This document summarizes a pre-proposal conference for a federal design-build contract opportunity. Key details include:

  • The National Oceanic and Atmospheric Administration seeks design and construction services to demolish existing structures at Pier Romeo in North Charleston, SC and construct a new dedicated pier, floating dock, warehouse, seawall, and living shoreline to support NOAA ship berthing.

  • The project magnitude is $55-65 million to be awarded as a firm fixed price contract. Proposals are due March 16, 2023 with oral presentations the week of April 3, 2023. Liquidated damages of $7,617.41 per day may be assessed for delays to substantial completion.

  • Evaluation criteria in descending order of importance are safety and quality control program, corporate experience, technical approach and risk, past performance, and subcontracting plans. Price is less important and non-price factors combined are significantly more important than price.

  • The scope of work includes demolition, sea wall construction, main floating pier, site civil/utilities, optional warehouse and small vessel dock construction, and optional living shoreline construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Attachment Page

PAGE 2 OF 50 1305M423RNAAJ00040002

1305M423RNAAJ0004

Pier Romeo Recapitalization North Charleston, SC

Amendment 0002

The purpose of this Amendment is to accomplish the following:

(1) Include the Pre-Proposal Conference Sign-in Sheet from the

Pre-Proposal Conference held February 9, 2023

(2) Include the NOAA Pier Romeo Presentation from the

Pre-Proposal Conference held February 9, 2023

(3) Include “Final Environmental Assessment - January 2023” in

Section J.6 of the solicitation.

PAGE 3 OF 50 1305M423RNAAJ00040002

PAGE 4 OF 50 1305M423RNAAJ00040002

PAGE 5 OF 50 1305M423RNAAJ00040002

PAGE 6 OF 50 1305M423RNAAJ00040002

PAGE 7 OF 50 1305M423RNAAJ00040002

PAGE 8 OF 50 1305M423RNAAJ00040002

PAGE 9 OF 50 1305M423RNAAJ00040002

PAGE 10 OF 50 1305M423RNAAJ00040002

PRE-PROPOSAL CONFERENCE

NOAA OMAO PIER ROMEO RECAPITALIZATION

IN

NORTH CHARLESTON, SC

Solicitation No. 1305M4-23-R-NAAJ0004 FEBRUARY 9, 2023

PAGE 11 OF 50 1305M423RNAAJ00040002

NOAA TEAM PERSONNEL

CONTRACTING OFFICER - Ronette McBean-Felder

SENIOR CONTRACT SPECIALIST - Diana Pickel

PROJECT MANAGER / COR - Timothy Calohan, PE

NOAA OMAO/Project Manager - Erik Juergensen

NOAA PIER ROMEO CONTACT - Rich Townes

ADG TEAM

PROJECT MANAGER - Larry Maynard, PE

CIVIL / SITE - Jeffery Montpas, PE

COASTAL ENGINEER - Adam Clinch, PE

PAGE 12 OF 50 1305M423RNAAJ00040002

FACILITY WELCOME

OVERVIEW OF SITE

• Emergency Exits

• Fire Drills meet up location

• Restrooms

• Leaving items in Conference Room

• Designated smoking areas

• Eateries / restaurants nearby

• Restricted access onsite

PAGE 13 OF 50 1305M423RNAAJ00040002

MEETING’S AGENDA

• Please Sign-In

• Introductions/Principal Stakeholders

• Disclaimer

• Opening Remarks

• Pre-Proposal Communications

• Authority for all Changes

• Synopsis

• Solicitation Section Overview

• Proposal Instructions

• Proposal Due Date and Delivery Instructions

• Period of Performance

• Liquidated Damages

• Basis for Award/Evaluation of Offerors Highlights

• Typical Proposal Shortfalls

• Helpful Websites

• Questions

• Technical Information

PAGE 14 OF 50 1305M423RNAAJ00040002

INTRODUCTIONS/PRINCIPAL STAKEHOLDERS

Contracting Officer – Ronette C. McBean-Felder

Sr. Contract Specialist – Diana Pickel

Contracting Officer’s Representative – Timothy Calohan

Office of Marine and Aviation Operations (Program Office/End User) -

● Director, Platform and Infrastructure Acquisition Division - Gregory Raymond

● Senior Project Manager - Erik Juergensen

Government Representative Project Manager – TBD

PAGE 15 OF 50 1305M423RNAAJ00040002

DISCLAIMER

In the event that there is a conflict between the RFP terms and conditions and the information that is disseminated during today’s conference, the RFP terms and conditions shall control. The formal RFP is the only document that should be relied upon in determining the Government’s requirements. Any changes to the RFP will be with a formal amendment.

