8 of 111 of the solicitation. None of the other Period of Performance years have this CLIN.

P a g e 2 | 2

PAGE 6 OF 6 1333ND21QNB1501360002

1.2

C:\PERFORM\FORMS\S30.FRP

Forms Management

C:PERFORMFORMSS30.FRP

Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6)

CODE

STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer) Previous edition unusable

Descript:
Descript1: See Attachment Page.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 6
DocNo: 1333ND21QNB1501360002
EffDate: MAY 05, 2021
ReqNo: NB153000-21-00662
ProjNo:
IssuedByCode: 000014
IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY

325 BROADWAY

BOULDER CO 80305-3328

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolNo: 1333ND21QNB150136
SolDate: APR 08, 2021
AwdNo:
AwdDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
15B. CONTRACTOR/OFFEROR:
signature:
AwdChg: Off
SolChg: Yes
Header:
Footer1:

File details come from the government source that posted it. Updated .