This solicitation seeks design-build services for the Pier Romeo Recapitalization Project in North Charleston, South Carolina. The scope of work includes demolishing existing structures and constructing a dedicated pier, access ramps, floating dock, shore infrastructure, and a new 5,000 square foot warehouse to support berthing of NOAA ships. It will also include a seawall and living shoreline. The contractor will provide 100% design and engineering services, marine demolition, sea wall construction, pier work including pilings and fendering, trestle work including pilings, gangway work including pilings, main site civil and shoreside utilities, small vessel floating dock, and living shoreline construction. Option pricing is requested for various line items. The total project magnitude is estimated between $55-65 million. The solicitation was issued by the National Oceanic and Atmospheric Administration within the Department of Commerce.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PIER ROMEO RECAPITALIZATION PROJECT

North Charleston, South Carolina

1305M423RNAAJ0004

PRICE PROPOSAL TEMPLATE

Line ItemDescriptionQuantityUnitLaborEquipmentMaterialSub-TotalTotal Price
1BASE PRICE: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for Facility Design, Preconstruction Services, Marine Demolition, and Sea Wall Construction in accordance with the Statement of Work and 15% Design Concept documents.1LS$0.00
Price to provide 100% design and engineering services required for the project including all optional items in accordance with the Statement of Work and 15% Design Concept documents.1LS$0.00
Price to provide all work outlined in the Statement of Work and applicable attachments for Marine Demolition.1LS$0.00
Price to provide all work outlined in the Statement of Work and applicable attachments for Sea Wall Construction.1LS$0.00
Performance and Payment Bonds1LS
OPTIONAL CLINS:
2Optional CLIN: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for the Pier, Gangway, and Trestle including Fender Piles, Utilities, and all other items to provide a fully operational pier in accordance with the Statement of Work.1LS$0.00
Price to provide all work outlined in the Statement of Work and applicable attachments for Pier Work including Piling, Fendering and applicable activities.1LS$0.00
Price to provide all work outlined in the Statement of Work and applicable attachments for Trestle Work including Pilings and applicable activities.1LS$0.00
Price for providing all work outlined in the Statement of Work and applicable attachments for Gangway work including Pilings and applicable activities.1LS$0.00
Performance and Payment Bonds1LS
3Optional CLIN: Total Price for itemized Main Site Civil and Shoreside Utilities in accordance with the Statement of Work.1LS$0.00$0.00
Performance and Payment Bonds1LS
4Optional CLIN: Total Price for itemized Warehouse Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN.1LS$0.00$0.00
Performance and Payment Bonds1LS
5Optional CLIN: Total Price for itemized Small Vessel Floating Dock Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN.1LS$0.00$0.00
Performance and Payment Bonds1LS
6Optional CLIN: Total Price for itemized Living Shoreline Construction in accordance with the Statement of Work.1LS$0.00$0.00
Performance and Payment Bonds1LS
UNIT PRICING FOR CONTAMINATED SOIL
Contaminated Soil Removal Cost*CY$0.00$0.00
*Assume a minimum of 20 CY of contaminated soil will need to be removed and transported to a subtitle D landfill.CY