PAGE 16 OF 50 1305M423RNAAJ00040002

OPENING REMARKS

▪ The goal of this meeting is to ensure that the Government’s requirements are clear to the potential Offerors. Ensuring that all Offerors have the opportunity to provide their best proposal to NOAA.

▪ Offerors will be able interact with the facility, investigate the local conditions and survey the site.

▪ Offerors are advised that while the Government may entertain questions during this Pre-Proposal Conference, the responses provided are not binding unless the question(s) is/are officially submitted to the Sr.

Contract Specialist and Contracting Officer as outlined in the Solicitation (via Google Form) and an amendment is issued thereafter providing an official response.

▪ Each offeror is responsible for knowing and understanding the project requirements regardless of what may or may not be covered during this meeting, as this meeting is strictly for advisory purposes

PAGE 17 OF 50 1305M423RNAAJ00040002

PRE-PROPOSAL COMMUNICATIONS

After RFP release

FAR 15.201, allows “Exchanges with industry before receipt of proposals”

»Pre-Proposal Conference constitutes an Informal Exchange of Information

»To provide Offerors with insight into Government Evaluation of Proposals to aid with Proposal Preparation

»Pre-Proposal Conference •No One-on-One discussions •Follow-up comments/questions allowed

FAR 3.104, “Procurement Integrity”

PAGE 18 OF 50 1305M423RNAAJ00040002

AUTHORITY FOR ALL CHANGES

▪ Only the Contracting Officer (CO) has the authority to issue amendments prior to award and modifications after award.

▪ Contractors shall not contact the Contracting Officer’s Representative (COR), Project Manager(s) or other members of NOAA (including the facility where the work is being accomplished) during this solicitation process on questions regarding this requirement.

▪ All questions pertaining to this requirement shall be addressed via the Sr. Contract Specialist and Contracting Officer. Additional concerns shall be addressed to the CO directly.

▪ After award a COR will be appointed by the CO with the delegated authority specified in the appointment letter.

PAGE 19 OF 50 1305M423RNAAJ00040002

SYNOPSIS OF CLINS

CLIN 0001 Base Pier Romeo Facility Design and Preconstruction Services, Demolition, and Sea Wall Construction:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for Design, Pre-Construction, Demolition and Sea Wall Construction of the Pier Romeo Facility Recapitalization Project. The Contractor shall complete the following tasks:

1) Design and Preconstruction services

2) Marine Demolition

3) Sea Wall Construction

Design & Construction Services 1 JOB $____________________

OPTIONAL CLIN 0002 - Main Floating Pier Construction:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Main Floating Pier Construction. The Contractor shall complete the following task:

1) Main Floating Pier Construction

Construction Services 1 JOB $____________________

OPTIONAL CLIN 0003 - Main Site Civil & Utilities:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Main Site Civil & Utilities. The Contractor shall complete the following task:

1) Main Site Civil & Utilities

Construction Services 1 JOB $____________________

PAGE 20 OF 50 1305M423RNAAJ00040002

SYNOPSIS OF CLINS

OPTIONAL CLIN 0004 - Warehouse Construction:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Warehouse Construction. The Contractor shall complete the following task:

1) Warehouse Construction

Construction Services 1 JOB $____________________

OPTIONAL CLIN 0005 - Small Vessel Floating Dock Construction:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Small Vessel Floating Dock Construction. The Contractor shall complete the following task:

1) Small Vessel Floating Dock Construction

Construction Services 1 JOB $____________________

OPTIONAL CLIN 0006 - Living Shoreline Construction:

The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Living Shoreline Construction. The Contractor shall complete the following task:

1) Living Shoreline Construction

Construction Services 1 JOB $____________________

PAGE 21 OF 50 1305M423RNAAJ00040002

SYNOPSIS CON’T

▪ This project is being solicited as Unrestricted/Full and Open Competition

▪ Magnitude = $55.0M - $65.0M

▪ A Firm Fixed Price Contract will be awarded

▪ Bonding Requirement = 100% of the contract price for both the Performance and Payment Bond

▪ All solicitation documents are available on SAM.gov

PAGE 22 OF 50 1305M423RNAAJ00040002

SOLICITATION SECTION OVERVIEW

▪ Solicitation

○ Sections A - M Section A – SF 1442 (be sure to complete page 2 and have an official authorized to bind the company complete blocks 30 A, 30B & 30C) Section B – Pricing (to include Options if applicable) Section C – Description/Specifications/Work Statement Section D – Packaging and Marking Section E – Inspection and Acceptance Section F – Deliveries or Performance Section G – Contract Administration Data Section H – Special Contract Requirements Section I – Contract Clauses Section J – List of Attachments Section K – Representations, Certifications and Other Statements of Offerors Section L – Instructions, Conditions and Notices to Offerors

- Provides Instructions on Preparing your Proposal Section M – Evaluation Factors For Award

- Provides guidance on how the Government will evaluate your Proposal

● Amendments

○ 0001 – Published to SAM.gov February 2, 2023

PAGE 23 OF 50 1305M423RNAAJ00040002

PROPOSAL INSTRUCTIONS

Proposals

The proposal will consist of two volumes a Technical .pdf document and a Cost .pdf document. Proposals shall be submitted as follows:

▪ VOLUME ONE: CORPORATE / TECHNICAL INFORMATION (Electronic copy via email)

▪ VOLUME TWO: BUSINESS/PRICE/OFFEROR INFORMATION (Electronic copy via email)

Contractor shall also complete Sections A & B of the Solicitation (SF1442).

PAGE 24 OF 50 1305M423RNAAJ00040002

PROPOSAL INSTRUCTIONS

VOLUME ONE: CORPORATE / TECHNICAL INFORMATION

Shall be in accordance with Section L of the RFP. Proposals must address all technical factors as instructed. Technical factors are:

▪ FACTOR 1: SAFETY & QUALITY CONTROL PROGRAM/PLAN (Written Material ONLY)

▪ FACTOR 2: CORPORATE EXPERIENCE (Written Material ONLY)

▪ SUBFACTOR 1: Offeror’s Organization for the Project

▪ SUBFACTOR 2: Staffing Approach and Key Resumes

▪ FACTOR 3: TECHNICAL APPROACH AND RISK (ORAL PRESENTATION)

▪ SUBFACTOR 1: Understanding Scope (Oral Presentation)

▪ SUBFACTOR 2: Schedule (Oral Presentation and Written Material Required)

▪ SUBFACTOR 3: Designer Project Experience (Written Material ONLY)

▪ FACTOR 4: CONTRACTOR PAST PERFORMANCE (Written Material ONLY)

▪ FACTOR 5: SUBCONTRACTING/SMALL BUSINESS PARTICIPATION (Written Material Only)

PAGE 25 OF 50 1305M423RNAAJ00040002

PROPOSAL INSTRUCTIONS

VOLUME TWO: BUSINESS/PRICE/OFFEROR INFORMATION

Shall be in accordance with Section L of the RFP:

▪ Acknowledge all Amendments

- Amendments: SF-30 – The offeror shall indicate receipt and inclusion of the amendment by completing and returning the SF-30(s)

▪ Pricing Format

- CLIN 0001 Base Pier Romeo Facility Design and Preconstruction Services, Demolition, and Sea Wall Construction

- OPTIONAL CLIN 0002 - Main Floating Pier Construction

- OPTIONAL CLIN 0003 - Main Site Civil & Utilities

- OPTIONAL CLIN 0004 - Warehouse Construction

- OPTIONAL CLIN 0005 - Small Vessel Floating Dock Construction:

- OPTIONAL CLIN 0006 - Living Shoreline Construction:

▪ Section K Representations and Certifications (Can be obtained from SAM.gov)

▪ Company Financial Statement

▪ Evidence of Bonding Capability (See FAR 28.204-1 through 28.204-3 for a list of securities instead of a corporate or individual surety for the bond).

▪ Joint Venture Agreement/Signed Statement of JV Intent & Description of Partnership (if applicable)

PAGE 26 OF 50 1305M423RNAAJ00040002

PROPOSAL DUE DATE AND DELIVERY

INSTRUCTIONS

Proposal Due Date

▪ Questions must be submitted NLT February 24, 2023 (12:00 PM Eastern Standard Time).

Questions submitted after the deadline will not be addressed.

▪ Your Proposal is Due March 16, 2023 (12:00 PM Eastern Standard Time) (valid for 180 calendar days)

▪ Oral Presentations will be scheduled during the week of Monday, April 3, 2023 - Friday, April 7, 2023.

▪ Proposal must be signed by an Officer of your company

▪ All amendments must be acknowledged

▪ Only an Electronic Proposal will be accepted

Delivery Instructions

▪ Provide an electronic copy of both Volume I and Volume II via email to Ronette C. McBean-Felder at ronette.mcbean-felder@noaa.gov and Diana Pickel at diana.pickel@noaa.gov

**Please Review Section L of the RFP for a complete listing of requirements for the Proposal Submittal.

PAGE 27 OF 50 1305M423RNAAJ00040002

PERIOD OF PERFORMANCE

Period of Performance

▪ The Period of Performance for this requirement is 821 Calendar Days after the issuance of the Notice to Proceed

PAGE 28 OF 50 1305M423RNAAJ00040002

LIQUIDATED DAMAGES

Liquidated Damages

▪ Liquidated Damages in the amount of $7,617.41 per day will be assessed from the substantial completion date indicated in the contract to the date that substantial completion is actually achieved by the Contractor, as determined by the Contracting Officer.

PAGE 29 OF 50 1305M423RNAAJ00040002

EVALUATION OF OFFERORS

HIGHLIGHTS

The Government will evaluate the information contained in Volume Two entitled “Business/Price/Offeror Information”. Price proposals will be evaluated for price reasonableness based on the total price proposed for performance of the project as specified in Section B of this solicitation. Analysis shall be performed in accordance with Federal Acquisition Regulation 15.305(a)(1) and as described at 15.404-1(b).

The Government anticipates the award of a single contract as a result of this solicitation to the responsible Offeror whose proposal conforms to the requirements of the solicitation and is determined to be the best value to the Government. In determining the best value, the evaluation factors are listed in descending order of importance, as follows: 1) Safety and Quality Control Program/Plan, 2) Corporate Experience, 3) Technical Approach and Risk, 4) Past Performance and 5) Subcontracting/Small Business Participation. Contractor Safety and Quality Control Program/Plan is more important than Corporate Experience, which is more important than Technical Approach and Risk, which is more important than Past Performance, which is more important than Subcontracting/Small Business Participation, which is more important than Price. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

Offerors receiving a Marginal rating for Factor 1 (Safety and Quality Control Program/Plan) or an Unsatisfactory rating for any of the other three non-price factors identified above shall not be considered for award.

The five (5) non-price factors play a dominant role in the basis for award; however, an Offeror whose proposed prices are determined not to be fair and reasonable will not be awarded a contract regardless of the Government’s evaluation of the non-price factors of the Offeror’s proposal.

The Contracting Officer may award a contract on the basis of initial proposals received, without discussions or any opportunity to make a further submission. Therefore, each initial offer should contain the Offeror’s best terms from a price and technical standpoint.

PAGE 30 OF 50 1305M423RNAAJ00040002

TYPICAL PROPOSAL SHORTFALLS

▪ Proposal Instructions not followed

- Information not provided as requested

▪ Statements in the proposal are not well supported

▪ Proposals are not well organized

- Does not follow Proposal Instructions structure and makes the evaluator hunt for the information

▪ Experience POCs are not current

▪ Deficiencies -preclude award

- Proposal is non-compliant to the requirements

▪ Not acknowledging published amendments

▪ Not signing Proposal

PAGE 31 OF 50 1305M423RNAAJ00040002

HELPFUL WEBSITES

● SAM.Gov: https://sam.gov/content/home

○ Solicitation and attachments

○ Wage Determinations

● Federal Acquisition Regulation (FAR):

https://www.acquisition.gov/browse/index/far

● Commerce Acquisition Regulations (CAR):

https://www.acquisition.gov/car

● U.S. Department Of The Treasury – List of Certified Sureties:

https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies .html

PAGE 32 OF 50 1305M423RNAAJ00040002

QUESTIONS

PAGE 33 OF 50 1305M423RNAAJ00040002

TECHNICAL INFORMATION

PAGE 34 OF 50 1305M423RNAAJ00040002

NOAA PROJECT OVERVIEW / STATEMENT OF WORK

Timothy Calohan – Project Manager / COR

Background and Overview by OCAO / FEO

∙ PROVIDE A STATE-OF-THE-ART FLOATING PIER WITH SITE IMPROVEMENTS AND A NEW

WAREHOUSE TO MEET THE NEEDS AND REQUIREMENTS OF NOAA.

∙ THE NEW FLOATING PIER AND ANCILLARY FACILITIES WILL ACCOMMODATE THE STAFF

AND EQUIPMENT TO MEET THE ONGOING NEEDS OF NOAA. THIS PROJECT WILL ALLOW

NOAA SHIPS TO HAVE ACCESS TO UTILITY SERVICES AT THE NEW FLOATING PIER, WHICH

WILL INCLUDE AN ADEQUATE FLOW OF POTABLE WATER, BLACK AND GRAY WATER

REMOVAL, ELECTRICAL SERVICES, AND NETWORK SERVICE CONNECTIONS.

∙ THE PROJECT WILL ALSO INCLUDE A SEAWALL SYSTEM TO PROTECT THE FACILITY FROM

STORMS AND FUTURE SLR. THE SYSTEM WILL ACCOMMODATE THE CURRENT

REQUIREMENTS OF NOAA SHIPS EQUIVALENT TO THE RONALD H. BROWN

SPECIFICATIONS.

PAGE 35 OF 50 1305M423RNAAJ00040002

NOAA PROJECT OVERVIEW / STATEMENT OF WORK

∙ THE PROJECT WILL INCLUDE THE FOLLOWING:

∙ FLOATING PIER

∙ GANGWAY TO FLOATING PIER

∙ TRESTLE

∙ CONCRETE RAMP

∙ SEAWALL

∙ WAREHOUSE

∙ REVISED PARKING

∙ SITE DRAINAGE

∙ SITE UTILITIES

∙ SITE LIGHTING

∙ PIER UTILITIES

∙ PIER LIGHTING

OPTIONAL ITEMS:

∙ SMALL BOAT DOCK

∙ LIVING SHORELINE

∙ JIB CRANE

∙ EXECUTIVE ORDER – ENERGY

CONSIDERATIONS

PAGE 36 OF 50 1305M423RNAAJ00040002

COVER SHEET AND INDEX TO DRAWINGS

PAGE 37 OF 50 1305M423RNAAJ00040002

EXISTING CONDITIONS PLAN

PAGE 38 OF 50 1305M423RNAAJ00040002

DEMOLITION PLAN

THE SITE DEMOLITION WILL INCLUDE BUT IS NOT

LIMITED TO THE FOLLOWING BUILDINGS,

STRUCTURES AND UTILITIES:

∙ PIER DECKING, PILES AND STRUCTURE.

∙ ELECTRICAL STRUCTURE ON PIER.

∙ WATER, SEWER, FIRE PROTECTION AND

ELECTRICAL CONNECTIONS ON THE EXISTING

PIER.

∙ WATER, SEWER, FIRE PROTECTION AND

ELECTRICAL CONNECTIONS LANDSIDE OF THE

EXISTING PIER.

∙ HIGH MAST LIGHTING FIXTURES.

∙ EQUIPMENT ON SITE SUCH AS CONEX BOXES,

EXISTING STRUCTURES, ETC. CONTRACTOR TO

FIELD VERIFY EXISTING CONDITIONS.

PAGE 39 OF 50 1305M423RNAAJ00040002

DEMOLITION PLAN

∙ EXISTING FENCE AND FENCE STRUCTURES.

∙ EXISTING ELECTRICAL SERVICE TO THE SITE

FROM PIER NOVEMBER/PIER PAPA LOCATION.

∙ ASPHALT FOR THE EXISTING PARKING TO

FACILITATE NEW ASPHALT TOPPING.

∙ STORM DRAINAGE AS REQUIRED TO

ACCOMMODATE NEW WAREHOUSE BUILDING.

∙ TEST AND REMOVE BARRELS OF DRILLING

SPOILS GENERATED ON SITE.

∙ PLAN FOR HAZMAT REMOVAL OF MATERIALS

GENERATED ON SITE.

PAGE 40 OF 50 1305M423RNAAJ00040002

EXISTING UTILITY STRUCTURE DATA

PAGE 41 OF 50 1305M423RNAAJ00040002

OVERALL SITE PLAN

∙ FLOATING PIER

∙ SMALL BOAT FLOATING DOCK

∙ SUBMERSIBLE ACCESS PLATFORM

∙ GANGWAY

∙ TRESTLE

∙ RAMP

∙ WAREHOUSE BUILDING

∙ PARKING AREA

∙ COVERED PARKING AREA

∙ SEAWALL

∙ FENCE

∙ MAIN GATE FOR PIER

∙ RESILIENT CURBING WITH SECURITY FENCING

∙ NEW SEAWALL

∙ WATERFRONT FENCE

∙ SHORELINE STABILIZATION

PAGE 42 OF 50 1305M423RNAAJ00040002

PARKING AREA PAVING AND STRIPING CONCEPT PLAN

∙ EXISTING PARKING LOT WILL BE

RECONSTRUCTED TO MAXIMIZE THE NUMBER

OF PARKING SPACES AND ALLOW THE

CONSTRUCTION OF A 5,000-SQUARE-FOOT

WAREHOUSE, WITH TRUCK ACCESS.

∙ ONE DRIVE ACCESS FROM S. HOBSON AVENUE

WILL BE CLOSED OFF TO PROVIDE ADDITIONAL

PARKING STALLS.

∙ THE EXISTING CURB AND GUTTER AND

LANDSCAPING TO BE REMOVED.

∙ NEW ISLANDS AND LANDSCAPING TO BE

PROVIDED.

∙ HIGH CURBS SHALL REQUIRE A FOUNDATION

SIMILAR TO THE RETAINING WALL DESIGNED

FOR WAVE LOADING.

∙ ELEVATIONS OF THE EXISTING SIDEWALK AND

DOOR STOOPS ARE TO REMAIN AT EXISTING

GRADE.

∙ PARKING WILL BE RESURFACED AND

RESTRIPED.

∙ EXISTING ISLAND LOCATIONS TO REMAIN.

PAGE 43 OF 50 1305M423RNAAJ00040002

SITE UTILITIES PLAN

∙ POTABLE WATER WILL BE CONNECTED TO

THE EXISTING SERVICE LINE THE INTENT IS

TO MAINTAIN THE PIPING FROM THE STREET

TO THIS NEW CONNECTION POINT.

∙ PIER POTABLE WATER LINE - 4-INCH HDPE

PIPE.

∙ SANITARY SEWER LINE TO PIER IS PROPOSED

TO BE AN 8-INCH HDPE FROM THE EXISTING

MANHOLE.

∙ THE EXISTING SEWER STRUCTURE SHOULD

BE EVALUATED AND REPLACED AS

REQUIRED.

∙ EXISTING FORCED SEWER MAIN.

∙ FLEXIBLE CONNECTIONS AT THE GANGWAY

AND TRESTLE.

∙ THE FIRE PROTECTION SYSTEM SHALL MEET

AND COMPLY WITH CURRENT NFPA

REQUIREMENTS.

∙ 5” STORZ FDC

PAGE 44 OF 50 1305M423RNAAJ00040002

SITE UTILITIES PLAN

∙ DOMINION ELECTRICAL SERVICE POINT.

∙ FUSIBLE MAIN ELECTRICAL SWITCHES.

∙ EMERGENCY GENERATOR.

∙ AUTOMATIC TRANSFER SWITCHES.

∙ ELECTRICAL DISTRIBUTION SYSTEM.

∙ SHORE POWER FOR VESSELS.

∙ AUTOMATIC TRANSFER SWITCHES.

∙ COMMUNICATION SYSTEMS TO WAREHOUSE

AND PIER.

∙ WATER AND SANITARY SEWER FOR

WAREHOUSE.

PAGE 45 OF 50 1305M423RNAAJ00040002

PIER AND SEAWALL LAYOUT

∙ THE FLOATING PIER SHALL BE A RIGID

SYSTEM.

∙ THE FLOATING PIER IS ALIGNED WITH THE

EXISTING PIER ROMEO.

∙ THE FLOATING PIER SHALL BE REMOVABLE

FOR SERVICING IF NEEDED.

∙ THE FLOATING PIER SHALL HAVE 4 FEET OF

FREEBOARD.

∙ SEAWALL ON SHEET PILE – 9.2 NAVD88

∙ FLOATING PIER – 62FT X 360FT

∙ RAMP TO TRESTLE – 30FT X 100 FT

∙ TRESTLE – 30FT X 80FT

∙ GANGWAY – 30FT X 160FT

∙ SMALL VESSEL FLOATING DOCK – 60FT X 20FT

∙ 4FT X 12FT PLATFORM

∙ PEDESTRIAN – 5FT X 24FT

PAGE 46 OF 50 1305M423RNAAJ00040002

PIER ELEVATIONS

∙ PILE SIZES INDICATED ON THIS

SHEET ARE AS FOLLOWS:

∙ 36” STEEL PIPE PILE

∙ 48” STEEL PIPE PILE

∙ SMALL VESSEL FLOATING DOCK

o 24” STEEL PIPE PILE

PAGE 47 OF 50 1305M423RNAAJ00040002

LIVING SHORELINE AND SEAWALL

• THE STEEL SHEET PILE WALL SHALL

BE APPROXIMATELY 620 FEET.

• INITIAL DESIGN ELEVATION OF THE

SEAWALL IS 9.2 FEET NAVD88.

• SEAWALL SECONDARY CAP TO BE

CONSTRUCTED ON THE 9.2-FOOT

NAVD88 CAP, FINAL ELEVATION OF

WALL TO 10.5 FEET NAVD88.

• LIVING SHORELINE SYSTEM WOULD BE

APPROXIMATELY 550 FEET IN LENGTH.

• LIVING SHORELINE INCLUDE A ROCK

BREAKWATER OR SILL WITH FILTER

FABRIC ALONG THE FOOTPRINT AND

INLAND PROFILE OF THE SILL.

• PROVIDE A MINIMUM OF 20 FEET OF

MARSH CORRIDOR BETWEEN THE

LOCATION OF THE SILL AND THE

EXISTING SHORELINE.

PAGE 48 OF 50 1305M423RNAAJ00040002

WAREHOUSE BUILDING FLOOR PLANS

∙ WAREHOUSE - 5,000 SQUARE-FOOT, 2-

STORY.

∙ CONNECT SANITARY SEWER TO

EXISTING SANITARY SYSTEM THAT IS

ON-SITE.

∙ WAREHOUSE DESIGN TO MEET

SUSTAINED CATEGORY 4 WIND LOADS.

∙ ROLL UP DOOR TO BE 16-FOOT WIDE BY

16-FOOT-TALL ELECTRIC DOOR.

∙ ALL DOORS AND ENTRANCES TO BE

CORROSION RESISTANT. SUCH AS

ALUMINUM OF FIBERGLASS

REINFORCED PLASTIC (FRP).

∙ STRUCTURE SHALL BE CONSTRUCTED

OF CORROSION RESISTANT MATERIALS

OR COVERED WITH EPOXY COATING.

∙ TRENCH DRAIN AT ROLLUP DOOR.

PAGE 49 OF 50 1305M423RNAAJ00040002

WAREHOUSE BUILDING ELEVATIONS

• CONDENSING UNITS LOCATED ON ROOF

ABOVE POTENTIAL SITE FLOOD LEVELS

• 16 FOOT ROLL UP DOOR

PAGE 50 OF 50 1305M423RNAAJ00040002

QUESTIONS ON THE PRESENTATION

1.2

C:\PERFORM\FORMS\S30.FRP

Forms Management

C:PERFORMFORMSS30.FRP

Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6)

CODE

STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer) Previous edition unusable

Descript:
Descript1: See Attachment Page.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 50
DocNo: 1305M423RNAAJ00040002
EffDate: FEB 15, 2023
ReqNo: NA-AJ5730-21-00393
ProjNo:
IssuedByCode: CSAD
IssuedBy: CORPORATE SRVCS ACQUISITION DV

1325 EAST WEST HWY

SSMC2, RM. 11323

SILVER SPRING MD 20910

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolNo: 1305M423RNAAJ0004
SolDate: JAN 06, 2023
AwdNo:
AwdDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
15B. CONTRACTOR/OFFEROR:
signature:
AwdChg: Off
SolChg: Yes
Header:
Footer1:

File details come from the government source that posted it. Updated .